CN105484751A - 一种防止大断面矩形顶管隧道产生背土现象的方法 - Google Patents

一种防止大断面矩形顶管隧道产生背土现象的方法 Download PDF

Info

Publication number
CN105484751A
CN105484751A CN201510057259.4A CN201510057259A CN105484751A CN 105484751 A CN105484751 A CN 105484751A CN 201510057259 A CN201510057259 A CN 201510057259A CN 105484751 A CN105484751 A CN 105484751A
Authority
CN
China
Prior art keywords
jacking
pipe
tunnel
separation layer
section rectangular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510057259.4A
Other languages
English (en)
Inventor
张俊岱
宋仪
吕剑英
黄伟
朱勇士
张总纲
倪伟伟
张彦岭
程鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRTG Survey and Design Institute Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201510057259.4A priority Critical patent/CN105484751A/zh
Publication of CN105484751A publication Critical patent/CN105484751A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明属于地下工程非开挖施工领域,尤其涉及一种防止大断面矩形顶管隧道产生背土现象的方法,第一步,施做顶管隧道工作井;第二步,在工作井临隧道侧井壁上对顶管隧道轮廓进行理论定位;第三步,在顶管隧道轮廓上方施做隔离层;第四步,施做隧道洞门;第五步,管节吊装就位;第六步,顶进施工;顶进施工时,上部土体因为隔离层的作用而得到有效保护,不会随着顶管机和顶管管节的顶进而发生土体移动,故能避免背土现象的发生。

Description

一种防止大断面矩形顶管隧道产生背土现象的方法
技术领域
本发明属于地下工程非开挖施工领域,尤其涉及一种防止大断面矩形顶管隧道产生背土现象的方法。
背景技术
矩形顶管隧道主要应用于地铁出入口、市政过街通道、地下商业街人行通道和市政隧道等工程。由于顶管掘进机机头和顶管管节与周边土体间存在摩擦作用,且摩擦接触面大,在顶管顶进施工过程中,顶管管节和顶管掘进机机头因过大的摩擦力带动其上方土体向前移动造成背土现象,导致顶管隧道上方土层严重扰动,引起地表土体发生隆起或沉陷现象,对顶管隧道上方土层环境产生重大影响。因此,迫切需要采取措施避免背土现象的产生。
目前,现有技术中常采用在管节四周注入触变泥浆的方法来减少背土现象。触变泥浆理想状态下会在顶管管节周边形成一圈泥浆套,从而增大土体与管节间的润滑作用,以此来减小顶管机和顶管管节与周边土体间的摩擦力。对于顶管隧道上方浅覆土的情况,采用该种方法时触变泥浆套虽然可以减小顶管与上部土体间摩擦力,但尚不能足够消除背土现象,地层和地表破坏仍无法避免。
发明内容
本发明提供一种防止大断面矩形顶管隧道产生背土现象的方法,以解决上述背景技术中提出的无法消除背土现象的问题。
本发明所解决的技术问题采用以下技术方案来实现:
一种防止大断面矩形顶管隧道产生背土现象的方法,其特征在于:依次包括以下步骤:
第一步,施做顶管隧道工作井;
第二步,在工作井临隧道侧井壁上对顶管隧道轮廓进行理论定位;
第三步,在顶管隧道轮廓上方施做隔离层;
第四步,施做隧道洞门;
第五步,管节吊装就位;
第六步,顶进施工。
顶管管节顶进施工前,在顶管隧道上方施做隔离层,隔离层使顶管掘进机和顶管管节与其上部土体相互分离。
采用所述方法,在顶管管节顶进施工过程中,隔离层能有效隔断顶管隧道上方土体发生背土破坏的路径,避免背土现象的发生。
采用所述方法,在顶管管节顶进施工过程中,隔离层自身不会发生破坏。
结合不同的顶管隧道工程,隔离层可通过以下不同的施做方式来实现:施做超前管棚或超前管幕或径向注浆或地表注浆或隔离钢板。
本发明的有益效果为:
在矩形顶管顶进施工前,通过工程措施在顶管隧道上部施做隔离层,使得顶管掘进机和顶管管节与其上方的土体相互隔离,顶进施工时,上部土体因为隔离层的作用而得到有效保护,不会随着顶管机和顶管管节的顶进而发生土体移动,故能避免背土现象的发生。可见,本发明提供了一种能有效防止大断面矩形顶管隧道产生背土现象的方法,从而避免了地表土体隆起或沉陷。
附图说明
图1是本发明的结构断面示意图;
图2是图1的A-A截面示意图。
图中,1-管节,2-触变泥浆注浆孔,3-管节吊装孔,4-隔离层,5-顶管上方浅覆土发生背土现象时的破坏路径,6-地面线。
具体实施方式
以下为本发明可选的一实施例,本专业领域内的技术人员在不改变本发明精神和内容的前提下可以对其进行修改和润色。以下结合附图对本发明做进一步描述:
一种防止大断面矩形顶管隧道产生背土现象的方法,依次包括以下步骤:
第一步,施做顶管隧道工作井;
第二步,在工作井临隧道侧井壁上对顶管隧道轮廓进行理论定位;
第三步,在顶管隧道轮廓上方施做隔离层;
第四步,施做隧道洞门;
第五步,管节吊装就位;
第六步,顶进施工。
顶管管节顶进施工前,在顶管隧道上方施做隔离层,隔离层使顶管掘进机和顶管管节与其上部土体相互分离。
采用所述方法,在顶管管节顶进施工过程中,隔离层能有效隔断顶管隧道上方土体发生背土破坏的路径,避免背土现象的发生。
采用所述方法,在顶管管节顶进施工过程中,隔离层自身不会发生破坏。
结合不同的顶管隧道工程,隔离层可通过以下不同的施做方式来实现:施做超前管棚或超前管幕或径向注浆或地表注浆或隔离钢板。
本实施例的具体结构为,包括管节1,管节1的垂直上方设有隔离层4,管节1内设有触变泥浆注浆孔2,管节1的外侧壁设有管节吊装孔3。
在顶管隧道上方施做隔离层4,隔离层4使顶管掘进机和顶管管节1与其上部土体相互分离,在顶管管节1顶进施工过程中,隔离层4能有效隔断顶管隧道上方土体发生背土破坏的路径5,避免背土现象的发生,并且隔离层4自身不会发生破坏。
结合不同的顶管隧道工程,本方法中的隔离层4可通过多种不同的施做方式来实现,如施做超前管棚、超前管幕、径向注浆、地表注浆、隔离钢板等等。在实际施工中,可以采取多种工程措施来施做隔离层4,所以,无论采取何种工程措施,都应认为其落在了本发明的保护范围。
本实施例中,沿隧道长度方向,以顶管顶进的方向为前向,反之为后向。隔离层4位于顶管管节1的正上方,顶管工作井施做完毕后,首先在工作井临隧道侧井壁上进行顶管轮廓理论定位,然后施做上部隔离层4,隔离层4施做完成后紧接着施做隧道洞门,随后吊装管节就位并开始顶进施工。
隔离层4能有效隔断顶管上方土体发生背土现象的破坏路径5,从而避免背土现象的发生。可见,本发明提供了一种能有效防止大断面矩形顶管隧道产生背土现象的方法。
利用本发明所述的技术方案,或本领域的技术人员在本发明技术方案的启发下,设计出类似的技术方案,而达到上述技术效果的,均是落入本发明的保护范围。

Claims (5)

1.一种防止大断面矩形顶管隧道产生背土现象的方法,其特征在于:依次包括以下步骤:
第一步,施做顶管隧道工作井;
第二步,在工作井临隧道侧井壁上对顶管隧道轮廓进行理论定位;
第三步,在顶管隧道轮廓上方施做隔离层;
第四步,施做隧道洞门;
第五步,管节吊装就位;
第六步,顶进施工。
2.根据权利要求1所述的一种防止大断面矩形顶管隧道产生背土现象的方法,其特征在于:顶管管节顶进施工前,在顶管隧道上方施做隔离层,隔离层使顶管掘进机和顶管管节与其上部土体相互分离。
3.根据权利要求1所述的一种防止大断面矩形顶管隧道产生背土现象的方法,其特征在于:采用所述方法,在顶管管节顶进施工过程中,隔离层能有效隔断顶管隧道上方土体发生背土破坏的路径,避免背土现象的发生。
4.根据权利要求1所述的一种防止大断面矩形顶管隧道产生背土现象的方法,其特征在于:采用所述方法,在顶管管节顶进施工过程中,隔离层自身不会发生破坏。
5.根据权利要求1所述的一种防止大断面矩形顶管隧道产生背土现象的方法,其特征在于:结合不同的顶管隧道工程,隔离层可通过以下不同的施做方式来实现:施做超前管棚或超前管幕或径向注浆或地表注浆或隔离钢板。
CN201510057259.4A 2015-02-04 2015-02-04 一种防止大断面矩形顶管隧道产生背土现象的方法 Pending CN105484751A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510057259.4A CN105484751A (zh) 2015-02-04 2015-02-04 一种防止大断面矩形顶管隧道产生背土现象的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510057259.4A CN105484751A (zh) 2015-02-04 2015-02-04 一种防止大断面矩形顶管隧道产生背土现象的方法

Publications (1)

Publication Number Publication Date
CN105484751A true CN105484751A (zh) 2016-04-13

Family

ID=55671996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510057259.4A Pending CN105484751A (zh) 2015-02-04 2015-02-04 一种防止大断面矩形顶管隧道产生背土现象的方法

Country Status (1)

Country Link
CN (1) CN105484751A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968686A (zh) * 2017-03-28 2017-07-21 中国五冶集团有限公司 一种管棚施工方法
CN108457660A (zh) * 2018-04-17 2018-08-28 中铁工程装备集团有限公司 一种矩形顶管施工防止背土的装置及其施工方法
CN109098725A (zh) * 2018-08-25 2018-12-28 许明 一种具有防背土装置的矩形盾构机
CN109723443A (zh) * 2018-12-30 2019-05-07 中铁十四局集团有限公司 隧道施工方法
CN109989758A (zh) * 2017-12-29 2019-07-09 中铁隧道集团二处有限公司 一种用于矩形隧道薄覆土防背土减阻措施
CN110118090A (zh) * 2019-06-13 2019-08-13 河南理工大学 用于防止隧道注浆加固引起地表隆起的防护结构

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147194A (ja) * 2000-11-07 2002-05-22 East Japan Railway Co 鉄筋・型枠組立方法
CN1391053A (zh) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 土压平衡矩形顶管施工工艺
CN101532386A (zh) * 2009-04-09 2009-09-16 上海建工(集团)总公司 用于浅层地下空间施工的减摩隔板托换方法及装置
CN201407050Y (zh) * 2009-04-09 2010-02-17 上海建工(集团)总公司 用于浅层地下空间施工的减摩隔板托换装置
CN102182464A (zh) * 2011-03-31 2011-09-14 上海建工集团股份有限公司 通道结构的施工结构及施工方法
CN102966357A (zh) * 2012-12-11 2013-03-13 上海市机械施工有限公司 矩形隧道掘进机机头防背土装置、方法及矩形隧道掘进机
CN103711498A (zh) * 2013-12-30 2014-04-09 上海市机械施工集团有限公司 矩形盾构机的防背土装置与方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147194A (ja) * 2000-11-07 2002-05-22 East Japan Railway Co 鉄筋・型枠組立方法
CN1391053A (zh) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 土压平衡矩形顶管施工工艺
CN101532386A (zh) * 2009-04-09 2009-09-16 上海建工(集团)总公司 用于浅层地下空间施工的减摩隔板托换方法及装置
CN201407050Y (zh) * 2009-04-09 2010-02-17 上海建工(集团)总公司 用于浅层地下空间施工的减摩隔板托换装置
CN102182464A (zh) * 2011-03-31 2011-09-14 上海建工集团股份有限公司 通道结构的施工结构及施工方法
CN102966357A (zh) * 2012-12-11 2013-03-13 上海市机械施工有限公司 矩形隧道掘进机机头防背土装置、方法及矩形隧道掘进机
CN103711498A (zh) * 2013-12-30 2014-04-09 上海市机械施工集团有限公司 矩形盾构机的防背土装置与方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968686A (zh) * 2017-03-28 2017-07-21 中国五冶集团有限公司 一种管棚施工方法
CN109989758A (zh) * 2017-12-29 2019-07-09 中铁隧道集团二处有限公司 一种用于矩形隧道薄覆土防背土减阻措施
CN109989758B (zh) * 2017-12-29 2020-08-11 中铁隧道集团二处有限公司 一种用于矩形隧道薄覆土防背土减阻措施
CN108457660A (zh) * 2018-04-17 2018-08-28 中铁工程装备集团有限公司 一种矩形顶管施工防止背土的装置及其施工方法
CN108457660B (zh) * 2018-04-17 2023-10-20 中铁工程装备集团有限公司 一种矩形顶管施工防止背土的装置及其施工方法
CN109098725A (zh) * 2018-08-25 2018-12-28 许明 一种具有防背土装置的矩形盾构机
CN109098725B (zh) * 2018-08-25 2020-05-19 浙江中铁工程装备有限公司 一种具有防背土装置的矩形盾构机
CN109723443A (zh) * 2018-12-30 2019-05-07 中铁十四局集团有限公司 隧道施工方法
CN109723443B (zh) * 2018-12-30 2021-07-20 中铁十四局集团有限公司 隧道施工方法
CN110118090A (zh) * 2019-06-13 2019-08-13 河南理工大学 用于防止隧道注浆加固引起地表隆起的防护结构
CN110118090B (zh) * 2019-06-13 2024-03-22 河南理工大学 用于防止隧道注浆加固引起地表隆起的防护结构

Similar Documents

Publication Publication Date Title
CN105484751A (zh) 一种防止大断面矩形顶管隧道产生背土现象的方法
CN101886390B (zh) 一种狭小空间全套管静压拔桩的方法
CN104533467B (zh) 一种高承压水、断层破碎巷道的支护方法
CN104047623B (zh) 一种大跨洞室开挖施工方法
CN106049532B (zh) 一种综合管廊明挖施工支挡装置及其施工方法
CN110173264B (zh) 断顶与常规卸压防治坚硬顶板留巷冲击地压方法
CN103485790A (zh) 一种管幕-支护结构组合体系浅埋暗挖法
CN103114857A (zh) 一种盾构隧道施工方法
CN208220817U (zh) 超大断面浅埋软弱围岩隧道井字形双侧壁支护体系
CN103603342A (zh) 大直径组合套管超长灌注桩施工方法
AU2014292699A1 (en) Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same
CN104947681A (zh) 一种超大超深地下室基坑的施工方法
CN102733390B (zh) 一种地下废弃锚索/锚杆的拆除方法
CN105909256A (zh) 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法
CN107575237A (zh) 一种暗挖法与盾构法相结合建造地铁车站的施工方法
Ni et al. Shield machine disassembly in grouted soils outside the ventilation shaft: a case history in Taipei Rapid Transit System (TRTS)
CN103291312B (zh) 能够实现三维注浆的盾构机
CN103527204B (zh) 一种先墙后拱交叉中隔壁的隧道施工方法
CN105715277A (zh) 一种盾构隧道的施工装置及施工方法
CN105909262B (zh) 一种暗挖隧道掘进方法
CN101864962A (zh) 软土地层隧道冻结暗挖原位修复施工方法
CN104074183A (zh) 一种钻孔及根部注入砼的组合桩植桩结构及施工方法
CN104831735B (zh) 一种桩幕合一的止水支护结构及其施工方法和施工设备
CN103132531A (zh) 基坑支护体系施工方法
CN102900026B (zh) 隧道开挖地段加固高架桥基保护桥面的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160413