CN107944570A - The automatic processing method and device of intelligent substation sequential control atypical state - Google Patents

The automatic processing method and device of intelligent substation sequential control atypical state Download PDF

Info

Publication number
CN107944570A
CN107944570A CN201711023650.8A CN201711023650A CN107944570A CN 107944570 A CN107944570 A CN 107944570A CN 201711023650 A CN201711023650 A CN 201711023650A CN 107944570 A CN107944570 A CN 107944570A
Authority
CN
China
Prior art keywords
state
interval
intelligent substation
atypical
typicalness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711023650.8A
Other languages
Chinese (zh)
Other versions
CN107944570B (en
Inventor
张海庭
李宝潭
吴正青
邱俊宏
李江林
郭利军
卫星
过锐
吴佳
李永照
陈哲
包芳
王卫东
朱斌斌
张思远
赵丹
刘登鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuji Group Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuji Group Co Ltd, XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711023650.8A priority Critical patent/CN107944570B/en
Publication of CN107944570A publication Critical patent/CN107944570A/en
Application granted granted Critical
Publication of CN107944570B publication Critical patent/CN107944570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of automatic processing method and device of intelligent substation sequential control atypical state, first determines whether each interval is in typicalness;When there is interval to be in atypical state, a typicalness is selected from the typicalness at the interval as end-state;Then the operation order using end-state as dbjective state is selected, then is selected from each operation order with the interval current state to corresponding operating procedure, finally and controls the interval to perform corresponding operation order since the operating procedure.Technical solution provided by the present invention, when spaced equipment is in atypical state in intelligent substation, select corresponding operation order and since the operation order with being performed the corresponding step of the space state, it is corresponding typicalness by the condition conversion at interval, sequential control can be continued to execute according to prefabricated sequence control program, so as to reduce the workload and control difficulty of sequential control.

Description

The automatic processing method and device of intelligent substation sequential control atypical state
Technical field
The invention belongs to intelligent substation sequential control technology field, and in particular to a kind of intelligent substation sequential control is non- The automatic processing method and device of typicalness.
Background technology
With the continuous development of intelligent power grid technology, intelligent substation technology is used widely in China. To carry out Guo Wang companies all-round construction " big operation " system job requirement, 220kV and following substation need to realize nothing People is on duty, and this requires gradually changed by the one-touch pattern being automatically brought into operation by the pattern for manually implementing operation to equipment in the past.Closely With the development of power grid primary equipment, secondary device, automatic technology, and intelligent substation and comprehensive automation over year Transformation, transformer substation sequence control operation have been increasingly becoming each intelligent substation necessary functions.
Sequential control is an advanced control model of intelligent substation, refers to intelligent substation complex automatic system root According to pre-defined equipment state and control logic, using prefabricated order operation order and operating procedure, by relevant device by both Fixed order is by current state to being switched to dbjective state.Substation is usually by equipment in monospace and across interval busbar or transformer The metastable method of operation of equipment is defined as typicalness such as operating status, hot stand-by duty, the cold standby of spacing devices State and inspecting state etc., the operating status for realizing distinct device by the equipment operation of permanent order switches, and sequential control It is then the automation means of mode of operation switching.Therefore, whole station can conveniently and efficiently be carried out using sequential control operation maintenance personnel The equipment method of operation is switched fast.One kind as disclosed in the patent that application publication number is CN104360835A is based on topology side The sequence operation ticket automatic generation method of formula, is exactly a kind of method of sequential control.
However, station equipment may be abnormal (the total generation of such as accident, equipment to sequential control task in operation Remote control is unsuccessfully etc.), for the needs of safe operation, sequential control when finding to have anomalous event generation in sequential control implementation process Operation will be terminated and exited automatically, and operation maintenance personnel needs that sequential control behaviour can be carried out after the completion of anomalous event is solved again Make, and the equipment method of operation terminated temporarily is usually not belonging to any type typicalness, therefore normal sequence control can not be passed through Typical mission operation processed arrives again at predeterminated target state, it is necessary to by manual operation.
But manual operation be need by manual analysis operation equipment with order, temporarily make out an invoice, operation order is checked, manually The operating processes such as straighforward operation, operating result verification, will so add the difficulty of sequential control on one side, on the other hand increase The workload of sequential control is added.
The content of the invention
The present invention provides a kind of automatic processing method and device of intelligent substation sequential control atypical state, for subtracting The workload of few sequential control.
To achieve the above object, technical solution provided by the invention is:
A kind of automatic processing method of intelligent substation sequential control atypical state, includes the following steps:
When the operating status for there are spacing devices in intelligent substation is mismatched with all typicalnesses in the interval, sentence Break and be in atypical state for the interval;
When there is interval to be in atypical state, a typicalness is selected from the typicalness at the interval, is made For end-state;
When some interval is in atypical state, listed from the typicalness at the interval in all preset typicalnesses The typicalness that inconsistent condition is minimum compared with the interval current state is selected, establishes immediate interval typicalness row Table, selects a typicalness, as end-state from the interval exemplary list;
All operation orders using end-state as dbjective state are selected, are selected from each operation order current with the interval State controls the interval to perform the operation order where the operating procedure since the operating procedure to corresponding operating procedure, Until the current state at the interval is the end-state.
Technical solution provided by the present invention, when spaced equipment is in atypical state in intelligent substation, choosing Corresponding operation order is selected out, and with being performed the corresponding step of the space state since the operation order, by the state at interval Corresponding typicalness is converted into, sequential control can be continued to execute according to prefabricated sequence control program, so as to reduce suitable The workload and control difficulty of sequence control.
Further, the typicalness at interval includes the equipment running status, hot stand-by duty, cold standby state at the interval And inspecting state.
Further, if the current state at interval is not correspond to all operations step in the operation order selected, Then send corresponding prompt message.
If the current state at interval is not correspond to all operations step in the operation order selected, illustrating cannot It is enough that the real-time status at the interval is converted into typicalness, so needing to send corresponding prompt message.
Further, after the current state at interval is the end-state, continued to execute since end-state between this Every sequence control program.
After the real-time running state of spacing devices is converted into end-state, since end-state is typicalness, so Sequential control can be performed normally, since the sequential control between target typicalness has performed completion, so only needing mesh Mark typicalness starts the operation order execution sequence control according to the spacing devices.
A kind of automatic processing device of intelligent substation sequential control atypical state, including controller, controller are used for:
When the operating status for there are spacing devices in intelligent substation is mismatched with all typicalnesses in the interval, sentence Break and be in atypical state for the interval;
When there is interval to be in atypical state, a typicalness is selected from the typicalness at the interval, is made For end-state;
All operation orders using end-state as dbjective state are selected, are selected from each operation order current with the interval State controls the interval to perform the operation order where the operating procedure since the operating procedure to corresponding operating procedure, Until the current state at the interval is the end-state.
Further, the typicalness at interval includes the equipment running status, hot stand-by duty, cold standby state at the interval And inspecting state.
Further, if the current state at interval is not correspond to all operations step in the operation order selected, Then send corresponding prompt message.
Further, after the current state at interval is the end-state, continued to execute since end-state between this Every sequence control program.
Brief description of the drawings
Fig. 1 is the cyberrelationship figure of equipment in intelligent substation in embodiment of the method;
Fig. 2 is the flow chart of the automatic processing method of sequential control atypical state in embodiment of the method;
Fig. 3 is the schematic diagram of the first bus run state in embodiment of the method;
Fig. 4 is the schematic diagram of atypical state in embodiment of the method.
Embodiment
The present invention provides a kind of automatic processing method and device of intelligent substation sequential control atypical state, for subtracting The workload of few sequential control.
To achieve the above object, technical solution provided by the invention is:
A kind of automatic processing method of intelligent substation sequential control atypical state, includes the following steps:
When the operating status for there are spacing devices in intelligent substation is mismatched with all typicalnesses in the interval, sentence Break and be in atypical state for the interval;
When there is interval to be in atypical state, a typicalness is selected from the typicalness at the interval, is made For end-state;
All operation orders using end-state as dbjective state are selected, are selected from each operation order current with the interval State controls the interval to perform the operation order where the operating procedure since the operating procedure to corresponding operating procedure, Until the current state at the interval is the end-state.
Technical scheme is described further with reference to specific embodiment.
Embodiment of the method:
The present embodiment provides a kind of automatic processing method of intelligent substation sequential control atypical state, when intelligent power transformation When the current operating conditions of certain spacing devices of standing are typicalness, the sequence operation of equipment under the interval for typicalness Switching, operating procedure perform to the end successively from starting in order, realize in sequence control procedure each interval operating status from Dynamic switching;When the current operating conditions of intelligent substation spacing devices are atypical state, under the interval equipment it is suitable Sequence control carries out the switching between atypical state and typicalness, and the execution sequence control since transformed typicalness System, until all operations step is finally completed.
It is the present embodiment provides the automatic processing method of intelligent substation sequential control atypical state, intelligent substation is suitable Atypical state in control operation includes the operating process of sequential control, realizes atypical state freely cutting to typicalness Change.In intelligent substation station level sequential control block with the cyberrelationship of wall, process layer and primary equipment as shown in Figure 1, suitable The flow of the automatic processing method of sequence control atypical state is as shown in Fig. 2, comprise the following steps that:
Step 1:Judge respectively being spaced whether under atypical state for intelligent substation, mode is:Obtain intelligent substation In each spacing devices operating status, and the operating status at the interval is compared with the corresponding typicalness in each interval;Such as The spaced operating status of the fruit typicalness all with it is inconsistent, then is judged as that the equipment at the interval is in atypia shape Under state;
In the present embodiment, the operating status of the typicalness of each spacing devices including the spacing devices in intelligent substation, Hot stand-by duty, cold standby state and inspecting state;
Step 2:When spaced equipment is under atypical state in intelligent substation, then by the current of the spacing devices Operating status is converted into typicalness, and mode is:
A typicalness is selected, using the typicalness as end-state;
When some interval is in atypical state, listed from the typicalness at the interval in all preset typicalnesses The typicalness that inconsistent condition is minimum compared with the interval current state is selected, establishes immediate interval typicalness row Table, selects a typicalness, as end-state from the interval exemplary list;As the present interval mode of connection is Single busbar, breaker, bus bar side are dividing position every all earthing knife-switch in knife, interval, and position is being closed in line side every knife, may be selected at this time hot standby By the use of or cold standby be used as dbjective state;
All operation orders using the end-state as dbjective state are selected, are selected from operation order current with the interval The corresponding operating procedure of state, using the operating procedure as object run step, the operation order belonging to the operating procedure is made For object run ticket;If can not select corresponding operating procedure, corresponding prompt message is sent;
Correspondence between object run step and the interval current state, refers between being somebody's turn to do when target step starts to perform Every state be the interval current state;
Step 3:Interval performance objective operation order since object run step is controlled, until the current state at the interval For above-mentioned end-state;
Since the end-state at interval is the typicalness at interval, so when the current state at the interval is above-mentioned final During state, it is controlled according to normal sequence control program, untill completing sequential control.
Above-mentioned control method is illustrated by taking the double-bus line segregation of certain intelligent substation as an example, when this intelligently becomes Breaker in the double-bus line segregation in power station closes position, the first bus bar side isolation switch closes position, the second bus bar side isolation switch When position is closed in point position, line side isolation switch, all grounding switchs divide position, for the first bus run state at the interval, such as Fig. 3 institutes Show;When breaker point position, the first bus bar side isolation switch point position, the second bus bar side isolation switch divide position, line side isolation switch When point position, all grounding switchs divide position, for the first busbar cold standby state at the interval;The first bus run state at the interval Belong to the typicalness for the interval with the first busbar cold standby state;
In execution sequence control operation, if current breaker, line side isolation switch, the second bus bar side isolation switch, Grounding switch is dividing position, and the first bus bar side isolation switch is closing position, as shown in figure 4, the operating status of the spacing devices at this time It is all inconsistent with all typicalnesses of the spacing devices, belong to atypical state;
The first busbar cold standby state is selected as end-state, and is selected all using end-state as dbjective state Operation order;Through judging, the current state at the interval and " the first bus run state turns the first busbar cold standby state " operation order In one of operating procedure it is corresponding, so using the corresponding operating procedure as object run step, by " the first busbar Operating status turns the first busbar cold standby state " it is used as object run ticket;
Controlling the interval to perform operation order since object run step, " the first bus run state turns the first busbar cold standby With state ", current until the interval is " the first busbar cold standby state ";
Then execution sequence controls since " the first busbar cold standby state " at the interval, until sequential control is completed.
In the present embodiment, the typicalness at interval includes the operating status of the spacing devices, hot stand-by duty, cold standby shape State and inspecting state;As other embodiment, according to the device category and working condition at each interval, others can also be set State.
Device embodiment:
The present embodiment provides a kind of automatic processing device of intelligent substation sequential control atypical state, which includes Controller, the method that controller is used in embodiment according to the method described above carry out intelligent substation sequential control atypical state Processing.

Claims (8)

1. a kind of automatic processing method of intelligent substation sequential control atypical state, it is characterised in that include the following steps:
When the operating status for there are spacing devices in intelligent substation is mismatched with all typicalnesses in the interval, it is judged as The interval is in atypical state;
When there is interval to be in atypical state, a typicalness is selected from the typicalness at the interval, as most Whole state;
All operation orders using end-state as dbjective state are selected, are selected from each operation order and the interval current state To corresponding operating procedure, and the interval is controlled to perform the operation order belonging to the operating procedure since the operating procedure, until The current state at the interval is the end-state.
2. a kind of automatic processing method of intelligent substation sequential control atypical state according to claim 1, it is special Sign is that the typicalness at interval includes the equipment running status at the interval, hot stand-by duty, cold standby state and maintenance shape State.
3. a kind of automatic processing method of intelligent substation sequential control atypical state according to claim 1 or 2, its It is characterized in that, if the current state at interval is not correspond to all operations step in the operation order selected, sends phase The prompt message answered.
4. a kind of automatic processing method of intelligent substation sequential control atypical state according to claim 1 or 2, its It is characterized in that, after the current state at interval is the end-state, the order at the interval is continued to execute since end-state Control program.
5. a kind of automatic processing device of intelligent substation sequential control atypical state, it is characterised in that including controller, control Device processed is used for:
When the operating status for there are spacing devices in intelligent substation is mismatched with all typicalnesses in the interval, it is judged as The interval is in atypical state;
When there is interval to be in atypical state, a typicalness is selected from the typicalness at the interval, as most Whole state;
All operation orders using end-state as dbjective state are selected, are selected from each operation order and the interval current state To corresponding operating procedure, and the interval is controlled to perform the operation order belonging to the operating procedure since the operating procedure, until The current state at the interval is the end-state.
6. a kind of automatic processing device of intelligent substation sequential control atypical state according to claim 5, it is special Sign is that the typicalness at interval includes the equipment running status at the interval, hot stand-by duty, cold standby state and maintenance shape State.
7. a kind of automatic processing device of intelligent substation sequential control atypical state according to claim 5 or 6, its It is characterized in that, if the current state at interval is not correspond to all operations step in the operation order selected, sends phase The prompt message answered.
8. a kind of automatic processing device of intelligent substation sequential control atypical state according to claim 5 or 6, its It is characterized in that, after the current state at interval is the end-state, the order at the interval is continued to execute since end-state Control program.
CN201711023650.8A 2017-10-27 2017-10-27 Automatic processing method and device for intelligent substation sequential control atypical state Active CN107944570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711023650.8A CN107944570B (en) 2017-10-27 2017-10-27 Automatic processing method and device for intelligent substation sequential control atypical state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711023650.8A CN107944570B (en) 2017-10-27 2017-10-27 Automatic processing method and device for intelligent substation sequential control atypical state

Publications (2)

Publication Number Publication Date
CN107944570A true CN107944570A (en) 2018-04-20
CN107944570B CN107944570B (en) 2021-02-02

Family

ID=61935818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711023650.8A Active CN107944570B (en) 2017-10-27 2017-10-27 Automatic processing method and device for intelligent substation sequential control atypical state

Country Status (1)

Country Link
CN (1) CN107944570B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108683178A (en) * 2018-04-28 2018-10-19 国网江苏省电力有限公司常州供电分公司 Substation switching automatic generation method
CN111931427A (en) * 2020-10-19 2020-11-13 国网江西省电力有限公司电力科学研究院 Method for determining induction motor model parameters in power distribution network load modeling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102255392A (en) * 2011-07-30 2011-11-23 山东电力研究院 Method for controlling switching operation sequences of full-automatic transformer substation based on mobile robot
CN105449867A (en) * 2015-12-25 2016-03-30 国网浙江省电力公司丽水供电公司 Visual operation process monitoring mistake precaution system and control method
CN105634129A (en) * 2016-01-27 2016-06-01 云南电网有限责任公司电力科学研究院 Sequence control method for intelligent substation
CN105787809A (en) * 2016-03-10 2016-07-20 国家电网公司 Data-mining-based intelligent checking method for running state of power grid equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102255392A (en) * 2011-07-30 2011-11-23 山东电力研究院 Method for controlling switching operation sequences of full-automatic transformer substation based on mobile robot
CN105449867A (en) * 2015-12-25 2016-03-30 国网浙江省电力公司丽水供电公司 Visual operation process monitoring mistake precaution system and control method
CN105634129A (en) * 2016-01-27 2016-06-01 云南电网有限责任公司电力科学研究院 Sequence control method for intelligent substation
CN105787809A (en) * 2016-03-10 2016-07-20 国家电网公司 Data-mining-based intelligent checking method for running state of power grid equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
谷月雁,司刚,刘清瑞: "智能变电站中顺序控制的功能分析与实现", 《电气技术工程科技II》 *
黄建阳: "电网正常运行和智能操作仿真培训系统的研究和开发", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108683178A (en) * 2018-04-28 2018-10-19 国网江苏省电力有限公司常州供电分公司 Substation switching automatic generation method
CN111931427A (en) * 2020-10-19 2020-11-13 国网江西省电力有限公司电力科学研究院 Method for determining induction motor model parameters in power distribution network load modeling

Also Published As

Publication number Publication date
CN107944570B (en) 2021-02-02

Similar Documents

Publication Publication Date Title
CN105634129B (en) A kind of intelligent substation sequence control method
CN101673965B (en) Automatic switching control method for wide-area emergency power source of electric power system
CN108233536A (en) A kind of intelligent program remote handling system
CN104965437A (en) Intelligent operation order generation method
CN108983006A (en) Type feeder automation switch terminal scene does not have a power failure full-automatic testing method on the spot
CN111624451B (en) Energy storage system and insulation detection method thereof
CN105932769A (en) Power supply seamless switching device and method of electrified railway traction substation
CN114977171A (en) Power distribution network load transfer method and device
CN113687220B (en) Simulation device and method for spring energy storage type vacuum circuit breaker
CN107944570A (en) The automatic processing method and device of intelligent substation sequential control atypical state
CN104410165A (en) Micro-network interconnection method and system
CN104242449B (en) A kind of serve scheduling application remote viewing information management realize method
CN113839548B (en) Method and controller for controlling start-up and shutdown of converter valve group
CN108879663B (en) One-key sequence control method and system for electric power system with exception handling
CN116742705A (en) Economical operation device and intelligent switching method for transformer of low-voltage power distribution station
CN109460896B (en) Automatic scanning analysis method for N-1 risk of 110kV line of power grid
CN117118056A (en) Method for intelligent power failure of 500kV bus of large hydropower plant by one key
CN111431150A (en) Power distribution fault processing method
CN207623767U (en) An a kind of key switch machine system
CN105244906A (en) Standby state control method, device and system for wind driven generator converter
CN104348153B (en) Area power grid master-failure automatically turns power supply control and performs method
CN109462217B (en) Power distribution terminal protection constant value self-adaptive switching method and device
CN113488211B (en) Control method for high-temperature gas cooled reactor plant water system based on MACS6 platform
CN113964873B (en) Garbage power generation grid-connected and security power supply system
CN105846438A (en) Power flow control method and control apparatus of district grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant