CN105500452A - Drilling equipment for glass fiber reinforced plastic water tank - Google Patents

Drilling equipment for glass fiber reinforced plastic water tank Download PDF

Info

Publication number
CN105500452A
CN105500452A CN201610033211.4A CN201610033211A CN105500452A CN 105500452 A CN105500452 A CN 105500452A CN 201610033211 A CN201610033211 A CN 201610033211A CN 105500452 A CN105500452 A CN 105500452A
Authority
CN
China
Prior art keywords
fixing plate
plate rail
bearing
cover
lifting screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610033211.4A
Other languages
Chinese (zh)
Other versions
CN105500452B (en
Inventor
张铁耀
赵天润
殷国祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610033211.4A priority Critical patent/CN105500452B/en
Publication of CN105500452A publication Critical patent/CN105500452A/en
Application granted granted Critical
Publication of CN105500452B publication Critical patent/CN105500452B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26FPERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
    • B26F1/00Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
    • B26F1/16Perforating by tool or tools of the drill type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D5/00Arrangements for operating and controlling machines or devices for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D5/02Means for moving the cutting member into its operative position for cutting
    • B26D5/06Means for moving the cutting member into its operative position for cutting by electrical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D5/00Arrangements for operating and controlling machines or devices for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D5/08Means for actuating the cutting member to effect the cut
    • B26D5/086Electric, magnetic, piezoelectric, electro-magnetic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/0006Means for guiding the cutter
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/01Means for holding or positioning work
    • B26D7/02Means for holding or positioning work with clamping means

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention discloses drilling equipment for a glass fiber reinforced plastic water tank and belongs to the technical field of manufacturing of glass fiber reinforced plastic water tanks. The drilling equipment comprises a support and is characterized in that a fixing plate rack, a first switch and a second switch are further included, a screw drive sleeve and at least two guide sleeves are fixed to the fixing plate rack, multiple drilling machines are evenly arranged on the circumference of the fixing plate rack, a bearing sleeve and at least two guide posts are fixed to the top of the support, the guide posts and the guide sleeves are in sliding fit, a lifting motor is arranged on the bearing sleeve, a lifting screw rod is connected to a motor shaft of the lifting motor and is in threaded connection with the screw drive sleeve, the drilling machines are connected with the first switch, and the lifting motor is connected with the second switch. The drilling machines conduct drilling at the same time, drilling uniformity is guaranteed, and drilling efficiency is improved. By means of a punching mode in which the fixing plate rack stably ascends and descends, drilling stability is guaranteed, and drilling precision is improved.

Description

A kind of rig for Glass fabre reinforced plastic water tank
Technical field
The present invention relates to Glass fabre reinforced plastic water tank manufacturing technology field, particularly relate to a kind of rig for Glass fabre reinforced plastic water tank.
Background technology
Glass fabre reinforced plastic water tank is assembled by multiple water chamber plate, and it is high, lightweight that entirety has intensity, and corrosion-resistant, maintenance is clean is easy to feature.Be widely used in the life in ordinary residence, commercial and residential building, office building, residential quarter, office, school, hotel etc., fire demand water; The production of industrial and mining enterprises, domestic water; Various types of recirculated water, cooling water, hot water supply system water; Soda acid deposit etc.
In the manufacture process of Combined glass reinforced plastic cistern, needing to join a lot of bolt connecting hole on adpting flange limit, in order to ensure that each sub-assembly has interchangeability when installing and connecting, just high requirement being proposed to borehole accuracy.Boring method conventional is at present drill jig pilot bore hole, and this kind of method is holed for a long time, due to the cutting of drill bit, drill jig guide hole can be made to expand, cause bore position to change, affect borehole accuracy; In order to improve borehole accuracy, certain frock clamp need be used to coordinate general bench drilling machine or numerical control drilling machine to realize, frock clamp and general bench drilling machine or numerical control drilling machine coordinate the bad precision that directly will affect boring, borehole stability is poor, prior art is holed to Glass fabre reinforced plastic water tank and is mostly adopted single hole to bore, and production efficiency is extremely low.
Publication number is CN202427990U, publication date is that the Chinese patent literature of on 09 12nd, 2012 discloses a kind of multi-hole drill, comprise base, it is characterized in that: above described base, be provided with guide pillar, guide pillar supports and is provided with gearbox, the power shaft of gearbox stretches out from the casing top of gearbox, its output shaft stretches out from the casing bottom of gearbox, output shaft is fixedly connected with rotating disk, the bottom end face of rotating disk is provided with multiple drill bit, described guide pillar is provided with bushing plate between base and multiple drill bit.
Multi-hole drill disclosed in this patent document, by the cooperation of multiple drill bit and bushing plate, component hole to be drilled once can get out position, multiple hole, but because drill bit is arranged on rotating disk, rotating disk is driven by gearbox, less stable during boring, affects borehole accuracy.
Publication number is CN203227839U, publication date is that the Chinese patent literature on October 09th, 2013 discloses a kind of multi-pore drilling machine, comprise base, drilling machine support, support rocking arm, stroke cylinder, regulating handle, abutment sleeve, it is characterized in that: described base vertical direction installing drill bedrest, drilling machine pedestal upper end mounting bracket rocking arm, middle installation abutment sleeve, support rocking arm is parallel with abutment sleeve, outside described drilling machine pedestal upper end, switch board is installed, described support rocking arm installs three motors, every platform motor arranges stroke cylinder, stroke cylinder connects straight shank drill, the other end of support rocking arm arranges regulating handle and starting switch.
Multi-pore drilling machine disclosed in this patent document, worked by three driven by motor stroke cylinders and straight shank drill simultaneously, three riveted holes once complete, although improve drilling efficiency, but, because three motors are mounted on same support rocking arm, straight shank drill is driven to hole by the cooperation of stroke cylinder, complete and once hole, just form three riveted holes be located along the same line, be only applicable to regular water chamber bore, and the water tank to curved-surface structure, complete the boring of a circumference, need the position of repeatedly re-adjustments straight shank drill, easily error is there is in adjustment process, not only reduce drilling efficiency, and affect borehole accuracy.
Summary of the invention
The present invention is in order to overcome the defect of above-mentioned prior art, a kind of rig for Glass fabre reinforced plastic water tank is provided, the present invention will complete the boring of a circumference, without the need to regulating drilling machine one by one separately, save time, multiple drilling machine is holed simultaneously, not only ensure that the homogeneity of boring, and improves the efficiency of boring; By the hole knockout that fixing plate rail is steadily elevated, ensure borehole stability, improve borehole accuracy.
The present invention is achieved through the following technical solutions:
A kind of rig for Glass fabre reinforced plastic water tank, comprise support, it is characterized in that: also comprise fixing plate rail, first switch and second switch, described fixing plate rail is fixed with worm drive cover and at least two guide pin bushings, that fixes plate rail is circumferentially evenly provided with multiple drilling machine, the top of described support is fixed with bearing holder (housing, cover) and at least two guide pillars, described guide pillar and guide pin bushing are slidably matched, described bearing holder (housing, cover) is provided with lifting motor, the motor shaft of lifting motor is connected with lifting screw, lifting screw is positioned at bearing holder (housing, cover), lifting screw and worm drive cover are threaded connection, described drilling machine is connected with the first switch, lifting motor is connected with second switch.
Described lifting screw is provided with bearing, the inner ring of bearing and the outer wall interference fit of lifting screw, the outer ring of bearing and the inwall matched in clearance of bearing holder (housing, cover).
Described bearing is two, and a bearing is positioned at the top of lifting screw, and another bearing is positioned at the middle part of lifting screw.
Described fixing plate rail is provided with link, and guide pin bushing and worm drive cover are all linked together by link and fixing plate rail.
Described guide pin bushing is four, and four guide pin bushings are uniformly distributed along the inner periphery fixing plate rail, and worm drive cover is positioned on the center of circle of fixing plate rail.
Be provided with cushion block between described lifting motor and bearing holder (housing, cover), lifting motor and bearing holder (housing, cover) are bolted.
Described guide pillar is provided with positive stop, and the upper end of guide pillar is connected with the top of support, and lower end is connected with positive stop.
Described drilling machine comprise be positioned at bore motor above fixing plate rail, through fixing plate rail bore hole axis, be positioned at drill point below fixing plate rail and drill bit, bore motor is connected with fixing plate rail by bolt, the motor shaft of bore motor is connected with boring axle key, the upper end of bore hole axis is connected with upper bearing (metal), lower end is connected with lower bearing, upper bearing (metal) and lower bearing are all embedded in fixing plate rail, and drill bit is connected with bore hole axis by drill point.
The bottom of described support is fixed with locating piece and two line slide rails be arranged in parallel, and locating piece is between two line slide rails.
Also comprise bracing or strutting arrangement, bracing or strutting arrangement is made up of cylinder frame, locking pin and slide block, and locking pin is fixed on the upper end of cylinder frame, and slide block is fixed on the lower end of cylinder frame, and slide block and line slide rail are slidably connected.
Operation principle of the present invention is as follows:
During use, Glass fabre reinforced plastic water tank hole to be drilled is placed on cylinder bracket, is locked with locking pin, then shift cylinder bracket onto below fixing plate rail punch position from line slide rail, be locked with locating piece.Open the first switch, drilling machine starts, and then rotates second switch to downshift position, lifting motor is rotated counterclockwise and drives fixing plate rail slowly to decline, punch, rear rotation second switch of having holed is to upshift position, and lifting motor drives lifting screw to turn clockwise, fixing plate rail is driven slowly to rise, when drill bit exits and drill bit extreme lower position exceeds cylinder pallet top, by the first switch, close drilling machine, and rotate second switch to stop position, close lifting motor.Finally open locating piece and locking pin, release cylinder bracket and taken off the Glass fabre reinforced plastic water tank of boring.Complete boring due to disposable, greatly improve drilling efficiency, due to without the need to regulating drilling machine separately, multiple drilling machine is holed simultaneously, improves the homogeneity of boring, has also ensured the precision of boring.
Worm drive principle: lifting screw fixedly makes it can only rotary motion by bearing and cushion block, can not move up and down, and worm drive cover because of guide pin bushing and guide pillar matching relationship make it move up and down can not rotary motion.Lifting screw and worm drive are threaded connection between overlapping, when lifting motor starts, the motor shaft drive lifting screw of lifting motor is clockwise or be rotated counterclockwise, lifting screw and worm drive produce precession or screw out action between overlapping, and then achieve rising or the decline of whole fixing plate rail.
Beneficial effect main manifestations of the present invention is in the following areas:
One, the present invention, fixing plate rail is fixed with worm drive cover and at least two guide pin bushings, that fixes plate rail is circumferentially evenly provided with multiple drilling machine, the top of support is fixed with bearing holder (housing, cover) and at least two guide pillars, guide pillar and guide pin bushing are slidably matched, bearing holder (housing, cover) is provided with lifting motor, the motor shaft of lifting motor is connected with lifting screw, lifting screw is positioned at bearing holder (housing, cover), lifting screw and worm drive cover are threaded connection, drilling machine is connected with the first switch, lifting motor is connected with second switch, during use, Glass fabre reinforced plastic water tank hole to be drilled is placed on below fixing plate rail, press second switch, lifting motor starts, being rotated and reverse by the motor shaft of lifting motor drives lifting screw to rotate, because lifting screw is positioned at bearing holder (housing, cover), and lifting screw and worm drive cover are threaded connection, thus achieve the precession and back-out that lifting screw and worm drive overlap, being slidably matched again by least two guide pillars and two guide pin bushings, achieve whole fixing plate rail rise stably and decline, the drilling machine on fixing plate rail can be made to aim at Glass fabre reinforced plastic water tank hole to be drilled accurately, open the first switch, all drilling machines start simultaneously, just disposablely can complete boring, comparatively prior art, complete the boring of a circumference, without the need to regulating drilling machine one by one separately, save time, multiple drilling machine is holed simultaneously, not only ensure that the homogeneity of boring, and improve the efficiency of boring, by the hole knockout that fixing plate rail is steadily elevated, ensure borehole stability, improve borehole accuracy.
Two, the present invention, lifting screw is provided with bearing, the inner ring of bearing and the outer wall interference fit of lifting screw, the outer ring of bearing and the inwall matched in clearance of bearing holder (housing, cover), by bearing, lifting screw is embedded in bearing holder (housing, cover), when turn is overlapped in lifting screw and worm drive, the power dispersion that worm drive cover acts on lifting screw is more even, effectively can prevent lifting screw generation double swerve, the central axis of the central axis of lifting screw and worm drive cover is coincided together all the time, and then make whole fixing plate rail rise and fall all the time along on vertical direction, do not offset, drilling machine boring is more steady, improve borehole accuracy.
Three, the present invention, bearing is two, a bearing is positioned at the top of lifting screw, and another bearing is positioned at the middle part of lifting screw, and two distance between bearings are fixed, lifting screw can better be embedded in bearing holder (housing, cover) by the mode of being inlayed by two bearings, lifting motor better can be made to drive lifting screw to rotate, reduce resistance, prevent lifting screw generation double swerve, further guarantee is fixed plate rail and is risen stably and fall, and makes borehole accuracy higher.
Four, the present invention, fixing plate rail is provided with link, guide pin bushing and worm drive cover are all linked together by link and fixing plate rail, guide pin bushing and worm drive cover is made to be subject to the active force of same link, not only increase the structural strength of whole fixing plate rail, and by cooperatively interacting of guide pin bushing and guide pillar and cooperatively interacting of worm drive cover and lifting screw, make fixing plate rail in the vertical direction, it is more steady that operation is fallen, and can not double swerve; In the horizontal direction, can not swing by dipping and heaving, make whole fixing plate rail drive drilling machine to hole stably, ensure overall borehole accuracy.
Five, the present invention, guide pin bushing is four, four guide pin bushings are uniformly distributed along the inner periphery fixing plate rail, and worm drive cover is positioned on the center of circle of fixing plate rail, adopts this specific arrangement mode, make fixing plate rail better with an integral rigidity be configured to, cooperatively interact more firm, be especially applicable to the boring of large glass reinforced plastic water container, large-size components stress deformation can be overcome, prevent deflection of borehole, be beneficial to raising borehole accuracy.
Six, the present invention, is provided with cushion block between lifting motor and bearing holder (housing, cover), and lifting motor and bearing holder (housing, cover) are bolted, by arranging cushion block, the outer ring of bearing can be compressed, and then can prevent lifting screw from occurring to shake up and down, ensure lifting screw job stability.
Seven, the present invention, guide pillar is provided with positive stop, the upper end of guide pillar is connected with the top of support, lower end is connected with positive stop, can prevent guide pin bushing from skidding off guide pillar during work on the one hand, when need change fixing plate rail on the other hand, fixing plate rail can be taken off after taking off positive stop, while guarantee working stability, make fixing plate rail and support dismantle convenient, enable same support mate the fixing plate rail of different bore position distribution, be convenient to the Glass fabre reinforced plastic water tank realizing different boring space requirements, boring is more flexible, improves boring diversity.
Eight, the present invention, drilling machine comprises the bore motor be positioned at above fixing plate rail, through the bore hole axis of fixing plate rail, be positioned at the drill point below fixing plate rail and drill bit, bore motor is connected with fixing plate rail by bolt, the motor shaft of bore motor is connected with boring axle key, the upper end of bore hole axis is connected with upper bearing (metal), lower end is connected with lower bearing, upper bearing (metal) and lower bearing are all embedded in fixing plate rail, drill bit is connected with bore hole axis by drill point, adopt in this way, can according to the position distribution of required boring, be arranged on fixing plate rail by precisely firm for all drilling machines, by the normal work of all drilling machines, realize disposable all drilled hole, borehole accuracy is high, efficiency is high, and each drilling machine is separate, failture evacuation is simple, convenient maintenance and replacement.
Nine, the present invention, the bottom of support is fixed with locating piece and two line slide rails be arranged in parallel, locating piece is between two line slide rails, line slide rail can be passed through, easily Glass fabre reinforced plastic water tank is pushed into below fixing plate rail, and is located by locating piece, be convenient to drilling machine boring, time saving and energy saving, overall drilling efficiency can be improved.
Ten, the present invention, also comprise bracing or strutting arrangement, bracing or strutting arrangement is made up of cylinder frame, locking pin and slide block, locking pin is fixed on the upper end of cylinder frame, slide block is fixed on the lower end of cylinder frame, slide block and line slide rail are slidably connected, locking pin by bracing or strutting arrangement can be good at Glass fabre reinforced plastic water tank, especially large glass reinforced plastic water container is fixed, and slided on line slide rail by slide block, just smoothly large glass reinforced plastic water container can be placed on below fixing plate rail, strengthen the drilling efficiency of whole rig.
Accompanying drawing explanation
Below in conjunction with specification drawings and specific embodiments, the present invention is described in further detail, wherein:
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of lifting motor of the present invention;
Fig. 3 is the structural representation of the embodiment of the present invention 4;
Fig. 4 is the structural representation of the embodiment of the present invention 4 medium-height trestle;
Fig. 5 is the structural representation of drilling machine in the embodiment of the present invention 5;
Fig. 6 is the structural representation of the embodiment of the present invention 6;
Fig. 7 is the structural representation of the embodiment of the present invention 7;
Fig. 8 is the structural representation fixing plate rail in the embodiment of the present invention 7;
Fig. 9 is the partial enlarged drawing at A place in Fig. 8;
Mark in figure: 1, support, 2, fixing plate rail, the 3, first switch, 4, second switch, 5, worm drive cover, 6, guide pin bushing, 7, drilling machine, 8, bearing holder (housing, cover), 9, guide pillar, 10, lifting motor, 11, lifting screw, 12, bearing, 13, link, 14, cushion block, 15, positive stop, 16, bore motor, 17, bore hole axis, 18, drill point, 19, drill bit, 20, upper bearing (metal), 21, lower bearing, 22, locating piece, 23, line slide rail, 24, cylinder frame, 25, locking pin, 26, slide block.
Detailed description of the invention
Embodiment 1
See Fig. 1 and Fig. 2, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and two guide pin bushings 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and two guide pillars 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
The present embodiment is the most basic embodiment, and structure is simple, the drilling machine of prior art, fixing plate rail is fixed with worm drive cover and at least two guide pin bushings, that fixes plate rail is circumferentially evenly provided with multiple drilling machine, the top of support is fixed with bearing holder (housing, cover) and at least two guide pillars, guide pillar and guide pin bushing are slidably matched, bearing holder (housing, cover) is provided with lifting motor, the motor shaft of lifting motor is connected with lifting screw, lifting screw is positioned at bearing holder (housing, cover), lifting screw and worm drive cover are threaded connection, drilling machine is connected with the first switch, lifting motor is connected with second switch, during use, Glass fabre reinforced plastic water tank hole to be drilled is placed on below fixing plate rail, press second switch, lifting motor starts, being rotated and reverse by the motor shaft of lifting motor drives lifting screw to rotate, because lifting screw is positioned at bearing holder (housing, cover), and lifting screw and worm drive cover are threaded connection, thus achieve the precession and back-out that lifting screw and worm drive overlap, being slidably matched again by least two guide pillars and two guide pin bushings, achieve whole fixing plate rail rise stably and decline, the drilling machine on fixing plate rail can be made to aim at Glass fabre reinforced plastic water tank hole to be drilled accurately, open the first switch, all drilling machines start simultaneously, just disposablely can complete boring, comparatively prior art, complete the boring of a circumference, without the need to regulating drilling machine one by one separately, save time, multiple drilling machine is holed simultaneously, not only ensure that the homogeneity of boring, and improve the efficiency of boring, by the hole knockout that fixing plate rail is steadily elevated, ensure borehole stability, improve borehole accuracy.
Embodiment 2
See Fig. 1 and Fig. 2, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and two guide pin bushings 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and two guide pillars 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
Described lifting screw 11 is provided with bearing 12, the inner ring of bearing 12 and the outer wall interference fit of lifting screw 11, the outer ring of bearing 12 and the inwall matched in clearance of bearing holder (housing, cover) 8.
Described bearing 12 is two, and a bearing 12 is positioned at the top of lifting screw 11, and another bearing 12 is positioned at the middle part of lifting screw 11.
The present embodiment is a better embodiment, lifting screw is provided with bearing, the inner ring of bearing and the outer wall interference fit of lifting screw, the outer ring of bearing and the inwall matched in clearance of bearing holder (housing, cover), by bearing, lifting screw is embedded in bearing holder (housing, cover), when turn is overlapped in lifting screw and worm drive, the power dispersion that worm drive cover acts on lifting screw is more even, effectively can prevent lifting screw generation double swerve, the central axis of the central axis of lifting screw and worm drive cover is coincided together all the time, and then make whole fixing plate rail rise and fall all the time along on vertical direction, do not offset, drilling machine boring is more steady, improve borehole accuracy.Bearing is two, a bearing is positioned at the top of lifting screw, another bearing is positioned at the middle part of lifting screw, two distance between bearings are fixed, and lifting screw can better be embedded in bearing holder (housing, cover) by the mode of being inlayed by two bearings, can better make lifting motor drive lifting screw to rotate, reduce resistance, prevent lifting screw generation double swerve, ensure that fixing plate rail rises stably and falls further, make borehole accuracy higher.
Embodiment 3
See Fig. 2 and Fig. 3, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and guide pin bushing 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and guide pillar 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
Described lifting screw 11 is provided with bearing 12, the inner ring of bearing 12 and the outer wall interference fit of lifting screw 11, the outer ring of bearing 12 and the inwall matched in clearance of bearing holder (housing, cover) 8.
Described bearing 12 is two, and a bearing 12 is positioned at the top of lifting screw 11, and another bearing 12 is positioned at the middle part of lifting screw 11.
Described fixing plate rail 2 is provided with link 13, and guide pin bushing 6 and worm drive cover 5 are all linked together by link 13 and fixing plate rail 2.
Described guide pin bushing 6 is four, and four guide pin bushings 6 are uniformly distributed along the inner periphery of fixing plate rail 2, and worm drive cover 5 is positioned on the center of circle of fixing plate rail 2.
The present embodiment is another better embodiment, fixing plate rail is provided with link, guide pin bushing and worm drive cover are all linked together by link and fixing plate rail, guide pin bushing and worm drive cover is made to be subject to the active force of same link, not only increase the structural strength of whole fixing plate rail, and by cooperatively interacting of guide pin bushing and guide pillar and cooperatively interacting of worm drive cover and lifting screw, make fixing plate rail in the vertical direction, it is more steady that operation is fallen, and can not double swerve; In the horizontal direction, can not swing by dipping and heaving, make whole fixing plate rail drive drilling machine to hole stably, ensure overall borehole accuracy.Guide pin bushing is four, four guide pin bushings are uniformly distributed along the inner periphery fixing plate rail, worm drive cover is positioned on the center of circle of fixing plate rail, adopt this specific arrangement mode, make fixing plate rail better with an integral rigidity be configured to, cooperatively interact more firm, especially the boring of large glass reinforced plastic water container is applicable to, large-size components stress deformation can be overcome, prevent deflection of borehole, be beneficial to raising borehole accuracy.
Embodiment 4
See Fig. 2-Fig. 4, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and guide pin bushing 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and guide pillar 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
Described lifting screw 11 is provided with bearing 12, the inner ring of bearing 12 and the outer wall interference fit of lifting screw 11, the outer ring of bearing 12 and the inwall matched in clearance of bearing holder (housing, cover) 8.
Described bearing 12 is two, and a bearing 12 is positioned at the top of lifting screw 11, and another bearing 12 is positioned at the middle part of lifting screw 11.
Described fixing plate rail 2 is provided with link 13, and guide pin bushing 6 and worm drive cover 5 are all linked together by link 13 and fixing plate rail 2.
Described guide pin bushing 6 is four, and four guide pin bushings 6 are uniformly distributed along the inner periphery of fixing plate rail 2, and worm drive cover 5 is positioned on the center of circle of fixing plate rail 2.
Be provided with cushion block 14 between described lifting motor 10 and bearing holder (housing, cover) 8, lifting motor 10 and bearing holder (housing, cover) 8 are bolted.
Described guide pillar 9 is provided with positive stop 15, and the upper end of guide pillar 9 is connected with the top of support 1, and lower end is connected with positive stop 15.
The present embodiment is another better embodiment, is provided with cushion block between lifting motor and bearing holder (housing, cover), and lifting motor and bearing holder (housing, cover) are bolted, by arranging cushion block, the outer ring of bearing can be compressed, and then can prevent lifting screw from occurring to shake up and down, ensure lifting screw job stability.Guide pillar is provided with positive stop, the upper end of guide pillar is connected with the top of support, lower end is connected with positive stop, can prevent guide pin bushing from skidding off guide pillar during work on the one hand, when need change fixing plate rail on the other hand, fixing plate rail can be taken off after taking off positive stop, while guarantee working stability, fixing plate rail and support is made to dismantle convenient, same support is enable to mate the fixing plate rail of different bore position distribution, be convenient to the Glass fabre reinforced plastic water tank realizing different boring space requirements, boring is more flexible, improves boring diversity.
Embodiment 5
See Fig. 2-Fig. 5, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and guide pin bushing 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and guide pillar 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
Described lifting screw 11 is provided with bearing 12, the inner ring of bearing 12 and the outer wall interference fit of lifting screw 11, the outer ring of bearing 12 and the inwall matched in clearance of bearing holder (housing, cover) 8.
Described bearing 12 is two, and a bearing 12 is positioned at the top of lifting screw 11, and another bearing 12 is positioned at the middle part of lifting screw 11.
Described fixing plate rail 2 is provided with link 13, and guide pin bushing 6 and worm drive cover 5 are all linked together by link 13 and fixing plate rail 2.
Described guide pin bushing 6 is four, and four guide pin bushings 6 are uniformly distributed along the inner periphery of fixing plate rail 2, and worm drive cover 5 is positioned on the center of circle of fixing plate rail 2.
Be provided with cushion block 14 between described lifting motor 10 and bearing holder (housing, cover) 8, lifting motor 10 and bearing holder (housing, cover) 8 are bolted.
Described guide pillar 9 is provided with positive stop 15, and the upper end of guide pillar 9 is connected with the top of support 1, and lower end is connected with positive stop 15.
Described drilling machine 7 comprise be positioned at bore motor 16 above fixing plate rail 2, through fixing plate rail 2 bore hole axis 17, be positioned at drill point 18 below fixing plate rail 2 and drill bit 19, bore motor 16 is connected with fixing plate rail 2 by bolt, the motor shaft of bore motor 16 is connected with bore hole axis 17 key, the upper end of bore hole axis 17 is connected with upper bearing (metal) 20, lower end is connected with lower bearing 21, upper bearing (metal) 20 and lower bearing 21 are all embedded in fixing plate rail 2, and drill bit 19 is connected with bore hole axis 17 by drill point 18.
The present embodiment is another better embodiment, drilling machine comprises the bore motor be positioned at above fixing plate rail, through the bore hole axis of fixing plate rail, be positioned at the drill point below fixing plate rail and drill bit, bore motor is connected with fixing plate rail by bolt, the motor shaft of bore motor is connected with boring axle key, the upper end of bore hole axis is connected with upper bearing (metal), lower end is connected with lower bearing, upper bearing (metal) and lower bearing are all embedded in fixing plate rail, drill bit is connected with bore hole axis by drill point, adopt in this way, can according to the position distribution of required boring, be arranged on fixing plate rail by precisely firm for all drilling machines, by the normal work of all drilling machines, realize disposable all drilled hole, borehole accuracy is high, efficiency is high, and each drilling machine is separate, failture evacuation is simple, convenient maintenance and replacement.
Embodiment 6
See Fig. 2, Fig. 4, Fig. 5 and Fig. 6, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and guide pin bushing 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and guide pillar 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
Described lifting screw 11 is provided with bearing 12, the inner ring of bearing 12 and the outer wall interference fit of lifting screw 11, the outer ring of bearing 12 and the inwall matched in clearance of bearing holder (housing, cover) 8.
Described bearing 12 is two, and a bearing 12 is positioned at the top of lifting screw 11, and another bearing 12 is positioned at the middle part of lifting screw 11.
Described fixing plate rail 2 is provided with link 13, and guide pin bushing 6 and worm drive cover 5 are all linked together by link 13 and fixing plate rail 2.
Described guide pin bushing 6 is four, and four guide pin bushings 6 are uniformly distributed along the inner periphery of fixing plate rail 2, and worm drive cover 5 is positioned on the center of circle of fixing plate rail 2.
Be provided with cushion block 14 between described lifting motor 10 and bearing holder (housing, cover) 8, lifting motor 10 and bearing holder (housing, cover) 8 are bolted.
Described guide pillar 9 is provided with positive stop 15, and the upper end of guide pillar 9 is connected with the top of support 1, and lower end is connected with positive stop 15.
Described drilling machine 7 comprise be positioned at bore motor 16 above fixing plate rail 2, through fixing plate rail 2 bore hole axis 17, be positioned at drill point 18 below fixing plate rail 2 and drill bit 19, bore motor 16 is connected with fixing plate rail 2 by bolt, the motor shaft of bore motor 16 is connected with bore hole axis 17 key, the upper end of bore hole axis 17 is connected with upper bearing (metal) 20, lower end is connected with lower bearing 21, upper bearing (metal) 20 and lower bearing 21 are all embedded in fixing plate rail 2, and drill bit 19 is connected with bore hole axis 17 by drill point 18.
The bottom of described support 1 is fixed with locating piece 22 and two line slide rails be arranged in parallel 23, and locating piece 22 is between two line slide rails 23.
The present embodiment is another better embodiment, the bottom of support is fixed with locating piece and two line slide rails be arranged in parallel, locating piece is between two line slide rails, line slide rail can be passed through, easily Glass fabre reinforced plastic water tank is pushed into below fixing plate rail, and is located by locating piece, be convenient to drilling machine boring, time saving and energy saving, overall drilling efficiency can be improved.
Embodiment 7
See Fig. 2, Fig. 4, Fig. 5, Fig. 7, Fig. 8 and Fig. 9, a kind of rig for Glass fabre reinforced plastic water tank, comprise support 1, also comprise fixing plate rail 2, first switch 3 and second switch 4, described fixing plate rail 2 is fixed with worm drive cover 5 and guide pin bushing 6, that fixes plate rail 2 is circumferentially evenly provided with multiple drilling machine 7, the top of described support 1 is fixed with bearing holder (housing, cover) 8 and guide pillar 9, described guide pillar 9 is slidably matched with guide pin bushing 6, described bearing holder (housing, cover) 8 is provided with lifting motor 10, the motor shaft of lifting motor 10 is connected with lifting screw 11, lifting screw 11 is positioned at bearing holder (housing, cover) 8, lifting screw 11 and worm drive are overlapped 5 and are threaded connection, described drilling machine 7 is connected with the first switch 3, lifting motor 10 is connected with second switch 4.
Described lifting screw 11 is provided with bearing 12, the inner ring of bearing 12 and the outer wall interference fit of lifting screw 11, the outer ring of bearing 12 and the inwall matched in clearance of bearing holder (housing, cover) 8.
Described bearing 12 is two, and a bearing 12 is positioned at the top of lifting screw 11, and another bearing 12 is positioned at the middle part of lifting screw 11.
Described fixing plate rail 2 is provided with link 13, and guide pin bushing 6 and worm drive cover 5 are all linked together by link 13 and fixing plate rail 2.
Described guide pin bushing 6 is four, and four guide pin bushings 6 are uniformly distributed along the inner periphery of fixing plate rail 2, and worm drive cover 5 is positioned on the center of circle of fixing plate rail 2.
Be provided with cushion block 14 between described lifting motor 10 and bearing holder (housing, cover) 8, lifting motor 10 and bearing holder (housing, cover) 8 are bolted.
Described guide pillar 9 is provided with positive stop 15, and the upper end of guide pillar 9 is connected with the top of support 1, and lower end is connected with positive stop 15.
Described drilling machine 7 comprise be positioned at bore motor 16 above fixing plate rail 2, through fixing plate rail 2 bore hole axis 17, be positioned at drill point 18 below fixing plate rail 2 and drill bit 19, bore motor 16 is connected with fixing plate rail 2 by bolt, the motor shaft of bore motor 16 is connected with bore hole axis 17 key, the upper end of bore hole axis 17 is connected with upper bearing (metal) 20, lower end is connected with lower bearing 21, upper bearing (metal) 20 and lower bearing 21 are all embedded in fixing plate rail 2, and drill bit 19 is connected with bore hole axis 17 by drill point 18.
The bottom of described support 1 is fixed with locating piece 22 and two line slide rails be arranged in parallel 23, and locating piece 22 is between two line slide rails 23.
Also comprise bracing or strutting arrangement, bracing or strutting arrangement is made up of cylinder frame 24, locking pin 25 and slide block 26, and locking pin 25 is fixed on the upper end of cylinder frame 24, and slide block 26 is fixed on the lower end of cylinder frame 24, and slide block 26 and line slide rail 23 are slidably connected.
The present embodiment is preferred forms, fixing plate rail is fixed with worm drive cover and at least two guide pin bushings, that fixes plate rail is circumferentially evenly provided with multiple drilling machine, the top of support is fixed with bearing holder (housing, cover) and at least two guide pillars, guide pillar and guide pin bushing are slidably matched, bearing holder (housing, cover) is provided with lifting motor, the motor shaft of lifting motor is connected with lifting screw, lifting screw is positioned at bearing holder (housing, cover), lifting screw and worm drive cover are threaded connection, drilling machine is connected with the first switch, lifting motor is connected with second switch, during use, Glass fabre reinforced plastic water tank hole to be drilled is placed on below fixing plate rail, press second switch, lifting motor starts, being rotated and reverse by the motor shaft of lifting motor drives lifting screw to rotate, because lifting screw is positioned at bearing holder (housing, cover), and lifting screw and worm drive cover are threaded connection, thus achieve the precession and back-out that lifting screw and worm drive overlap, being slidably matched again by least two guide pillars and two guide pin bushings, achieve whole fixing plate rail rise stably and decline, the drilling machine on fixing plate rail can be made to aim at Glass fabre reinforced plastic water tank hole to be drilled accurately, open the first switch, all drilling machines start simultaneously, just disposablely can complete boring, comparatively prior art, complete the boring of a circumference, without the need to regulating drilling machine one by one separately, save time, multiple drilling machine is holed simultaneously, not only ensure that the homogeneity of boring, and improve the efficiency of boring, by the hole knockout that fixing plate rail is steadily elevated, ensure borehole stability, improve borehole accuracy.Also comprise bracing or strutting arrangement, bracing or strutting arrangement is made up of cylinder frame, locking pin and slide block, locking pin is fixed on the upper end of cylinder frame, slide block is fixed on the lower end of cylinder frame, and slide block and line slide rail are slidably connected, and locks pin can be good at Glass fabre reinforced plastic water tank by bracing or strutting arrangement, especially large glass reinforced plastic water container is fixed, and slided on line slide rail by slide block, just smoothly large glass reinforced plastic water container can be placed on below fixing plate rail, strengthen the drilling efficiency of whole rig.

Claims (10)

1. the rig for Glass fabre reinforced plastic water tank, comprise support (1), it is characterized in that: also comprise fixing plate rail (2), first switch (3) and second switch (4), described fixing plate rail (2) is fixed with worm drive cover (5) and at least two guide pin bushings (6), that fixes plate rail (2) is circumferentially evenly provided with multiple drilling machine (7), the top of described support (1) is fixed with bearing holder (housing, cover) (8) and at least two guide pillars (9), described guide pillar (9) and guide pin bushing (6) are slidably matched, described bearing holder (housing, cover) (8) is provided with lifting motor (10), the motor shaft of lifting motor (10) is connected with lifting screw (11), lifting screw (11) is positioned at bearing holder (housing, cover) (8), lifting screw (11) and worm drive cover (5) are threaded connection, described drilling machine (7) is connected with the first switch (3), lifting motor (10) is connected with second switch (4).
2. a kind of rig for Glass fabre reinforced plastic water tank according to claim 1, it is characterized in that: described lifting screw (11) is provided with bearing (12), the inner ring of bearing (12) and the outer wall interference fit of lifting screw (11), the outer ring of bearing (12) and the inwall matched in clearance of bearing holder (housing, cover) (8).
3. a kind of rig for Glass fabre reinforced plastic water tank according to claim 2, it is characterized in that: described bearing (12) is two, a bearing (12) is positioned at the top of lifting screw (11), and another bearing (12) is positioned at the middle part of lifting screw (11).
4. a kind of rig for Glass fabre reinforced plastic water tank according to claim 1, it is characterized in that: described fixing plate rail (2) is provided with link (13), guide pin bushing (6) and worm drive cover (5) are all linked together by link (13) and fixing plate rail (2).
5. a kind of rig for Glass fabre reinforced plastic water tank according to claim 1, it is characterized in that: described guide pin bushing (6) is four, four guide pin bushings (6) are uniformly distributed along the inner periphery fixing plate rail (2), and worm drive cover (5) is positioned on the center of circle of fixing plate rail (2).
6. a kind of rig for Glass fabre reinforced plastic water tank according to claim 1, is characterized in that: be provided with cushion block (14) between described lifting motor (10) and bearing holder (housing, cover) (8), and lifting motor (10) and bearing holder (housing, cover) (8) are bolted.
7. a kind of rig for Glass fabre reinforced plastic water tank according to claim 3, it is characterized in that: described guide pillar (9) is provided with positive stop (15), the upper end of guide pillar (9) is connected with the top of support (1), and lower end is connected with positive stop (15).
8. a kind of rig for Glass fabre reinforced plastic water tank according to claim 7, it is characterized in that: described drilling machine (7) comprises the bore motor (16) being positioned at fixing plate rail (2) top, through the bore hole axis (17) of fixing plate rail (2), be positioned at drill point (18) and the drill bit (19) of fixing plate rail (2) below, bore motor (16) is connected with fixing plate rail (2) by bolt, the motor shaft of bore motor (16) is connected with bore hole axis (17) key, the upper end of bore hole axis (17) is connected with upper bearing (metal) (20), lower end is connected with lower bearing (21), upper bearing (metal) (20) and lower bearing (21) are all embedded in fixing plate rail (2), drill bit (19) is connected with bore hole axis (17) by drill point (18).
9. a kind of rig for Glass fabre reinforced plastic water tank according to claim 8, it is characterized in that: the bottom of described support (1) is fixed with locating piece (22) and two line slide rails be arranged in parallel (23), and locating piece (22) is positioned between two line slide rails (23).
10. a kind of rig for Glass fabre reinforced plastic water tank according to claim 9, it is characterized in that: also comprise bracing or strutting arrangement, bracing or strutting arrangement is made up of cylinder frame (24), locking pin (25) and slide block (26), locking pin (25) is fixed on the upper end of cylinder frame (24), slide block (26) is fixed on the lower end of cylinder frame (24), and slide block (26) and line slide rail (23) are slidably connected.
CN201610033211.4A 2016-01-19 2016-01-19 Drilling equipment for glass fiber reinforced plastic water tank Expired - Fee Related CN105500452B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610033211.4A CN105500452B (en) 2016-01-19 2016-01-19 Drilling equipment for glass fiber reinforced plastic water tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610033211.4A CN105500452B (en) 2016-01-19 2016-01-19 Drilling equipment for glass fiber reinforced plastic water tank

Publications (2)

Publication Number Publication Date
CN105500452A true CN105500452A (en) 2016-04-20
CN105500452B CN105500452B (en) 2017-04-12

Family

ID=55708941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610033211.4A Expired - Fee Related CN105500452B (en) 2016-01-19 2016-01-19 Drilling equipment for glass fiber reinforced plastic water tank

Country Status (1)

Country Link
CN (1) CN105500452B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106546457A (en) * 2016-09-30 2017-03-29 长安大学 A kind of rut plate test specimen ingot stripper and die trial

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19521604C1 (en) * 1995-06-14 1997-04-17 Wachsmuth & Co Werkzeugbau Blades adjusting device for multi-compartment stamping installation
CN2541090Y (en) * 2002-04-15 2003-03-26 何其荣 Semi-automatic multi-hole drill
CN201423685Y (en) * 2009-04-13 2010-03-17 唐祎迪 Special perforating machine for binding
CN203343480U (en) * 2013-05-17 2013-12-18 全椒县和平压铸有限公司 Rapid drilling device
CN203495275U (en) * 2013-10-30 2014-03-26 浙江天力机车部件有限公司 Multi-head drilling device
CN104668609A (en) * 2015-03-10 2015-06-03 常熟纳佳利精密零件有限公司 High-precision multi-hole drilling machine
CN205364073U (en) * 2016-01-19 2016-07-06 张铁耀 A drilling equipment for FRP water tank

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19521604C1 (en) * 1995-06-14 1997-04-17 Wachsmuth & Co Werkzeugbau Blades adjusting device for multi-compartment stamping installation
CN2541090Y (en) * 2002-04-15 2003-03-26 何其荣 Semi-automatic multi-hole drill
CN201423685Y (en) * 2009-04-13 2010-03-17 唐祎迪 Special perforating machine for binding
CN203343480U (en) * 2013-05-17 2013-12-18 全椒县和平压铸有限公司 Rapid drilling device
CN203495275U (en) * 2013-10-30 2014-03-26 浙江天力机车部件有限公司 Multi-head drilling device
CN104668609A (en) * 2015-03-10 2015-06-03 常熟纳佳利精密零件有限公司 High-precision multi-hole drilling machine
CN205364073U (en) * 2016-01-19 2016-07-06 张铁耀 A drilling equipment for FRP water tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106546457A (en) * 2016-09-30 2017-03-29 长安大学 A kind of rut plate test specimen ingot stripper and die trial
CN106546457B (en) * 2016-09-30 2019-05-10 长安大学 A kind of track plate test specimen ingot stripper and die trial

Also Published As

Publication number Publication date
CN105500452B (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN201309089Y (en) Error proofing clamp for manufacturing mass hole series components
CN202639385U (en) Multi-drill head drill rig
CN207127301U (en) Porous combination drill jig and drilling machine
CN103691987A (en) Coaxial drilling machine for butterfly plate check valve
CN203622025U (en) Coaxial drilling machine with butterfly plate check valve
CN201455698U (en) Positioning fixture for wind fan box body and inner ring gear with drawbores
CN203495276U (en) Novel multidirectional numerical control drilling device
CN113328319A (en) On-site machining equipment for collector ring of hydraulic turbine unit and using method
CN101758399A (en) Drilling fixture for crank positioning pin hole
CN201231365Y (en) Angle-hole processing device
CN102729057B (en) Rotary table capable of being used for machining knock-over plate
CN103612082B (en) The process of large-sized water turbine field ring processing centering
CN205364073U (en) A drilling equipment for FRP water tank
CN105500452A (en) Drilling equipment for glass fiber reinforced plastic water tank
CN202291529U (en) Device for machining equally-divided hole in mass mode
CN210736823U (en) Slewing bearing quenching coupling gap positioning device
CN103231090B (en) Vehicle frame drilling device
CN201283503Y (en) Angle crank positioning pin hole boring clamp
CN109014288A (en) Perforating device is used in a kind of processing of automobile metal accessory
CN204546134U (en) A kind of revolving dial
CN204700344U (en) A kind of wheel facing attachment
CN201783675U (en) Drill jig for processing weep holes on damping ring of water turbine generator
CN202377562U (en) Multi-hole gang drill tool
CN213898416U (en) BIM-based protective guard for building engineering
CN211467581U (en) Dual-mode duplex hydraulic machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20220119