CN105525910B - Multistage blocks both-end observation procedure - Google Patents

Multistage blocks both-end observation procedure Download PDF

Info

Publication number
CN105525910B
CN105525910B CN201510903125.XA CN201510903125A CN105525910B CN 105525910 B CN105525910 B CN 105525910B CN 201510903125 A CN201510903125 A CN 201510903125A CN 105525910 B CN105525910 B CN 105525910B
Authority
CN
China
Prior art keywords
probe unit
pressure
card slot
water
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510903125.XA
Other languages
Chinese (zh)
Other versions
CN105525910A (en
Inventor
刘伟韬
宋文成
穆殿瑞
王晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201510903125.XA priority Critical patent/CN105525910B/en
Publication of CN105525910A publication Critical patent/CN105525910A/en
Application granted granted Critical
Publication of CN105525910B publication Critical patent/CN105525910B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geophysics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of multistage to block both-end observation procedure, its used observation system includes detection system, plugging system and supply propulsion system, detection system includes the first probe unit, second probe unit, 3rd probe unit and the 4th probe unit, card slot connector is provided between adjacent probe unit, each probe unit includes communicating pipe and the leak pipe of parallel arrangement, the communicating pipe of adjacent probe unit is connected with leak pipe by the card slot connector, wherein, the communicating pipe of adjacent detector unit keeps connection, positioned at the first probe unit and the second probe unit, the leak pipe of 3rd probe unit and the 4th probe unit keeps connection, leak pipe between the second probe unit and the 3rd probe unit is divided into independent two parts by card slot connector, respectively detect I sections and II sections of detection.Observation procedure of the present invention can detect water filling in sections to two at the same time, add measurement end, improve measurement efficiency.

Description

Multistage blocks both-end observation procedure
Technical field
The invention belongs to mine roof and floor rock mass damage scope determination techniques field, and in particular to multistage closure both-end observation Method.
Background technology
The measurement of mine roof and floor rock mass damage scope is to indicate the important parameter of coal petrography occurrence status.Prevent in research mine When harnessing the river, it is a critical underlying parameter, and therefore, the formation of conduit pipe in country rock is adopted in research, it is therefore necessary to Grasp strata movement rule and definite roof and floor rock mass damage scope.Generally use numerical simulation, empirical equation are estimated, scene is real The means such as survey.However, since field condition is complicated, to a certain extent, numerical simulation cannot reflect field condition well, warp Test that the estimated blindness of formula is larger, and with deep increasing is adopted, empirical equation applicability is worse and worse.
First, as mining depth increases, drilling be easily deformed in a short time, it is necessary to drilling quickly measured, And drillable length is substantially in 50-70m, test site often uses single hop water filling visualizer, promotes measurement length (about 1m) every time, This adds increased promote number and observation time.Secondly, fail to realize closure observation integration in existing multistage scope, and When multistage is observed, an only measurement end, observed efficiency increase is less.Finally, during actual observation, closure pressure is general 2.5MPa is taken, drilling observation hydraulic pressure generally takes 0.1MPa, and drilling interior observation source pressure can not be excessive, otherwise, can be to drilling hole Preexisting crack forms dilating effect in wall.Under same external source, how to allow in integrated scope and block water source with seeing Water source is surveyed to work at the same time under respective pressure.
The prior art fails to solve the problems, such as above three at the same time.
The content of the invention
It is an object of the invention to provide a kind of multistage to block both-end observation procedure, which can be at the same time to two Water filling in section is detected, measurement end is added, improves measurement efficiency.
Its technical solution includes:
A kind of closure both-end observation procedure for wall-rock crack, its used observation system include detection system, envelope Stifled system and supply propulsion system, the detection system are installed in the drilling of wall-rock crack,
The detection system include the first probe unit, the second probe unit, the 3rd probe unit, the 4th probe unit, Pressure-regulating valve, card slot connector and U-tube road, first probe unit is positioned at the outermost of drilling, the 4th detection list Member positioned at the most inner side of drilling, the card slot connector is arranged between adjacent probe unit, the front portion of the first probe unit and The afterbody of 4th probe unit, each probe unit includes communicating pipe and the leak pipe of parallel arrangement, in each card slot connector Inside it has been provided with swollen hole;
Hydraulic pressure converting system is provided with the card slot connector of the 4th probe unit afterbody, the hydraulic pressure converting system includes Hydraulic pressure converter and card slot pipe fitting, the hydraulic pressure converter include piston and matrix two parts, piston left side area More than right side area, interconnected water-guiding hole is provided with the piston, the water-guiding hole positioned at right end passes through aperture and institute State card slot connector to be connected, by matrix inner wall sealing when starting positioned at the water-guiding hole of left end, the right end of piston be provided with boss, The boss is used to carry out the spring one in piston spacing, and the piston is controlling in left end water-guiding hole and wall-rock crack Drilling keeps connection or closes;
The plugging system includes closure capsule, and the closure capsule surrounds the outside of each card slot connector, the card Swollen hole has been provided with trough connection;
The supply propulsion system includes water flood operations platform one, water flood operations platform two and oil gear, single in each detection Oil pipe road is both provided with above first leak pipe, the oil gear includes oil pressure tank, accumulator and shut-off valve;
The observation procedure comprises the following steps:
A drillings, the multiple drillings for predetermined angular of successively constructing into top plate or floor rock in coal petrography tunnel, hole depth 30-70m;
B installs observation system, successively by the first probe unit, the second probe unit, the 3rd probe unit and the 4th detection The communicating pipe of unit and leak pipe are linked together by card slot connector so that and the communicating pipe of adjacent detector unit keeps connection, Keep connecting positioned at the leak pipe of the first probe unit and the second probe unit, the 3rd probe unit and the 4th probe unit, position Leak pipe between the second probe unit and the 3rd probe unit is divided into independent two parts by card slot connector, respectively visits Survey I sections and II sections of detection;
Card slot between the first probe unit and the second probe unit, between the 3rd probe unit and the 4th probe unit Installation pressure-regulating valve in connector, the 4th probe unit stretch into one end connection U-tube road of drilling, hydraulic pressure converting system are installed On the card slot connector of the 4th probe unit afterbody;
Closure capsule is surrounded to the outside of each card slot connector, water flood operations platform one is connected for I sections with detection, water filling behaviour Make platform two to be connected with communicating pipe, oil pipe road is connected with oil gear;
C closing drillings, after it reaches initial position, with water flood operations platform one and water flood operations platform two into observation system Injection water source reaches predetermined initial water pressure to play swollen closure capsule to it;
D measures flowing water vector parameters, including following sub-step:
(1) setting hydraulic pressure converter Opening pressure is 2.5 than m, takes observation hydraulic pressure PIt is leftFor 0.1MPa;
(2) 2.5MPa water sources are injected into communicating pipe by water flood operations platform two, on the one hand plays swollen closure by playing swollen hole Capsule, on the other hand, the water source after the conversion of hydraulic pressure converter by, with 0.1MPa water fillings into the 4th probe unit, observing;Protect After water holding is pressed 1-2 minutes, read and calculate average wastage L in time period1;At the same time, by water flood operations platform one to 0.1MPa observations water source is directly provided in the first probe unit, it is corresponding to read and calculate average wastage L in time period2
(3) step (2) is connect, the high pressure oil of certain pressure is provided by oil gear into pressure-regulating valve, makes piston group Square hole is connected to other end movement, at this time, the first probe unit is connected with the second probe unit, the 4th probe unit and the Three probe units connect, and open shut-off valve and accumulator, keep high pressure oil pressure, make observation water source single to the second detection respectively Member, supplement in the 3rd probe unit, and worked on 0.1MPa pressure, wait 1-2 minutes, read respectively and calculate first, The average wastage L of two probe units and third and fourth probe unit3, L4, at this time, L3- L2As the second probe unit is averaged Wastage, L4- L1The as average wastage of the 3rd probe unit;
E withdraws pressure water source and high pressure oil, closure capsule and pressure-regulating valve is in depressurization phase, then utilizes supply To next observation area, repeat step c, d, successively measures drilling propulsion system mobile observation system.
The operation principle of above-mentioned hydraulic pressure converter is:
The larger cylinder piston area area of left end is S in hydraulic pressure converterIt is left, contact hydraulic pressure is the 4th probe unit leak Boring hydraulic pressure P is observed in pipeIt is left, the less cylinder piston area area of right end is SIt is right, contact hydraulic pressure is the 4th probe unit company Hydraulic pressure P in siphunculusIt is right, coefficient of elasticity k, decrement x in spring one, from balance between two forces principle:
Work as FIt is left+FBullet≥FIt is right, i.e. PIt is leftSIt is left+kx≥PIt is rightSIt is right, then hydraulic pressure converter be closed, piston is not outer to be moved, water guide Hole is stopped by matrix inner wall, it is impossible to is connected with leak pipe.
Work as FIt is left+FBullet≤FIt is right, i.e. PIt is leftSIt is left+kx≤PIt is rightSIt is right, then hydraulic pressure converter be in opening, piston is moved out, water guide Matrix inner wall is exposed in hole, is connected with leak pipe, to carrying out moisturizing in drilling.
Communicating pipe, mesohigh water was into the 4th probe unit leak pipe during the above process can be both realized from the 4th probe unit Boring low pressure water conversion is observed, and can realize the real-time moisturizing process into drilling as needed.
Wherein, PIt is leftTo observe boring hydraulic pressure, engineering often takes 0.1MPa, PIt is rightTo connect inner pipe water pressure, on the one hand can be used for Swollen closure capsule is played, on the other hand after pressure converts, available for the real-time moisturizing into the survey section leak pipe, engineering is often greater than 2.5MPa, it follows that SIt is leftRatio with the S right sides is about 25:1, add spring and adjust area difference, first, left and right face can be reduced Product ratio, needs easy to actual manufacture, second, can make piston self-return.
As the preferred solution of the present invention, two parallel passages are additionally provided with the card slot connector, are respectively Passage I and passage II, the passage I link together the leak pipe of adjacent detector unit, and the passage II is by adjacent detector The communicating pipe of unit links together, and block is provided with the passage I between the second probe unit and the 3rd probe unit, The block separates the second probe unit and the 3rd probe unit;Oil pipe road interface is provided with above the passage I, it is described Oil pipe road interface is connected on the oil pipe road, and described swollen hole is arranged on below the passage II.
As the present invention another preferred solution, between the passage I and leak pipe, passage II and between communicating pipe To be threadedly coupled.
Preferably, the pressure-regulating valve includes asymmetric piston group, spring two, the oil-through-hole positioned at top and positioned at side The square hole in portion, the oil-through-hole are connected with the oil pipe road.
Preferably, the supply propulsion system further includes pressure of return water table, electronic logger, drilling machine and drilling rod, the electricity Subrecord device is installed on water flood operations platform, and the pressure of return water table is used to be corrected inspection to the pressure of return water in return pipe Survey.
Preferably, the oil pipe road is fixed on each card slot connector by fastening screw.
Advantageous effects caused by the present invention:
Observation procedure of the present invention synchronous at the same time can measure both ends enemy, be grasped by water flood operations platform one and water filling Make platform two to II section of detection system water filling at the same time, I section of independent detection and detection, realize and block the both ends enemy of survey section together Pacing amount, adds measurement end, improves measurement efficiency, is particularly suitable for the quick survey of mine roof and floor rock mass damage scope Amount.
Bulging is played by blocking capsule realizes closure and leaks hunting integration into closure space, the system.
The water source that water flood operations platform two provides enters in hydraulic pressure converter through communicating pipe, and piston in hydraulic pressure converter can be with Control left end water-guiding hole keeps connecting or closing with the drilling in wall-rock crack, it is achieved thereby that blocking high-pressure in integrated process Water source ensures that water source is blocked in observation process to work with observation water source under respective pressure to the pressure conversion at observation low pressure water source Problem, avoids destruction of the observation water source hypertonia to borehole fissure.
Brief description of the drawings
The present invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structure diagram of observation system of the present invention;
Fig. 2 is the overall schematic of test probe in observation system of the present invention;
Fig. 3-1,3-2,3-3 are pressure-regulating valve structure diagram of the present invention;
Fig. 4-1,4-2 are hydraulic pressure converter structure schematic diagram;
Fig. 5-1,5-2,5-3,5-4 are hydraulic pressure converter and card slot pipe joint structure schematic diagram;
Fig. 6 is hydraulic pressure switcher state schematic diagram;
Fig. 7 blocks oil pipe line structure schematic diagram in both-end observation system for multistage;
Fig. 8 is leak pipe structure diagram;
Fig. 9 is communicating tube structure schematic diagram;
Figure 10 is one structure diagram of card slot connector;
Figure 11 is two structure diagram of card slot connector;
Figure 12 is three structure diagram of card slot connector;
Figure 13 is four structure diagram of card slot connector;
Figure 14 is five structure diagram of card slot connector;
In figure, 1, rock mass, 2, drilling, 3, card slot connector one, the 301, first probe unit, the 302, second probe unit, 303rd, the 3rd probe unit, the 304, the 4th probe unit, 4, card slot connector two, 5, card slot connector three, 6, card slot connector four, 7, card Trough connection five, 8, hydraulic pressure converting system, 9, pressure-regulating valve, 10, closure capsule, 11, leak pipe, 12, communicating pipe, 13, logical oil Pipeline, 14, card slot pipe fitting, 15, hydraulic pressure converter, 16, aperture, 17, piston, 18, matrix, 19, spring one, 20, boss, 21st, limbers, 22, piston group, 23, square hole, 24, spring two, 25, oil-through-hole, 26, fastening screw, 27, leakage hole, 28, note Water operation console one, 29, water flood operations platform two, 30, drilling machine, 31, drilling rod, 32, accumulator, 33, shut-off valve, 34, oil pressure tank, 35, Oil pipe road interface, 36, rise swollen hole.
Embodiment
Elaborate with reference to specific embodiment to the present invention.
The present invention, observation system is as shown in Figure 1, including observation system, envelope used by multistage blocks both-end observation procedure Stifled system and supply propulsion system, observation system are observed for multistage, and as shown in Figure 2, observation system is mainly by the first probe unit 301st, the second probe unit 302, the 3rd probe unit 303 and the 4th probe unit 304 form, wherein, each probe unit is equal Include leak pipe 11, communicating pipe 12, the head of the 4th probe unit 304 sets card slot connector 1, the 4th probe unit 304 It is connected between the 3rd probe unit 303 by card slot connector 24, between the 3rd probe unit 303 and the second probe unit 302 Connected by card slot connector 35, connected between the second probe unit 302 and the first probe unit 301 by card slot connector 46, In the other end of the first probe unit 301, card slot connector 57 is set.
With reference to shown in Fig. 2, Fig. 8 and Fig. 9, multiple leakage holes 27 are provided with leak pipe 11, for 2 leaks that drill, seeing Gaging hole wall fracture water flow, the first end of communicating pipe 12 are connected by card slot connector five with water flood operations platform 2 29, adjacent closure unit Leak pipe connected with communicating pipe by card slot connector.
Structure chart as in Figure 10-14, being respectively five card slot connectors of the invention, card slot connector 1 is positioned at the 4th detection , there are two central symmetry pipelines on the right side of unit 304, side is in respectively screw thread with leak pipe 11, hydraulic pressure conversion valve 8, communicating pipe 12 Connection, is provided with swollen hole 36 together in card slot connector 1 below communicating pipe 12 side.
Card slot connector 24 has two central symmetry pipes between the 3rd probe unit 303 and the 4th probe unit 304 Road, is threaded with leak pipe 11, pressure-regulating valve 9, communicating pipe 12 respectively, and 11 side of leak pipe is upper in card slot connector 24 Side is fixed with square oil pipe road interface 35, is communicated with the oil-through-hole 25 on pressure-regulating valve 9, the other end and card slot connector two 4 side wall is connected, and oil pipe road interface 35 is threaded with oil pipe road 13, interior logical high pressure oil, is connected in card slot connector 24 Swollen hole 36 together is provided with below 12 side of pipe, oil pipe road is fixed on each card slot connector by fastening screw 26.
As shown in Fig. 4-1,4-2, card slot connector 35 has between the second probe unit 302, the 3rd probe unit 303 Two central symmetry pipelines, are threaded with leak pipe 11, communicating pipe 12 respectively, in card slot connector 35 with 11 phase of leak pipe Center section even does not connect, and is entity blockage structure, can be divided into and detect I sections and II sections of detection, leak pipe in card slot connector 35 An oil pipe road interface 35 is fixed with above 11 sides, 35 both ends of oil pipe road interface and the side wall of card slot connector 35 are connected, and lead to Oil pipe line interface 35 is threaded with oil pipe road 13, interior logical high pressure oil, is opened in card slot connector 35 below communicating pipe 35 side There is swollen hole 36 together.
Card slot connector 46 has two central symmetry pipes between the first probe unit 301, the second probe unit 302 Road, is threaded with leak pipe 11, pressure-regulating valve 9, communicating pipe 12 respectively, and 11 side of leak pipe is upper in card slot connector 46 Side is fixed with " T-shaped " oil pipe road, is communicated with the oil-through-hole 25 on pressure-regulating valve 9, oil pipe road both ends connect with card slot First 46 side wall is connected, and oil pipe road interface is threaded with oil pipe road, interior logical high pressure oil, is connected in card slot connector 46 Swollen hole 36 together is provided with below 12 side of pipe.
Card slot connector 57 is located at the left end of the first probe unit 301, there is two central symmetry pipelines, respectively with leak pipe 11st, communicating pipe 12 is threaded, and has an oil pipe road interface and card slot connector in card slot connector 57 above 11 side of leak pipe 57 side wall is connected, and oil pipe road interface is threaded with oil pipe road, interior logical high pressure oil, communicating pipe in card slot connector 57 Swollen hole 36 together is provided with below 12 sides.
Hydraulic pressure converting system 8 includes hydraulic pressure converter 15 and card slot pipe fitting 14, which is located at card slot connector In one 3, and it is threaded by card slot pipe fitting 14 and card slot connector 1.With reference to Fig. 3-1,3-2,3-3,4-1,4-2 institute Show, hydraulic pressure converter 15 divides piston 17 and matrix 18 two parts, and piston 17 is in the anisometric cylinder in left and right ends, and left end is larger 17 face area of cylinder piston be SIt is left, contact hydraulic pressure is PIt is left, the less 17 face area of cylinder piston of right end is SIt is right, contact water Press as PIt is right.Right end close to piston 17 has a boss 20 to set, and is coordinated by spring 1 and 18 inside corresponding site of matrix, protected Card piston 17 will not depart from matrix 18 while movement in matrix 18.
Interconnected limbers 21 is provided with piston 17, right end limbers 21 passes through aperture 16 and card slot pipe fitting 14 It is connected, by 18 inner wall sealing of matrix when left end limbers 21 starts.It is more than a certain position when piston 17 stretches out matrix 18 to the left When, left end limbers 21 is connected with drilling 2.
Opening pressure ratio designed by hydraulic pressure converter 15 is m, works as PIt is left/PIt is rightDuring≤m, hydraulic pressure converter 15, which is in, closes shape State, works as PIt is left/PIt is rightDuring >=m, hydraulic pressure converter 15 is in opening.
The less 17 face area of cylinder piston of right end is S in piston 17It is rightThe cylinder piston 17 face face larger with left end Product is SIt is leftArea compare SIt is right/SIt is leftIt can be designed according to the Opening pressure designed by hydraulic pressure converter 15 than m.
15 operation principle of hydraulic pressure converter is:
As shown in fig. 6, the larger 17 face area of cylinder piston of left end is S in hydraulic pressure converter 15It is left, contact hydraulic pressure is the The hydraulic pressure P of observation drilling 2 in four probe units, 304 leak pipe 11It is left, the less 17 face area of cylinder piston of right end is SIt is right, connect It is hydraulic pressure P in 304 communicating pipe 12 of the 4th probe unit to touch hydraulic pressureIt is right, coefficient of elasticity k in spring 1, decrement x, is put down by two power The principle that weighs is understood:
Work as FIt is left+FBullet≥FIt is right, i.e. PIt is leftSIt is left+kx≥PIt is rightSIt is right, then hydraulic pressure converter 15 be closed, piston 17 is not outer to be moved, Limbers 21 is stopped by 18 inner wall of matrix, it is impossible to is connected with leak pipe 11.
Work as FIt is left+FBullet≤FIt is right, i.e. PIt is leftSIt is left+kx≤PIt is rightSIt is right, then hydraulic pressure converter 15 be in opening, piston 17 is moved out, 18 inner wall of matrix is exposed in limbers 21, is connected with leak pipe 11, to carrying out moisturizing in drilling 2.
Communicating pipe, 12 mesohigh water was to the 4th probe unit 304 during the above process can be both realized from the 4th probe unit 304 Observation drilling 2 is converted with low pressure water in leak pipe 11, and can realize the process of moisturizing in real time into drilling 2 as needed.
Wherein, PIt is leftHydraulic pressure is used for observation drilling 2, engineering often takes 0.1MPa, PIt is rightIt is on the one hand available for 12 hydraulic pressure in communicating pipe Swollen closure capsule 10, normal available for the real-time moisturizing into the survey section leak pipe 11, engineering on the other hand after pressure converts in More than 2.5MPa, it follows that SIt is leftRatio with the S right sides is about 25:1, it is contemplated that area difference is too big, therefore add spring 1 into Row is adjusted, first, left and right area ratio can be reduced, is needed easy to actual manufacture, second, can make 17 self-return of piston.
With reference to shown in Fig. 5-1 to 5-4, pressure-regulating valve 9 is located at card slot connector 24, in card slot connector 46, and pressure is adjusted 9 weeks ends of valve are threaded, and are connected by screw thread with card slot connector 24, card slot connector 46,9 two side ends of force regulating valve are provided with symmetrically Square hole 23 it is several, a screw-type oil-through-hole 25 is provided with Zhou Duan.
The pressure-regulating valve 9 includes asymmetric piston group 22 and spring 2 24, and during original state, spring 2 24 acts on Under, asymmetric piston group 22 is located at one end of 9 inner cavity of pressure-regulating valve, blocks 9 side side of pressure-regulating valve completely just at this time Shape hole 23, during working status, high pressure oil enters 9 inner cavity of pressure-regulating valve by oil-through-hole 25, acts on 22 side of piston group, will Piston group 22 pushes 2 24 end of spring to, and at this time, 22 gaps of piston group are by chance connected with square hole 23, and current can pass through pressure tune Save valve 9.
Plugging system is referred to shown in Fig. 1 to Fig. 2, Fig. 6 to Figure 14, main to include closure capsule 10, and closure capsule 10 is distinguished Surround on card slot connector 1, card slot connector 24, card slot connector 35, card slot connector 46 and card slot connector 57, pass through fixation Component is sealed against fixing, and is linked up by a swollen hole 36 and external source, and oil pipe road both ends set fastening screw 26, will can lead to Oil pipe line is fixed on the oil pipe between each card slot connector, and oil pipe road is connected with oil gear, is connected with high pressure oil inside it.
Oil gear includes oil pressure tank 34, shut-off valve 33 and accumulator 32, and oil pressure tank 34, which is responsible for offer, makes pressure-regulating valve 9 The high pressure oil that middle piston group 22 moves, shut-off valve 33 are responsible for the circulation and cut-off of high pressure oil, accumulator 32 by with shut-off valve 33 Coordinate, ensure that shut-off valve 33 is in when state, ensure that the high pressure oil in oil pipe 35 and capsule connecting tube 13 keeps certain Pressure state.
Supply propulsion system in detail as shown in Figure 1, including water flood operations platform 1, water flood operations platform 2 29, drilling rod 31, drilling machine 30th, pressure of return water table and electronic logger etc., water flood operations platform 1 are responsible for the first probe unit 301, the second probe unit 302 provide pressure water source, source pressure 0.1MPa, and water flood operations platform 2 29 is responsible for detecting to the 3rd probe unit the 303, the 4th Unit 304, closure capsule 10 provide pressure water source, pressure water source 2.5MPa, on the one hand, after the conversion of pressure changeover valve 9, Supplied water with the hydraulic pressure of 0.1MPa to the 3rd probe unit 303, the 4th probe unit 304, on the other hand, with the pressure water of 2.5MPa Swollen closure capsule 10 is played by playing swollen hole 36 in source.
The course of work of observation system of the present invention is:
Step 1, set 15 Opening pressure of hydraulic pressure converter in card slot connector 1 than being respectively m=2.5, to take observation hydraulic pressure PIt is leftFor 0.1MPa;
Step 2, water flood operations platform 2 29 provide 2.5MPa high pressure waters by communicating pipe 12, on the one hand, this high pressure water passes through Play swollen hole 36 and play swollen closure capsule 10, on the other hand, this high pressure water changed by hydraulic pressure converter 15 after with 0.1MPa to the 4th Water filling in probe unit 304, observation;Hydraulic pressure is kept, after 1-2 minutes, reads and calculates average wastage L in time period1, with This is corresponded to, water flood operations platform 1, and 0.1MPa observations water source is directly provided into the first probe unit 301, corresponding to read and count Calculate average wastage L in time period2
After step 3, the above process, oil pressure tank 34 provides certain pressure by associated conduit into pressure-regulating valve 9 High pressure oil, piston group 22 is moved to the other end, square hole 23 connects.At this time, the first probe unit 301 and the second detection are single Member 302 connects, and the 4th probe unit 304 is connected with the 3rd probe unit 303, opens shut-off valve 33 and accumulator 32, keeps high Oil pressure, makes observation water source be supplemented respectively into the second probe unit 302, the 3rd probe unit 301, and with 0.1MPa pressure Work on, wait 1-2 minutes, read respectively and calculate first and second probe unit 301,302 and third and fourth probe unit 303rd, 304 average wastage L3, L4, at this time, L3- L2As the second probe unit 302 is averaged wastage, L4- L1As the 3rd Probe unit equals 303 equal wastages;
Step 4, by pressure-regulating valve 9 and closure 10 pressure release of capsule, observation system is pushed into down with drilling machine 30 and drilling rod 31 One observation area is observed, until all observation finishes in 2 length of drilling.
The observation procedure of observation system of the present invention, specifically includes following steps:
(1) drilling 2:Successively constructed into top plate or floor rock 1 in coal petrography tunnel with conventional coal mine drilling machine 30 Predetermined angular drilling 2 is several, and hole depth 30-70m is differed;
(2) observation system is installed:Cleaning drilling in debris, install observation system, by corresponding pipeline connect drilling machine 30, Water flood operations platform 1, water flood operations platform 2 29 etc., and it is sent to 2 initial positions of drilling using drilling machine 30 and drilling rod 31;
(3) closing drilling 2:After it reaches initial position, swollen closure capsule 10 sealing drilling 2 is played, that is, uses water flood operations Platform 28,29 injects water source into observation system and reaches predetermined initial water pressure to it;
(4) flowing water vector parameters are measured:After closure is qualified, flowing water vector parameters measure is carried out, reads respectively and calculates the One probe unit 301, the second probe unit 302, the 3rd probe unit 303, the average wastage L of the 4th probe unit 3042, L3- L2, L4- L1, L1.Pressure water source and high pressure oil are withdrawn, closure capsule 10 and pressure-regulating valve 9 is in depressurization phase, so Afterwards using drilling machine 30 and 31 mobile observation system of drilling rod to next observation area, repeat step 3 to step 4, successively to drilling 2 into Row measurement.
The part do not addressed in the present invention uses or uses for reference prior art and can be achieved.

Claims (6)

1. a kind of closure both-end observation procedure for wall-rock crack, its used observation system includes detection system, closure System and supply propulsion system, the detection system are installed in the drilling of wall-rock crack, it is characterised in that:
The detection system includes the first probe unit, the second probe unit, the 3rd probe unit, the 4th probe unit, pressure Regulating valve, card slot connector and U-tube road, first probe unit is positioned at the outermost of drilling, the 4th probe unit position In the most inner side of drilling, the card slot connector is arranged between adjacent probe unit, the front portion of the first probe unit and the 4th The afterbody of probe unit, each probe unit include communicating pipe and the leak pipe of parallel arrangement, are set in each card slot connector It has been equipped with swollen hole;
Hydraulic pressure converting system is provided with the card slot connector of the 4th probe unit afterbody, the hydraulic pressure converting system includes hydraulic pressure Converter and card slot pipe fitting, the hydraulic pressure converter include piston and matrix two parts, and piston left side area is more than Right side area, is provided with interconnected water-guiding hole in the piston, the water-guiding hole positioned at right end passes through aperture and the card Trough connection is connected, and by matrix inner wall sealing when starting positioned at the water-guiding hole of left end, the right end of piston is provided with boss, described Boss is used to carry out the spring one in piston spacing, and the piston is controlling the drilling in left end water-guiding hole and wall-rock crack Keep connection or close;
The plugging system includes closure capsule, and the closure capsule surrounds the outside of each card slot connector;
The supply propulsion system includes water flood operations platform one, water flood operations platform two and oil gear, is leaked in each probe unit Oil pipe road is both provided with above water pipe, the oil gear includes oil pressure tank, accumulator and shut-off valve;
The observation procedure comprises the following steps:
A drillings, the multiple drillings for predetermined angular of successively constructing into top plate or floor rock in coal petrography tunnel, hole depth 30- 70m;
B installs observation system, successively by the first probe unit, the second probe unit, the 3rd probe unit and the 4th probe unit Communicating pipe and leak pipe linked together by card slot connector so that communicating pipe of adjacent detector unit keeps connection, is located at The leak pipe of first probe unit and the second probe unit, the 3rd probe unit and the 4th probe unit keeps connection, positioned at the Leak pipe between two probe units and the 3rd probe unit is divided into independent two parts by card slot connector, respectively detects I II sections of section and detection;
Card slot connector between the first probe unit and the second probe unit, between the 3rd probe unit and the 4th probe unit Interior installation pressure-regulating valve, the 4th probe unit stretch into one end connection U-tube road of drilling, and hydraulic pressure converting system is installed on the On the card slot connector of four probe unit afterbodys;
Closure capsule is surrounded to the outside of each card slot connector, water flood operations platform one is connected for I sections with detection, water flood operations platform Two are connected with communicating pipe, and oil pipe road is connected with oil gear;
C closing drillings, after it reaches initial position, are injected with water flood operations platform one and water flood operations platform two into observation system Water source reaches predetermined initial water pressure to play swollen closure capsule to it;
D measures flowing water vector parameters, including following sub-step:
(1) setting hydraulic pressure converter Opening pressure is 2.5 than m, takes observation hydraulic pressure PIt is leftFor 0.1MPa;
(2) 2.5MPa water sources are injected into communicating pipe by water flood operations platform two, on the one hand play swollen closure capsule by playing swollen hole, On the other hand, with 0.1MPa water fillings into the 4th probe unit, observation after which is changed by hydraulic pressure converter;Keep hydraulic pressure After 1-2 minutes, read and calculate average wastage L in time period1;At the same time, visited by water flood operations platform one to first Survey in unit and 0.1MPa observations water source is directly provided, it is corresponding to read and calculate average wastage L in time period2
(3) step (2) is connect, the high pressure oil of certain pressure is provided by oil gear into pressure-regulating valve, makes piston group to another One end movement connects square hole, and at this time, the first probe unit is connected with the second probe unit, and the 4th probe unit and the 3rd is visited Unit connection is surveyed, opens shut-off valve and accumulator, keeps high pressure oil pressure, makes observation water source respectively to the second probe unit, the Supplement in three probe units, and worked on 0.1MPa pressure, wait 1-2 minutes, read respectively and calculate first and second detection The average wastage L of unit and third and fourth probe unit3, L4, at this time, L3- L2The average leakage of as the second probe unit Amount, L4- L1The as average wastage of the 3rd probe unit;
E withdraws pressure water source and high pressure oil, closure capsule and pressure-regulating valve is in depressurization phase, is then promoted using supply To next observation area, repeat step c, d, successively measures drilling system mobile observation system.
2. the closure both-end observation procedure according to claim 1 for wall-rock crack, it is characterised in that:The card slot connects Two parallel passages are additionally provided with head, are respectively passage I and passage II, the passage I by the leak of adjacent detector unit Pipe links together, and the passage II links together the communicating pipe of adjacent detector unit, positioned at the second probe unit and Block is provided with passage I between three probe units, the block separates the second probe unit and the 3rd probe unit;Institute State and be provided with oil pipe road interface above passage I, oil pipe road interface is connected on the oil pipe road, described swollen hole It is arranged on below the passage II.
3. the closure both-end observation procedure according to claim 2 for wall-rock crack, it is characterised in that:The passage I Between leak pipe, passage II and be to be threadedly coupled between communicating pipe.
4. the closure both-end observation procedure according to claim 1 for wall-rock crack, it is characterised in that:The pressure tune Saving valve includes asymmetric piston group, spring two, the oil-through-hole positioned at top and the square hole positioned at sidepiece, the oil-through-hole and institute State the connection of oil pipe road.
5. the closure both-end observation procedure according to claim 1 for wall-rock crack, it is characterised in that:The supply pushes away Pressure of return water table, electronic logger, drilling machine and drilling rod are further included into system, the electronic logger is installed on water flood operations platform On, the pressure of return water table is used to be corrected detection to the pressure of return water in return pipe.
6. the closure both-end observation procedure according to claim 1 for wall-rock crack, it is characterised in that:The oil pipe Road is fixed on each card slot connector by fastening screw.
CN201510903125.XA 2015-12-09 2015-12-09 Multistage blocks both-end observation procedure Active CN105525910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510903125.XA CN105525910B (en) 2015-12-09 2015-12-09 Multistage blocks both-end observation procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510903125.XA CN105525910B (en) 2015-12-09 2015-12-09 Multistage blocks both-end observation procedure

Publications (2)

Publication Number Publication Date
CN105525910A CN105525910A (en) 2016-04-27
CN105525910B true CN105525910B (en) 2018-05-08

Family

ID=55768394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510903125.XA Active CN105525910B (en) 2015-12-09 2015-12-09 Multistage blocks both-end observation procedure

Country Status (1)

Country Link
CN (1) CN105525910B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859512B (en) * 2017-12-05 2022-03-04 山东科技大学 Double-section type top and bottom plate surrounding rock damage range observation system
CN108444889B (en) * 2018-04-20 2020-05-19 大连理工大学 Variable-pressure adjustable rock mass fracture permeability testing device
CN108643899B (en) * 2018-04-20 2021-08-17 大连理工大学 Mining destructive zone segmented observation method for mine roof and floor
CN108732075B (en) * 2018-04-20 2020-05-19 大连理工大学 Rock mass permeability in-situ test method
CN108645774B (en) * 2018-04-20 2020-05-19 大连理工大学 Single-loop overburden fracture double-end plugging leakage detection system
CN108613909B (en) * 2018-04-20 2020-04-07 大连理工大学 Rock mass loosening ring testing method based on drilling water pressing effect
CN108643898B (en) * 2018-04-20 2019-08-13 大连理工大学 Drilling single loop based on the detection of overlying strata water flowing fractured zone presses water control system
CN108643891B (en) * 2018-04-20 2021-08-17 大连理工大学 Single-loop overburden fracture double-end plugging and leakage detection method
CN108643901B (en) * 2018-04-20 2021-08-17 大连理工大学 Multi-section graded pressure reduction water injection observation method based on fracture observation
CN108643900B (en) * 2018-04-20 2021-08-17 大连理工大学 Mining destructive zone segmented observation system for mine roof and floor
CN109596433A (en) * 2018-12-13 2019-04-09 天地科技股份有限公司 Crack of coal-mine roof Evolution dynamics detection device and method
CN109611078B (en) * 2018-12-26 2023-09-01 河南理工大学 Self-adaptive angle-adjusting double-end water shutoff measuring device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5473939A (en) * 1992-06-19 1995-12-12 Western Atlas International, Inc. Method and apparatus for pressure, volume, and temperature measurement and characterization of subsurface formations
CN101245701A (en) * 2007-05-28 2008-08-20 中国矿业大学(北京) Down-hole guiding height viewer and its observation method
JP2013125003A (en) * 2011-12-16 2013-06-24 Keiichi Doigawa Water leakage detection device and water leakage detection method for ground-buried water pipe
CN104358561A (en) * 2014-10-16 2015-02-18 山东科技大学 Gas pressure observation system for downstream drill hole in aqueous coal rock
CN204754919U (en) * 2015-06-25 2015-11-11 山东科技大学 Multistage shutoff of roof water guide crack area is system of leaking hunting in step

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5473939A (en) * 1992-06-19 1995-12-12 Western Atlas International, Inc. Method and apparatus for pressure, volume, and temperature measurement and characterization of subsurface formations
CN101245701A (en) * 2007-05-28 2008-08-20 中国矿业大学(北京) Down-hole guiding height viewer and its observation method
JP2013125003A (en) * 2011-12-16 2013-06-24 Keiichi Doigawa Water leakage detection device and water leakage detection method for ground-buried water pipe
CN104358561A (en) * 2014-10-16 2015-02-18 山东科技大学 Gas pressure observation system for downstream drill hole in aqueous coal rock
CN204754919U (en) * 2015-06-25 2015-11-11 山东科技大学 Multistage shutoff of roof water guide crack area is system of leaking hunting in step

Also Published As

Publication number Publication date
CN105525910A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN105525910B (en) Multistage blocks both-end observation procedure
CN105386752B (en) Multistage blocks both-end observation system
CN105547721B (en) Double-end sealing leak detection integration observation procedure
CN105403930B (en) Country rock Mining failure scope sectionalization test system
CN105422078B (en) Country rock Mining failure scope sectionalization test method
CN105372410B (en) Double-end sealing leak detection combined geometry
CN205229149U (en) Bi -polar shutoff integrated observation system of leaking hunting
CN103995097B (en) A kind of test method and device of simulating jacking construction initiation stratum deformation
CN205172554U (en) Multistage shutoff bi -polar observation system
CN204754919U (en) Multistage shutoff of roof water guide crack area is system of leaking hunting in step
US20200165887A1 (en) Graded pressure drop type multi stage water injection device and method based on fracture observation
CN108643891B (en) Single-loop overburden fracture double-end plugging and leakage detection method
US20200165915A1 (en) Graded pressure drop type detection system and detection method of borehole cracks
CN205176296U (en) Destruction scope sectionalization test system is adopted to country rock
CN107829723A (en) Rock body quality of mine Mining failure scope integral type detecting devices and detection method
CN110243746A (en) A kind of device and method of layer-through drilling quick in situ test coal seam permeability
CN108645774B (en) Single-loop overburden fracture double-end plugging leakage detection system
CN103016007A (en) Electronically controlled single-loop water-plugging overburden strata fracture detection method
CN109975125A (en) The pressure water experimental facilities and method detected based on coal body or rock-mass relaxing circle
CN102401749B (en) Testing device of underground pressure pipeline
CN107859512A (en) Two section type roof and floor surrounding rock failure scope observation system
CN108643899B (en) Mining destructive zone segmented observation method for mine roof and floor
CN109736779A (en) A kind of pressure break radius measurement method of this coal seam hydraulic fracture
CN208073472U (en) One kind being used for deep-well floor rock mining induced fissure detection device
CN207485420U (en) Rock body quality of mine Mining failure range integral type detecting devices

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant