CN105484273B - A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original - Google Patents
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original Download PDFInfo
- Publication number
- CN105484273B CN105484273B CN201510809860.4A CN201510809860A CN105484273B CN 105484273 B CN105484273 B CN 105484273B CN 201510809860 A CN201510809860 A CN 201510809860A CN 105484273 B CN105484273 B CN 105484273B
- Authority
- CN
- China
- Prior art keywords
- original
- improve
- soil moved
- side slope
- moved
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B79/00—Methods for working soil
- A01B79/02—Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/22—Improving land use; Improving water use or availability; Controlling erosion
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P60/00—Technologies relating to agriculture, livestock or agroalimentary industries
- Y02P60/40—Afforestation or reforestation
Abstract
The invention discloses the methods that anti-soil moved in improve the original overly moist in a kind of dry spray operation of side slope soil moved in improve the original blocks pipeline, include the following steps:1) improvement soil moved in improve the original is prepared:Sandstone material and vegetable matter are added into aqueous soil moved in improve the original, is uniformly mixed;2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.The method of the present invention reduces agglomeration using the method effective solution dispersion adhesive aggregation particle and matrix wall sticking phenomenon for improving soil moved in improve the original proportioning to reduce viscosity;Reduce the generation of wall sticking phenomenon;Plugging phenomenon in dry spray operation is can effectively prevent, ensures that construction is smoothed out, waste utilization reduces cost so that side slope surface is sowed grass seeds by duster uniformly, ensure that construction speed, and can guarantee the afforestation effect of side slope.
Description
Technical field
This method is related to a kind of done for side slope and sprays in operation, and the method for preventing overly moist substrate clogging pipeline belongs to highway
Protecting slope ecology technical field.
Technical background
Road construction play the role of for expanding economy it is very important, but due to artificially constructing often to nature
Environment brings certain negative effect, and especially in mountainous region and hilly country, road construction generally requires to carry out cutting slope to massif
Equal operations, influence landform, excavate more.These side slopes excavated not only affect the whole landscape for destroying road, Er Qieduo
Number is not in stable state, the destructive behaviors such as regular appearance collapses, rubble slump, landslide, mud-rock flow.Therefore, right
In side slope improvement and greening measure be administer these side slopes important means.Using cement as the governance model of main material once
It is the important means that side slope is quickly administered, nowadays with China in recent years, increasingly pay attention to ecological afforestation, is built in road and bridge
Also begin to attach great importance to the ecological afforestation engineering of excavation slope in if.With being paid more attention to environmental protection, slope ecological is green
Chemical conversion is a new bright spot.Seed spraying technology is increasingly becoming the major measure of slope treatment, mainly has in alien earth sparging
Dry spray and two kinds of techniques of wet shot, relatively dry spray, wet shot working efficiency is more relatively high, but horizontal and vertical fed distance is all
More much shorter than dry spray, wherein the horizontal transport distance of dry spraying construction can reach 200m, but wet shot is generally in 30m or so;Dry spray is hung down
Straight fed distance is generally in 50m or so, but wet shot can only achieve 20m.For high gradient slope or larger side slope, wet spraying process
Obviously be not suitable for, but when side slope carries out dry spray operation, due to being influenced by factors such as rainfalls, the humidity of soil is glued
Degree is big, and plugging phenomenon is serious during sowing grass seeds by duster, and seriously restricts being normally carried out for dry spraying construction, not only delay the duration, waste raw material,
Cost is increased, and seriously affects sow grass seeds by duster quality and slope greening situation.
Invention content
The purpose of the present invention is overcoming the problems, such as line clogging present in dry pressure spray process, a kind of dry spray work of side slope soil moved in improve the original is provided
Anti- soil moved in improve the original overly moist blocks the method for pipeline in industry.
Technical scheme of the present invention is summarized as follows:
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original, includes the following steps:
1) improvement soil moved in improve the original is prepared:Sandstone material and vegetable matter are added into aqueous soil moved in improve the original, is uniformly mixed, it is described
The mass ratio of aqueous soil moved in improve the original, sandstone material and vegetable matter is 70%-91%:4%-15%:5%-15%;It is described to contain boatman
Soil is 20%~60% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
The mass ratio of aqueous soil moved in improve the original, sandstone material and vegetable matter is preferably 84%:8%:8%;The aqueous soil moved in improve the original
Containing water quality be 36.5%;
Sandstone material is rubble, Machine-made Sand, haydite or zeolite.
Vegetable matter is cavings, sawdust, rice straw end, broomcorn straw end or maize straw end.
Advantages of the present invention:
The method of the present invention disperses adhesive aggregation particle and matrix wall sticking phenomenon using the method effective solution for improving soil moved in improve the original proportioning,
To reduce viscosity, reduction agglomeration;Reduce the generation of wall sticking phenomenon;Plugging phenomenon in dry spray operation is can effectively prevent,
Ensure that construction is smoothed out, waste utilization reduces cost so that side slope surface is sowed grass seeds by duster uniformly, ensure that construction speed, and can protect
The afforestation effect of side slope is demonstrate,proved.
Specific implementation mode
In order to better illustrate the content of present invention, it is described in detail and invents with reference to specific embodiment.It is all not depart from this hair
Bright purpose and main idea, any combination and variation within the scope of the claims are formed by similar other implementation forms and belong to
Range according to the present invention.
Soil moved in improve the original refers to that non-locality is primary, is used to replace the nonlocal soil of sedendary soil by other places in-migration, typically refers to quality
Good loam (sandy loam) or artificial soil further needs exist for the substances such as the agent of addition granule, fiber, organic fertilizer, has to bring up
It is certain thickness that there is resistance to rainwater, wind to corrode, securely ventilative, or more preferably porous stable soil knot similar with natural table soil
Structure.
Embodiment 1
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original, includes the following steps:
1) improvement soil moved in improve the original is prepared:Rubble and cavings are added into aqueous soil moved in improve the original, is uniformly mixed, the aqueous soil moved in improve the original,
The mass ratio of rubble and cavings is 84%:8%:8%;The aqueous soil moved in improve the original is 36.5% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
Embodiment 2
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original, includes the following steps:
1) improvement soil moved in improve the original is prepared:Machine-made Sand and sawdust are added into aqueous soil moved in improve the original, is uniformly mixed, it is described to contain boatman
The mass ratio of soil, Machine-made Sand and sawdust is 70%:15%:15%;The aqueous soil moved in improve the original is 60% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
Embodiment 3
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original, includes the following steps:
1) improvement soil moved in improve the original is prepared:Haydite and rice straw end are added into aqueous soil moved in improve the original, is uniformly mixed, it is described to contain boatman
Soil, haydite and the mass ratio at rice straw end are 91%:4%:5%;The aqueous soil moved in improve the original is 30% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
Embodiment 4
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original, includes the following steps:
1) improvement soil moved in improve the original is prepared:Zeolite and broomcorn straw end are added into aqueous soil moved in improve the original, is uniformly mixed, it is described aqueous
The mass ratio of soil moved in improve the original, zeolite and broomcorn straw end is 80%:15%:5%;The aqueous soil moved in improve the original is 20% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
Embodiment 5
A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original, includes the following steps:
1) improvement soil moved in improve the original is prepared:Rubble and maize straw end are added into aqueous soil moved in improve the original, is uniformly mixed, it is described aqueous
The mass ratio of soil moved in improve the original, rubble and maize straw end is 87%:7%:6%;The aqueous soil moved in improve the original is 36.5% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
In the experiment for carrying out soil moved in improve the original improvement, the germination percentage of seed is tested respectively, data are shown in Table 1.
Table 1
In experiment, related experiment has all been carried out using adaptability herbaceous plant English ryegrass and Festuca Arundinacea.Due to incorporation
After sandstone material and vegetable matter, soil moved in improve the original is uniformly mixed, and density reduces, germination preferably, so spraying rear germination percentage
There is different degrees of raising.
When plugging wall sticking phenomenon occurs, soil moved in improve the original matrix is typically in the range of containing water quality between 20%~60%, in stirring
In the process, there is a large amount of agglomerated particle, waste raw material, while serious plugging wall sticking phenomenon occur during sowing grass seeds by duster, influence
Construction is smoothed out.
When mixing the soft materials such as sandstone hard material and cavings, sawdust, sandstone material can destroy in whipping process
The grain size of adhesive aggregation phenomenon between soil, sandstone material is less than the maximum particle diameter requirement for equipment of gushing.
Vegetable matter has water absorbing properties, can bulk matrix, reduce substrate water content by water absorbing properties and disperse
Matrix granule, guarantee, which is sowed grass seeds by duster, to be smoothed out, and being typically chosen is advisable with powdered.
Experiment:
1) side slope is tested on the right side of your the tenth bid section of hundred road of Anxin area.
Side slope belongs to low middle mountainous region looks, ROCK MASS JOINT cranny development, rock crushing on the right side of the tenth bid section of hundred roads;Road is filled out
Digging is smaller, and landform nature longitudinal slope is relatively slow, slope natural stability, and stability of slope problem is not present after road excavation, but due to quick-fried
It is broken to cause side slope surface layer rock crack broken.Meanwhile side slope multi-step is excavated in construction, ensures slope stability.But by
Complex in rock mass structure, step is not regular smooth enough.
Side slope slope foot width 102m, vertical height 52m, top of the slope to slope foot length is 59.4m.The side slope gross area is about
4980m2, 56.4 ° of whole angle, slope surface excavate two steps, be divided into three sections, middle and lower part slope surface angle is distributed between 65~75 °,
Top slope surface angle>80 °, near vertical.
2) since by influences such as rainfalls, aqueous soil moved in improve the original moisture content is 36.5%;
Prepare improvement soil moved in improve the original:Rubble and cavings are added into aqueous soil moved in improve the original, is uniformly mixed, aqueous soil moved in improve the original, rubble and
The mass ratio of cavings is 84%:8%:8%;Improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope.
Dry spray operation is carried out using the aqueous soil moved in improve the original control group for not mixing sandstone and cavings simultaneously, the results are shown in Table 2.
It operates 5 days altogether.Every workday is 8 hours.
Table 2
Control group | Embodiment 1 | Embodiment 5 | |
Scrap rate | 5.6% | 0.34% | 0.21% |
Average every workday plugging number | 8.2 | 1 | 0.4 |
Average every workday normal spraying time (hour) | 2.60 | 7.67 | 7.88 |
Note:Scrap rate refers in the soil moved in improve the original mixed according to the ratio, can not pass through the visitor of hydroseeder sieve since particle is excessive
Native agglomerated particle.According to hydroseeder specification different from, the equipment requirement particle diameter used in experiment is not more than granular size
20mm belongs to waste material more than 20mm.
From, as can be seen that after using improvement soil moved in improve the original, scrap rate is substantially reduced, while plugging number is big in above-mentioned experimental data
Width reduce so that can ensure 7 normal spraying times more than hour in a working day, ensure that construction it is smooth into
Row.
The above description of test is done present method solves pipeline is blocked present in current dry pressure spray process without influencing
Pressure spray process is normally carried out, while improving construction efficiency, when the dry spray operation of side slope in a kind of preferable technology.
Claims (2)
1. anti-soil moved in improve the original overly moist blocks the method for pipeline in a kind of dry spray operation of side slope soil moved in improve the original, it is characterized in that including the following steps:
1) improvement soil moved in improve the original is prepared:Sandstone material and vegetable matter are added into aqueous soil moved in improve the original, is uniformly mixed, it is described aqueous
The mass ratio of soil moved in improve the original, sandstone material and vegetable matter is 70%-91%:4%-15%:5%-15%;The aqueous soil moved in improve the original
It is 20%~60% containing water quality;
2) improvement soil moved in improve the original is sprayed on by road by the dry pressure spray process of soil moved in improve the original in massif side slope;
The sandstone material is rubble, Machine-made Sand, haydite or zeolite;
The vegetable matter is cavings, sawdust, rice straw end, broomcorn straw end or maize straw end.
2. according to the method described in claim 1, it is characterized in that the quality of the aqueous soil moved in improve the original, sandstone material and vegetable matter
Than being 84%:8%:8%;The aqueous soil moved in improve the original is 36.5% containing water quality.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510809860.4A CN105484273B (en) | 2015-11-20 | 2015-11-20 | A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510809860.4A CN105484273B (en) | 2015-11-20 | 2015-11-20 | A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105484273A CN105484273A (en) | 2016-04-13 |
CN105484273B true CN105484273B (en) | 2018-07-24 |
Family
ID=55671519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510809860.4A Active CN105484273B (en) | 2015-11-20 | 2015-11-20 | A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105484273B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109041691A (en) * | 2018-08-13 | 2018-12-21 | 紫金矿业集团股份有限公司 | Utilize the method for repairing mining area abrupt slope of sowing grass seeds by duster in lime with body refuse machinery |
CN109463180A (en) * | 2018-09-05 | 2019-03-15 | 重庆交通大学 | Method |
CN109699434A (en) * | 2018-11-21 | 2019-05-03 | 昆明理工大学 | A kind of alien earth sparging substrate for the greening of rock abrupt slope |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1736140A (en) * | 2005-07-28 | 2006-02-22 | 沈阳金柏园林景观工程有限公司 | Method for recovering vegetation on rock dome in north region |
CN101696574A (en) * | 2009-10-30 | 2010-04-21 | 河南国网宝泉抽水蓄能有限公司 | Ecological protection method for high steep side slope |
CN103122641A (en) * | 2012-12-21 | 2013-05-29 | 陕西红叶园林绿化设计工程集团有限公司 | Slope reinforced structure and reinforcing method thereof |
CN103798047A (en) * | 2014-02-27 | 2014-05-21 | 黄鹤平 | Greening spray planting method |
CN104045447A (en) * | 2014-06-04 | 2014-09-17 | 武汉橄石代环境资源科技有限公司 | Making method of foreign soil spraying matrix |
-
2015
- 2015-11-20 CN CN201510809860.4A patent/CN105484273B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1736140A (en) * | 2005-07-28 | 2006-02-22 | 沈阳金柏园林景观工程有限公司 | Method for recovering vegetation on rock dome in north region |
CN101696574A (en) * | 2009-10-30 | 2010-04-21 | 河南国网宝泉抽水蓄能有限公司 | Ecological protection method for high steep side slope |
CN103122641A (en) * | 2012-12-21 | 2013-05-29 | 陕西红叶园林绿化设计工程集团有限公司 | Slope reinforced structure and reinforcing method thereof |
CN103798047A (en) * | 2014-02-27 | 2014-05-21 | 黄鹤平 | Greening spray planting method |
CN104045447A (en) * | 2014-06-04 | 2014-09-17 | 武汉橄石代环境资源科技有限公司 | Making method of foreign soil spraying matrix |
Also Published As
Publication number | Publication date |
---|---|
CN105484273A (en) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103348831B (en) | The husky body of modification | |
CN103265361B (en) | Macromolecular aggregate plant growth substrate and preparation method thereof | |
CN109534737A (en) | A kind of administering method for improveing soil matrix and its Green Mine | |
CN103270881B (en) | Rapid ecological restoration method for rock-soil side slopes | |
CN112195940B (en) | Ecological protection structure suitable for uneven rock slope in hollow and construction method | |
CN101696574A (en) | Ecological protection method for high steep side slope | |
CN107700429A (en) | The anti-runoff of side slope washes away erosion device and the anti-runoff of side slope washes away corrosion method | |
CN103924605A (en) | Sash girder ecological slope protection structure and construction method thereof | |
CN103229644A (en) | Double-layer spray-seeding method of alien soil matrix and water-retaining agents for recovering rock slope vegetations | |
CN103348830B (en) | Plant type modified sandy soil is utilized to administer the method for sand ground | |
CN105484273B (en) | A kind of dry method sprayed anti-soil moved in improve the original overly moist in operation and block pipeline of side slope soil moved in improve the original | |
CN104106324A (en) | Tailing pond reclamation greening method | |
Wang et al. | A sand control and development model in sandy land based on mixed experiments of arsenic sandstone and sand: A case study in Mu Us Sandy Land in China | |
CN108513874A (en) | A kind of hillock side slope anti-erosion method for recovering vegetation | |
CN103348798B (en) | Sand control method using modified sand soil for tree planting | |
CN103194241A (en) | Polymer aggregation agent for high order aggregate spray seeding greening, and preparation method thereof | |
CN104770257A (en) | Method for recovering vegetation through micropore thin films | |
CN104947693B (en) | A kind of method that utilization plant coiled material carries out high gradient slope revegetation | |
CN107439320A (en) | A kind of greening method of concordant limestone breakage mountain body | |
CN103348836B (en) | Modified sandy soil is utilized to administer the method for sand ground | |
CN109699434A (en) | A kind of alien earth sparging substrate for the greening of rock abrupt slope | |
CN206815352U (en) | The side slope mechanism of one species loam matrix | |
CN103352459B (en) | The method utilizing modified husky body Desert Control | |
CN103348835B (en) | The method utilizing modified husky physical culture tree Desert Control | |
KR101283514B1 (en) | Restoration method based on reinforecment and organic vegetation material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |