CN105549524B - A kind of system of bubble beans operation control - Google Patents

A kind of system of bubble beans operation control Download PDF

Info

Publication number
CN105549524B
CN105549524B CN201610011398.8A CN201610011398A CN105549524B CN 105549524 B CN105549524 B CN 105549524B CN 201610011398 A CN201610011398 A CN 201610011398A CN 105549524 B CN105549524 B CN 105549524B
Authority
CN
China
Prior art keywords
equipment
module
beans
executing
equipment module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610011398.8A
Other languages
Chinese (zh)
Other versions
CN105549524A (en
Inventor
王罡
吴育声
梁展鹏
郭宪堂
李囧洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lee Kum Kee (Xinhui) Food Co Ltd
Original Assignee
Lee Kum Kee (Xinhui) Food Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lee Kum Kee (Xinhui) Food Co Ltd filed Critical Lee Kum Kee (Xinhui) Food Co Ltd
Priority to CN201610011398.8A priority Critical patent/CN105549524B/en
Publication of CN105549524A publication Critical patent/CN105549524A/en
Application granted granted Critical
Publication of CN105549524B publication Critical patent/CN105549524B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/058Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25268PLD programmable logic device

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Beans For Foods Or Fodder (AREA)

Abstract

The invention discloses a kind of bubble beans operation control system, system includes execution EM equipment module, for controlling the device control module for executing EM equipment module, breakdown judge processing module, wherein:It includes several bubble beans cylinders, particle pump and transmission unit to execute EM equipment module;Breakdown judge processing module includes signal judging unit, status display unit and fault processing unit, and wherein signal judging unit judges equipment fault situation according to the time for starting signal in place that EM equipment module returns is executed, and carries out corresponding troubleshooting;Troubleshooting includes that status display unit shows that the state for executing EM equipment module, fault processing unit obtain the control of execution EM equipment module by indicator light.The present invention carries out electrification innovation by various control modules to device systems, and the efficiency that the use, monitoring and failure problems of equipment are handled is made to be substantially improved, and is conducive to increase enterprise competitiveness, promotes profit.

Description

A kind of system of bubble beans operation control
Technical field
The present invention relates to a kind of systems of bubble beans operation control, belong to electric automatization field.
Background technology
Competition among enterprises are fierce in society, and the rising of human cost prevents equipment tupe independent of each other from providing more Good achievement.
With the development and progress of science and technology, the treatment effeciency of electrification systems increases the attraction of large enterprise, can By the processing capacity and control system of machinery, to grasp the situation of production in real time, artificial cost is reduced, control is quantified Journey is conducive to enterprise and wins in competition.
Invention content
In order to carry out electrified upgrading, increase the efficiency of system, the present invention provides a kind of bubble beans operation control system, special Sign is that system includes executing EM equipment module, device control module and breakdown judge processing module by control layer real-time performance to lead to Letter;The execution EM equipment module includes that several bubble beans cylinders, particle pump, water separator, quantitative pot, transmission unit and preheating are single Member, wherein bubble beans cylinder is for impregnating beans, for the beans impregnated to be transported to water separator, water separator is used for particle pump Moisture is filtered, quantitative pot is used to control the amount of beans input and exports the beans for meeting quantitative requirement, and transmission unit is used for will Beans is transmitted to preheating unit, and preheating unit is used for the pre-heat treatment of beans;The device control module include sensor group, PLC groups and management console, wherein sensor group are used to measure the temperature and pressure of bubble beans cylinder, and PLC groups are for showing bubble beans Cylinder operating status and control bubble beans cylinder operation, management console are used to receive and show the operating status letter for executing EM equipment module Breath, the measurement data of processing sensor group and control execute EM equipment module;The breakdown judge processing module includes that signal judges Unit, status display unit and fault processing unit, wherein signal judging unit are opened according to what the execution EM equipment module returned The time of dynamic signal in place judges whether equipment breaks down, and the status display unit is shown by indicator light executes equipment mould The state of block, the fault processing unit obtain the control for executing EM equipment module when judging that equipment breaks down.
The preferably described device control module is for executing following steps:A, carry out executing the initialization of EM equipment module, really Recognize execution EM equipment module and it controls program and can use;B, confirm the state for executing EM equipment module, judge whether to enter next A flow starts the equipment for executing EM equipment module, otherwise stops flow in sequence if equipment normally starts;C, it analyzes It executes the parameter of EM equipment module output and monitors the operating condition for executing EM equipment module, and the operation information that EM equipment module will be executed Feed back to breakdown judge processing module.
The preferably described step A further includes:Loading equipment running configuration file, wherein equipment running configuration file include setting Standby ID, the parameter of equipment operation, the connection signal table of equipment room, failure reply program and breakdown judge threshold value.
The preferably described step A further includes:When not can confirm that executing EM equipment module can use with its control program, Into exception handles, arrestment operation.
The preferably described step B includes:Device control module sends enabling signal to EM equipment module is executed, and executes equipment mould Block returns after completing to start starts signal in place.
If the preferably described signal in place that starts is not sent or is sent delay time more than breakdown judge threshold value, Breakdown judge processing module is determined as equipment fault occur.
After the preferably described equipment fault judging treatmenting module judges equipment fault, fault message is recorded and to equipment event Barrier is handled.
The preferably described fault message includes the ID and fault-signal of faulty equipment.
Beneficial effects of the present invention are:Using device control module, breakdown judge processing module carries out electricity to device systems Gasification transformation, makes the efficiency that the use, monitoring and failure problems of equipment are handled be substantially improved, and is conducive to increase enterprise competitiveness, Promote profit.
Description of the drawings
Fig. 1 show the schematic diagram of the system of bubble beans operation control according to the ... of the embodiment of the present invention;
Fig. 2 show the schematic diagram of bubble soya bean flow according to the ... of the embodiment of the present invention.
Specific implementation mode
First embodiment according to the present invention, a kind of bubble beans operation control system as shown in Figure 1, system include executing equipment Module, device control module and breakdown judge processing module for controlling the execution EM equipment module, wherein:Execute equipment mould Block, device control module and breakdown judge processing module are communicated by control layer real-time performance;The execution EM equipment module includes Several bubble beans cylinder, particle pump, water separator, quantitative pot, transmission unit and preheating units, wherein bubble beans cylinder is used for soaking beans Class, particle pump by the beans impregnated for being transported to water separator, and water separator is for filtering moisture, and quantitative pot is for controlling The amount of beans input simultaneously exports the beans for meeting quantitative requirement, and transmission unit is used to beans being transmitted to preheating unit, preheats Unit is used for the pre-heat treatment of beans;The sequence for executing EM equipment module operation is as follows:Bubble beans cylinder receives the beans of a process And bubble beans processing is carried out, after bubble beans processing is completed, the processed beans of beans will be steeped by particle pump and be transferred to water separator, water Seperator separates water and beans, and beans is passed to quantitative pot from water separator later, and quantitative pot can be according to weight or volume Setting, by beans control on a certain amount of, the beans of the amount is then passed into delivery unit, delivery unit includes some transports Band, by conveyer belt, beans is transported to preheating unit, and preheating unit includes preheating machine and some mating devices.The equipment Control module includes sensor group, PLC (programmable logic controller (PLC)) groups and management console, and wherein sensor group is for surveying The temperature and pressure of amount bubble beans cylinder;PLC (programmable logic controller (PLC)) groups are for showing bubble beans cylinder operating status and control bubble beans Cylinder is run, PLC (programmable logic controller (PLC)) i.e. programmable logic controller (PLC)s, and journey is stored using a kind of programmable memory Sequence executes the user oriented instructions such as logical operation, sequential control, timing, counting and arithmetical operation, and passes through number or simulation The various types of machineries of formula input/output control or production process.According to self-ability, the operating status of equipment can be shown simultaneously Can control device operation, such as in actual production, some bubble beans cylinder break down but do not know specific problem or Person engineering staff needs to vacate when the practicability that bubble beans cylinder is used to verify bubble beans program, PLC (Programmable logical controllers Device) controller as monomer, the bubble beans cylinder of monomer can gradually be controlled, the failure for being conducive to individually steep beans cylinder is asked Topic, is conducive to production procedure or the verification of technology;Management console is used to receiving and showing the operation for executing EM equipment module Status information, the measurement data for handling sensor group and control execute EM equipment module, and management console is as a personal-machine control System processed, the various signals (liquid level, activity duration, flow serial number, device id etc.) by that will execute EM equipment module are converted into can With the data shown over the display, signal is controlled by transmission and controls execution equipment to PLC (programmable logic controller (PLC)) Module;The breakdown judge processing module includes signal judging unit, status display unit and fault processing unit, wherein signal Judging unit judges whether equipment breaks down according to the time for starting signal in place that the execution EM equipment module returns, described Status display unit shows that the state for executing EM equipment module, the fault processing unit are judging equipment appearance event by indicator light The control for executing EM equipment module is obtained when barrier.
Device control module is for executing following steps:A, the initialization for carrying out executing EM equipment module, the first of energization A scan period sets equipment and parameter to original state, by being smoothed out initialization, confirms and executes EM equipment module equipment Controlling program with it can use;B, the control device of equipment such as bubble beans cylinder, the particle pump and transmission unit of EM equipment module is executed The data-interface of this equipment operating data can be exported by having, and the data line road direction equipment by controlling layer network controls mould The state of block feedback device, device control module judge whether to enter next flow, be set if executed according to the state of equipment The equipment state of standby module feedback is normal startup, then executes setting for EM equipment module according to the production procedure sequence starting set It is standby, it is gradually produced, otherwise just stops production procedure;C, device control module executes the ginseng of EM equipment module output by analysis Number (such as this processing carry out time, the height of liquid level, if be abnormal, the signal for starting and stopping with its send out when Between, steep the temperature and pressure etc. of beans cylinder) monitoring executes EM equipment module operating condition, and will execute EM equipment module operation information feedback Give breakdown judge processing module.
Step A further includes loading equipment running configuration file, and wherein equipment running configuration file includes equipment (such as bubble beans Cylinder, particle pump and transmission unit) ID, the parameter of equipment operation, the connection signal table of equipment room, failure reply program and failure Judgment threshold.
The code name of device id, that is, equipment is conducive to simplify system administration.Due to the development of science and technology, many equipment can be into The careful operation of row and have multiple functions, the setting of equipment operating parameter is contributed to preferably to adjust the flow produced, is had The utilization equipment of effect.Failure reply program is the performance of attribute and equipment according to cargo, orderly to take counter-measure, such as To accurate sports equipment, need that it is made slowly to close, to protect part of appliance.Breakdown judge threshold value is as breakdown judge According to according to circumstances being freely arranged.
If step A initialization failures, it not can confirm that the equipment of bubble beans operation control system and its control program can make With when, that is, be judged as equipment fault, into exception handles, arrestment run simultaneously pass through breakdown judge processing module Fault message is fed back away, maintenance personal is notified to handle.
The equipment Booting sequence of step B:Device control module sends enabling signal to EM equipment module is executed, and executes equipment mould Block receives enabling signal and starts, and startup is returned after completing to start, and signal gives breakdown judge processing module in place.
If starting signal in place not being sent or is sent and postpone, the time postponed is more than breakdown judge threshold value The set time is determined as equipment fault by breakdown judge processing module.
After the equipment fault judging treatmenting module judges equipment fault, processing controller record fault message simultaneously pair is set Standby failure is handled, wherein the failure information package includes, the ID and fault-signal of faulty equipment (send delay, not actuated, hair Send time fluctuation big or the types such as the distinctive failure of equipment itself).
According to the second embodiment of the present invention, the bubble beans flow of soya bean operation is steeped as shown in Figure 2, including as follows:
After receiving initiation command, initialization program of program scanning, and judge whether ready, it is executed if ready Lower step command, otherwise executes exception handles, and send out sound-light alarm.After device ready, carried out to bubble beans pattern first Selection, and it is correctly assigned to lower layer PLC (programmable logic controller (PLC)), simultaneous selection steeps well the operation mode of beans control system. Bubble soya bean instruction starts timing after sending out, and opens the soya bean feeding pipe for the bubble beans cylinder for needing to feed at this time, performs charging and prepare, If being delayed 10 seconds not receiving valve and reach a signal after valve opening order is sent out and being considered as failure, into exception handles.When After the run signal for receiving particle pump, compressed air valve is opened, if being delayed 10 seconds after valve opening order is sent out does not receive valve It reaches a signal and is considered as failure, into exception handles.Feed time reaches setting value, and fill process terminates, and is knot first Beam signal sends back to a process, after bubble beans control system receives the stop signal of particle pump, closes the soya bean on bubble beans cylinder Inlet valve.Feed time reaches setting value, and fill process terminates, and is prepared to enter into following bubble beans flows.
It is first the hot water circuit terminal valve for opening bubble beans cylinder, after sending out valve opening order after fill process terminates And if be delayed do not receive within 10 seconds valve reach a signal, be considered as failure, corresponding equipment is shown in red.When program is received After reaching a signal to valve, system will start hot water circulating pump automatically, if when start order send out after and the several seconds of delay not It receives pump operation signal or what is received is fault-signal, be then considered as failure, into exception handles, relevant device is shown as It is red.When temperature reaches setting value, then first stops hot water circulating pump, turn off hot water circuit terminal valve.The bubble beans time arrives, system Go out beans pattern automatically into following, the outlet valve for opening back-water valve (BWV) moisturizing and cylinder body bottom end is needed at this time, when opening for valve Close it is all normal in place after, start discharging pump (the particle pump for discharging) to Chu Dou workshop sections conveying.
It is to open water separator first, if after sending out valve opening order and being delayed 10 seconds not after steeping beans operation completion Receive valve reaches a signal, then is considered as failure, and corresponding equipment is shown in red.Believe in place when program receives water separator After number, the inlet valve of quantitative pot is opened, water separator has detached the beans of moisture, into quantitative pot, when the beans in quantitative pot After class meets certain condition, quantitative pot opens outlet valve, beans is transferred to conveyer belt, being transferred to preheating by conveyer belt sets It is standby, after preheating is completed, it is prepared to enter into next process.
The above, only presently preferred embodiments of the present invention, the invention is not limited in the above embodiments, as long as It reaches the technique effect of the present invention with identical means, should all belong to the scope of protection of the present invention.In the protection model of the present invention Its technical solution and/or embodiment can have a variety of different modifications and variations in enclosing.

Claims (7)

1. a kind of bubble beans operation control system, it is characterised in that system includes executing EM equipment module, being set for controlling the execution The device control module and breakdown judge processing module of standby module, wherein:
EM equipment module, device control module and breakdown judge processing module is executed to communicate by control layer real-time performance;
The execution EM equipment module includes that several bubble beans cylinders, particle pump, water separator, quantitative pot, transmission unit and preheating are single Member, wherein bubble beans cylinder is for impregnating beans, for the beans impregnated to be transported to water separator, water separator is used for particle pump Moisture is filtered, quantitative pot is used to control the amount of beans input and exports the beans for meeting quantitative requirement, and transmission unit is used for will Beans is transmitted to preheating unit, and preheating unit is used for the pre-heat treatment of beans;
The device control module includes sensor group, PLC groups and management console, and wherein sensor group is for measuring bubble beans The temperature and pressure of cylinder, PLC groups are for showing bubble beans cylinder operating status and control bubble beans cylinder operation, and management console is for connecing It receives and shows and execute the running state information of EM equipment module, the measurement data for handling sensor group and control execution EM equipment module;
The breakdown judge processing module includes signal judging unit, status display unit and fault processing unit, wherein signal Judging unit judges whether equipment breaks down according to the time for starting signal in place that the execution EM equipment module returns, described Status display unit shows that the state for executing EM equipment module, the fault processing unit are judging equipment appearance event by indicator light The control for executing EM equipment module is obtained when barrier;
The device control module is for executing following steps:
A, the initialization for carrying out executing EM equipment module confirms that executing EM equipment module and its controls program and can use;
B, confirm the state for executing EM equipment module, judge whether to enter next flow, if equipment normally starts, according to suitable Sequence starts the equipment for executing EM equipment module, otherwise stops flow;
C, analysis executes the parameter of EM equipment module output and monitors the operating condition for executing EM equipment module, and will execute EM equipment module Operation information feed back to breakdown judge processing module.
2. a kind of bubble beans operation control system according to claim 1, which is characterized in that the step A further includes:
Loading equipment running configuration file, the equipment running configuration file include device id, equipment operating parameter, equipment room Connection signal table, failure reply program and breakdown judge threshold value.
3. a kind of bubble beans operation control system according to claim 1, which is characterized in that the step A further includes:
When not can confirm that executing EM equipment module can use with its control program, into exception handles, arrestment Operation.
4. a kind of bubble beans operation control system according to claim 1, which is characterized in that the step B includes:
Device control module sends enabling signal and returns and start to after completing to start to EM equipment module, execution EM equipment module is executed Position signal.
5. a kind of bubble beans operation control system according to claim 4, which is characterized in that if start in place signal not by It is more than breakdown judge threshold value to send or send delay time, then breakdown judge processing module is determined as equipment fault occur.
6. a kind of bubble beans operation control system according to claim 5, which is characterized in that the breakdown judge processing module After judging equipment fault, records fault message and equipment fault is handled.
7. a kind of bubble beans operation control system according to claim 6, which is characterized in that the fault message includes failure The ID and fault-signal of equipment.
CN201610011398.8A 2016-01-06 2016-01-06 A kind of system of bubble beans operation control Active CN105549524B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610011398.8A CN105549524B (en) 2016-01-06 2016-01-06 A kind of system of bubble beans operation control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610011398.8A CN105549524B (en) 2016-01-06 2016-01-06 A kind of system of bubble beans operation control

Publications (2)

Publication Number Publication Date
CN105549524A CN105549524A (en) 2016-05-04
CN105549524B true CN105549524B (en) 2018-07-27

Family

ID=55828772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610011398.8A Active CN105549524B (en) 2016-01-06 2016-01-06 A kind of system of bubble beans operation control

Country Status (1)

Country Link
CN (1) CN105549524B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116138434A (en) * 2023-02-28 2023-05-23 李锦记(新会)食品有限公司 System for controlling production operation of Guangdong soy sauce

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101171958A (en) * 2007-11-29 2008-05-07 山西瑞飞机械制造有限公司 Computer-controlled energy-saving circulation bean soaking device
CN203676035U (en) * 2014-01-24 2014-07-02 江苏谷全生物科技有限公司 Automatic bean soaking device
CN104298165A (en) * 2014-09-19 2015-01-21 西北农林科技大学 PLC control system of orchard working platform

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3776531B2 (en) * 1996-10-24 2006-05-17 株式会社フジワラテクノアート Continuous pressure steaming device using water-cooled rotary valve
WO2004017758A1 (en) * 2002-08-21 2004-03-04 Yugengaisha Chima Apparatus for producing processed soybean product having individual soybean cells dispersed therein and process for producing the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101171958A (en) * 2007-11-29 2008-05-07 山西瑞飞机械制造有限公司 Computer-controlled energy-saving circulation bean soaking device
CN203676035U (en) * 2014-01-24 2014-07-02 江苏谷全生物科技有限公司 Automatic bean soaking device
CN104298165A (en) * 2014-09-19 2015-01-21 西北农林科技大学 PLC control system of orchard working platform

Also Published As

Publication number Publication date
CN105549524A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
EP1370770B1 (en) Modular system for the control of compression systems
CN107065793B (en) Assembly line Real-time Monitor Management method, assembly line real-time monitoring management device
CN104635669B (en) A kind of I&C system verification method
US10554522B2 (en) Master device, slave device, error monitoring system, and control method and control program of master device
CN108965044A (en) A kind of electric car electrically-charging equipment universal data link health status test device, system and method
CN107505576A (en) Module automatic recognition system and method in distributed system
CN104968922A (en) System for acquiring pressure data
CN105549524B (en) A kind of system of bubble beans operation control
CN107797816A (en) FPGA program online updating circuits
CN110409206A (en) A kind of automatic control system and its operation method of papermaking pulping section
US20100234983A1 (en) Control system for granular material transport system
CN107910086A (en) One kind is based on nuclear plant safety abnormal parameters condition adjudgement system and method
CN110269513A (en) A kind of self-service milk tea machine control system
CN106502749A (en) Based on the method and system that program write with a brush dipped in Chinese ink by CAN multimachine
CN104122507A (en) Program-controllable online detection system for low-power power supply module
CN109933179A (en) A kind of server intelligence start-up control method, device and equipment
CN102223268A (en) Network equipment as well as method and device for starting hardware testing of same
CN205066909U (en) Accuracy feed proportioning system of weighing
CN105467977A (en) Bean storehouse operation control system
CN111287824B (en) Control method, device and system for urea pump in air-assisted SCR system
CN110427291A (en) A kind of embedded software is from closed loop verification method
CN107870614A (en) A kind of plastic and plant producing line and its management method based on CC LINK
CN109733831A (en) Control the method and device of feeder
CN105353645B (en) A kind of pilot solenoid valve device and test method
CN105511327B (en) A kind of system for washing beans operation control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Gang

Inventor after: Wu Yusheng

Inventor after: Liang Zhanpeng

Inventor after: Guo Xiantang

Inventor after: Li Jiongzhou

Inventor before: Wang Gang

Inventor before: Wu Yusheng

Inventor before: Guo Xiantang

Inventor before: Li Jiongzhou

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant