CN103995924A - IEC 61850-based communication simulation device and method for on-line switch monitoring equipment - Google Patents
IEC 61850-based communication simulation device and method for on-line switch monitoring equipment Download PDFInfo
- Publication number
- CN103995924A CN103995924A CN201410185601.4A CN201410185601A CN103995924A CN 103995924 A CN103995924 A CN 103995924A CN 201410185601 A CN201410185601 A CN 201410185601A CN 103995924 A CN103995924 A CN 103995924A
- Authority
- CN
- China
- Prior art keywords
- iec61850
- line monitoring
- switch
- alarm
- intelligent electronic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 23
- 238000004891 communication Methods 0.000 title claims abstract description 14
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000004088 simulation Methods 0.000 title claims abstract description 8
- 230000011664 signaling Effects 0.000 claims abstract description 12
- 239000007787 solid Substances 0.000 claims abstract description 8
- 238000012806 monitoring device Methods 0.000 claims description 11
- 238000005259 measurement Methods 0.000 claims description 7
- 230000005540 biological transmission Effects 0.000 abstract 1
- 238000011156 evaluation Methods 0.000 abstract 1
- 230000003862 health status Effects 0.000 description 4
- 230000007257 malfunction Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000006399 behavior Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention provides a switch on-line monitoring equipment communication simulation device and method based on IEC61850, comprising an embedded processor, a power supply, an SSD solid state memory, a network card and a panel indicator light, wherein the device is started by the following steps: IEC61850/MMS communication service is started in a simulation mode; (2) inquiring the values of analog quantities analyzed by the intelligent electronic equipment for on-line monitoring of the switch to be simulated, which are pre-stored in an SSD solid state memory, generating an alarm rule by using a pre-configured telemetering threshold-crossing, and automatically calculating a corresponding alarm telecommand state; (3) driving a panel indicator light to flash and indicating the data transmission; (4) sending each analog quantity and a remote alarm signaling state in an IEC61850 report form through a network card; (5) and (3) waiting for the next data sending time, and repeating the step (2), so that the method gets rid of the dependence on actual online monitoring of the intelligent electronic equipment when advanced applications such as evaluation of the health state of primary equipment of the intelligent substation are debugged, and simultaneously simplifies the complexity of debugging work before the advanced applications are put into operation.
Description
Technical field
The present invention relates to a kind of switch on-line monitoring devices communicating simulator based on IEC61850, belong to international standard " substation communication network and system " manufacture message specification (MMS) (IEC61850) in the field of the application of power system transformer substation automated system, refer to especially a kind of simulator of on-line monitoring.
Background technology
IEC61850 standard is TC57 working group of International Electrotechnical Commission for " substation communication network and the system " series standard that solves the up-to-date appointment of interoperability new problem that electric substation automation system faces.This standard obtains the support of domestic and international most of main flow producer, become the whole world in automation of transformation substations field unique unified standard, therefore in the communication of on-line monitoring switch intelligent electronic device, also obtain applying more and more widely.
Along with the promotion and application at intelligent substation based on IEC61850 standard primary equipment on-line monitoring, as the senior application of intelligence of intelligent substation important feature if the functions such as primary equipment health status assessment are also in pilot application progressively.Even but utilize actual on-line monitoring intelligent electronic device, and being also difficult to the fault of primary equipment to simulate, and being generally difficult to possess this condition in laboratory, this has caused very large difficulty for the problem of following the tracks of and find senior application.Another kind method is to use the emulation of general purpose I EC61850/MMS service end, manually generation remote measurement, remote signalling amount are simulated the communication behavior of on-line monitoring intelligent electronic device, but between each analog data that on-line monitoring intelligent electronic device sends, analog quantity and remote signalling amount data are to have its inherent logical relation, this logical relation is simulated the key point of primary equipment fault just, and the emulation of general purpose I EC61850/MMS service end is difficult to meet corresponding requirement.Therefore how to carry out simply efficiently the simulation of on-line monitoring intelligent electronic device communication simulation, relevant senior application is developed to debugging, and on engineering test platform, verify it is a problem demanding prompt solution.
Summary of the invention
Object: in order to overcome the deficiencies in the prior art, the invention provides a kind of switch on-line monitoring devices communicating simulator and method based on IEC61850, can use the embedded equipment of framework as shown in Figure 1 to set up switch on-line monitoring intelligent electronic device analogue system, be used for replacing actual on-line monitoring intelligent electronic device etc., produce the online monitoring data of the malfunction of primary equipment, carry out convenient, flexible debugging and verification with senior application such as the primary equipment health status assessments to automatic system of intelligent transformer station.
Technical scheme: for solving the problems of the technologies described above, the technical solution used in the present invention is:
A switch on-line monitoring devices communicating simulator based on IEC61850, comprises the frameworks such as flush bonding processor, power supply, SSD solid memory, network interface card and panel leds as shown in Figure 1.
According to the method for a kind of switch on-line monitoring devices communicating simulator based on IEC61850 of technique scheme, it is characterized in that: device starts operation and adopts following steps:
Step (1): emulation starts IEC61850/MMS communication service;
Step (2): inquiry is stored in the value for the treatment of each analog quantity that Artificial switch on-line monitoring intelligent electronic device once analyzes of SSD solid memory in advance; And use the out-of-limit generation alarm regulation of pre-configured remote measurement, automatically calculate corresponding alarm remote signalling state;
Step (3): drive the flickers such as panel instruction, indicate this secondary data to send;
Step (4): send each analog quantity and alarm remote signalling state with IEC61850 report form by network interface card;
Step (5): wait for lower secondary data delivery time, repeating step (2).
Described step (3) specifically refers to: in the time sending remote measurement and remote signalling report, drive panel leds flicker, indicate this secondary data to send, in order to observation communication simulation device operating condition.
Beneficial effect: a kind of switch on-line monitoring devices communicating simulator and operation method based on IEC61850 provided by the invention, can be used for replacing actual on-line monitoring intelligent electronic device etc., produce the online monitoring data of the malfunction of primary equipment, the complexity of debugging work before these senior application put into operation has been simplified in dependence to actual on-line monitoring intelligent electronic device when having broken away from intelligent substation primary equipment health status and the senior application debugging such as commenting simultaneously.
Brief description of the drawings
Fig. 1 is the configuration diagram of simulator of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further described.
As shown in Figure 1, a kind of switch on-line monitoring devices communicating simulator based on IEC61850, comprise the frameworks such as flush bonding processor, power supply, SSD solid memory, network interface card and panel leds, it starts operation following steps: step (1): emulation starts IEC61850/MMS communication service; Step (2): inquiry is stored in the value for the treatment of each analog quantity that Artificial switch on-line monitoring intelligent electronic device once analyzes of SSD solid memory in advance; And use the out-of-limit generation alarm regulation of pre-configured remote measurement, automatically calculate corresponding alarm remote signalling state; Step (3): drive the flickers such as panel instruction, indicate this data sending step (4): send each analog quantity and alarm remote signalling state by network interface card with IEC61850 report form; Step (5): wait for lower secondary data delivery time, repeating step (2).
Described step (3) specifically refers to: in the time sending remote measurement and remote signalling report, drive the flickers such as panel instruction, indicate this secondary data to send, in order to observation communication simulation device operation work.
A kind of switch on-line monitoring devices communicating simulator based on IEC61850 provided by the invention, can be used for replacing actual on-line monitoring intelligent electronic device etc., produce the online monitoring data of the malfunction of primary equipment, the complexity of debugging work before these senior application put into operation has been simplified in dependence to actual on-line monitoring intelligent electronic device when having broken away from intelligent substation primary equipment health status and the senior application debugging such as commenting simultaneously.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; not departing under the prerequisite of principle of the present invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.
Claims (3)
1. the switch on-line monitoring devices communicating simulator based on IEC61850, is characterized in that comprising flush bonding processor and distinguishes the frameworks such as coupled power supply, SSD solid memory, network interface card and panel leds.
2. the method for the switch on-line monitoring devices communicating simulator based on IEC61850 according to claim 1, is characterized in that: device starts operation and adopts following steps:
Step (1): emulation starts IEC61850/MMS communication service;
Step (2): inquiry is stored in the value for the treatment of each analog quantity that Artificial switch on-line monitoring intelligent electronic device once analyzes of SSD solid memory in advance, and uses the out-of-limit generation alarm regulation of pre-configured remote measurement, automatically calculates corresponding alarm remote signalling state;
Step (3): drive the flickers such as panel instruction, indicate this secondary data to send;
Step (4): send each analog quantity and alarm remote signalling state with IEC61850 report form by network interface card;
Step (5): wait for lower secondary data delivery time, repeating step (2).
3. the method for the switch on-line monitoring devices communicating simulator based on IEC61850 according to claim 2, it is characterized in that: described step (3) specifically refers to: in the time sending remote measurement and remote signalling report, drive the flickers such as panel instruction, indicate this secondary data to send, in order to observation communication simulation device operating condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410185601.4A CN103995924A (en) | 2014-05-05 | 2014-05-05 | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410185601.4A CN103995924A (en) | 2014-05-05 | 2014-05-05 | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103995924A true CN103995924A (en) | 2014-08-20 |
Family
ID=51310089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410185601.4A Pending CN103995924A (en) | 2014-05-05 | 2014-05-05 | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103995924A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015149594A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for partial discharge on-line monitoring device |
WO2015149592A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for lightning arrester on-line monitoring device |
WO2015149596A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for leakage current on-line monitoring device |
WO2015149595A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for insulation on-line monitoring device |
WO2015149593A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for transformer grounding on-line monitoring device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101478146A (en) * | 2008-10-13 | 2009-07-08 | 清华大学 | Digital transforming plant protecting controlling method and multifunctional protection controller |
US20110090606A1 (en) * | 2009-10-19 | 2011-04-21 | Vanessa Ramirez | Countermeasure for EMP-E3 induced currents |
CN102929757A (en) * | 2012-11-09 | 2013-02-13 | 南京国电南自电网自动化有限公司 | IEC61850/MMS communication simulation method of protection action event when fault occurs in power system |
CN203086238U (en) * | 2012-11-23 | 2013-07-24 | 中国西电电气股份有限公司 | Intelligent high-voltage switch control signal conversion equipment |
-
2014
- 2014-05-05 CN CN201410185601.4A patent/CN103995924A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101478146A (en) * | 2008-10-13 | 2009-07-08 | 清华大学 | Digital transforming plant protecting controlling method and multifunctional protection controller |
US20110090606A1 (en) * | 2009-10-19 | 2011-04-21 | Vanessa Ramirez | Countermeasure for EMP-E3 induced currents |
CN102929757A (en) * | 2012-11-09 | 2013-02-13 | 南京国电南自电网自动化有限公司 | IEC61850/MMS communication simulation method of protection action event when fault occurs in power system |
CN203086238U (en) * | 2012-11-23 | 2013-07-24 | 中国西电电气股份有限公司 | Intelligent high-voltage switch control signal conversion equipment |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015149594A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for partial discharge on-line monitoring device |
WO2015149592A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for lightning arrester on-line monitoring device |
WO2015149596A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for leakage current on-line monitoring device |
WO2015149595A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for insulation on-line monitoring device |
WO2015149593A1 (en) * | 2014-04-04 | 2015-10-08 | 袁志贤 | Iec61850-based communication simulation method for transformer grounding on-line monitoring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103955563A (en) | IEC 61850-based communication simulation method for transformer grounding on-line monitoring equipment | |
CN103051065B (en) | The distributed FA interlock method of testing of a kind of power distribution automation and system | |
CN103984795A (en) | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method | |
CN103995924A (en) | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment | |
CN104569688A (en) | Automatic testing system and method for power distribution terminal | |
CN103955564A (en) | IEC 61850-based leakage current on-line monitoring equipment communication simulation method | |
WO2015149595A1 (en) | Iec61850-based communication simulation method for insulation on-line monitoring device | |
CN103902768A (en) | Communication simulation method for oil chromatography on-line monitoring equipment | |
CN103955561A (en) | IEC 61850-based lightning arrester on-line monitoring equipment communication simulation method | |
CN103746882A (en) | Test method for intelligent substation station-control layer | |
CN103995916A (en) | IEC 61850-based SF6Communication simulation method for gas online monitoring equipment | |
CN204291050U (en) | A kind of dispatching and monitoring information check system | |
KR20130019228A (en) | Apparatus and method for automating digital substation | |
CN103837785A (en) | Feeder automation detection and simulation system | |
CN102323502A (en) | The line closed loop test macro and the method for testing thereof that are used for relay protection | |
CN105049282A (en) | Intelligent relay protection device control overhauling method based on on-line monitoring information | |
CN106909615B (en) | Method and device for verifying data information consistency between master station and substation | |
CN103793370A (en) | Automatic intelligent substation information sheet generating system | |
CN103676669A (en) | Method and system for checking motion information | |
CN106094574A (en) | Fault simulation equipment | |
CN104363121A (en) | GOOSE communication simulation and fault diagnosis method for station level of intelligent substation | |
CN105337805A (en) | Portable telecommand and telemetering checking device and system for intelligent substation | |
CN104091480A (en) | Transmission line condition-based maintenance simulation training method | |
CN203951261U (en) | switchyard fault simulator | |
CN202393811U (en) | On-line monitoring apparatus for lightning arrester for protecting series compensation capacitor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140820 |
|
RJ01 | Rejection of invention patent application after publication |