CN105511409A - Substation automatic control and operation method - Google Patents
Substation automatic control and operation method Download PDFInfo
- Publication number
- CN105511409A CN105511409A CN201410485768.2A CN201410485768A CN105511409A CN 105511409 A CN105511409 A CN 105511409A CN 201410485768 A CN201410485768 A CN 201410485768A CN 105511409 A CN105511409 A CN 105511409A
- Authority
- CN
- China
- Prior art keywords
- ticket
- intelligent
- client
- equipment
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The invention discloses a substation automatic system control and operation method. Operation tickets are operated intelligently through a computer instead of being operated manually, and equipment is controlled and operated intelligently. Various substation operations are pre-edited into intelligent operation tickets, which are downloaded to an execution server, wherein the operation tickets of pure intra-internal operations are downloaded to interlayer intelligent equipment, and the operation tickets of cross-interval operations are downloaded to a special intelligent operation server. When the substation is running, if the operations are needed, execution commands are sent to the execution server through a background monitoring interface or a scheduling terminal in a remote control mode, and the execution server automatically finishes a series of switching operations. According to the substation automatic system control and operation method of the invention, operation tickets are operated intelligently through a computer instead of being operated manually. Therefore, the operation efficiency is improved, wrong operation caused by man-made reasons is reduced or eliminated, and the level of safe operation of the substation is improved.
Description
Technical field
The present invention relates to intelligent power grid technology field, relate in particular to a kind of electric substation automation system and control and method of operating.
Background technology
Along with popularizing of electric substation automation system application; increasing transformer station achieves unattended; but for electric operation; still traditional Substation Operating pattern is generally adopted to operate: first according to operation requirements and working specification compilation operation ticket; then operated according to the execution requirements of operation order and order by operating personnel; and manually check accordingly, operating efficiency is lower, and the impact that the execution of operation order is subject to human factor is larger; And need operating personnel to arrive in substation field enforcement from Surveillance center, consume a large amount of manpowers and time, make the advantage of unattended substation increasing efficiency by downsizing staff be difficult to play; On the other hand, how many manual operations also exists the possibility of maloperation, although formulated a series of safety regulation for operations to prevent the generation of maloperation, in fact still there will be the generation that the maloperation caused due to a variety of causes causes great personnel casualty accidents.Therefore be necessary to take effective measure technically, improve operating efficiency, reduce or stop, because the maloperation that causes of artificial origin, to improve the safety operation level of transformer station.
Summary of the invention
The object of the present invention is to provide a kind of electric substation automation system to control and method of operating, the manual operation of operation order is changed and is realized by Computerized intelligent.Improve operating efficiency, reduce or stop, because the maloperation that causes of artificial origin, to improve the safety operation level of transformer station.
For achieving the above object, present invention employs following technical scheme:
A kind of electric substation automation system controls and method of operating, comprises the steps:
A), according to the operation conditions of equipment, the running status of equipment is set as run mode, stand-by heat state, cold standby state, maintenance state, the equipment state of equipment state configuration instrument to each interval is utilized to edit, form intellectualized operation ticket, described intellectualized operation ticket is divided into an intelligent ticket and intelligent secondary ticket; An intelligent ticket is realize spacing devices from a kind of equipment state to the transformation of another kind of equipment state, and form an intelligent ticket by the operation task arranged in order, each operation task is defined as its executive condition and confirmation condition respectively; Intelligent secondary ticket be the relevant soft pressing plate of secondary device is taken out move back, the operative combination of definite value group switching, form intelligent secondary ticket by a series of operation task arranged in order, each operation task is defined as its executive condition and confirmation condition respectively;
Wherein intellectualized operation ticket is divided into an intelligent ticket and intelligent secondary ticket; An intelligent ticket, for realizing spacing devices from a kind of equipment state to the transformation of another kind of equipment state, forms the operation task of a series of arranged in sequence the form of ticket; The operations such as intelligent secondary ticket moves back for realizing throwing the relevant soft pressing plate of secondary device, the switching of definite value group, the form of the secondary operation task of a series of arranged in sequence composition ticket.
B), utilize intellectualized operation ticket emulation tool to emulate opened Intelligent switching order, simulation result batch downloads to execution server;
C) run mode, stand-by heat state, cold standby state, the maintenance state of each equipment, is collected by various sensor, client issues intellectualized operation order by remote control mode to actuator, performs server and can confirm on the particular content of this operation to client;
D), client issues fill order, performs server and presses the content of operation order successively voluntarily;
E), perform server before operating, carry out executive condition inspection, if straighforward operation also needs to carry out interlocking inspection, check successfully, then carry out this step operation, if failure, then stop the operation of this execution ticket, or information upload user side, after confirming, stop this operation;
F), perform server completing and often walk after task operating, carry out the inspection of confirmation condition, check successfully, then in client, send successful information, and proceed next step operation, if check unsuccessfully, then in client, send operation failure information, and point out failure cause;
G), perform server when performing if any pausing operation action, then go up carry information to client, confirm prompting or check through client, client confirms errorless, then actuating unit continues to perform remaining operation, and confirm wrong, client can select terminating operation;
H) when, all tasks complete, differentiate whether corresponding interval has been in object equipment running status for once performing the capable server of ticket stubs, if, then in client, send programming operations successful information, if failure, failure information is sent in side, ticket is performed for secondary, send directly and perform ticket successful information.
Compared with prior art, beneficial effect of the present invention is: electric substation automation system of the present invention controls and method of operating, the manual operation of operation order is changed and is realized by Computerized intelligent.Improve operating efficiency, reduce or stop, because the maloperation that causes of artificial origin, to improve the safety operation level of transformer station.
Accompanying drawing explanation
Fig. 1 is equipment state transition diagram of the present invention.
Fig. 2 is the executive routine figure that will invent.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As illustrated in fig. 1 and 2, electric substation automation system of the present invention controls and method of operating, and step is as follows:
A), according to the operation conditions of equipment, the running status of equipment is set as run mode, stand-by heat state, cold standby state, maintenance state, the equipment state of equipment state configuration instrument to each interval is utilized to edit, form intellectualized operation ticket, described intellectualized operation ticket is divided into an intelligent ticket and intelligent secondary ticket; An intelligent ticket is realize spacing devices from a kind of equipment state to the transformation of another kind of equipment state, and form an intelligent ticket by the operation task arranged in order, each operation task is defined as its executive condition and confirmation condition respectively; Intelligent secondary ticket be the relevant soft pressing plate of secondary device is taken out move back, the operative combination of definite value group switching, form intelligent secondary ticket by a series of operation task arranged in order, each operation task is defined as its executive condition and confirmation condition respectively;
Wherein intellectualized operation ticket is divided into an intelligent ticket and intelligent secondary ticket.An intelligent ticket, for realizing spacing devices from a kind of equipment state to the transformation of another kind of equipment state, forms the operation task of a series of arranged in sequence the form of ticket; The operations such as intelligent secondary ticket moves back for realizing throwing the relevant soft pressing plate of secondary device, the switching of definite value group, the form of the secondary operation task of a series of arranged in sequence composition ticket.
B), utilize intellectualized operation ticket emulation tool to emulate opened Intelligent switching order, simulation result batch downloads to execution server;
C) run mode, stand-by heat state, cold standby state, the maintenance state of each equipment, is collected by various sensor, client issues intellectualized operation order by remote control mode to actuator, performs server and can confirm on the particular content of this operation to client;
D), client issues fill order, performs server and presses the content of operation order successively voluntarily;
E), perform server before operating, carry out executive condition inspection, if straighforward operation also needs to carry out interlocking inspection, check successfully, then carry out this step operation, if failure, then stop the operation of this execution ticket, or information upload user side, after confirming, stop this operation;
F), perform server completing and often walk after task operating, carry out the inspection of confirmation condition, check successfully, then in client, send successful information, and proceed next step operation, if check unsuccessfully, then in client, send operation failure information, and point out failure cause;
G), perform server when performing if any pausing operation action, then go up carry information to client, confirm prompting or check through client, client confirms errorless, then actuating unit continues to perform remaining operation, and confirm wrong, client can select terminating operation;
H) when, all tasks complete, differentiate whether corresponding interval has been in object equipment running status for once performing the capable server of ticket stubs, if, then in client, send programming operations successful information, if failure, failure information is sent in side, ticket is performed for secondary, send directly and perform ticket successful information.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (1)
1. electric substation automation system controls and a method of operating, it is characterized in that: comprise the steps:
A), according to the operation conditions of equipment, the running status of equipment is set as run mode, stand-by heat state, cold standby state, maintenance state, the equipment state of equipment state configuration instrument to each interval is utilized to edit, form intellectualized operation ticket, described intellectualized operation ticket is divided into an intelligent ticket and intelligent secondary ticket; An intelligent ticket is realize spacing devices from a kind of equipment state to the transformation of another kind of equipment state, and form an intelligent ticket by the operation task arranged in order, each operation task is defined as its executive condition and confirmation condition respectively; Intelligent secondary ticket be the relevant soft pressing plate of secondary device is taken out move back, the operative combination of definite value group switching, form intelligent secondary ticket by a series of operation task arranged in order, each operation task is defined as its executive condition and confirmation condition respectively;
Wherein intellectualized operation ticket is divided into an intelligent ticket and intelligent secondary ticket; An intelligent ticket, for realizing spacing devices from a kind of equipment state to the transformation of another kind of equipment state, forms the operation task of a series of arranged in sequence the form of ticket; The operations such as intelligent secondary ticket moves back for realizing throwing the relevant soft pressing plate of secondary device, the switching of definite value group, the form of the secondary operation task of a series of arranged in sequence composition ticket;
B), utilize intellectualized operation ticket emulation tool to emulate opened Intelligent switching order, simulation result batch downloads to execution server;
C) run mode, stand-by heat state, cold standby state, the maintenance state of each equipment, is collected by various sensor, client issues intellectualized operation order by remote control mode to actuator, performs server and can confirm on the particular content of this operation to client;
D), client issues fill order, performs server and presses the content of operation order successively voluntarily;
E), perform server before operating, carry out executive condition inspection, if straighforward operation also needs to carry out interlocking inspection, check successfully, then carry out this step operation, if failure, then stop the operation of this execution ticket, or information upload user side, after confirming, stop this operation;
F), perform server completing and often walk after task operating, carry out the inspection of confirmation condition, check successfully, then in client, send successful information, and proceed next step operation, if check unsuccessfully, then in client, send operation failure information, and point out failure cause;
G), perform server when performing if any pausing operation action, then go up carry information to client, confirm prompting or check through client, client confirms errorless, then actuating unit continues to perform remaining operation, and confirm wrong, client can select terminating operation;
H) when, all tasks complete, differentiate whether corresponding interval has been in object equipment running status for once performing the capable server of ticket stubs, if, then in client, send programming operations successful information, if failure, failure information is sent in side, ticket is performed for secondary, send directly and perform ticket successful information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410485768.2A CN105511409A (en) | 2014-09-23 | 2014-09-23 | Substation automatic control and operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410485768.2A CN105511409A (en) | 2014-09-23 | 2014-09-23 | Substation automatic control and operation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105511409A true CN105511409A (en) | 2016-04-20 |
Family
ID=55719475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410485768.2A Pending CN105511409A (en) | 2014-09-23 | 2014-09-23 | Substation automatic control and operation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105511409A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109213125A (en) * | 2018-09-05 | 2019-01-15 | 长园共创电力安全技术股份有限公司 | A kind of control method of operation task, device and equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201242684Y (en) * | 2008-07-04 | 2009-05-20 | 珠海优特电力科技股份有限公司 | Electronic operational ticket hand-held set |
CN101594004A (en) * | 2009-06-29 | 2009-12-02 | 江苏金智科技股份有限公司 | The intelligence control method of electric substation automation system |
CN101776910A (en) * | 2010-01-19 | 2010-07-14 | 华北电网有限公司 | Integrated five-prevention operation ticket system-based substation programmed control system |
CN102222982A (en) * | 2011-06-22 | 2011-10-19 | 南京信息工程大学 | Method and device for realizing programmed operation of transformer station based on SVG (Scalable Vector Graphics) technology |
-
2014
- 2014-09-23 CN CN201410485768.2A patent/CN105511409A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201242684Y (en) * | 2008-07-04 | 2009-05-20 | 珠海优特电力科技股份有限公司 | Electronic operational ticket hand-held set |
CN101594004A (en) * | 2009-06-29 | 2009-12-02 | 江苏金智科技股份有限公司 | The intelligence control method of electric substation automation system |
CN101776910A (en) * | 2010-01-19 | 2010-07-14 | 华北电网有限公司 | Integrated five-prevention operation ticket system-based substation programmed control system |
CN102222982A (en) * | 2011-06-22 | 2011-10-19 | 南京信息工程大学 | Method and device for realizing programmed operation of transformer station based on SVG (Scalable Vector Graphics) technology |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109213125A (en) * | 2018-09-05 | 2019-01-15 | 长园共创电力安全技术股份有限公司 | A kind of control method of operation task, device and equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101594004A (en) | The intelligence control method of electric substation automation system | |
CN105302121A (en) | Sequential control operation order automatic anti-error check method based on simulation IED device | |
CN102447305B (en) | Topological anti-misoperation system for power grid | |
CN112366823B (en) | Distribution network power cut and supply automatic regulation and control system and method | |
CN202524167U (en) | A state detection and intelligent control device for high-voltage circuit breaker | |
CN103364663A (en) | Intelligent device for simulating transformer substation primary equipment behavior | |
CN202616876U (en) | Substation visualization system based on operating perceiving | |
CN104407577A (en) | Intelligent check anti-maloperation method based on real-time trend | |
CN103995916A (en) | SF6 gas online monitoring device communication simulation method based on IEC61850 | |
CN103793370A (en) | Automatic intelligent substation information sheet generating system | |
CN105281429A (en) | Method for preventing maloperation in scheduling remote control | |
CN103995924A (en) | Switch online monitoring equipment communication simulating device based on IEC61850 and method thereof | |
CN105511409A (en) | Substation automatic control and operation method | |
CN103795084A (en) | Microgrid one-button smooth switching control method from grid connection to off-grid mode | |
CN103647349B (en) | A kind of intelligent control method of Masterstation Automation System | |
CN109768619B (en) | Automatic debugging system and debugging method for monitoring information | |
CN104135067B (en) | Transformer station remotely operates on-the-spot suggestion device | |
CN102664455A (en) | Remote control method for remotely-controlled reclosing switching | |
CN104539045A (en) | Intelligent fault-analysis-prevention system and working method thereof | |
CN103105843B (en) | A kind of anti-error check module for supervisory system | |
CN114254774A (en) | One-key sequential control-based automatic issuing system for maintenance order associated operation order | |
CN107944570A (en) | The automatic processing method and device of intelligent substation sequential control atypical state | |
CN104319889B (en) | A kind of with neutral point isolation switch operation realization protection automatic switching method | |
CN105024295B (en) | Intelligent substation based on topological analysis is listed method | |
CN201540590U (en) | B/S framework networking electronic analog chart board system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160420 |