CN201309089Y - Error proofing clamp for manufacturing mass hole series components - Google Patents
Error proofing clamp for manufacturing mass hole series components Download PDFInfo
- Publication number
- CN201309089Y CN201309089Y CNU2008202207887U CN200820220788U CN201309089Y CN 201309089 Y CN201309089 Y CN 201309089Y CN U2008202207887 U CNU2008202207887 U CN U2008202207887U CN 200820220788 U CN200820220788 U CN 200820220788U CN 201309089 Y CN201309089 Y CN 201309089Y
- Authority
- CN
- China
- Prior art keywords
- drill
- workpiece
- drill jig
- hole series
- hole
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title abstract 4
- 238000005553 drilling Methods 0.000 claims abstract description 9
- 238000000034 methods Methods 0.000 claims abstract description 5
- 230000037250 Clearance Effects 0.000 claims abstract description 4
- 230000035512 clearance Effects 0.000 claims abstract description 4
- 238000005516 engineering processes Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 238000005755 formation reactions Methods 0.000 description 1
Abstract
Description
Technical field
The utility model relates to the process technology of ring-shaped work pieces hole system, relates generally to a kind of mistake proofing anchor clamps that large quantities of metering-orifices are part of processing.
Background technology
On lasso of a lot of medium-and-large-sized bearings installing hole, the bolt hole of counting in ten arranged at present, the hole that has is uniform, the hole that has is not uniform, adding man-hour a kind of in boring is to adopt index dial to carry out continuous calibration, boring, rely on fully manually to position boring processing, a little mistake all may cause scrapping of product; Another kind is to adopt the method for setting-out to hole, and operating personnel's quality and energy is had very high requirement.
Summary of the invention
The purpose of this utility model provides a kind of mistake proofing anchor clamps that large quantities of metering-orifices are part of processing, and makes it have simple in structure, convenient to use and suitable machining characteristics in enormous quantities.
The purpose of this utility model can adopt following technical scheme to realize: a kind ofly process the mistake proofing anchor clamps that large quantities of metering-orifices are part, it comprises drill jig, drill bushing, pressing plate and follower bolt and nut; The ring-shaped step that the bottom had of described drill jig constitutes the positioning spigot to the workpiece location; The external diameter of positioning spigot and workpiece is a matched in clearance, has a plurality of stepped holes on the drill jig and conveniently replaced drill bushing is installed in stepped hole; Described drill jig and workpiece are fixed on the workbench of drilling machine by pressing plate and follower bolt, nut.
The utility model is simple in structure, and is convenient to use, and being fit to the hole is the processing in enormous quantities of part.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model.
Accompanying drawing 2 is the vertical view of Fig. 1.
Accompanying drawing 3 user mode schematic diagrames of the present utility model.
Among the figure: 1, bolt, 2, positioning spigot, 3, drill jig, 4, drill bushing, 5, pressing plate, 6, clamp nut, 7, stepped hole, 8, annular workpieces, 9, workbench.
The specific embodiment
In conjunction with the accompanying drawings, embodiment of the present utility model is illustrated:
As shown in Figure 1, and with reference to Fig. 2, the ring-shaped step that the bottom had of drill jig 3 of the present utility model constitutes positioning spigot 2, and in order to workpiece is located, the external diameter of positioning spigot and workpiece is a matched in clearance; Have a plurality of stepped holes 7 on the drill jig and drill bushing 4 is installed in stepped hole, the hole of required processing is corresponding on stepped hole 7 and the workpiece; Drill jig 3 and workpiece 8 are fixed on the workbench of drilling machine by pressing plate 5 and follower bolt 1, nut 6.As shown in Figure 3, when being part, earlier follower bolt 1 is put into machining hole the T-slot of workbench, then annular workpieces is put into bolt 1, put the drill jig that has drill bushing again, drill jig is fixing on horizontal plane workpiece by seam, cover pressing plate 5 then, workpiece 8 and drill jig 3 are fixed on the workbench by pressing plate 5 with nut 6, this moment, workpiece 8 and drill jig 3 just were completely fixed on the workbench, drill bit on the radial drilling machine is moved to the position in hole on the drill jig, carry out the processing in hole, after the hole processing, withdraw from drill bit, other hole is processed successively again.After the hole machines, withdraw from nut 6, take off pressing plate 5 and the drill jig 3 that has drill bushing 4, take off workpiece 8, put workpiece to be processed, repeat above operation and get final product.If drill bit misalignment drill bushing then can't bore down, just can not bore the position in hole wrong; When requiring big bit bore, because drill bit is bigger than drill jig 3, also can't dig into, so can be to dislocation with the situation formation mistake proofing of wrong drill bit than drawing.Improve operating efficiency thus and alleviated labour intensity.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202207887U CN201309089Y (en) | 2008-11-10 | 2008-11-10 | Error proofing clamp for manufacturing mass hole series components |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202207887U CN201309089Y (en) | 2008-11-10 | 2008-11-10 | Error proofing clamp for manufacturing mass hole series components |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201309089Y true CN201309089Y (en) | 2009-09-16 |
Family
ID=41106341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008202207887U CN201309089Y (en) | 2008-11-10 | 2008-11-10 | Error proofing clamp for manufacturing mass hole series components |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201309089Y (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102069400A (en) * | 2010-11-16 | 2011-05-25 | 溧阳市星河精密机械有限公司 | Error-proof part clamping clamp |
CN102729079A (en) * | 2012-07-03 | 2012-10-17 | 芜湖市湖净环保机械有限公司 | Drilling clamp for drilling installing holes of flange disc of pump body of multi-stage pump |
CN102974870A (en) * | 2012-12-14 | 2013-03-20 | 镇江汇通金属成型有限公司 | Mould for drilling holes in worm wheel |
CN103100739A (en) * | 2012-12-14 | 2013-05-15 | 镇江汇通金属成型有限公司 | Method of boring worm gear |
CN103722214A (en) * | 2012-10-15 | 2014-04-16 | 诺德轮毂制造有限公司 | Drilling jig for automobile rim connecting hole |
CN103737398A (en) * | 2013-12-27 | 2014-04-23 | 柳江县龙满机械部件有限责任公司 | Machining center reduction sleeve drilling clamp |
CN103909295A (en) * | 2013-12-21 | 2014-07-09 | 青特集团有限公司 | Practical multi-functional overturning drilling jig tooling with reaming function |
CN104475884A (en) * | 2014-10-27 | 2015-04-01 | 西安航空动力股份有限公司 | Tapping tool for grouped threaded holes |
CN105127925A (en) * | 2015-09-23 | 2015-12-09 | 上海应用技术学院 | Universal error prevention clamp for disc brake caliper shells |
CN106425687A (en) * | 2016-12-09 | 2017-02-22 | 无锡银联齿轮传动机械有限公司 | Detection drill jig combined tool |
CN106735957A (en) * | 2016-12-20 | 2017-05-31 | 桂林福达股份有限公司 | Frock is known in the mark that clutch drived disk assy is beaten in a kind of mistake proofing |
-
2008
- 2008-11-10 CN CNU2008202207887U patent/CN201309089Y/en not_active IP Right Cessation
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102069400A (en) * | 2010-11-16 | 2011-05-25 | 溧阳市星河精密机械有限公司 | Error-proof part clamping clamp |
CN102729079A (en) * | 2012-07-03 | 2012-10-17 | 芜湖市湖净环保机械有限公司 | Drilling clamp for drilling installing holes of flange disc of pump body of multi-stage pump |
CN103722214B (en) * | 2012-10-15 | 2016-06-29 | 诺德科技股份有限公司 | A kind of automobile rim connecting hole drilling jig for drilling |
CN103722214A (en) * | 2012-10-15 | 2014-04-16 | 诺德轮毂制造有限公司 | Drilling jig for automobile rim connecting hole |
CN102974870A (en) * | 2012-12-14 | 2013-03-20 | 镇江汇通金属成型有限公司 | Mould for drilling holes in worm wheel |
CN103100739A (en) * | 2012-12-14 | 2013-05-15 | 镇江汇通金属成型有限公司 | Method of boring worm gear |
CN103909295A (en) * | 2013-12-21 | 2014-07-09 | 青特集团有限公司 | Practical multi-functional overturning drilling jig tooling with reaming function |
CN103737398A (en) * | 2013-12-27 | 2014-04-23 | 柳江县龙满机械部件有限责任公司 | Machining center reduction sleeve drilling clamp |
CN103737398B (en) * | 2013-12-27 | 2016-09-28 | 柳江县龙满机械部件有限责任公司 | A kind of Machining center reduction sleeve drilling clamp |
CN104475884A (en) * | 2014-10-27 | 2015-04-01 | 西安航空动力股份有限公司 | Tapping tool for grouped threaded holes |
CN104475884B (en) * | 2014-10-27 | 2017-01-25 | 西安航空动力股份有限公司 | Tapping tool for grouped threaded holes |
CN105127925A (en) * | 2015-09-23 | 2015-12-09 | 上海应用技术学院 | Universal error prevention clamp for disc brake caliper shells |
CN106425687A (en) * | 2016-12-09 | 2017-02-22 | 无锡银联齿轮传动机械有限公司 | Detection drill jig combined tool |
CN106735957A (en) * | 2016-12-20 | 2017-05-31 | 桂林福达股份有限公司 | Frock is known in the mark that clutch drived disk assy is beaten in a kind of mistake proofing |
CN106735957B (en) * | 2016-12-20 | 2019-04-02 | 桂林福达股份有限公司 | The mark knowledge tooling of clutch drived disk assy is beaten in a kind of mistake proofing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103418698B (en) | Full-automation accessory assembly machine | |
CN201313260Y (en) | Fixture used for drilling holes on small end of connecting rod | |
CN102069214B (en) | Clamp for multi-hole drill | |
CN201357251Y (en) | Drill jig for machining cylinder head hole | |
CN201304576Y (en) | Drill press principal shaft boring apparatus | |
CN201544029U (en) | Multi-station combined equipment | |
CN104924125A (en) | Universal clamp for numerical control machine tool | |
CN202606709U (en) | Full-automatic accessory assembly machine | |
CN102151876B (en) | Linkage compressed type multihole drilling tool | |
CN103286578A (en) | Flange drilling fixture | |
CN201516554U (en) | Mobile multi-station machining machine tool | |
CN101559505B (en) | Combined electrode clamp for electric spark processing | |
CN202129468U (en) | Circumference equal-dividing hole processing device | |
CN104959864A (en) | Numerical control machine tool clamp | |
CN201720483U (en) | Drilling equipment for drilling circumference of circular shaft parts | |
CN102689235B (en) | Multi-station pipe end machining equipment | |
CN206200585U (en) | The axial perforating device of camshaft VCT hole punchers | |
CN202490987U (en) | Tool for fast clamping processed gear rings of gear shaping machine | |
CN204171743U (en) | Calibration rotates milling clamper | |
CN101786246A (en) | Drilling jig for speed reducer connecting cover | |
CN202780539U (en) | Device for machining inner holes of thin-walled annular workpiece | |
CN201744871U (en) | Flange plate processing clamp | |
CN201450421U (en) | Drilling device of motor end cover | |
CN202240640U (en) | Simple and multi-purpose positioning device | |
CN201979174U (en) | Special inner bore burring pneumatic machine for cylinder-type parts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090916 Termination date: 20111110 |