CN105484782B CN201610015031.3A CN201610015031A CN105484782B CN 105484782 B CN105484782 B CN 105484782B CN 201610015031 A CN201610015031 A CN 201610015031A CN 105484782 B CN105484782 B CN 105484782B
Authority
CN
China
Prior art keywords
powder stick
slip casting
casting powder
rod
fine steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610015031.3A
Other languages
Chinese (zh)
Other versions
CN105484782A (en
Inventor
王文
程志斌
王伸
杨洁
顾合龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201610015031.3A priority Critical patent/CN105484782B/en
Publication of CN105484782A publication Critical patent/CN105484782A/en
Application granted granted Critical
Publication of CN105484782B publication Critical patent/CN105484782B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin

Abstract

The present invention provides a kind of anchor pole and its application method that high pre-stress full length fastening is realized using two fluid grouting powder stick,Slip casting powder stick A,Slip casting powder stick B is hollow tubular,Slip casting powder stick A and slip casting powder stick B is located in the middle part of the body of rod,The close slip casting powder stick B of body of rod one end carries out end anchorage to smash up the resin explosive roll of foot of hole,Slip casting powder stick B remote slip casting powder stick A one end is provided with fixed catch,Slip casting powder stick A remote slip casting powder stick B one end is provided with active blade,The close slip casting powder stick A of body of rod one end is provided with nut,Nut side is provided with supporting plate,Rubber slanting wedge is provided with the body of rod of supporting plate,The fine steel rib being provided through on supporting plate,Fine steel rib is pushed and is connected on active blade,The present invention realizes high pre-stress full length fastening using two fluid grouting powder stick,It is used,Method is simple,Cost is low,Workload is small and construction technology change is small.

Description

A kind of anchor pole and its application method for realizing high pre-stress full length fastening
Technical field
Realize that high pre-stress is complete the present invention relates to mine roadway support technical field, more particularly to using two fluid grouting powder stick Long anchoring anchor field.
Background technology
Colliery tunnel support technology is the key technology in coal mining.Adjoining rock stability is kept, roadway deformation is controlled and breaks Bad is the necessary condition realized mine safety, efficiently produced.As mine develops both in depth and in breadth, roadway support issues performance Obtain more and more prominent.BOLTING TECHNOLOGY TO COAL ROADWAY is quickly grown in recent years, it has also become mine realizes the supporting of high-yield and high-efficiency indispensability Technology.
The current anchorage style of suspension roof support has the anchorage styles such as end anchor, the extensible bolting and full length fastening, in order to improve branch Effect, the tunnel absciss layer for reducing initial stage, deformation are protected, most of end anchors and the extensible bolting anchor pole all apply pretightning force.Full length fastening For anchor pole due to complicated construction technique, application pretightning force difficulty is big, is typically not added with pretightning force, it is impossible to realizes that full-length prestress anchors.
The prestressing force full length fastening of common bolt typically uses two kinds of forms at present.One kind is to use fast slow hardening resin explosive roll To realize, but in actual applications, when aperture ratio is constant because powder stick skin easily forms spherical junctions under the rotation of anchor pole pushing tow Group, directly hinder anchor pole to promote, cause rockbolt installation not in place, therefore often solved using increase bore diameter mode, still Aperture ratio mismatch again be present, the problems such as bond effect is undesirable.Another is that anchor pole is fixed using resin explosive roll, and drilling is non- Strength knot section uses big drill sleeve hole, along anchor rod body arranging exhaust air pipe, rockbolt installation grouting plug, and after the completion of rockbolt installation, slip casting To complete prestressing force full length fastening.
It is big based on current prestressing force full length fastening technology difficulty of construction, the problems such as construction technology complexity, the invention provides The prestressing force Bolt and supporting side that a kind of method is simple, cost is low, workload is small and construction technology change is small are provided Method.
The content of the invention
The invention aims to overcome above-mentioned deficiency of the prior art, there is provided one kind utilizes two fluid grouting powder stick The anchor pole and its application method of high pre-stress full length fastening are realized, is specifically adopted the following technical scheme that:One kind realizes high pre-stress The anchor pole of full length fastening, it include the body of rod, supporting plate, rubber slanting wedge, slip casting powder stick A, slip casting powder stick B, resin explosive roll, fine steel rib, Nut, active blade and fixed catch, it is characterised in that described slip casting powder stick A, slip casting powder stick B is hollow tubular, described Slip casting powder stick A and slip casting powder stick B is located in the middle part of the body of rod, and the close slip casting powder stick B of body of rod one end is bored with smashing up The resin explosive roll in bottom hole portion carries out end anchorage, and the remote slip casting powder stick A of slip casting powder stick B one end is provided with fixation Catch, the remote slip casting powder stick B of slip casting powder stick A one end are provided with active blade, the body of rod close to described Slip casting powder stick A one end is provided with nut, and the nut side is provided with supporting plate, and rubber is provided with the body of rod of the supporting plate Glue wedge, the fine steel rib being provided through on the supporting plate, the fine steel rib are pushed and are connected on the active blade.
Further, preferably, the structure of the fine steel rib must assure that can pushes on movable catch so as to crushing slip casting Powder stick A and B, until active blade is pushed into fix at catch.
Further, preferably, the diameter of the body of rod is less than the diameter of the drilling.
Further, preferably, a diameter of 30mm of the drilling, hole depth 1700mm.
Further, preferably, being provided with primary nut on the termination of the fine steel rib, it is provided with the primary nut and only starches Elastic tape.
In addition, present invention also offers the application method that a kind of anchor pole for realizing high pre-stress full length fastening is anchored, Characterized in that, it comprises the following steps:
A. drilled using jumbolter, borehole cleaning is carried out to it after drilling;
B. resin explosive roll is attached to foot of hole;
C. insertion is equipped with hollow tubular slip casting powder stick A and slip casting powder stick B anchor rod body, and smashes up resin explosive roll progress End anchorage, and apply compared with high pretightening force;
D. fine steel rib is promoted to make its pushes on movable catch so as to crush slip casting powder stick A and slip casting powder stick B, until by active catch Piece is pushed into fix at catch, and plays a part of stirring slurries in slip casting powder stick A and slip casting powder stick B, makes its quick solidification;
E. primary nut of the fine steel rib end with only slurry elastic tape is screwed, and completes the installation of anchor pole.
Further, preferably, in the step a, a diameter of 30mm of the drilling, hole depth 1700mm.
The beneficial effects of the present invention are:
The present invention realizes high pre-stress full length fastening using two fluid grouting powder stick, and it is used, and method is simple, cost Low, workload is small and construction technology change is small.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the anchor pole for realizing high pre-stress full length fastening of the present invention before anchoring;
Fig. 2 is a kind of structural representation of the anchor pole for realizing high pre-stress full length fastening of the present invention after resin explosive roll is smashed up Figure;
Fig. 3 is a kind of structural representation of the anchor pole for realizing high pre-stress full length fastening of the present invention after the completion of anchoring;
Fig. 4 is a kind of mplifying structure schematic diagram of the end for the anchor pole for realizing high pre-stress full length fastening of the present invention.
Wherein, 1- supporting plates 2- rubber slanting wedges 3- slip castings powder stick A 4- slip casting powder stick B 5- bodies of rod 6- drillings 7- resin medicines Roll up 8- fine steel rib 9- nut 10- active blades 11- and fix catch 12- mixing rear slurries.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As Figure 1-4, the invention provides a kind of anchor pole for realizing high pre-stress full length fastening, it includes the body of rod 5, support Plate 1, rubber slanting wedge 2, slip casting powder stick A3, slip casting powder stick B4, resin explosive roll 7, fine steel rib 8, nut 9, active blade 10 and fixation Catch 11, it is characterised in that described slip casting powder stick A3, slip casting powder stick B4 is hollow tubular, the slip casting powder stick A3 and note Slurry powder stick B4 is located in the middle part of the body of rod 5, and close the slip casting powder stick B4 of the body of rod 5 one end is to smash up 6 bottoms that drill Resin explosive roll 7 carries out end anchorage, and the remote slip casting powder stick A3 of slip casting powder stick B7 one end is provided with fixed catch 11, the slip casting powder stick the A3 remote slip casting powder stick B4 one end are provided with active blade 10, the close institute of the body of rod 5 The one end for stating slip casting powder stick A is provided with nut 9, and the side of nut 9 is provided with supporting plate 1, on the body of rod 5 of the supporting plate 1 Rubber slanting wedge 2, the fine steel rib 8 being provided through on the supporting plate 1 are provided with, the fine steel rib 8 pushes and is connected to the activity On catch 10.
In the present embodiment, the structure of the fine steel rib 8 must assure that can pushes on movable catch 10 so as to crushing slip casting Powder stick A and slip casting powder stick B, until active blade 10 is pushed into fix at catch 11.The diameter of the body of rod is less than the drilling Diameter.The diameter 30mm of the drilling, hole depth 1700mm.
In addition, being provided with primary nut on the termination of the fine steel rib 8, it is provided with the primary nut and only starches elastic tape.
In addition, present invention also offers the application method that a kind of anchor pole for realizing high pre-stress full length fastening is anchored, Characterized in that, it comprises the following steps:
A. drilling 6 is carried out using jumbolter, borehole cleaning is carried out to it after drilling;
B. resin explosive roll 7 is attached to 6 bottoms of drilling;
C insert the anchor rod body 5 for being equipped with hollow tubular slip casting powder stick A3 and slip casting powder stick B4, and smash up resin explosive roll 7 carry out end anchorage, and apply compared with high pretightening force;
D. fine steel rib 8 is promoted to make its pushes on movable catch so as to crush slip casting powder stick A3 and slip casting powder stick B4, until will be living Dynamic catch 10 is pushed into fix at catch 11, and plays a part of stirring slurries in slip casting powder stick A3 and slip casting powder stick B4, makes it Quick solidification;
E. primary nut of the end of fine steel rib 8 with only slurry elastic tape is screwed, and completes the installation of anchor pole.
Further, preferably, in the step a, a diameter of 30mm of the drilling, hole depth 1700mm.
The present invention realizes high pre-stress full length fastening using two fluid grouting powder stick, and it is used, and method is simple, cost Low, workload is small and construction technology change is small.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (2)

1. a kind of anchor pole for realizing high pre-stress full length fastening, it includes the body of rod, supporting plate, rubber slanting wedge, slip casting powder stick A, slip casting Powder stick B, resin explosive roll, fine steel rib, nut, active blade and fixed catch, it is characterised in that described slip casting powder stick A, slip casting Powder stick B is hollow tubular, and slip casting powder stick A and slip casting the powder stick B is located in the middle part of the body of rod, the close note of the body of rod Slurry powder stick B one end carries out end anchorage, the remote slip casting of the slip casting powder stick B to smash up the resin explosive roll of foot of hole Powder stick A one end is provided with fixed catch, and the remote slip casting powder stick B of slip casting powder stick A one end is provided with active catch Piece, the close slip casting powder stick A of body of rod one end are provided with nut, and the nut side is provided with supporting plate, close to institute State and rubber slanting wedge is provided with the body of rod of supporting plate, the fine steel rib being provided through on the supporting plate, the fine steel rib pushes connection On the active blade;The structure of the fine steel rib must assure that can pushes on movable catch so as to crush slip casting powder stick A and Slip casting powder stick B, until active blade is pushed into fix at catch;The diameter of the body of rod is less than the diameter of the drilling;It is described The a diameter of 30mm, hole depth 1700mm of drilling;Primary nut is provided with the termination of the fine steel rib, is set on the primary nut Have and only starch elastic tape.
2. the application method anchored using a kind of anchor pole for realizing high pre-stress full length fastening described in claim 1, its It is characterised by, it comprises the following steps:
A. drilled using jumbolter, borehole cleaning is carried out to it after drilling;
B. resin explosive roll is attached to foot of hole;
C. insertion is equipped with hollow tubular slip casting powder stick A and slip casting powder stick B anchor rod body, and smashes up resin explosive roll and carry out end Anchoring, and apply compared with high pretightening force;
D. fine steel rib is promoted to make its pushes on movable catch so as to crush slip casting powder stick A and slip casting powder stick B, until active blade is pushed away To fixed catch, and play a part of stirring slurries in slip casting powder stick A and slip casting powder stick B, make its quick solidification;
E. primary nut of the fine steel rib end with only slurry elastic tape is screwed, and completes the installation of anchor pole.
CN201610015031.3A 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening Expired - Fee Related CN105484782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610015031.3A CN105484782B (en) 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610015031.3A CN105484782B (en) 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Publications (2)

Publication Number Publication Date
CN105484782A CN105484782A (en) 2016-04-13
CN105484782B true CN105484782B (en) 2018-01-30

Family

ID=55672027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610015031.3A Expired - Fee Related CN105484782B (en) 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Country Status (1)

Country Link
CN (1) CN105484782B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640160B (en) * 2016-10-24 2019-03-29 河南理工大学 A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4764055A (en) * 1986-10-02 1988-08-16 Birmingham Bolt Company, Inc. Resin reinforced expansion anchor system
CN2195569Y (en) * 1994-05-20 1995-04-26 中国矿业大学 Fast-setting cement anchoring pile easy to recovery
CN2208617Y (en) * 1994-05-25 1995-09-27 中国矿业大学 Double-end anchored type anchor rod
CN201650320U (en) * 2010-03-27 2010-11-24 中国矿业大学 Hollow rapid hardening resin capsule used for grouted anchor bar sealing
CN102644470A (en) * 2012-04-18 2012-08-22 李治中 General energy-saving quick anchoring method and general energy-saving quick anchor rod
CN203925545U (en) * 2014-05-20 2014-11-05 霍州煤电集团技术研究院 A kind of hollow powder stick for shutoff anchor pole bar tail hell
CN104278998A (en) * 2014-09-22 2015-01-14 山东科技大学 Double-end anchoring type anchor bolt for roadway surrounding rock
CN205370613U (en) * 2016-01-08 2016-07-06 河南理工大学 Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4764055A (en) * 1986-10-02 1988-08-16 Birmingham Bolt Company, Inc. Resin reinforced expansion anchor system
CN2195569Y (en) * 1994-05-20 1995-04-26 中国矿业大学 Fast-setting cement anchoring pile easy to recovery
CN2208617Y (en) * 1994-05-25 1995-09-27 中国矿业大学 Double-end anchored type anchor rod
CN201650320U (en) * 2010-03-27 2010-11-24 中国矿业大学 Hollow rapid hardening resin capsule used for grouted anchor bar sealing
CN102644470A (en) * 2012-04-18 2012-08-22 李治中 General energy-saving quick anchoring method and general energy-saving quick anchor rod
CN203925545U (en) * 2014-05-20 2014-11-05 霍州煤电集团技术研究院 A kind of hollow powder stick for shutoff anchor pole bar tail hell
CN104278998A (en) * 2014-09-22 2015-01-14 山东科技大学 Double-end anchoring type anchor bolt for roadway surrounding rock
CN205370613U (en) * 2016-01-08 2016-07-06 河南理工大学 Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock

Also Published As

Publication number Publication date
CN105484782A (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN205370613U (en) Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock
CN201103397Y (en) Yielding deformed steel bar slip-casting anchor bar
CN200996296Y (en) High-strength decompressing slip-casting rockbolt
CN105257328B (en) A kind of the segmentation archoring slip casting archoring-balt device and its anchoring process of energy automatic clamping
CN104500115B (en) A kind of prestressing force Bolt method for protecting support
CN109578033A (en) Coal mine roadway anchor and its implementation method
CN205532664U (en) Novel flexible stock
CN105626112A (en) Support device based on built-in type constant-resistance device and use method thereof
CN105840221B (en) It rotatably can quick anchoring installation binding type hollow bolt
CN207761696U (en) A kind of end expansion type can connect prestressing force grouted anchor bar
CN103774649B (en) Anti-mouth prevents the prestressed anchor extracted from anchor hole
CN105840222B (en) Push-press type can quick anchoring installation binding type hollow bolt
CN102900447B (en) A kind of anchor pole reinforced for weak surrounding rock
CN105484782B (en) A kind of anchor pole and its application method for realizing high pre-stress full length fastening
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN206539359U (en) A kind of umbrella-type grouted anchor bar
CN205840899U (en) Push-press type can install binding type hollow bolt by quick anchoring
CN111255493B (en) Connectable extension anchor rod capable of achieving segmented anchoring and mounting device thereof
CN206071626U (en) It is rotary can quick anchoring install binding type hollow bolt
CN204475323U (en) The telescopic Inner bolt head of a kind of modified
CN103498690B (en) A kind of two anchor cable combined locking devices and methods therefor
CN111520158B (en) Inclined coal seam fully-mechanized coal mining face roadway combined supporting system and supporting method thereof
CN204982874U (en) Anchor rope construction system of dismouting many times
CN202645603U (en) Recoverable anchor rod for grouting
CN202936778U (en) Aboral pre-stressed anchor capable of preventing from being pulled out of anchor holes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

CF01 Termination of patent right due to non-payment of annual fee