CN105488019A - Power quality monitoring device testing report automatic generation method - Google Patents

Power quality monitoring device testing report automatic generation method Download PDF

Info

Publication number
CN105488019A
CN105488019A CN201510851392.7A CN201510851392A CN105488019A CN 105488019 A CN105488019 A CN 105488019A CN 201510851392 A CN201510851392 A CN 201510851392A CN 105488019 A CN105488019 A CN 105488019A
Authority
CN
China
Prior art keywords
data
bookmark
report
power quality
examining report
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510851392.7A
Other languages
Chinese (zh)
Other versions
CN105488019B (en
Inventor
覃日升
赵泽平
王欣
徐志
周鑫
李胜男
马红升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201510851392.7A priority Critical patent/CN105488019B/en
Publication of CN105488019A publication Critical patent/CN105488019A/en
Application granted granted Critical
Publication of CN105488019B publication Critical patent/CN105488019B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/174Form filling; Merging
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power quality monitoring device testing report automatic generation method. The method comprises the following steps: (1) generating a testing report in an Excel format; inserting tags into a table cell required to insert data according to a table data output position while issuing a final detection report; (2) generating a detection report in the Word format, inserting bookmarks into a position required to insert the data according to the output position of the data in all types while issuing the final detection report; (3) querying an original detection data of the power quality monitoring device; (4) entering the original detection data in the corresponding table cell of the detection report in the Excel format one by one according to the bookmarks; (5) generating the final detection report in the Word format after inserting the data in all types into the detection report in the Word format according to the bookmarks; the artificial participation loop is greatly reduced, the possibility of making mistakes in the detection is reduced, the detection automation degree is promoted, and the working efficiency and working quality of the detection are improved.

Description

A kind of equipment for monitoring power quality Fulfill testing report automatically method
Technical field
The present invention relates to electric device maintenance technical field, particularly relate to a kind of equipment for monitoring power quality Fulfill testing report automatically method.
Background technology
Along with equipment for monitoring power quality is more and more applied to electrical network, before putting into operation, carry out detection to equipment for monitoring power quality more and more to come into one's own, current power supply department at different levels is general according to " GB/T19862 power quality monitoring device General Requirement " to the detection of equipment for monitoring power quality, Detection of content comprises Function detection, accuracy detection, security performance detection, mechanical property detection, Electro Magnetic Compatibility detection etc., and every testing result is all presented in the examining report finally provided.
For each electric energy quality detection device, detected parameters type in every test item is normally determined, the form of the examining report that is finally provided is fixing, just concrete raw sensor data is different, the quality of certain parameter of these raw sensor data reflection current detection device.Raw sensor data can be related to character string, numeral, form etc. according to its attributive classification polytype, such as, to accuracy examining report, also want and the secondary detection data that calculated by raw sensor data such as relative error, absolute error.
Usual examining report is all by testing staff's Manual arranging, and process is: by raw sensor data according to fixed format manual typing examining report after transforming; To secondary detection data, also need to calculate rear typing with counter.The examining report arranging a Detection of content relative complex will expend time several days usually, and makes mistakes unavoidably, and accuracy is low.Especially in the face of similar accuracy detect the report of this mass detection arrange time, a large amount of dull uninteresting repeated work more can cause testing staff to produce psychology of conflicting, and the problem that work efficiency is low, fault rate increases is particularly evident.
Consider the stationarity of examining report, the regularity of testing, the possibility of robotization that examining report finishing utensil is standby, therefore the present invention proposes a kind of equipment for monitoring power quality Fulfill testing report automatically method, make the examining report that user does not need Manual arranging loaded down with trivial details again, significantly promote the accuracy of detection efficiency and examining report.
Summary of the invention
Provide a kind of equipment for monitoring power quality Fulfill testing report automatically method in the embodiment of the present invention, of the prior artly manually complete that above-mentioned examining report is wasted time and energy to solve, problem that error rate height also affects testing progress.
In order to solve the problems of the technologies described above, the embodiment of the invention discloses following technical scheme:
A kind of equipment for monitoring power quality Fulfill testing report automatically method, is characterized in that, comprise the following steps:
(1) examining report of Excel form is generated: according to list data outgoing position when providing final examining report, form is needed in the cell of data inserting, insert label, as the address designation of the raw sensor data typing of equipment for monitoring power quality, and leave the examining report of described Excel form in specified path once; Wherein, described label refers to the data type code named according to the first naming rule.
(2) examining report of Word form is generated: put according to all types of data output bit when providing final examining report, bookmark is inserted by needing the position of data inserting, as the address designation of all types of data inputting, and leave the examining report of described Word form in specified path two times; Wherein, described bookmark refers to the data type code according to the name of the second naming rule, and described bookmark comprises list data bookmark, character data bookmark, numeric data bookmark and paragraph data bookmark.
(3) under leaving the raw sensor data of described equipment for monitoring power quality in specified path three tunnel.
(4) specified path three is accessed, inquire about the raw sensor data of described equipment for monitoring power quality, access specified path one, according to described label by the corresponding unit lattice of the raw sensor data of the described equipment for monitoring power quality examining report of typing Excel form one by one, the intermediate detection generating the Excel form corresponding to the examining report of described Excel form is reported, and leaves the report of the intermediate detection of described Excel form in specify path four.
(5) specified path four is accessed, after according to described bookmark all types of data being inserted the examining report of described Word form, generate the final examining report of Word form, and the final examining report of described Word form is left in the path of specifying five times; Described bookmark comprises reports corresponding list data bookmark, character data, numeric data bookmark and paragraph data bookmark with the intermediate detection of described Excel form.
Preferably, in above-mentioned equipment for monitoring power quality Fulfill testing report automatically method, described step (1) specifically comprises: be stored in by the raw sensor data of the test item of each equipment for monitoring power quality in the different operating table of the examining report of described Excel form respectively, and with the corresponding worksheet of the name nominating of test item, according to list data outgoing position when providing final examining report, each worksheet is needed in the cell of data inserting, insert label, and under worksheet used being stored in successively described specified path different sub-paths once.
Described step (4) specifically comprises: retrieve all labels in each worksheet, according to described label, the raw sensor data of described equipment for monitoring power quality is imported in described worksheet corresponding unit lattice, generate the different operating table of the intermediate detection report of the Excel form of composition, and under each worksheet being left in the different sub-paths under the path four of specifying.
Preferably, in above-mentioned equipment for monitoring power quality Fulfill testing report automatically method, described step (5) specifically comprises:
Resolve the data type of all bookmarks in the examining report of described Word form, and according to described worksheet name nominating described in list data bookmark;
According to described list data bookmark, each worksheet is inserted the list data outgoing position of the examining report of described Word form;
According to described numeric data bookmark, paragraph data bookmark and character data label, the raw sensor data of remaining equipment for monitoring power quality is inserted into the outgoing position of the numerical value of the examining report of described Word form, paragraph and character data, generates the final examining report of Word form.
Preferably, in above-mentioned equipment for monitoring power quality Fulfill testing report automatically method, described the second naming rule is: attribute _ data type name _ extended attribute.
Preferably, in above-mentioned equipment for monitoring power quality Fulfill testing report automatically method, the first naming rule described is: _ data type name.
From above technical scheme, simply provided by the invention, easy-to-use, a kind of workable equipment for monitoring power quality Fulfill testing report automatically method, detailed process is: by raw sensor data, utilize label first to transform via Excel template and obtain form, above table association is filled to Word report template by recycling bookmark, also on the relevant position utilizing the mode of bookmark to be inserted in Word template the data that detection non-in Word examining report directly obtains in addition, the data finally non-detection directly obtained and raw sensor data all insert the position of specifying according to rule, obtain final examining report, a large amount of minimizing manually participates in link, reduce the possibility of making a fault in detecting, promote and detect automaticity, improve testing efficiency and work quality.The Fulfill testing report automatically method provided can be applicable to other similar detection fields equally, possesses good application and replicability.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, for those of ordinary skills, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The schematic flow sheet of a kind of equipment for monitoring power quality Fulfill testing report automatically method that Fig. 1 provides for the embodiment of the present invention.
Embodiment
Technical scheme in the present invention is understood better in order to make those skilled in the art person, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, should belong to the scope of protection of the invention.
See Fig. 1, the figure shows the schematic flow sheet of a kind of equipment for monitoring power quality Fulfill testing report automatically method that the embodiment of the present invention provides, as shown in the figure, comprise the following steps:
In step S01, generate the examining report of Excel form and leave specified path in once: according to list data outgoing position when providing final examining report, form being needed in the cell of data inserting, insert label.
Described label is as the address designation of the raw sensor data typing of equipment for monitoring power quality, and described label refers to the data type code named according to the first naming rule.Citing: in accuracy rate examining report, the ad-hoc location of final examining report is a form, form is the form (3i × 3j) that three row three are indulged, and 1i × 1j cell should insert average, then can utilize _ the such rule of data type name to be to name the label of each cell.By the label _ MA of 1i × 1j cell, similar label also has _ TS (permissible error), _ TM (measuring error), _ C (test result, whether qualified), _ MVs (measurement raw data), _ SP/N/Z (fundamental positive sequence/negative phase-sequence/zero sequence) etc.
In step s 2, generating the examining report of Word form and leave specified path in two times: putting according to all types of data output bit when providing final examining report, inserting bookmark by needing the position of data inserting.
Wherein, bookmark is as the address designation of all types of data inputting, and described bookmark comprises list data bookmark, character bookmark, numeric data bookmark and paragraph data bookmark.Described bookmark refers to the data type code according to the name of the second naming rule.Citing: in final examining report, except having list data in specific position, also has other test relevant informations, may not belong to the original test data directly measured and obtain.Such as report number, dates of test etc., these may be made up of data such as numeral and characters, and want when output detections is reported, this part data can be tested relevant information with some automatically associates; Also bookmark to be utilized to name one by one these relevant informations, the second naming rule can be attribute _ data type name, such as v_ReportID represents report number bookmark, v_TestDate represents bookmark date of test, the similar a_Freq that also has represents frequency bookmark, and a_MharVolt represents harmonic voltage bookmark.The type of the data that attribute representation's label wherein will insert, V represents numerical value class data, a represents form class data, and P represents so paragraph format data.
In step s3, access specified path one, according to described label by the corresponding unit lattice of the described raw sensor data examining report of typing Excel form one by one, generates the intermediate detection report of Excel form, and is left in the path of specifying four times.
Wherein, under the raw sensor data of described equipment for monitoring power quality leaves specified path three tunnel in.Access specified path three, inquires about the raw sensor data of described equipment for monitoring power quality.Citing: in step sl, the label of 1i × 1j cell is _ MA, represents average, after typing raw sensor data, their average is just logged in 1i × 1j cell, the like, one by one after typing, just generate the intermediate detection report of above-mentioned Excel form.
In step s 4 which, access specified path four, after according to described bookmark all types of data being inserted the examining report of described Word form, generates the final examining report of Word form, and is left in the path of specifying five times.
Wherein, described bookmark comprises and reports corresponding list data bookmark, character data, numeric data bookmark and paragraph data bookmark with the intermediate detection of described Excel form.Citing: when the intermediate detection of above-mentioned Excel form is reported as frequency form, character data is on 00 00th, 0000, the paragraph format bookmark regulation the first row top output test date, when a line output frequency form, after step S4, corresponding list data bookmark, character data bookmark, numeric data bookmark and paragraph data bookmark is reported according to the intermediate detection of described Excel form, the data of on 05 05th, 2015 are inserted in automatically on the position of the first row top, then every a line output frequency form.
We know, may comprise the result of multinomial test item in general a examining report, such as, have the list data of multiple different names, in order to can prepare more fast by the final examining report of automatic for every data typing Word form.On the basis of technique scheme as shown in Figure 1, can make adjustment further, realize above-mentioned purpose with this.Concrete scheme is as follows:
By the examining report of the Excel form in above-mentioned steps S1, be split as and the raw sensor data of the test item of each equipment for monitoring power quality is stored in described different operating table respectively, and with the corresponding worksheet of the name nominating of test item, citing: when having two forms in final output detections report, be respectively the form that frequency is relevant with harmonic voltage, just SHEET1 is named frequency, SHEET called after harmonic voltage.Respectively each worksheet is needed to insert label in the cell of data inserting.Then, retrieve all labels in each worksheet, according to described label, the raw sensor data of described equipment for monitoring power quality is imported in described worksheet corresponding unit lattice, generate the intermediate detection report of the Excel form be made up of described worksheet, and leave the report of the intermediate detection of described Excel form in specify path four.
Then, resolve the data type of all bookmarks in the examining report of described Word form, and according to described worksheet name nominating described in list data bookmark; According to described list data bookmark, each worksheet is inserted the list data outgoing position of the examining report of described Word form; According to described numeric data bookmark, paragraph data bookmark and character data label, the raw sensor data of remaining equipment for monitoring power quality is inserted into the outgoing position of the numerical value of the examining report of described Word form, paragraph and character data, generates the final examining report of Word form.
By the description of above embodiment of the method, those skilled in the art can be well understood to the mode that the present invention can add required general hardware platform by software and realize, hardware can certainly be passed through, but in a lot of situation, the former is better embodiment.Based on such understanding, technical scheme of the present invention can embody with the form of software product the part that prior art contributes in essence in other words, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform all or part of step of method described in each embodiment of the present invention.And aforesaid storage medium comprises: ROM (read-only memory) (ROM), random access memory (RAM), magnetic disc or CD etc. various can be program code stored medium.
It should be noted that, in this article such as the relational terms of " first " and " second " etc. and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
The above is only the specific embodiment of the present invention, makes those skilled in the art can understand or realize the present invention.To be apparent to one skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (5)

1. an equipment for monitoring power quality Fulfill testing report automatically method, is characterized in that, comprises the following steps:
(1) examining report of Excel form is generated: according to list data outgoing position when providing final examining report, form is needed in the cell of data inserting, insert label, as the address designation of the raw sensor data typing of equipment for monitoring power quality, and leave the examining report of described Excel form in specified path once; Wherein, described label refers to the data type code named according to the first naming rule;
(2) examining report of Word form is generated: put according to all types of data output bit when providing final examining report, bookmark is inserted by needing the position of data inserting, as the address designation of all types of data inputting, and leave the examining report of described Word form in specified path two times; Wherein, described bookmark refers to the data type code according to the name of the second naming rule, and described bookmark comprises list data bookmark, character data bookmark, numeric data bookmark and paragraph data bookmark;
(3) under leaving the raw sensor data of described equipment for monitoring power quality in specified path three tunnel;
(4) specified path three is accessed, inquire about the raw sensor data of described equipment for monitoring power quality, access specified path one, according to described label by the corresponding unit lattice of the raw sensor data of the described equipment for monitoring power quality examining report of typing Excel form one by one, the intermediate detection generating the Excel form corresponding to the examining report of described Excel form is reported, and leaves the report of the intermediate detection of described Excel form in specify path four;
(5) specified path four is accessed, after according to described bookmark all types of data being inserted the examining report of described Word form, generate the final examining report of Word form, and the final examining report of described Word form is left in the path of specifying five times; Described bookmark comprises reports corresponding list data bookmark, character data bookmark, numeric data bookmark and paragraph data bookmark with the intermediate detection of described Excel form.
2. a kind of equipment for monitoring power quality Fulfill testing report automatically method according to claim 1, it is characterized in that, described step (1) specifically comprises: be stored in by the raw sensor data of the test item of each equipment for monitoring power quality in the different operating table of the examining report of described Excel form respectively, and with the corresponding worksheet of the name nominating of test item, according to list data outgoing position when providing final examining report, each worksheet is needed in the cell of data inserting, insert label, and under described worksheet being stored in successively described specified path different sub-paths once,
Described step (4) specifically comprises: retrieve all labels in each worksheet, according to described label, the raw sensor data of described equipment for monitoring power quality is imported in described worksheet corresponding unit lattice, generate the different operating table of the intermediate detection report of the Excel form of composition, and under each worksheet being left in the different sub-paths under the path four of specifying.
3. a kind of equipment for monitoring power quality Fulfill testing report automatically method according to claim 2, it is characterized in that, described step (5) specifically comprises:
Resolve the data type of all bookmarks in the examining report of described Word form, and according to described worksheet name nominating described in list data bookmark;
According to described list data bookmark, each worksheet is inserted the list data outgoing position of the examining report of described Word form;
According to described numeric data bookmark, paragraph data bookmark and character data label, the raw sensor data of remaining equipment for monitoring power quality is inserted into the outgoing position of the numerical value of the examining report of described Word form, paragraph and character data, generates the final examining report of Word form.
4. a kind of equipment for monitoring power quality Fulfill testing report automatically method according to claim 1, it is characterized in that, described the second naming rule is: attribute _ data type name _ extended attribute.
5. a kind of equipment for monitoring power quality Fulfill testing report automatically method according to claim 1, it is characterized in that, the first naming rule described is: _ data type name.
CN201510851392.7A 2015-11-30 2015-11-30 A kind of equipment for monitoring power quality Fulfill testing report automatically method Active CN105488019B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510851392.7A CN105488019B (en) 2015-11-30 2015-11-30 A kind of equipment for monitoring power quality Fulfill testing report automatically method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510851392.7A CN105488019B (en) 2015-11-30 2015-11-30 A kind of equipment for monitoring power quality Fulfill testing report automatically method

Publications (2)

Publication Number Publication Date
CN105488019A true CN105488019A (en) 2016-04-13
CN105488019B CN105488019B (en) 2018-05-29

Family

ID=55675003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510851392.7A Active CN105488019B (en) 2015-11-30 2015-11-30 A kind of equipment for monitoring power quality Fulfill testing report automatically method

Country Status (1)

Country Link
CN (1) CN105488019B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106447540A (en) * 2016-09-26 2017-02-22 珠海市测绘院 Method for automatically generating town and country planning inspection surveying and mapping achievement
CN106940693A (en) * 2017-02-28 2017-07-11 广东智源信息技术有限公司 Laboratory original record single structure processing method
CN107315728A (en) * 2017-05-31 2017-11-03 民政部国家减灾中心 The method and system of the condition of a disaster report are automatically generated based on the condition of a disaster list
CN107885711A (en) * 2017-11-13 2018-04-06 中国电子科技集团公司第四十研究所 A kind of automatic friendship detecting method of intelligence instrument
CN109255112A (en) * 2018-08-29 2019-01-22 中国信息通信研究院 A kind of report automatic generation method and system
CN112084294A (en) * 2020-09-14 2020-12-15 重庆长安新能源汽车科技有限公司 Whole vehicle electromagnetic compatibility grading management method based on artificial intelligence
CN112100995A (en) * 2020-08-20 2020-12-18 中国核电工程有限公司 Method and device for batch generation of pressure container anti-seismic reports
CN112804136A (en) * 2021-01-29 2021-05-14 浪潮软件股份有限公司 Method for automatically monitoring abnormal data in data transmission process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103020168A (en) * 2012-11-27 2013-04-03 辽宁省电力有限公司电力科学研究院 System and method for automatically generating reports during power monitoring and supervision
US20130290822A1 (en) * 2011-12-29 2013-10-31 Bibo Labs, Inc. Spreadsheet-based programming language adapted for report generation
CN103714492A (en) * 2014-01-02 2014-04-09 广西电网公司电力科学研究院 Automatic report generating method capable of meeting power distribution network management specific data standards

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130290822A1 (en) * 2011-12-29 2013-10-31 Bibo Labs, Inc. Spreadsheet-based programming language adapted for report generation
CN103020168A (en) * 2012-11-27 2013-04-03 辽宁省电力有限公司电力科学研究院 System and method for automatically generating reports during power monitoring and supervision
CN103714492A (en) * 2014-01-02 2014-04-09 广西电网公司电力科学研究院 Automatic report generating method capable of meeting power distribution network management specific data standards

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
勇增智慧: "从Excel中获取数据创建Word报表文档", 《HTTP://WWW.360DOC.COM/CONTENT/14/0121/16/1038189_346904846.SHTML》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106447540A (en) * 2016-09-26 2017-02-22 珠海市测绘院 Method for automatically generating town and country planning inspection surveying and mapping achievement
CN106447540B (en) * 2016-09-26 2021-01-26 珠海市测绘院 Automatic generation method for urban and rural planning inspection surveying and mapping result
CN106940693A (en) * 2017-02-28 2017-07-11 广东智源信息技术有限公司 Laboratory original record single structure processing method
CN106940693B (en) * 2017-02-28 2020-09-01 广东智源信息技术有限公司 Single structure processing method for laboratory original record
CN107315728A (en) * 2017-05-31 2017-11-03 民政部国家减灾中心 The method and system of the condition of a disaster report are automatically generated based on the condition of a disaster list
CN107885711A (en) * 2017-11-13 2018-04-06 中国电子科技集团公司第四十研究所 A kind of automatic friendship detecting method of intelligence instrument
CN109255112A (en) * 2018-08-29 2019-01-22 中国信息通信研究院 A kind of report automatic generation method and system
CN112100995A (en) * 2020-08-20 2020-12-18 中国核电工程有限公司 Method and device for batch generation of pressure container anti-seismic reports
CN112100995B (en) * 2020-08-20 2024-02-09 中国核电工程有限公司 Method and device for batch generation of earthquake-proof reports of pressure vessels
CN112084294A (en) * 2020-09-14 2020-12-15 重庆长安新能源汽车科技有限公司 Whole vehicle electromagnetic compatibility grading management method based on artificial intelligence
CN112084294B (en) * 2020-09-14 2022-07-26 重庆长安新能源汽车科技有限公司 Whole vehicle electromagnetic compatibility grading management method based on artificial intelligence
CN112804136A (en) * 2021-01-29 2021-05-14 浪潮软件股份有限公司 Method for automatically monitoring abnormal data in data transmission process

Also Published As

Publication number Publication date
CN105488019B (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN105488019A (en) Power quality monitoring device testing report automatic generation method
CN110231528B (en) Transformer household variation common knowledge identification method and device based on load characteristic model library
CN106951369B (en) Management method and device for joint debugging test
CN104298588B (en) The implementation method and device of a kind of continuous integrating
CN106570232A (en) Inspection procedure automatic generation method
CN110929965A (en) Project risk assessment method and device
CN111598541A (en) Enterprise business reporting method, device, equipment and storage medium
Adesta et al. Total Productive Maintenance (TPM) implementation based on lean manufacturing tools in Indonesian manufacturing industries
CN107146165B (en) Distribution network planning data management method and system
Banduka et al. Using 80/20 principle to improve decision making at PFMEA
Salim et al. Developing integrated building indicator system (IBIS)(a method of formulating the building condition rating)
CN111966707A (en) Query statement generation method and device, electronic equipment and computer readable medium
CA3142579A1 (en) Method and apparatus for validation of event tracking acquired data
CN103760497A (en) Post-evaluation method and system of storage batteries
DE102007013340A1 (en) System and method for managing environmental impacts of companies
CN108133341A (en) A kind of generation method and system of the material alternative condition based on ERP system
CN104299065A (en) Dispatching automation host and backup model correctness checking method
Vafadar et al. Sensitivity analysis for justification of utilising special purpose machine tools in the presence of uncertain parameters
CN107146166A (en) Accessory system is planned in a kind of distribution
CN115689386A (en) Enterprise operation monitoring method based on knowledge graph and FP (Fabry-Perot) growth algorithm
Frolov Variation coefficient and some distribution laws in the context of cutting tools and other technical objects reliability modeling
CN107238764A (en) The electric energy quality monitoring method and device of power system
Teekasap National economic benefits of circular economy policy
Zhou et al. Design and development of the reliability prediction software for smart meters
CN108073612A (en) The method and apparatus of synchronous SQL executive plans

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant