CN105525598B - Repair method is torn open in large-scale pumped storage power unit - Google Patents

Repair method is torn open in large-scale pumped storage power unit Download PDF

Info

Publication number
CN105525598B
CN105525598B CN201610058582.8A CN201610058582A CN105525598B CN 105525598 B CN105525598 B CN 105525598B CN 201610058582 A CN201610058582 A CN 201610058582A CN 105525598 B CN105525598 B CN 105525598B
Authority
CN
China
Prior art keywords
hydraulic synchronization
top cover
jacking
jack
power unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610058582.8A
Other languages
Chinese (zh)
Other versions
CN105525598A (en
Inventor
丁光
戴然
张芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XIANJU PUMPED STORAGE CO Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
ZHEJIANG XIANJU PUMPED STORAGE CO Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XIANJU PUMPED STORAGE CO Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical ZHEJIANG XIANJU PUMPED STORAGE CO Ltd
Priority to CN201610058582.8A priority Critical patent/CN105525598B/en
Publication of CN105525598A publication Critical patent/CN105525598A/en
Application granted granted Critical
Publication of CN105525598B publication Critical patent/CN105525598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacture Of Motors, Generators (AREA)

Abstract

The invention discloses repair method is torn in large-scale pumped storage power unit open, the method is circumferentially to be symmetrically disposed between top cover and base ring in direction two groups of hydraulic synchronization jack, and all of hydraulic synchronization jack is connected with oil pump;Then the two groups of hydraulic synchronization jack of mode loop start for alternately starting carry out jacking, and place cushion block under hydraulic synchronization jack, by top cover jacking to satisfaction maintenance requirement for height;It is then used by screw rod and nut suspends top cover in midair, and stator is sling by stator suspension centre and boom hoisting;Machine hole is finally entered to be overhauled.The present invention can not only shorten the duration, improve security, it is to avoid rotor returns dress, also have the advantages that difficulty of construction is small and the cost of overhaul is low.

Description

Repair method is torn open in large-scale pumped storage power unit
Technical field
It is particularly a kind of to shorten the big of duration the present invention relates to tear repair method open in a kind of large-scale pumped storage power unit Repair method is torn open in type pump-storage generator.
Background technology
Existing large-scale pumped storage power unit typically arranges that its generator motor is located at the upper of pump turbine using vertical shaft Side, both are connected by big shaft flange;Top cover, runner and stator etc. are respectively mounted as the important composition part of pump turbine Inside the machine hole of pump turbine.In order to improve the operation stability of unit, needed to water in large pumped storage power plant Pump turbine is overhauled;General use above tears mode open during maintenance, electricity generation and electromotion machine rotor, the stator that will be mounted above first With the equipment Removal such as lower bearing bracket and hang out, then top cover point valve is disintegrated, then with bridge machine by top cover, stator etc. one by one to hanging oneself Go out, finally can just be overhauled.
There is problems with above-mentioned existing repair method:Take-down time during maintenance and the gyration time after maintenance compared with Long, total maintenance duration needs more than 60 days;The rotor weight of generator motor is heavier(The pump-storage generator of usual 300MW Rotor weight more than 400 tons), security during lifting is undesirable;Rotor return dress when, it is necessary to re-start connecting shaft, it is necessary to Big axle axis and unit throw are controlled, the revolution difficulty after maintenance is higher;Point valve of top cover is dismantled and charge-coupled circle is returned dress to be needed Completed in pump turbine machine hole, working space is narrow and small, and difficulty of construction is big;The cost of overhaul is higher.Therefore, it is existing large-scale to take out Torn open in water accumulation of energy unit repair method exist that the duration is more long, security is undesirable, rotor return fill more difficult, difficulty of construction it is larger and Cost of overhaul problem higher.
The content of the invention
It is an object of the present invention to provide tearing repair method open in a kind of large-scale pumped storage power unit.The present invention can not only Shorten the duration, improve security, it is to avoid rotor returns dress, also have the advantages that difficulty of construction is small and the cost of overhaul is low.
Technical scheme:Repair method is torn open in large-scale pumped storage power unit, comprise the following steps:
A, two groups of hydraulic synchronization jack are circumferentially symmetrically disposed between top cover and base ring in direction, and by all of liquid Pressure synchronous jack is connected and debugs with oil pump;
B, startup oil pump, by first group of hydraulic synchronization jack by the steady jacking of top cover, after reaching regulation top lifting height Stop;
C, under second group of hydraulic synchronization jack cushion block is placed, restarting oil pump makes second group of hydraulic synchronization jack will The steady jacking of top cover, stops after reaching regulation top lifting height;
D, under first group of hydraulic synchronization jack cushion block is placed, restarting oil pump makes first group of hydraulic synchronization jack will The steady jacking of top cover, stops after reaching regulation top lifting height;
E, circulating repetition perform step c and step d, and two groups of hydraulic synchronization jack are used alternatingly carries out jacking, until will Top cover jacking stops to after meeting maintenance requirement for height;
F, using screw rod and nut by top cover Suspending fixation on generator motor infrastructure concrete;
G, stator is sling by stator suspension centre corresponding with gate positing and boom hoisting;
H, by access path into machine cheat overhauled.
In tearing repair method in foregoing large-scale pumped storage power unit open, the regulation top in the step b, step c and step d Rise is respectively less than the jacking stroke of the hydraulic synchronization jack for carrying out jacking.
Torn open in foregoing large-scale pumped storage power unit in repair method, the jacking in the step b, step c and step d is fast Degree is respectively less than 20 centimeter per minutes.
Torn open in foregoing large-scale pumped storage power unit in repair method, described screw rod one end is connected with top cover, the other end leads to Cross sleeve pipe to be connected with generator motor infrastructure concrete, the dismounting and installation of screw rod can be facilitated.
Torn open in foregoing large-scale pumped storage power unit in repair method, the height of the cushion block used in each step is small The top lifting height of hydraulic synchronization jack in back step.
In tearing repair method in foregoing large-scale pumped storage power unit open, the step f is, using screw rod and nut by top cover Suspending fixation is on generator motor infrastructure concrete, and setting support frame is supported protection below top cover.
Torn open in foregoing large-scale pumped storage power unit in repair method, the boom hoisting in the step g is chain block, Convenient operation, reduces operation difficulty.
In tearing repair method in foregoing large-scale pumped storage power unit open, first group of hydraulic synchronization jack and second group Hydraulic synchronization jack includes the hydraulic synchronization jack of more than 3, and the stress of single hydraulic jack is smaller when making jacking, Improve the stability and security of jacking.
Compared with prior art, present invention improves over repair method is torn open in large-scale pumped storage power unit, by alternate cycles Using two groups of symmetrically arranged hydraulic synchronization jack by top cover jacking, the top lifting height of top cover is set to meet maintenance requirement for height, Then top cover is suspended on generator motor infrastructure concrete by screw rod and nut, and by stator suspension centre and is pulled Cucurbit slings stator, facilitates maintainer to be overhauled into machine hole, reverse operating when returning dress;Not only eliminate generating The equipment Removals such as motor rotor, stator and lower bearing bracket, the process for hanging out and returning dress, also eliminate point valve dismounting and the handle of top cover Charge-coupled circle returns the process of dress;So as to foreshorten to more than 50% the duration, i.e., duration of 60 days original can be needed to shorten 30 days with On, while security can also be improved, it is to avoid rotor returns dress, reduce difficulty of construction, the cost of overhaul is greatly lowered.Additionally, this hair It is bright two groups of hydraulic synchronization jack are used alternatingly to carry out jacking, each top lifting height be respectively less than carry out jacking hydraulic synchronization it is very heavy The jacking stroke on top, and jacking speed is respectively less than 20 centimeter per minutes, so that jacking process is steadily carried out, prevents top cover on top Inclined during rising, further improve security;Meanwhile, in the height respectively less than back step of the cushion block used in each step The top lifting height of hydraulic synchronization jack, convenient operation, reduces difficulty of construction;Protection is supported to top cover by support frame, Further improve security.Therefore, the present invention can not only shorten the duration, improve security, it is to avoid rotor returns dress, also with applying Work difficulty is small and the low advantage of the cost of overhaul.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the attachment structure schematic diagram at hydraulic synchronization jack;
Fig. 3 is the attachment structure figure of boom hoisting;
Fig. 4 is the structural representation that the present invention can be when maintenance.
Mark in accompanying drawing for:1- hydraulic synchronization jack, 2- top covers, 3- base rings, 4- cushion blocks, 5- screw rods, 6- generates electricity electric Motivation, 7- base concretes, 8- stators, 9- stator suspension centres, 10- boom hoistings, 11- access paths.
Specific embodiment
With reference to embodiment, the present invention is further illustrated, but is not intended as the foundation to present invention limitation.
Embodiment.Tear repair method in large-scale pumped storage power unit open, as shown in Figure 1,2,3, 4, comprise the following steps:
A, by two groups of hydraulic synchronization jack 1, circumferentially direction is symmetrically disposed between top cover 2 and base ring 3, and will be all Hydraulic synchronization jack 1 be connected and debug with oil pump;
B, startup oil pump, by first group of hydraulic synchronization jack 1 by the steady jacking of top cover 2, reach regulation jacking high Stop after degree;
C, in second group of the placement cushion block 4 of hydraulic synchronization jack 1 time, restarting oil pump makes second group of hydraulic synchronization thousand Jin top 1 stops the steady jacking of top cover 2 after reaching regulation top lifting height;
D, in first group of the placement cushion block 4 of hydraulic synchronization jack 1 time, restarting oil pump makes first group of hydraulic synchronization thousand Jin top 1 stops the steady jacking of top cover 2 after reaching regulation top lifting height;
E, circulating repetition perform step c and step d, and two groups of hydraulic synchronization jack 1 are used alternatingly carries out jacking, until will The jacking of top cover 2 stops to after meeting maintenance requirement for height;
F, using screw rod 5 and nut by the Suspending fixation of top cover 2 on the base concrete 7 of the bottom of generator motor 6;
G, stator 8 is sling by stator suspension centre 9 corresponding with the position of stator 8 and boom hoisting 10;
H, by access path 11 into machine cheat overhauled.
Regulation top lifting height in the step b, step c and step d is respectively less than the hydraulic synchronization jack 1 for carrying out jacking Jacking stroke.Jacking speed in the step b, step c and step d is respectively less than 20 centimeter per minutes.The one end of the screw rod 5 It is connected with top cover 2, the other end is connected by sleeve pipe with the base concrete 7 of the bottom of generator motor 6.Used in each step The height of cushion block 4 be respectively less than the top lifting height of hydraulic synchronization jack 1 in back step.The step f is to use screw rod 5 and nut by the Suspending fixation of top cover 2 on the base concrete 7 of the bottom of generator motor 6, and below top cover 2 set support Frame is supported protection.Boom hoisting 10 in the step g is chain block.Described first group of hydraulic synchronization jack 1 Hydraulic synchronization jack 1 with second group includes the hydraulic synchronization jack 1 of more than 3.
In top cover jacking, can be measured by setting up dial gauge, accurate measurement top cover is on tri- directions of X, Y, Z Displacement, so as to the jacking state of adjustment hydraulic synchronization jack in time, i.e. top lifting height, top lift and jacking speed, it is ensured that The steady jacking of top cover.Only dress need to be completed back by falling stator and top cover by above-mentioned steps reverse operating after the completion of maintenance.
The present invention is used in the experiment of Xianju, Zhejiang pumping energy storage power station project, can shorten maintenance duration 35 days, separate unit machine Group can reduce the cost of overhaul more than 5,000,000;Calculated by the scale of 4, whole power station unit, can just reduce the cost of overhaul of entirety More than 20000000.

Claims (6)

1. in large-scale pumped storage power unit open repair method is torn, it is characterised in that comprise the following steps:
A, two groups of hydraulic synchronization jack are circumferentially symmetrically disposed between top cover and base ring in direction, and all of hydraulic pressure is same Step jack is connected and debugs with oil pump;
B, startup oil pump, by first group of hydraulic synchronization jack by the steady jacking of top cover, stop after reaching regulation top lifting height;
C, under second group of hydraulic synchronization jack cushion block is placed, restarting oil pump makes second group of hydraulic synchronization jack by top cover Steady jacking, stops after reaching regulation top lifting height;
D, under first group of hydraulic synchronization jack cushion block is placed, restarting oil pump makes first group of hydraulic synchronization jack by top cover Steady jacking, stops after reaching regulation top lifting height;
E, circulating repetition perform step c and step d, and two groups of hydraulic synchronization jack are used alternatingly carries out jacking, until by top cover Jacking stops to after meeting maintenance requirement for height;
F, using screw rod and nut by top cover Suspending fixation on generator motor infrastructure concrete, and set below top cover Put support frame and be supported protection;
G, stator is sling by stator suspension centre corresponding with gate positing and boom hoisting;
H, by access path into machine cheat overhauled;Described screw rod one end is connected with top cover, and the other end is by sleeve pipe and hair Electric motor infrastructure concrete connection.
2. in large-scale pumped storage power unit according to claim 1 open repair method is torn, it is characterised in that:The step b, step Regulation top lifting height in rapid c and step d is respectively less than the jacking stroke of the hydraulic synchronization jack for carrying out jacking.
3. in large-scale pumped storage power unit according to claim 1 open repair method is torn, it is characterised in that:The step b, step Jacking speed in rapid c and step d is respectively less than 20 centimeter per minutes.
4. in large-scale pumped storage power unit according to claim 1 open repair method is torn, it is characterised in that:In each step The top lifting height of hydraulic synchronization jack in the height of the cushion block for using respectively less than back step.
5. in large-scale pumped storage power unit according to claim 1 open repair method is torn, it is characterised in that:In the step g Boom hoisting be chain block.
6. in the large-scale pumped storage power unit according to any claim in claim 1 to 5 open repair method is torn, its feature It is:First group of hydraulic synchronization jack and second group of hydraulic synchronization jack are including the hydraulic synchronization thousand of more than 3 Jin top.
CN201610058582.8A 2016-01-28 2016-01-28 Repair method is torn open in large-scale pumped storage power unit Active CN105525598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610058582.8A CN105525598B (en) 2016-01-28 2016-01-28 Repair method is torn open in large-scale pumped storage power unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610058582.8A CN105525598B (en) 2016-01-28 2016-01-28 Repair method is torn open in large-scale pumped storage power unit

Publications (2)

Publication Number Publication Date
CN105525598A CN105525598A (en) 2016-04-27
CN105525598B true CN105525598B (en) 2017-06-09

Family

ID=55768093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610058582.8A Active CN105525598B (en) 2016-01-28 2016-01-28 Repair method is torn open in large-scale pumped storage power unit

Country Status (1)

Country Link
CN (1) CN105525598B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132943A (en) * 2018-08-04 2019-01-04 国网福建省电力有限公司 Aerial cooler original place maintenance craft method
CN109335996A (en) * 2018-09-29 2019-02-15 东方电气集团东方电机有限公司 A kind of lifting device for top cover and method
CN112128040B (en) * 2020-09-23 2022-05-24 国家电网有限公司 Inspection method for upper and lower leak-stopping rings of vertical shaft mixed-flow water turbine
CN113463583B (en) * 2021-06-24 2022-03-18 中国长江电力股份有限公司 Method for rapidly disassembling large oil cylinder of gate in water inlet accident of high-water-head power station on site
CN113864098B (en) * 2021-08-26 2023-12-19 长江勘测规划设计研究有限责任公司 Method for middle disassembly and lower disassembly, inspection and repair of rotating wheel of vertical shaft two-stage mixed flow unit

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006039144A1 (en) * 2006-08-16 2008-02-21 Lodahl, Manfred, Dipl.-Ing. Floating wave energy converter
CN202116236U (en) * 2011-06-20 2012-01-18 王锁林 Self-return hydraulic lifting jack
CN202250582U (en) * 2011-08-04 2012-05-30 中国水电顾问集团西北勘测设计研究院 Regulating and controlling device of leakage-stopping sealed gap of high-head radial-axial flow turbine runner
CN204371545U (en) * 2014-12-15 2015-06-03 国家电网公司 A kind of power station impeller apparatus for examination and repair

Also Published As

Publication number Publication date
CN105525598A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN105525598B (en) Repair method is torn open in large-scale pumped storage power unit
CN103510529B (en) Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof
CN103114604B (en) Prestressed concrete tubular type wind generating set foundation
CN205329648U (en) Open and inspect among large -scale pumped storage unit and repair with dismantling structure
CN107386244A (en) A kind of truss-like hydraulic bolt lowering or hoisting gear
CN213771194U (en) Synchronous lifting device for top cover of water pump turbine
CN211691444U (en) Wind power generator tower template
CN102661249A (en) Automatic lifting rod of small wind driven generator
CN211141282U (en) Steel reinforcement cage installation hoist device
CN101580214A (en) Hydraulic lifting method for large-scale equipment
CN204802884U (en) Storage tank flip -chip balanced hoisting device
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN103084825A (en) Jacking method for keeping position of gravity center of upper structural component of material machine unchanged
CN203788069U (en) Hydro generator stator base plate structure
CN216241100U (en) But reuse's offshore anemometer tower system of rising certainly
CN101257238A (en) Method for electric motor with stationary rotor to on site penetrate rotor
CN201405835Y (en) Inverse regulating device for starting gear shifting box of diesel locomotive
CN106481967B (en) A kind of installation method of rubber diaphragm gas chamber
CN102296959A (en) Electric walking shaft formwork supporting system
CN101318617A (en) Hydraulic hoisting hanging apparatus with steering and horizontally moving functions
CN210071826U (en) Slump tester
CN102409120A (en) Method for replacing bottom of blast furnace
CN203782734U (en) Precast concrete bearing platform with reserved foundation ring hole and pile socket ring hole
CN208716716U (en) Wind-power electricity generation installs loop wheel machine
CN206611308U (en) A kind of type vertical water pump rotor hoisting tool specials of HYL630 8

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant