CN105544464B - A kind of clear beach material fill construction method of mountain area middle and small river - Google Patents

A kind of clear beach material fill construction method of mountain area middle and small river Download PDF

Info

Publication number
CN105544464B
CN105544464B CN201610001616.XA CN201610001616A CN105544464B CN 105544464 B CN105544464 B CN 105544464B CN 201610001616 A CN201610001616 A CN 201610001616A CN 105544464 B CN105544464 B CN 105544464B
Authority
CN
China
Prior art keywords
river
mountain area
spats
stone
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610001616.XA
Other languages
Chinese (zh)
Other versions
CN105544464A (en
Inventor
王立华
黄锦林
黄亚梅
张挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG WATER RESOURCES AND ELECTRIC POWER VOCATIONAL TECHNOLOGY INSTITUTE
Guangdong Research Institute of Water Resources and Hydropower
Original Assignee
GUANGDONG WATER RESOURCES AND ELECTRIC POWER VOCATIONAL TECHNOLOGY INSTITUTE
Guangdong Research Institute of Water Resources and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG WATER RESOURCES AND ELECTRIC POWER VOCATIONAL TECHNOLOGY INSTITUTE, Guangdong Research Institute of Water Resources and Hydropower filed Critical GUANGDONG WATER RESOURCES AND ELECTRIC POWER VOCATIONAL TECHNOLOGY INSTITUTE
Priority to CN201610001616.XA priority Critical patent/CN105544464B/en
Publication of CN105544464A publication Critical patent/CN105544464A/en
Application granted granted Critical
Publication of CN105544464B publication Critical patent/CN105544464B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/128Coherent linings made on the spot, e.g. cast in situ, extruded on the spot
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/127Flexible prefabricated covering elements, e.g. mats, strips bags filled at the side

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention discloses a kind of clear beach material fill construction method of mountain area middle and small river, and it comprises the following steps, and the river shoal boulder and cobble of mountain area middle and small river, sandy soil are removed after debris, is well mixed, is transported to levee body, layered rolling is closely knit;Side surface is bordered on the river along filling clay core sloping core on slope in levee body;In clay core sloping core surface layout loaded filter;Bank protection is arranged on loaded filter;Spats is arranged in levee toe.The present invention expects fill using clear beach, and having broken fill must be fettered with the traditional thought of homogeneous soil, take the technical measures of easy economy; ensure embankment stabilization and seepage stability, can both reduce clear beach material outward transport, and can also avoid the transport of fill homogeneous soil; cost saving, also protecting ecology.The present invention is in fill construction mountain area.

Description

A kind of clear beach material fill construction method of mountain area middle and small river
Technical field
The present invention relates to a kind of fill construction method, particularly a kind of clear beach material fill construction method of mountain area middle and small river.
Background technology
Mountain stream is numerous, and river is short, bigger than dropping, cause flood suddenly, go soon, and most of is without dyke or dike The low river of anti-standard, river flood control ability is low, easily cause mud-rock flow, dyke breaking whenever flood season, destroy by rush of water village and road, The disasters such as farmland are flooded, and most of middle and small river two sides soil is fertile, densely populated, losses due to flood and waterlogging is larger.
Mountain area middle and small river has that drainage area is small, flow is short, the concentration time is short, stream gradient is big, and Flood Suddenly rise to fall suddenly, and the time that water flow in dry season very little, the basic cutout having, riverbank or river levee bear high water level pressure is not long, right The destruction of embankment is relatively small, stream seashore is broad, the embankment gradient is relatively delayed, and height is smaller, is generally that farmland, precipitation fill after dike It abundant, pleasant Climate, the features such as be conducive to plant growth, should combine actual, suit measures to local conditions in the improvement of mountain area middle and small river, Safety, ecology are gived top priority, and the nature in river is retained as far as possible, the pattern of ecological management is taken.According to traditional Great rivers administering method and requirement, river embankment must be filled with homogeneous soil, and the clear beach material in river course cannot be used for fill, because This, on the one hand, a large amount of mountain area middle and small river harnessing projects transport outward the clear beach material in river course, build stockyard storage, occupy a large amount of soil Ground, stockyard often turns into problem;On the other hand, homogeneous soil fill is transported into from outside, certain destruction is caused to mountain forest.So, one Have a try, not only increase investment, waste soil, damaged mountain forest, waste resource, destroy ecology, also, easily increase Journey and local contradiction are processed, is unfavorable for engineering construction and makes smooth advances.If clear beach material can be used for fill, these problems will all be met Sword and solve.
The content of the invention
The purpose of the present invention, is to provide a kind of mountain area middle and small river clear beach material fill construction method, it is by using clear Fill is expected on beach, and having broken fill must be fettered with the traditional thought of homogeneous soil, take the technical measures of easy economy, it is ensured that embankment is steady Fixed and seepage stability, can both reduce clear beach material outward transport, and can also avoid the transport of fill homogeneous soil, cost saving is also protected It is ecological.
The present invention solve its technical problem solution be:A kind of clear beach material fill construction method of mountain area middle and small river, It comprises the following steps,
1)The river shoal boulder and cobble of mountain area middle and small river, sandy soil are removed after debris, are well mixed, levee body is transported to, layering is ground Densification is real, lift height 30cm~50cm;
2)Side surface is bordered on the river along filling clay core sloping core on slope in levee body, the thickness 30cm of clay core sloping core~ 100cm, layered rolling is closely knit, layer height 30cm~50cm;
3)On clay core sloping core surface loaded filter is arranged by graded sand and stone and geotextiles;
4)Bank protection, thickness 20cm~50cm are arranged by block stone, lattice guest protection pad and turf on loaded filter;
5)Spats is arranged by concrete, stone masonry, loose stone, gabion and building block in levee toe.
As the further improvement of above-mentioned technical proposal, in step 5)Afterwards, clear beach is passed through on the riverbed near spats Boulder and cobble, jackstone, gabion arrangement protection-apron.
As the further improvement of above-mentioned technical proposal, pass through concrete, pitch and mud calculus cloth at the top of the levee body Road on the bank is put, thickness 10cm~50cm of the road on the bank, road on the bank width is narrower than levee crown width.
As the further improvement of above-mentioned technical proposal, dividing in the layering gap and clay core sloping core in the levee body Stagger lamellar spacing.
As the further improvement of above-mentioned technical proposal, in step 3)In, the graded sand and stone is put into after geotextiles viscous Native seepage-proof dip dire surface layout is into loaded filter, thickness 10cm~15cm of graded sand and stone.
As the further improvement of above-mentioned technical proposal, in step 5)In, when the spats is located at thalweg offshore section, Ying Yan Talweg is extended, and the requirement of riverbed limiting scour should be met;The spats is located at relatively delays section in current smooth-going, bank slope When, it is l preferably to protect to the gradient:3~1:At 4 gentle slope riverbed, spats width 0.3m to 0.6m, crest level to design low water position.
The beneficial effects of the invention are as follows:The present invention expects fill using clear beach, and the tradition think of of homogeneous soil must be used by having broken fill Think constraint, take the technical measures of easy economy, it is ensured that embankment stabilization and seepage stability, can both reduce clear beach material outward transport, and also might be used Avoid the transport of fill homogeneous soil, cost saving, also protecting ecology.
Embodiment
The technique effect of the design of the present invention, concrete structure and generation is carried out below with reference to embodiment clear, complete Ground is described, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is the one of the present invention Section Example, rather than whole embodiments, based on embodiments of the invention, those skilled in the art is not paying creativeness The other embodiment obtained on the premise of work, belongs to the scope of protection of the invention.In addition, what is be previously mentioned in text is all / annexation is connect, not singly refers to component and directly connects, and refers to according to specific implementation situation by adding or reducing to be coupled Auxiliary, to constitute more excellent draw bail.
A kind of clear beach material fill construction method of mountain area middle and small river, it comprises the following steps,
1)The river shoal boulder and cobble of mountain area middle and small river, sandy soil are removed after debris, are well mixed, levee body is transported to, layering is ground Densification is real, lift height 30cm~50cm;
2)Side surface is bordered on the river along filling clay core sloping core on slope in levee body, the thickness 30cm of clay core sloping core~ 100cm, layered rolling is closely knit, layer height 30cm~50cm;
3)On clay core sloping core surface loaded filter is arranged by graded sand and stone and geotextiles;
4)Bank protection, thickness 20cm~50cm are arranged by block stone, lattice guest protection pad and turf on loaded filter;
5)Spats is arranged by concrete, stone masonry, loose stone, gabion and building block in levee toe.
It is further used as preferred embodiment, in step 5)Afterwards, clear beach ovum gravel is passed through on the riverbed near spats Stone, jackstone, gabion arrangement protection-apron.
It is further used as preferred embodiment, dike is arranged by concrete, pitch and mud calculus at the top of the levee body Road surface is pushed up, thickness 10cm~50cm of the road on the bank, road on the bank width is narrower than levee crown width.
It is further used as preferred embodiment, between the layering in layering gap and clay core sloping core in the levee body Gap staggers.
It is further used as preferred embodiment, in step 3)In, the graded sand and stone is put into anti-in clay after geotextiles Sloping core surface layout is oozed into loaded filter, thickness 10cm~15cm of graded sand and stone.
It is further used as preferred embodiment, in step 5)In, when the spats is located at thalweg offshore section, it should extend to Talweg, and the requirement of riverbed limiting scour should be met;The spats is located at when current smooth-going, bank slope relatively delay section, preferably Shield to the gradient is l:3~1:At 4 gentle slope riverbed, spats width 0.3m to 0.6m, crest level to design low water position.
Middle and small river clear beach material in mountain area is a kind of ecological banking material, with following features:
1)Gather materials on the spot, economical rationality is concrete dynamic modulus, water-permeable and air permeable, environment-friendly natural building material;
2)Under the premise that security is guaranteed, the graceful near-nature forest riverbank structure of good ecological environment, landscape can be built, to protect and Create the biological good living environment in riverbank;
3)Adapting to riverbed deformability should be strong;
4)It is easy to construct, repairs, reinforces.
The following is currently preferred one embodiment.
The river shoal boulder and cobble of mountain area middle and small river, sandy soil are removed after debris, is well mixed, is turned over hook machine and be transported to levee body, Layered rolling is closely knit, and lift height 30cm~50cm, levee body cross dimensions should meet the requirement of design flood;
The levee body side surface Shun Po that borders on the river fills clay core sloping core, and the material of clay core sloping core is sticky earth material, clay Thickness 30cm~100cm of seepage-proof dip dire, layered rolling is closely knit, layer height 30cm~50cm, and infiltration coefficient and compactness should Meet design requirement.
In clay core sloping core surface layout loaded filter, material is graded sand and stone, geotextiles etc., graded sand and stone thickness 10cm ~15cm.
Bank protection, bank protection thickness 20cm~50cm are arranged on loaded filter, material can be block stone, lattice guest protection pad, turf etc..
Spats is arranged in levee toe, when spats is located at thalweg offshore section, talweg should be extended to, and riverbed most favourable opposition should be met The requirement of degradation degree;Spats is located at when current smooth-going, bank slope relatively delay section, and it is l preferably to protect to the gradient:3~1:4 gentle slope riverbed Place, spats width 0.3m to 0.6m, crest level to design low water position.Spats material includes concrete, stone masonry, loose stone, lattice Guest's net cage, building block etc..
Protection-apron is arranged on the riverbed near spats, material is clear beach boulder and cobble, jackstone, gabion etc.;The thickness of protection-apron The need for degree, width should meet landform and waterflow stabilization.
In levee body top layout road on the bank, thickness 10cm~50cm of road on the bank, material can be concrete, drip Green grass or young crops, mud calculus etc., the width of road on the bank is narrower than levee crown width
Above is the better embodiment to the present invention is illustrated, but the invention is not limited to the reality Apply example, those skilled in the art can also make a variety of equivalent modifications or replace on the premise of without prejudice to spirit of the invention Change, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (4)

1. a kind of clear beach material fill construction method of mountain area middle and small river, it is characterised in that:It comprises the following steps,
1)The river shoal boulder and cobble of mountain area middle and small river, sandy soil are removed after debris, is well mixed, is transported to levee body, layered rolling is close It is real, lift height 30cm~50cm;
2)Side surface is bordered on the river along filling clay core sloping core on slope in levee body, thickness 30cm~100cm of clay core sloping core, point Layer grinding compacting, layer height 30cm~50cm;
3)Loaded filter is arranged by graded sand and stone and geotextiles on clay core sloping core surface, the graded sand and stone puts into geotextiles Afterwards in clay core sloping core surface layout into loaded filter, thickness 10cm~15cm of graded sand and stone;
4)Bank protection, thickness 20cm~50cm are arranged by block stone, lattice guest protection pad and turf on loaded filter;
5)Spats, the river near spats are arranged by concrete, stone masonry, loose stone, gabion and building block in levee toe Protection-apron is arranged by clear beach boulder and cobble, jackstone, gabion on bed.
2. middle and small river clear beach material fill construction method in mountain area according to claim 1, it is characterised in that:In the levee body Road on the bank, the thickness 10cm of the road on the bank~50cm, road on the bank are arranged in top by concrete, pitch and mud calculus Width is narrower than levee crown width.
3. middle and small river clear beach material fill construction method in mountain area according to claim 1, it is characterised in that:In the levee body Layering gap and clay core sloping core in layering gap stagger.
4. middle and small river clear beach material fill construction method in mountain area according to claim 1, it is characterised in that:In step 5) In, when the spats is located at thalweg offshore section, talweg should be extended to, and the requirement of riverbed limiting scour should be met;Institute State spats to be located at when current smooth-going, bank slope relatively delay section, it is l preferably to protect to the gradient:3~1:At 4 gentle slope riverbed, spats width 0.3m to 0.6m, crest level to design low water position.
CN201610001616.XA 2016-01-05 2016-01-05 A kind of clear beach material fill construction method of mountain area middle and small river Expired - Fee Related CN105544464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610001616.XA CN105544464B (en) 2016-01-05 2016-01-05 A kind of clear beach material fill construction method of mountain area middle and small river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610001616.XA CN105544464B (en) 2016-01-05 2016-01-05 A kind of clear beach material fill construction method of mountain area middle and small river

Publications (2)

Publication Number Publication Date
CN105544464A CN105544464A (en) 2016-05-04
CN105544464B true CN105544464B (en) 2017-10-10

Family

ID=55823991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610001616.XA Expired - Fee Related CN105544464B (en) 2016-01-05 2016-01-05 A kind of clear beach material fill construction method of mountain area middle and small river

Country Status (1)

Country Link
CN (1) CN105544464B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542059B (en) * 2017-09-14 2019-04-09 张传河 A method of it repairing base soil flow and loses buttress

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100577845B1 (en) * 2005-09-29 2006-05-10 주식회사 남원건설엔지니어링 Ecological embankment construction for river
CN203383188U (en) * 2013-08-06 2014-01-08 江西省水利规划设计院 Ground sand pebble revetment
CN204282308U (en) * 2014-11-18 2015-04-22 中国电建集团贵阳勘测设计研究院有限公司 A kind of lattice guest gabion composite material dam adapting to deep covering layer
CN204418127U (en) * 2015-01-30 2015-06-24 广东梅雁吉祥水电股份有限公司 A kind of landscape type overfall dam

Also Published As

Publication number Publication date
CN105544464A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN101580305B (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN102108690B (en) Silt retaining and consolidating method for use in debris flow gully ecological engineering and use thereof
CN110644430A (en) Composite ecological revetment structure and construction method thereof
CN108677871A (en) A kind of construction method of assembled grass planting concrete precast block and its ecological revetment
CN107989051A (en) The ecological revetment system that screen work bank protection seeps water with sand drain and water guide slope surface is combined
CN106368227A (en) Water erosion prevention system and method for ecology of slope of abandoned rear-earth mine land
CN109736257A (en) It is a kind of for constructing the double river structures and its construction method of ecological circulation water system
CN108457247A (en) A kind of combination bank protection and its construction method
CN205077512U (en) High slope protective structure of office area
CN207392127U (en) A kind of bank protection barricade applied to hydraulic engineering
CN207452823U (en) A kind of ecology typed bank revetment sea wall
CN206245283U (en) A kind of river course dykes and dams ecological revetment
CN105544464B (en) A kind of clear beach material fill construction method of mountain area middle and small river
CN206189345U (en) Dry rubble ecological landscape bank protection is filled on concrete check ridge
CN210216320U (en) Hydraulic engineering of city view river course prevents bank protection
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN107604928A (en) A kind of anti-runoff anti-erosion ecological protection blanket complex structure body and its construction method
CN204825785U (en) Stain farm ditch is arranged in water logging control of adopting geotextile ecological bag to build shore protection by laying bricks or stones
CN207739092U (en) Landscape ecology Pavement Construction
CN105926645A (en) Ecological restoration method for construction refuse landfill
CN207193880U (en) A kind of gabion revetment structure of natural prototype
CN214061496U (en) Protection device for soil and water conservation
CN205954574U (en) Ecological bank protection of river course dykes and dams
CN213682159U (en) Ecological compound slope protection
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171010

Termination date: 20220105