CN105544622B - A kind of anti-floating system and its checking device of underground structure - Google Patents
A kind of anti-floating system and its checking device of underground structure Download PDFInfo
- Publication number
- CN105544622B CN105544622B CN201610087685.7A CN201610087685A CN105544622B CN 105544622 B CN105544622 B CN 105544622B CN 201610087685 A CN201610087685 A CN 201610087685A CN 105544622 B CN105544622 B CN 105544622B
- Authority
- CN
- China
- Prior art keywords
- water
- hypogee
- collector
- ground
- underground structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
- E02D31/12—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
- E02D31/025—Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a kind of anti-floating systems of the underground structure in impervious stratum:By combination application every oozing device, drainage arrangement and drainage channel checking device, the buoyancy force of underground water suffered by underground structure is effectively reduced, to reliably achieve the purpose for preventing underground structure from floating.It is exactly specifically:Foundation pit backfill area top between hypogee exterior wall (6) and hypogee foundation pit boundary (4) constructs a level every infiltration layer (3);A permeable ground (1) is constructed in foundation pit backfill region lower part;It is laid with the parallel porous collector pipe or water collector (17,18) that at least two are not connected to directly mutually in the permeable ground (1) and each communicates at least one water outlet (2).After taking above-mentioned measure, the anti-uplift ground water level of the underground structure is determined by the absolute altitude of identical at least two water outlets (2) of the absolute altitude.A kind of ground water drainage access checking device of underground structure is also disclosed in the present invention.
Description
Technical field
The present invention relates to the hypogees in a kind of anti-floating system of underground structure more particularly to a kind of impervious stratum
The anti-floating system of object, the invention further relates to a kind of checking device of anti-floating of underground building device, more particularly to one kind are waterproof
The ground water drainage access checking device of underground structure in soil layer.
Background technology
In order to avoid buoyancy force of underground water causes underground structure to float, the prior art uses all kinds of measure of anti float:A. it sets
Uplift pile is set, the buoyancy suffered by underground structure is offset by the withdrawal resistance of uplift pile;B., ballast is set, by ballast
Gravity offsets the buoyancy suffered by underground structure;C., apparatus for draining subsurface water is set, underground water is reduced by the way that underground water is discharged
Water level, to reduce the buoyancy suffered by underground structure.These three measures respectively have deficiency:The engineering of the measure of a classes and b. class measures
Costly, economy is poor;The a class measure completions time of project are longer;The measure of c classes needs a large amount of pump drainage underground water during use,
Maintenance cost is higher;Part measure in c class measures needs just to can guarantee thorough pump drainage underground in exterior wall and bottom plate brill many holes
Water, therefore have certain influence using function to hypogee;C class measure drainage channels are in the wind for having siltation to block over the long term
Danger.
It is below impervious stratum (8) with hypogee foundation pit boundary (4) surrounding soil layer for hypogee bottom plate (5)
Geological environment, the source of underground water is mainly the downward seepage flow of surface soil layer backwater in hypogee foundation pit backfill region, described
Without other underground water such as diving, artesian water within the scope of the foundation pit of hypogee.For this kind of geological environment, there is technical measures suggestion to adopt
With d class measures:The backfill in region is backfilled using cohesive soil or dirt and layered rolling to foundation pit or rams densification reality, it is intended to whereby
The buoyancy suffered by underground structure is eliminated in measure.But be affected by human factors due to " rolling or ramming pressure " in work progress it is larger,
Construction quality be difficult to ensure it is reliable and stable, so this measure is difficult to make us trusting.
In hydraulic engineering and port engineering, extensively using various composite geo-membranes as vertical seepage control material, every
Ooze that effect is fine, this kind of material is introduced being used every field of oozing for underground structure underground water by the present invention;In patent document【Application
Numbers 201420655634.6】A kind of drainage arrangement of underground structure underground water is disclosed in (hereinafter referred to as document 1), the present invention
The anti-floating field for being introduced into underground structure uses.
Invention content
It is below impervious stratum (8) with hypogee foundation pit boundary (4) surrounding soil layer for hypogee bottom plate (5)
Geological environment, the present invention provides a kind of simple and reliable anti-floating of underground building methods:By combination application every oozing device
And drainage arrangement, the buoyancy force of underground water suffered by underground structure is effectively reduced, is reliably prevented on underground structure to reach
Floating purpose.The present invention also provides a kind of ground water drainage access checking devices of underground structure, can be to ground water drainage
Whether access is unobstructed to be checked at any time.
Technical scheme of the present invention:Foundation pit backfill between hypogee exterior wall (6) and hypogee foundation pit boundary (4)
Region lower part constructs a permeable ground (1) and is connected to the identical water outlet (2) of at least two absolute altitudes, the permeable ground (1)
It is full of whole foundation pits in the horizontal direction and backfills region;Construct a level every infiltration layer (3) in foundation pit backfill area top, it is described every
The whole foundation pits of infiltration layer (3) covering backfill region, see Fig. 1, Fig. 2;After taking above-mentioned measure, the anti-floating of the underground structure is set up defences
Water level is determined by the absolute altitude of at least two water outlets (2).
It is described to be selected by one of following devices every infiltration layer (3):A. described to use the soft of composite geo-membrane composition every infiltration layer (3)
It is property, successional every oozing material;B. described to use earth material mixing impermeable material, earth material mixing impermeable material every infiltration layer (3)
Including at least cohesive soil, dirt or soil cement, and layered rolling or rammer densification are real;C. described to be superimposed using soil every infiltration layer (3)
It material mixing impermeable material and is made of composite geo-membrane flexible, successional every oozing material.It is described to form slope every infiltration layer (3)
Drop is higher than close to underground structure one end (9) absolute altitude far from underground structure one end (10) absolute altitude.
It is described constituted using composite geo-membrane every infiltration layer (3) it is flexible, successional when oozing material, it is described flexible every oozing
Layer (3) and the equal tight seal of underground structure exterior wall (6) or hypogee top plate (7) junction, the flexibility are prolonged every infiltration layer (3)
It extends to and is completely embedded sealing with impervious stratum (8) other than hypogee foundation pit boundary (4);It is described soft when there is underground piping to pass through
Property when infiltration layer (3), it is described flexible to be completely embedded sealing every infiltration layer (3) and underground piping outer surface.As flexibility every infiltration layer (3)
The further in-depth of connection scheme, the flexible connection every infiltration layer (3) close underground structure one end (9) and underground structure
Using one of following two kinds of modes:A. two protrusions (15) are set in hypogee exterior wall (6), the flexibility is leaned on every infiltration layer (3)
Nearly underground structure one end (9) rises to the lower section of item in exterior wall protrusion (15) along hypogee exterior wall (6), then builds on the outside
It builds brick wall or casting concrete (16) compresses sealing, see Fig. 3;B. described flexible every the close underground structure one end (9) of infiltration layer (3)
It is adjacent to hypogee top plate (7) and compresses sealing with weight (14) is compressed, see Fig. 4.It is described it is flexible every infiltration layer (3) remotely under
Building one end (10) and the connection of the impervious stratum (8) other than the foundation pit of hypogee use following manner:It is described it is flexible every
Within the impervious stratum (8) that infiltration layer (3) is inserted into far from underground structure one end (10) other than the foundation pit of hypogee and compress close
Real closing.
The permeable ground (1), water outlet (2) referenced patent document【Document 1】Content select:The permeable ground
(1) fine sand, middle sand, coarse sand, gravelly sand, dust, circle gravel, rubble or cobble are included at least;The water outlet (2) is built across underground
It builds exterior wall (6) and leads to lower ground, mine pit or pipe trench in the room of hypogee.
In order to ensure that the permeable ground (1) is always unobstructed to the ground water drainage access between water outlet (2), it is arranged
Ground water drainage access checking device:At least two parallel porous collector pipes or collection are laid in the permeable ground (1)
Hydrophone (17,18);It is not connected to directly mutually between two collector pipes or water collector (17,18), two collector pipes or water collector
Flow in (17,18) can only be carried out by the hole of the permeable ground (1) between two collector pipes or water collector (17,18)
Interaction circulation;The every collector pipe or water collector (17,18) each communicate at least one water outlet (2), see Fig. 5.Thereto
One water outlet (2) water filling, observes whether another water outlet (2) drains,EnergyThe permeable ground (1) is checked to going out
Whether the ground water drainage access between the mouth of a river (2) is unobstructed.Mud, husky siltation are in collector pipe or water collector (17,18) in order to prevent
Inlet opening, every collector pipe or water collector (17,18) outer surface cladding is at least one layer of crosses filter mud, husky filter cloth or filter membrane.
The device have the advantages that:
Compared with d class measures are used alone, the present invention by using permeable ground (1), water outlet (2), every infiltration layer (3)
Aggregate measures, it is ensured that anti-floating of underground building is safe and reliable:May insure to reduce even every infiltration layer (3) prevents earth's surface infiltration from penetrating into
Within the foundation pit of hypogee;Water yield by observing water outlet (2) can find defect in time and adopt remedial measures, it is ensured that
Construction quality;Even if any accident occur causes to permeate the ground within building foundation pit, permeable ground (1) and water outlet (2)
The underground water of infiltration can also be discharged in time, prevent in the foundation pit of hypogee groundwater level rise to anti-uplift ground water level with
On, it is ensured that underground structure safety.
Compared with the measure of a classes and b class measures, anti-floating system of the invention can reduce uplift pile or ballast, engineering
Expense is relatively low.Compared with c class measures are used alone, the present invention is by being arranged every infiltration layer (3) and examining its sealing performance basic
Earth's surface can be prevented to permeate the ground within building foundation pit, only need a small amount of pump drainage underground water, maintenance cost during use
It is relatively low;Under extreme case, earth's surface can be entirely prevented to permeate the ground within building foundation pit every infiltration layer (3), do not needed substantially
Pump drainage underground water, maintenance cost are extremely low;Since water outlet (2) quantity of needs is few, it is only necessary to a small amount of through walls in exterior wall (6) arrangement
Hole, hypogee use are substantially unaffected.
(this section of vacancy)
When the long-term anhydrous outflow of water outlet (2), the patency for checking its drainage channel is needed.It can a water outlet thereto
(2) water filling, observes whether another water outlet (2) drains, to check the permeable ground (1) between water outlet (2)
Whether ground water drainage access is unobstructed.The ground water drainage access checking device of the present invention can check the permeable ground at any time
(1) whether unobstructed to the ground water drainage access between water outlet (2), it prevents siltation from blocking and causes security risk.
Description of the drawings
Fig. 1 is that underground structure top elevation is above the ground level the hypogee foundation pit backfill region sectional view of absolute altitude
Fig. 2 is hypogee foundation pit backfill region sectional view of the underground structure top elevation less than ground elevation
Fig. 3 is that flexibility connect detail drawing every infiltration layer with underground structure exterior wall
Fig. 4 is that flexibility connect detail drawing every infiltration layer with underground structure top plate
Fig. 5 is parallel collector pipe or water collector and water outlet position relationship floor map
In figure:1-- permeable grounds;2-- water outlets;3-- is every infiltration layer;The hypogees 4-- foundation pit boundary;The hypogees 5--
Bottom plate;The hypogees 6-- exterior wall;The hypogees 7-- top plate;Impervious stratum other than the foundation pit of the hypogees 8--;9- closely under
Building every infiltration layer one end;10-- is far from underground structure every infiltration layer one end;11-- foundation pits lower part backfill;12- foundation pits
Top backfill;13- earth's surface backfills;14-- compresses weight;The hypogees 15-- exterior wall protrusion;The outer brick-on-edge walls of 16- or coagulation
Soil block;17, the parallel collector pipes of 18- or water collector
Specific implementation mode
Embodiment 1
More than basement roof there are 1m thickness earthing in two layers of basement buried depth 10m of certain building, part without above-ground structures,
Soil layer is argillic horizon around the foundation pit of hypogee.Basement floating-up in order to prevent compares the anti-floating system of invention
With beat two kinds of schemes of anti-floating pile:According to a conventional method, using elevation of levelled ground as basement anti-uplift ground water level, it is necessary to beat anti-floating
Stake;Using the anti-floating system of invention, using the absolute altitude of water outlet 2 as basement anti-uplift ground water level, local basement
It would not float.The relatively later anti-floating system for determining to use invention, specific implementation method are:In hypogee exterior wall
6 reserve 2 wall conduit of water outlet at the 2.0m of bottom;Foundation pit backfill is constructed in the following order from bottom to top:It is opened with place
The backfilling of earthwork lower part soil layer 11 digged up is to the absolute altitude close to 2 conduit of water outlet --- backfill intermediate permeable ground 1 with medium coarse sand
And it is distributed to whole foundation pit backfills region, it is placed during this period around a pair of parallel more of hypogee among permeable ground 1
Hole collector pipe 17,18 simultaneously respectively leads to 2 conduit of water outlet --- the backfilling of earthwork upper soil horizon being excavated with place
Laying that 12 to every 3 absolute altitude of infiltration layer --- each soil layer compaction in layers in backfilling process --- is flexible to cover whole foundation pits backfills every infiltration layer 3
Region and the impervious stratum 8 other than hypogee foundation pit boundary 4 is extended to, sees Fig. 2 --- it is flexible to be inserted into ground every infiltration layer one end 10
Within impervious stratum 8 other than lower building foundation pit and press closely closing --- it is flexible to be pushed up every the infiltration layer other end 9 and hypogee
Plate 7 is adjacent to and compresses sealing with weight 14 is compressed, and sees Fig. 4 --- and backfill surface soil layer 13 simultaneously completes various pipes installation.
Hypogee during use, observe that water outlet 2 there are flowing out, but water very little, formation are dripped.Building is heavy
Drop observation has no apparent deformation, and the components such as structural beams, column are working properly, have no crack, it was demonstrated that using the absolute altitude of water outlet 2 as ground
Lower room anti-uplift ground water level is safe and reliable.
Embodiment 2
Two layers of basement buried depth 10m of certain building, local above-ground structures only have one layer, and basement roof is higher than outdoor ground
Face, soil layer is argillic horizon around the foundation pit of hypogee, using the device anti-floating of invention.Due to narrow space, underground
Building foundation pit short of width 1m, it is difficult to ensure backfill construction quality, determine that composite geo-membrane is selected to be used as every infiltration layer 3, with true
It protects every oozing effect, specific implementation method is:In hypogee, exterior wall 6 reserves 2 wall conduit of water outlet and exterior wall protrusion 15;Base
Hole backfill is constructed in the following order from bottom to top:The backfilling of earthwork lower part soil layer 11 being excavated with place is to close to water outlet
The absolute altitude of 2 conduits --- it backfills intermediate permeable ground 1 with medium coarse sand and is distributed to whole foundation pits backfills region, during this period saturating
The a pair of parallel porous collector pipe 17,18 around hypogee is placed among water and soil layer 1 and is each communicated with lead to water outlet 2 and lead
Pipe --- the backfilling of earthwork upper soil horizon 12 being excavated with place is to every 3 absolute altitude of infiltration layer --- is laid with covers whole bases every infiltration layer 3
Hole backfills region and extends to the impervious stratum 8 other than hypogee foundation pit boundary 4, sees Fig. 1 --- it is inserted into every infiltration layer one end 10
Within impervious stratum 8 other than the foundation pit of hypogee and press closely --- every the infiltration layer other end 9 along hypogee exterior wall 6
The lower section of item in exterior wall protrusion 15 is risen to, then builds brick wall 16 by laying bricks or stones on the outside and compresses sealing, sees Fig. 3 --- backfill surface soil layer 13
And complete various pipes installation;It is sealed service check every 3 all sealing positions of infiltration layer.
Hypogee during use, observe 2 substantially anhydrous outflow of water outlet, have a small amount of drop in heavy rain season once in a while
Water, display composite geo-membrane is every oozing the fine every oozing effect of device.
Claims (5)
1. a kind of anti-floating system of underground structure, underground structure include hypogee exterior wall (6), hypogee bottom plate (5),
Hypogee top plate (7), the region between hypogee exterior wall (6) and hypogee foundation pit boundary (4) are that foundation pit backfills region,
Hypogee bottom plate (5) is below impervious stratum (8) with the soil layer other than hypogee foundation pit boundary (4);It is characterized in that:
A level is constructed in foundation pit backfill area top every infiltration layer (3), it is described to cover whole foundation pits every infiltration layer (3) and backfill region;
Foundation pit backfill region lower part constructs a permeable ground (1) and is connected to the identical water outlet (2) of at least two absolute altitudes, described permeable
Soil layer (1) is full of whole foundation pits and backfills region in the horizontal direction.
2. a kind of anti-floating system of underground structure according to claim 1, it is characterised in that:The permeable ground (1) is at least
Including fine sand, middle sand, gravelly sand, dust, circle gravel, rubble, cobble, block stone or erratic boulder;At least two absolute altitudes it is identical go out
Lower ground, mine pit or pipe trench in the room of hypogee are led in the mouth of a river (2) across hypogee exterior wall (6).
3. a kind of anti-floating system of underground structure according to claim 1, it is characterised in that:In the permeable ground (1)
It is laid at least two parallel porous collector pipes or water collector (17,18);Between two collector pipes or water collector (17,18)
Be not connected to directly mutually, the flow in two collector pipes or water collector (17,18) can only by two collector pipes or water collector (17,
18) hole of the permeable ground (1) between circulates to interact;The every collector pipe or water collector (17,18) respectively connect
Lead at least one water outlet (2), water outlet (2) water filling thereto is observed whether another water outlet (2) drains, can be looked into
It is whether unobstructed to the ground water drainage access between water outlet (2) to test the permeable ground (1).
4. wanting a kind of anti-floating system of 3 underground structure according to right, it is characterised in that:The every collector pipe or water collector
(17,18) outer surface cladding is at least one layer of to cross filter mud, husky filter cloth or filter membrane.
5. a kind of ground water drainage access checking device of underground structure, underground structure include hypogee exterior wall (6),
Lower building bottom plate (5), hypogee top plate (7), the region between hypogee exterior wall (6) and hypogee foundation pit boundary (4)
Region is backfilled for foundation pit, hypogee bottom plate (5) is below impervious stratum with the soil layer other than hypogee foundation pit boundary (4)
(8);It is characterized in that:It is identical in a permeable ground (1) connection at least two absolute altitudes that foundation pit backfill region lower part is constructed
Water outlet (2);At least two parallel porous collector pipes or water collector (17,18) are laid in underground water-permeable soil layer (1);It is described
It is not connected to directly mutually between two collector pipes or water collector (17,18), the flow in two collector pipes or water collector (17,18) is only
Circulation can be interacted by the hole of the permeable ground (1) between two collector pipes or water collector (17,18);It is every described
Collector pipe or water collector (17,18) each communicate at least one water outlet (2), thereto water outlet (2) water filling, and observation is another
Whether one water outlet (2) drains, and can check the permeable ground (1) to the ground water drainage access between water outlet (2) is
It is no unobstructed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610087685.7A CN105544622B (en) | 2015-06-05 | 2016-02-15 | A kind of anti-floating system and its checking device of underground structure |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510311646 | 2015-06-05 | ||
CN2015103116466 | 2015-06-05 | ||
CN201610087685.7A CN105544622B (en) | 2015-06-05 | 2016-02-15 | A kind of anti-floating system and its checking device of underground structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105544622A CN105544622A (en) | 2016-05-04 |
CN105544622B true CN105544622B (en) | 2018-09-14 |
Family
ID=55824142
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510400153.XA Pending CN106284434A (en) | 2015-06-05 | 2015-07-03 | The anti-float method of a kind of underground structure and every oozing device |
CN201610087685.7A Active CN105544622B (en) | 2015-06-05 | 2016-02-15 | A kind of anti-floating system and its checking device of underground structure |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510400153.XA Pending CN106284434A (en) | 2015-06-05 | 2015-07-03 | The anti-float method of a kind of underground structure and every oozing device |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106284434A (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760722B (en) * | 2017-02-28 | 2018-09-18 | 南通华荣建设集团有限公司 | Without pile foundation single layer underground garage anti-floating construction method |
CN108625402A (en) * | 2017-03-24 | 2018-10-09 | 中国二十冶集团有限公司 | Foundation pit fertilizer slot ponding processing method |
CN108487331B (en) * | 2018-03-21 | 2020-02-21 | 东北大学 | Underground structure anti-floating system integrating gallery drainage and fertilizer groove seepage prevention |
CN110820720A (en) * | 2019-11-19 | 2020-02-21 | 四川省建筑机械化工程有限公司 | Water-blocking and drainage-resisting anti-floating construction structure and method |
CN113175005B (en) * | 2021-04-29 | 2022-05-20 | 山东金城建设有限公司 | Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period |
CN113373985B (en) * | 2021-06-10 | 2022-12-09 | 浙江鹏盛建设集团有限公司 | Basement waterproof construction method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05287767A (en) * | 1992-04-08 | 1993-11-02 | Shimizu Corp | Preventing method of lift of structure by ground water |
CN103510528B (en) * | 2012-06-29 | 2015-09-02 | 深圳市工勘岩土工程有限公司 | For the blind drainage structure of underground structure anti-floating |
CN203729348U (en) * | 2014-01-17 | 2014-07-23 | 长沙有色冶金设计研究院有限公司 | Water storage structure anti-floating device |
CN203834527U (en) * | 2014-05-15 | 2014-09-17 | 中航天建设工程有限公司 | Waterproof system for building foundation pit |
-
2015
- 2015-07-03 CN CN201510400153.XA patent/CN106284434A/en active Pending
-
2016
- 2016-02-15 CN CN201610087685.7A patent/CN105544622B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105544622A (en) | 2016-05-04 |
CN106284434A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544622B (en) | A kind of anti-floating system and its checking device of underground structure | |
CN105002913A (en) | Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof | |
CN110219313B (en) | Drainage system and construction method for underground construction blind well | |
CN102383412A (en) | Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit | |
CN109281330A (en) | A kind of osmotic control method | |
CN105569094A (en) | Water discharge and drainage system and construction method adopting basement bottom plate water buoyant force releasing method | |
CN103741715A (en) | Novel waterproof hydrophobic construction method for basement | |
CN108867673A (en) | A kind of underwater prevention method in the foundation pit based on the curtain that draws water | |
CN209066468U (en) | A kind of base pit dewatering device | |
CN107245989A (en) | Bear the tunnel structure and its construction technology of external water pressure in height | |
CN107100206A (en) | A kind of prevention and controls of basement leakage | |
CN214194602U (en) | Precipitation structure suitable for deep foundation pit of high-pressure-bearing water-rich karst stratum | |
CN112609720A (en) | Precipitation construction method suitable for deep foundation pit of high-pressure-bearing water-rich karst stratum | |
CN109930632B (en) | Basement groundwater self-balancing anti-floating system based on bedrock shallow buried slope area | |
CN109577337A (en) | Deep foundation pit construction method for drainage pipeline | |
CN205077527U (en) | Drainage system is dredged to basement bottom plate release water buoyancy method | |
CN105625448A (en) | Underground water drainage method and device for underground building | |
CN216275788U (en) | Drainage device used after failure of water interception curtain of deep foundation pit | |
CN112523272B (en) | Anti-floating blind ditch for strongly weathered rock stratum and construction method thereof | |
CN214245855U (en) | Water-proof pressure-control anti-floating structure | |
CN209353360U (en) | The anti-floating drainage arrangement of basement structure | |
CN110287563B (en) | Method for determining design parameters of foundation pit deep horizontal back cover waterproof curtain | |
CN207484487U (en) | For the steel drum that catchments of deep basal pit crack sealing with pressure | |
CN108487331B (en) | Underground structure anti-floating system integrating gallery drainage and fertilizer groove seepage prevention | |
CN204570717U (en) | The dewatering installation of a kind of underground structure underground water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |