CN204982874U - Anchor rope construction system of dismouting many times - Google Patents
Anchor rope construction system of dismouting many times Download PDFInfo
- Publication number
- CN204982874U CN204982874U CN201520292301.6U CN201520292301U CN204982874U CN 204982874 U CN204982874 U CN 204982874U CN 201520292301 U CN201520292301 U CN 201520292301U CN 204982874 U CN204982874 U CN 204982874U
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- anchor cable
- construction system
- steel strand
- dismounted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
An object of the utility model is to provide an anchor rope construction system of dismouting many times, include anchor rope subassembly, drilling rod, steel strand wires, bear support and tool to lock, the anchor rope subassembly includes unblock portion, loading board and spiral enhancement stirrup, unblock portion and the thread connection of loading board through unblock portion, loading board and spiral enhancement stirrup coaxial coupling and the central department of loading board and spiral enhancement stirrup all is equipped with the central through hole of the same diameter, the drilling rod passes the central through hole, the nearly loading board of drilling rod one side is the head, closely is the afterbody on one side of the spiral enhancement stirrup the afterbody of drilling rod has set gradually and has born support and tool to lock, the tool to lock sticiss and is bearing the nearly drilling rod afterbody of support one side, steel strand wires are connected in unblock portion. The utility model provides an anchor rope construction system of dismouting many times, it is low to have solved current anchor rope device bearing capacity, and it is poor that the effect is retrieved to the anchor rope, unblock difficulty, problem with high costs.
Description
Technical field
The utility model belongs to technical field of building construction, be specifically related to a kind of can the anchor cable construction system of being dismounted for multiple times.
Background technology
When excavating ground in building engineering construction, need to carry out temporary support to foundation ditch, to protect foundation ditch safety of surrounding environment, foundation ditch supports mainly to be needed to use anchor cable, bracing of foundation pit stake.Anchor cable, through weak rocks (soil) layer or slide plane by boring, anchor rod anchored for one end in hard rock stratum or soil layer, then stretch-draw is carried out at another free end, thus to unstable rock mass or the soil body, anchoring is carried out to rock stratum or soil layer applying pressure, its stream line is in the soil layer by steel strand inclined being squeezed into foundation ditch week side.In anchor cable construction, mostly need to carry out drilling operation, in hole, squeeze into water under high pressure while boring earth in hole is uniformly mixed, simultaneously to slip casting in hole, when drilling rod is beaten to desired location, the mixing of earth in boring, slurries solidifies rear formation anchoring section, then penetration concrete, is strained by steel strand and lock outside bracing of foundation pit stake after solidifying.
Along with development and the limited land development resource of China's urban construction, its deep-foundation pit engineering is on the increase, and the application of prestress anchorage cable gets more and more.But as a kind of temporary supporting measure, anchor cable cannot reclaim after supporting disabler, steel strand forever bury and cannot take out in underground, so not only result in great waste, and take a large amount of underground spaces for a long time, form underground garbage, cause underground environmental pollution, serious impact is all caused on the construction in adjacent plot and the long-term plan in city and sustainable development, but and recoverable prestress anchorage cable technology can well address this problem. because the removable anchor cable product design adopted is unreasonable, and underground building situation alters a great deal, problems can be produced during actual use.
As churning anchor cable of the prior art, in structure, this kind of anchor cable is carried out by many steel strand extruded sleeves crimping or by stress application, many steel strand being squeezed in certain space, then be fixed on one piece of loaded plate foremost, be connected with capping beam (enclosing purlin beam) by steel strand (bundle) again, be close to capping beam (enclosing purlin beam) in the outside of capping beam (enclosing purlin beam) and lock with ground tackle; There is following shortcoming: (1) uplift resistance is little, cost performance is low: anchor cable only has lowermost end stressed when Shi Hanzhang, substantially do not stress on 6 meters, front end, record according to pertinent literature, the potential stressing influence district of anchor pole or anchor cable is anchor cable (anchor pole) front end 6-7 rice, is less than 10 times of anchored end diameter, therefore, its back segment anchoring body can not play a role, thus causes its anchor cable (anchor pole) uplift resistance less, and cost performance is low; (2) poor stability: one piece of loaded plate that the in use all prestressing force of anchor cable all concentrates on by anchor cable lowermost end is stressed, thus make the anchoring body of parcel anchor cable (loaded plate) (cement slurry) be easy to be split, the poor stability of anchor cable, cause failure of cable foundation ditch Local Cracking, the generation foundation ditch total collapse that situation is serious.In construction technology, first use three leaf drill bits with certain inclination angle (needing to regulate according to design) pore-forming (reaming), in pore forming process, drilling rod from start to finish carries out high-pressure rotary-spray thus forms an anchoring body, after pore-forming reaches and needs length, extract whole drilling rod, then the loaded plate of anchor cable (have in plate a hole specialize in top anchor cable with) to be inserted on another kind of drill bit by force by anchor cable in hand-hole, and then secondary withdraws from all drilling rods, constructs complete; There is following shortcoming: (1) anchoring body destructible, inefficacy, the distortion of foundation ditch retrospective is large: drill bit from start to finish carries out high-pressure rotary-spray in pore forming process, by continuous print high-pressure rotary-spray, the actual as a whole cylinder formed, is a kind of connected mode of rigidity between it and capping beam (enclosing purlin beam).This anchor cable is without side pressure, and the frictional resistance that anchoring body one of only having anchoring body surface area and surrounding soil to be formed when stressed is single, retrospective distortion easily occurs anchor cable when stressed, causes foundation ditch displacement slowly to become large.Especially (come from dynamic load when loaded vehicle is passed by) when running into ground and having shock wave, move after peak value can occur for the destruction of anchoring body, anchoring body can destroy in segmentation, and then pointwise becomes face to destroy.Just as the reinforcing bar that hit with a hammer in concrete beam, just having started reinforcing bar can not loosen, and along with the frequent impact of shock wave, reinforcing bar can little by little loosen, until the whole body of rod destroys, lost efficacy, (2) anchor cable construction quality is unstable, discreteness is large: anchor cable when pore-forming with three leaf drill bits with certain inclination angle pore-forming (reaming), slip casting (its technique be limit reaming marginal not slurry), to treat after pore-forming again with another kind of drill bit to insert in anchor cable mesopore by force by anchor cable in burying, the deadweight of a drilling rod is only had when initial pore-forming, when laying anchor cable, the tip of drilling rod inserts in anchor cable loaded plate mesopore, at this moment (deadweight of the deadweight+anchor cable of total deadweight=drilling rod of drilling rod), and the place (depth of pore forming can reach 20-50 rice sometimes as required) of in hole tens meters far away is stretched at drilling rod, at this moment gravity when drill bit gravity has foremost been far longer than pore-forming, therefore, drilling rod track when the insertion track when anchor cable is laid and pore-forming is not on same straight line, that is the topmost loaded plate stressed member of anchor cable fails to be wrapped in centre or the substantial deviation anchoring body (cement slurry) of anchoring body (cement slurry), thus greatly reduce the bond stress (self-strength of churning anchoring body centered by high peripheral low) of anchoring body to supporting body, (3) difficulty laid by the anchor cable body of rod: anchor cable by by force in burying time, due to friction, the shearing of loaded plate and the hole wall surrounding soil body, along with the degree of depth of loaded plate jacking is more and more longer, a large amount of soil bodys can be gathered in the front end of loaded plate, thus infinitely increase the resistance of drilling rod jacking, when this resistance is added to enough large, anchor cable just cannot be laid (or lay length inadequate), and thus the uplift resistance of this anchor cable also just cannot meet design needs.In recovery, this kind of anchor cable reclaims difficulty, the rate of recovery is low, shortcoming is as follows: (1) this anchor cable is carried out by one or more steel strand extruded sleeve crimping or by stress application one or more steel strand are squeezed in certain space (being then fixed on one piece of loaded plate foremost): no matter be adopt the mode of " extruded sleeve " or adopt the mode of " one or more steel strand are squeezed in certain space ", all need previously to apply certain stress (according to existing product to him, its stress is generally about 120KN-180KN, by this stress, the assembly of neighbour is pressed together mutually), it just cannot carry and (not reach this prestressing force not have this prestressing, will come off or ultimate tension reduction when the locking of engineering anchorage cable stretching is stressed, affect deep pit monitor coefficient), on the contrary, after engineering failure of cable (using function terminates) ground tackle (capping beam section) unlocks, its end retracting device be fixed on loaded plate also must apply equal stress anchor cable device and could unlock, and that is whole anchor cable could reclaim, if and due to other reasons, as artificial construction reason, due to the cataclysm of sub-surface, carelessness of geological prospecting unit etc., cause a certain anchor cable limit resistance to plucking pulling force be less than before apply prestressing force, so it is buried underground and just cannot unlock with the tripper in the anchoring body of underground, the steel strand of this group anchor cable just cannot take out at all, so not only result in great waste, and take a large amount of underground spaces for a long time, form underground garbage, cause underground environmental pollution, serious impact is all caused on the construction in adjacent plot and the long-term plan in city and sustainable development, (2) outside being close to capping beam (enclosing purlin beam) carries out locking with ground tackle: along with State owned land is exploited natural resources the energy-conserving and environment-protective building that more and more rare and country advocates energetically, for improving land utilization ratio, the outer shear wall of its basement is all very near apart from bracing of foundation pit stake, especially second anchor cable is generally between 80-120cm, deduct the width 60-70cm enclosing purlin beam, actual clear spacing is not more than 50cm, and the anchor cable recovery scope of operation needs 75cm(jack length 45cm+ jack stroke 25cm+ lockset 5cm=75cm usually, if jack again its stroke little cannot unlock not), therefore, when in practical operation, first anchor cable steel strand reclaim often, operation side can meet, and cannot carry out when second anchor cable reclaims construction at all.
Also have a kind of with tubular type churning anchor cable in prior art, basic identical with above-mentioned churning anchor cable on product structure, difference is riding position and the construction technology of the anchor cable body of rod.In construction technology, this kind first rotates into a steel sleeve with tubular type churning anchor cable, and bath limit, limit rotates, rotation limit, limit pore-forming.After desired depth to be achieved, sleeve pipe stops entering being embedded in soil layer temporarily, and then the anchor cable body of rod is inserted in anchor cable hole from casing inner diameter, finally complete slip casting, anchor cable construction is complete; It is as follows to there is shortcoming in it: (1) is constructed slowly, affected programming: cause holding tube (cannot rotate because resistance becomes large steel sleeve), until whole sleeve pipe all cannot be fetched together with the anchor cable body of rod with casing pipe hole forming is as easy as rolling off a log.Especially in sandy soil layer, this phenomenon highlights more, have a strong impact on construction speed (2) body of rod and lay difficulty: sleeve pipe is when pore-forming, the inwall of sleeve pipe is easily filled by the soil body glowed, blocking, especially in argillic horizon, often need repeatedly to dredge casing inner diameter just can lay the anchor cable body of rod, sometimes an anchor cable all cannot be laid for one day, and anchor cable construction is stagnated substantially; (3) anchor cable uplift resistance is little, cost performance is low: anchor cable drilling diameter is less, and the diameter of anchor cable is also just equal to the diameter of steel sleeve, it also reduces the frictional resistance between anchoring body and the soil body simultaneously; (4) anchoring body destructible, inefficacy, the distortion of foundation ditch retrospective is large: anchor cable is stressed more single, and the distortion of foundation ditch retrospective is large.When running into the live load on ground, steel strand easily can little by little loosen, until whole anchoring body destroys, lost efficacy (concrete reason analyzes description) comprehensively.Same, in recovery, this kind of anchor cable reclaims difficulty, and the rate of recovery is low.
From the above, still there is anchor cable device low bearing capacity in prior art stream line structure and construction thereof, and anchor cable recovering effect is poor, unlocks difficulty, high in cost of production problem.In anchor cable (anchor pole) construction, a large amount of steel strand cannot be removed recovery, not only expend a lot of metal material and cause serious underground pollution, become the obstruction of successive projects construction, and can increase difficulty of construction, thus affect construction speed.
Summary of the invention
The purpose of this utility model be to provide a kind of can the anchor cable construction system of being dismounted for multiple times, solve current anchor cable device low bearing capacity, anchor cable recovering effect is poor, unlocks difficulty, the problem that cost is high, and during construction, easily destroy the slow problem of around soil layer, complex operation, construction.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of can the anchor cable construction system of being dismounted for multiple times, comprise: anchor rope component, drilling rod, steel strand, bearing support and lockset, described anchor rope component comprises separates lock section, stirrup strengthened by loaded plate and spiral, described solution lock section is connected by the external screw thread separating lock section with loaded plate, described loaded plate and spiral are strengthened stirrup and are coaxially connected, and the center of described loaded plate and spiral reinforcement stirrup is equipped with the central through hole of same diameter, described drilling rod is through described central through hole, the nearly loaded plate side of described drilling rod is head, stirrup side strengthened by nearly spiral is afterbody, bearing support and lockset is disposed with at the afterbody of described drilling rod, described lockset is pressed on bearing support nearly drilling rod afterbody side, described steel strand are connected to be separated on lock section.
Preferably, described anchor rope component is more than two being connected on described drilling rod.
Preferably, described drilling rod also comprises drilling rod extension bar, described drilling rod extension bar has the centre bore pipeline be connected with drilling rod centre bore pipeline, described drilling rod extension bar front end is connected with extension bar joint, described extension bar joint is connected closely with described tool joint, the equal UNICOM of centre bore pipeline of described extension bar joint and described tool joint endoporus, extension bar.
Preferably, described drilling rod front end is dismountable arranges drill bit assembly, described drill bit assembly comprises connecting rod, drill bit, the front end of described drill bit and connecting rod is by spline clamping, rear end and the described drilling rod front end of described connecting rod are spirally connected, described connecting rod has the endoporus connected with described drilling rod centre bore pipeline, described endoporus extends to described connecting rod front end always and communicates with the external world and forms straight spraying nozzle, the oral area that described endoporus communicates with the external world is the diminishing taper hole of radius, and described drill bit top arranges the mesopore coaxial with described straight spraying nozzle mouth; Also include straight spraying nozzle seal valve, described straight spraying nozzle seal valve is spherical or taper, and the external diameter of described straight spraying nozzle seal valve is greater than the minimum diameter of described straight spraying nozzle oral area taper hole.
Preferably, arrange the side spray nozzle that described endoporus is communicated with in the middle part of described connecting rod, described side spray jet hole diameter and described straight spraying nozzle mouth diameter are than being 1:10-15, and described side spray nozzle is two or more.
Preferably, described solution lock section comprises anchor cable guide way and locking plate, and described locking plate is connected in anchor cable guide way tail end, locking plate occlusion steel strand.
Preferably, described steel strand are arranged in sleeve pipe, and described solution lock section is connected with described sleeve pipe by its inside spin.
Preferably, described steel strand comprise the steel wire harness be wound by more than two steel wire lashings, have gap between described sleeve pipe and steel wire harness, fill filler in this gap.
What the utility model provided can the anchor cable construction system of being dismounted for multiple times, can carry out dispersion carrying, increase the stability that anchor cable is stressed, improve the safety of foundation ditch the stress that need apply; Owing to adopting decentralized stressed, when anchor cable provides identical uplift resistance, anchor cable can reduce the intensity of cement slurry or body, thus reduces construction cost; Bearing support and lockset is disposed with at the afterbody of described drilling rod, described lockset is pressed on bearing support nearly drilling rod afterbody side, steel strand pass in the mesopore of bearing support, and be connected to form an entirety by stress application, when carrying stressed, this bearing support can be stressed as billet; Cut off one by one single for steel strand in the bearing support of hollow with portable minitype cutting machine when anchor cable reclaims, stress slow releasing, the anchor cable rate of recovery is high; Overcome prior art when anchor cable reclaims, must unlock the ground tackle locking plate of anchor cable upper end, and need to utilize jack to provide several the even power of tens tons, when jack cannot be installed at all, ground tackle locking plate then cannot unlock, thus makes the problem that steel strand can not reclaim completely.
Accompanying drawing explanation
Fig. 1 is that the utility model can the overall schematic of anchor cable construction system of being dismounted for multiple times;
Fig. 2 is that the utility model can the drilling rod schematic diagram of anchor cable construction system of being dismounted for multiple times;
Fig. 3 is the enlarged diagram in P portion in Fig. 2;
Fig. 4 is the L-L schematic cross-section of Fig. 3;
Fig. 5 is the M-M schematic cross-section of Fig. 1;
Fig. 6 is the N-N schematic cross-section of Fig. 1;
Fig. 7 is the utility model embodiment solution lock section 11 schematic diagram.
In figure: 10. anchor rope component, 11 separate lock section, 111. guide waies, 112. locking plates, 12. loaded plates, 121. central through holes, 122. steel strand perforation, 123. injected holes, stirrup strengthened by 13 spirals, 20. drilling rods, 21. centre bore pipelines, 22. extension bars, 23. tool joints, 24. extension bar joints, 30. steel strand, 40. supports, 50 locksets, 60. drill bit assemblies, 61. drill bits, 611. mesopores, 62. connecting rods, 63. splines, 64. endoporus, 65. straight spraying nozzles, 66. taper holes, 67. straight spraying nozzle control valves, 68. side spray nozzles, 70. Grouting Pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, the technical solution of the utility model is further described.
As shown in Figure 1, the utility model can the anchor cable construction system of being dismounted for multiple times, comprise: anchor rope component 10, drilling rod 20, steel strand 30, bearing support 40 and lockset 50, described anchor rope component 10 comprises separates lock section 11, stirrup 13 strengthened by loaded plate 12 and spiral, described solution lock section 11 is connected by the external screw thread separating lock section 11 with loaded plate 12, described loaded plate 12 and spiral are strengthened stirrup 13 and are coaxially connected, and the center of described loaded plate 12 and spiral reinforcement stirrup 13 is equipped with the central through hole 121 of same diameter, described drilling rod 20 is through described central through hole 121, the nearly loaded plate side of described drilling rod 20 is head, stirrup 13 side strengthened by nearly spiral is afterbody, bearing support 40 and lockset 50 is disposed with at the afterbody of described drilling rod 20, described lockset 50 is pressed on the nearly drilling rod 20 afterbody side of bearing support 40, described steel strand 30 are connected to be separated on lock section 11.Described bearing support 40 is hollow structure, when anchor cable reclaims at the partial relief steel strand 30 of described bearing support 40 hollow, is cut off by steel strand 30.
Wherein, described anchor rope component 10 is connected on described drilling rod 20 for more than two.Single anchor rope component 10 is connected formation anchor cable community, and each loaded plate 12 is decentralized loaded plates, not only increases the uplift resistance of anchor cable, also suitably reduces the diameter of anchoring body, saves the construction period, reduces engineering cost.Wherein, as illustrated in Figures 5 and 6, loaded plate 12 is provided with injected hole 123 and steel strand perforation 122, described injected hole 123 is for inserting Grouting Pipe 70, when many group anchor rope components 10 are connected, described steel strand perforation 122 is for separating steel strand 30 on lock section 11 through being fixed on other anchor rope components 10.
Wherein, as shown in Figure 2, described drilling rod also comprises drilling rod extension bar 22, described drilling rod extension bar 22 has the centre bore pipeline 21 be connected with drilling rod centre bore pipeline 21, described drilling rod extension bar 22 front end is connected with extension bar joint 24, described extension bar joint 24 is connected closely with described tool joint 23, described extension bar joint 24 UNICOM equal to the centre bore pipeline 21 of described tool joint 23 endoporus, extension bar.Reaming can be carried out as required to the soil layer of different depth.
Wherein, as shown in figures 2-6, described drilling rod 20 front end is dismountable arranges drill bit assembly 60, described drill bit assembly 60 comprises drill bit 61, connecting rod 62, described drill bit 61 passes through spline 63 clamping with the front end of connecting rod 62, rear end and the described drilling rod front end of described connecting rod 62 are spirally connected, described connecting rod 62 has the endoporus 64 connected with described drilling rod centre bore pipeline 21, described endoporus 64 extends to described connecting rod 62 front end always and communicates with the external world and forms straight spraying nozzle 65, the oral area that described endoporus 64 communicates with the external world is the diminishing taper hole 66 of radius, described drill bit 61 top arranges the mesopore 611 coaxial with described straight spraying nozzle mouth, also include straight spraying nozzle seal valve 67, described straight spraying nozzle seal valve 67 is spherical or taper, and the external diameter of described straight spraying nozzle seal valve 67 is greater than the minimum diameter of described straight spraying nozzle oral area taper hole 66.Water under high pressure (or cement paste) is poured in the centre bore pipeline 21 of described drilling rod 20, when without the need to reaming, water under high pressure (or cement paste) sprays forward by straight spraying nozzle 65, carry out die-cut to the soil in drill bit front, when needs carry out reaming to Soil Surrounding, described straight spraying nozzle seal valve 67 is dropped in the centre bore pipeline 21 of described drilling rod 20, described straight spraying nozzle seal valve 67 prolongs described centre bore pipeline 21 and falls in the taper hole 66 of described straight spraying nozzle oral area always, that blocks described straight spraying nozzle 65 goes out water line, thus spray the side spray nozzle 68 forcing water under high pressure to arrange in the middle part of connecting rod 62, rotary-cut is carried out to the soil of connecting rod 62 surrounding, reaming, displacement, stir formation expanding reach, while carrying out ream operation, slip casting in this section of soil, make soil, water, injection slurry is lumped together, solidify rear intensity stronger, simultaneously, because the soil (i.e. the soil of expanding reach front end) above this section of soil is not by disturbance during reaming, destroy, be still that original dense state is (when expanding reach front end face is stressed, its original soil body is just as its natural backing plate), therefore overall tensile strength strengthens, in addition, straight spraying nozzle 65 is sprayed water forward and also can be reduced the resistance that drill bit gets into the cave, reduce energy consumption, reduce the engineering time, thus reduce costs.
Wherein, arrange the side spray nozzle 68 that described endoporus 64 is communicated with in the middle part of described connecting rod 62, described side spray jet hole diameter and described straight spraying nozzle mouth diameter are than being 1:10-15, and described side spray nozzle 68 is two or more.Need to arrange side spray nozzle 68 quantity by practice of construction, different borehole strength and speed are provided.
Wherein, as shown in Figure 7, described solution lock section 11 comprises anchor cable guide way 111 and locking plate 112, and described locking plate 112 is connected in anchor cable guide way 111 tail end, and locking plate 112 is engaged steel strand 30, fixing steel strand 30.Inside locking plate 112, tensioner spring can also be set, during unblock, increase the oral area open-angle that locking plate 112 is engaged steel strand 30, and then control to separate lock section 11, steel strand 30 are reclaimed.Described solution lock section 11 locking plate 112 and steel strand 30 can repeatedly carry out being engaged (locking) and dismounting (unblock)
Wherein, described steel strand 30 are arranged in sleeve pipe, and described solution lock section 11 is connected with described sleeve pipe by its inside spin.Sleeve pipe arrange concrete and steel strand 30 are mutually isolated opens, make the recovery of steel strand 30 become easy.
Wherein, described steel strand 30 comprise the steel wire harness be wound by more than two steel wire lashings, have gap between described sleeve pipe and steel wire harness, fill filler in this gap.Be beneficial to the recovery of steel strand 30.
Set forth a lot of detail in the above description so that fully understand the utility model.But above description is only preferred embodiment of the present utility model, the utility model can be much different from alternate manner described here to implement, and therefore the utility model is not by the disclosed concrete restriction implemented above.Any those skilled in the art are not departing under technical solutions of the utility model ambit simultaneously, the Method and Technology content of above-mentioned announcement all can be utilized to make many possible variations and modification to technical solutions of the utility model, or be revised as the Equivalent embodiments of equivalent variations.Every content not departing from technical solutions of the utility model, according to technical spirit of the present utility model to any simple modification made for any of the above embodiments, equivalent variations and modification, all still belongs in the scope of technical solutions of the utility model protection.
Claims (8)
1. one kind can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, comprise: anchor rope component, drilling rod, steel strand, bearing support and lockset, described anchor rope component comprises separates lock section, stirrup strengthened by loaded plate and spiral, described solution lock section is connected by the external screw thread separating lock section with loaded plate, described loaded plate and spiral are strengthened stirrup and are coaxially connected, and the center of described loaded plate and spiral reinforcement stirrup is equipped with the central through hole of same diameter, described drilling rod is through described central through hole, the nearly loaded plate side of described drilling rod is head, stirrup side strengthened by nearly spiral is afterbody, bearing support and lockset is disposed with at the afterbody of described drilling rod, described lockset is pressed on bearing support nearly drilling rod afterbody side, described steel strand are connected to be separated on lock section.
2. according to claim 1 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, described anchor rope component is more than two being connected on described drilling rod.
3. according to claim 1 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, described drilling rod also comprises drilling rod extension bar, described drilling rod extension bar has the centre bore pipeline be connected with drilling rod centre bore pipeline, described drilling rod extension bar front end is connected with extension bar joint, described extension bar joint is connected closely with described tool joint, the equal UNICOM of centre bore pipeline of described extension bar joint and described tool joint endoporus, extension bar.
4. according to claim 1 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, described drilling rod front end is dismountable arranges drill bit assembly, described drill bit assembly comprises connecting rod, drill bit, the front end of described drill bit and connecting rod is by spline clamping, rear end and the described drilling rod front end of described connecting rod are spirally connected, described connecting rod has the endoporus connected with described drilling rod centre bore pipeline, described endoporus extends to described connecting rod front end always and communicates with the external world and forms straight spraying nozzle, the oral area that described endoporus communicates with the external world is the diminishing taper hole of radius, described drill bit top arranges the mesopore coaxial with described straight spraying nozzle mouth, also include straight spraying nozzle seal valve, described straight spraying nozzle seal valve is spherical or taper, and the external diameter of described straight spraying nozzle seal valve is greater than the minimum diameter of described straight spraying nozzle oral area taper hole.
5. according to claim 4 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, arrange the side spray nozzle that described endoporus is communicated with in the middle part of described connecting rod, described side spray jet hole diameter and described straight spraying nozzle mouth diameter are than being 1:10-15, and described side spray nozzle is two or more.
6. according to claim 1 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, described solution lock section comprises anchor cable guide way and locking plate, and described locking plate is connected in anchor cable guide way tail end, locking plate occlusion steel strand.
7. according to claim 1 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, described steel strand are arranged in sleeve pipe, and described solution lock section is connected with described sleeve pipe by its inside spin.
8. according to claim 7 can the anchor cable construction system of being dismounted for multiple times, it is characterized in that, described steel strand comprise the steel wire harness be wound by more than two steel wire lashings, have gap between described sleeve pipe and steel wire harness, fill filler in this gap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520292301.6U CN204982874U (en) | 2015-05-08 | 2015-05-08 | Anchor rope construction system of dismouting many times |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520292301.6U CN204982874U (en) | 2015-05-08 | 2015-05-08 | Anchor rope construction system of dismouting many times |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204982874U true CN204982874U (en) | 2016-01-20 |
Family
ID=55117256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520292301.6U Active CN204982874U (en) | 2015-05-08 | 2015-05-08 | Anchor rope construction system of dismouting many times |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204982874U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895073A (en) * | 2015-05-08 | 2015-09-09 | 霍炳旭 | Anchor rope construction system capable of being disassembled for many times and construction method thereof |
CN108894221A (en) * | 2018-09-25 | 2018-11-27 | 兰州理工大学 | Reinforced anchor bolt and its recovery method can be recycled in two generation hands |
-
2015
- 2015-05-08 CN CN201520292301.6U patent/CN204982874U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895073A (en) * | 2015-05-08 | 2015-09-09 | 霍炳旭 | Anchor rope construction system capable of being disassembled for many times and construction method thereof |
CN108894221A (en) * | 2018-09-25 | 2018-11-27 | 兰州理工大学 | Reinforced anchor bolt and its recovery method can be recycled in two generation hands |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101906977B (en) | Method for preventing and treating large deformation and collapse of softrock tunnel | |
CN104895073B (en) | Can being dismounted for multiple times anchor cable construction system and its construction method | |
CN106065624B (en) | Suitable for passing through the permanent seal cooling prestress anchorage cable and its construction method of broken rock | |
CN105064356B (en) | Prestressed composite rod cable anchoring device for supporting soft loose soil body | |
CN107060774A (en) | A kind of anti-tunnel portal wall damage device and construction method | |
CN106321119A (en) | Double-layer anchor net cable supporting structure for controlling mining roadway surrounding rock deformation and method thereof | |
CN102966360A (en) | Method for reinforcing rock walls in neighborhood tunnel | |
CN101570970A (en) | Construction method of cement soil anchor and anchor plate combined member thereof | |
CN108386217B (en) | A kind of the automatic classification expansion head Pulling-Resistant Anchor Rod and its application method of reinforcing soft rock mass | |
CN102535458A (en) | Reinforced cement-soil anchor bolt and construction method thereof | |
CN103437354A (en) | Water drainage anchor rod and construction method | |
CN108589723A (en) | Band only starches the segmentation hollow grouting anchor of the segmenting slip casting of branch sleeve | |
CN104452784A (en) | Composite bolt pile used for slope strengthening and construction technique of composite bolt pile | |
CN108643169A (en) | One kind can slip casting prefabricated pile and its piling construction and grouting method | |
CN204982874U (en) | Anchor rope construction system of dismouting many times | |
CN206581960U (en) | The solid anchoring integral hydraulic expansion anchor pole of mining slip casting | |
CN101768973B (en) | Method and equipment for setting rotary-jet steel strand ground anchor | |
CN2326728Y (en) | Expansion-cracking type self-adaptive multi-point-anchoring anchor | |
CN104929101B (en) | Resistance to plucking prestress anchoraging broken stone pile and construction method that a kind of base expanding and base expanding multistage side is expanded | |
CN109183786A (en) | A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method | |
CN205712063U (en) | Anchor pole-ball-star member basis | |
CN205012333U (en) | Recoverable FRP stock with enlarged footing | |
CN204311463U (en) | A kind of Composite Bolt stake for slope reinforcement | |
CN103266608B (en) | Truss combined antiskid anchor pole | |
CN218117814U (en) | Pipe-cable combined type prestress grouting anchoring structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |