CN105464280B - A kind of reassembling type corner furred ceiling layer and forming method thereof - Google Patents

A kind of reassembling type corner furred ceiling layer and forming method thereof Download PDF

Info

Publication number
CN105464280B
CN105464280B CN201610011070.6A CN201610011070A CN105464280B CN 105464280 B CN105464280 B CN 105464280B CN 201610011070 A CN201610011070 A CN 201610011070A CN 105464280 B CN105464280 B CN 105464280B
Authority
CN
China
Prior art keywords
furred ceiling
lifting plate
colligator
corner
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610011070.6A
Other languages
Chinese (zh)
Other versions
CN105464280A (en
Inventor
胡崇亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong New House Building Materials Co., Ltd.
Original Assignee
Foshan Beautiful Building Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Beautiful Building Material Technology Co Ltd filed Critical Foshan Beautiful Building Material Technology Co Ltd
Priority to CN201610011070.6A priority Critical patent/CN105464280B/en
Publication of CN105464280A publication Critical patent/CN105464280A/en
Application granted granted Critical
Publication of CN105464280B publication Critical patent/CN105464280B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/16Connections between non-parallel members of the supporting construction the members lying in different planes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/30Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Vehicle Interior And Exterior Ornaments, Soundproofing, And Insulation (AREA)

Abstract

The present invention relates to a kind of reassembling type corner furred ceiling layer and forming method thereof, including the first lifting plate being attached on top layer facade and it is attached to the colligator erect on metope, first lifting plate, colligator are all in section bar shape, first lifting plate is not only vertically extending below top layer facade but also extends in transverse direction, colligator is disposed to extend along metope horizontal direction is erect, there is pitch space between first lifting plate and setting metope, furred ceiling laminate is substantially horizontally disposed with pitch space;The first extension edge of side direction extension inwardly is provided with the inner side at the bottom of the first lifting plate or middle part, colligator includes longitudinal support arm, the outboard end of furred ceiling laminate is set aside on the first extension edge, and the medial extremity of furred ceiling laminate is set aside on longitudinal support arm.So, corner furred ceiling layer can dismount and easy for assembly.Because the present invention has These characteristics and advantage, may apply to for this in corner furred ceiling.

Description

A kind of reassembling type corner furred ceiling layer and forming method thereof
Technical field
The invention belongs to furred ceiling technical field, relates in particular to a kind of dismounting that a kind of corner in house is formed The corner furred ceiling layer and forming method of formula.The rotation angle position in house typically all includes setting metope, also includes top layer and stands The top layer face in face such as house or the top layer face of furred ceiling, that is to say, that present invention is mainly applied to substantially have orthogonal two The reassembling type corner furred ceiling layer of one-level or two level is formed between individual facade position, the corner furred ceiling layer at least has furred ceiling laminate So as to form the ceiling plane layer of one-level or two level in rotation angle position, the ceiling plane layer is generally parallel to ground(Water in other words Plane).
Background technology
The house of existing house particularly household, is typically desirable in parlor, dining room, passageway or the kitchen in house etc. The rotation angle position in space is provided with the corner furred ceiling layer in closing rotation angle position space, and then further enhances the rotation angle position Third dimension and level sense.Somebody wishes to set ornament lamp on the corner furred ceiling layer of these rotation angle positions, strengthens illuminating effect Third dimension.The existing method for forming corner furred ceiling layer in rotation angle position, most traditional technique is exactly in advance in rotation angle position system The wood frame of plank, composited aluminum and plastic decking can be connected by making, then directly plank, composited aluminum and plastic decking are followed closely or pasted in the framework On so as to form a corner furred ceiling layer at least with two exposed facades, this corner furred ceiling layer is obviously not easy to dismount. After aluminium alloy extrusions technology is applied to furred ceiling layer, therefore reassembling type lifting is risen, but this furred ceiling typically will also combine triangle The section bar of keel or similar structures, by buckle, furred ceiling laminate snapping is positioned on these keel and corner section bar in other words.So Structure not only the complicated personnel for needing specialty of mounting structure implement installation, nor long length or random length can be used Furred ceiling laminate, be usually 300 × 300 ㎜, 500 × 500 ㎜ for this suspended ceiling pinch plate of reassembling type that we can see at present Or 800 × 800 the standard specification such as ㎜ small-sized buckle or laminate.Using during these small-sized buckles, not only erector Work amount is big, it is often more important that can not arbitrarily cut, namely the transverse width of a wall facade when house and tiring out for multiple buckles When meter width can not just coincide, the buckle of these standards can hardly be actually used, for this in reassembling type corner furred ceiling Aspect, we are difficult to see using situation of the standard-sized aluminum-pinch as decorative panel.In recent years as customization of individual character needs Development and fast-assembling market rise, not only need furred ceiling layer that there is preferable individual character and aesthetic but also be also required to install Process is fool, allows for example young owner of less professional personnel also can implement live group according to instruction for mounting as far as possible Dress, it is the domestic demand in customization of individual character and fast-assembling market.
The content of the invention
The domestic demand of customization of individual character and fast-assembling market for continuous development, the present invention propose a kind of dismantled and assembled and group Fill easy corner furred ceiling layer and forming method thereof.
The present invention also proposes a kind of reassembling type corner furred ceiling layer first, it is characterised in that including being attached on top layer facade The first lifting plate and be attached to the colligator erect on metope, the first lifting plate, the colligator are all in section bar shape, described the One lifting plate is not only vertically extending below the top layer facade but also extends in transverse direction, and the colligator is described in Erect metope horizontal direction to be disposed to extend, there is pitch space between the first lifting plate and the setting metope, described Furred ceiling laminate is substantially horizontally disposed with pitch space;Set on the inner side at the bottom of the described first lifting plate or middle part The first extension edge of side direction extension inwardly is equipped with, the colligator includes longitudinal support arm, the outside of the furred ceiling laminate End is set aside on first extension edge, and the medial extremity of the furred ceiling laminate is set aside on longitudinal support arm.
Wherein, the top layer facade can be the top floor plate face in house or arranged in-plane Furred ceiling aspect.The first lifting plate being attached on top layer facade, refers to that the first lifting plate can directly be fixedly mounted Refer on to the top layer facade or only and be connected onto the top layer facade.In linking into the scheme on the top layer facade, The first lifting plate can be directly on other locating surfaces on the top layer facade.As for the described first lifting Plate is attached to the method on top layer facade, such as when the top layer facade is the top floor plate face in house, can be in advance in institute State the unwrapping wire on floor face and determine the bearing of trend and angle of the first lifting plate, then pre-set and can determine in unwrapping wire position The positioning hole of position coupler body, the coupler body is plugged on the first lifting plate, then by the described first lifting plate together with the hook Body is integrally lifted to the top layer facade, then is fixed by screw the coupler body to the floor face, so as to consequently also just will The first lifting plate is navigated on the floor face;Either, the positioning of coupler body can be positioned by being pre-set in unwrapping wire position Hole simultaneously pre-fixes the coupler body in the top floor plate face, then first lifting plate hook is suspended on the coupler body, then The coupler body is tightened up by screw so as to consequently also just navigate to the described first lifting plate in the top floor plate face.
Wherein, the first lifting plate has special-shaped or flat geometry, institute in section bar shape and then its cross section The first lifting plate is stated to be mainly used in lifting the furred ceiling laminate and form the corner furred ceiling layer vertical(Perpendicular to ground Direction)Alien invasion, for this, it is not only vertically extending but also extends in transverse direction.So finished in the corner installation of ceiling Afterwards, people station is able to observe that the lateral surface of the first lifting plate on the ground, is also the lateral surface of the first lifting plate this described Form the setting alien invasion of the partial visual of the corner furred ceiling.Certainly, when the outside setting in the described first lifting plate covers Decorative panel when, people station on the ground may not it is observed that it is described first lifting plate setting alien invasion.
Wherein, it is provided with the first of side direction extension inwardly on the bottom of the first lifting plate or the inner side at middle part Extension edge, the position set by first extension edge is define not only, and define the extension side of first extension edge To.Be on the inside of the first lifting plate relative to the bearing definition that provides on the outside of the described first lifting plate, it is described inwards Direction extension is also directed towards corresponding setting metope direction extension, and first extension edge both can be vertical equity Ground extension can also slightly askew be extended.It is that this described first extension edge can because the described first lifting plate is profile piece Be installed on being independent component on the first lifting plate or with the described first lifting plate integrated molding.
Wherein, it is described to erect the setting metope or the tool parallel with the setting metope that metope be house There are other replacement faces of the facade of setting.Particularly in the setting metope of such as window is provided with, it is necessary to by means of described Replacement face for example be will be detailed below referring to the second lifting plate, and exit window is reserved between the metope where the described second lifting plate and window The position of curtain.
Wherein, the colligator is disposed to extend in section bar shape and along the setting metope horizontal direction, define not only institute Stating colligator has the cross section of abnormity and also defines its arrangement on the setting metope, the horizontal direction Referring not only to it, bearing of trend is identical and also parallel with horizontal plane in the horizontal with the described first lifting plate;The colligator can Integrally it is transversely arranged on the setting metope or several colligators connect and are transversely arranged on institute with being one State and erect on metope.
Wherein, the colligator includes longitudinal support arm, can also also include will be detailed below the vertical walls referred to certainly Body.Longitudinal support arm is mainly used in furred ceiling laminate described in support.The longitudinal direction is primarily referred to as being approximately perpendicular to the transverse direction The direction in direction, and it is almost parallel with horizontal plane.But it is this described longitudinal support arm because the colligator is in section bar shape Not only Longitudinal extending but also it is disposed to extend in transverse direction, simply the different extension sides obtained from different view directions To.
Wherein, the furred ceiling laminate can be prefabricated standard plate or at the scene in the plate body of whole in advance On the fritter plate body that cuts out.In order to suitably suppress be shelved on it is described first lifting plate the first extension edge on described in hang Top plate, further scheme can also be is additionally provided with side direction extension inwardly on the inner side of the described first lifting plate And for limiting the second extension edge of the furred ceiling laminate, second extension edge is located at the top of first extension edge, institute State the thickness that the spacing between the second extension edge and first extension edge is more than the furred ceiling laminate.Second extension edge can It is plugged on as first extension edge being independent component on the first lifting plate or with described first Plate integrated molding is lifted, wherein second extension edge for being used to limit the furred ceiling laminate, refers to the furred ceiling laminate When outboard end is too jacked up certain height by external force, it can be limited by means of second extension edge, conversely normal During using the furred ceiling laminate, second extension edge also has certain gap therewith, so as to improve different thicknesss of slab The scope of application of the furred ceiling laminate, and can at least allow the furred ceiling laminate when installing the furred ceiling laminate Outboard end is rotated so as to up or down obliquely lift the furred ceiling laminate using first extension edge as fulcrum;But work as When the furred ceiling laminate is excessively tilted, the furred ceiling laminate and can is limited by second extension edge, now actually First, second extension edge, which forms a kind of clamping mechanism, to be suppressed residence and states furred ceiling laminate, consequently facilitating facing in installation process Furred ceiling laminate described in Shi Dingwei.Furred ceiling laminate is substantially horizontally disposed with the pitch space, so as to allow the furred ceiling laminate The exposed facade of the corner furred ceiling layer in the horizontal direction can be turned into.
In such scheme, further scheme is also possible that is changed to elastic device or in institute by second extension edge State and at least one elastic device is additionally provided with above the first extension edge, elastic arm possessed by the elastic device is to described One extension edge direction extension.So when shelving the furred ceiling laminate to first extension edge, the elastic arm can push up The outboard end for pushing down the furred ceiling laminate can not be beated by it with blast.One or several elastic devices can be connected to institute State on the first lifting plate.
Many places herein refer to inner or outer side, if without particularly illustrating, the inner side refers to limited component It is the medial extremity referred in this text towards the side in the direction of the setting metope, is just proximate to the setting metope direction End, and the interior side direction, also refer to the direction towards the setting metope;And the outside, outboard end or lateral direction Implication it is just in opposite direction with the inner side, medial extremity or inner side.Secondly, horizontal direction mentioned in this article, refers to and edge The horizontal direction for erectting metope extension, the vertical direction refer to the direction parallel with the setting metope, the longitudinal direction Direction refers to the horizontal direction perpendicular to the setting metope.
According to above-mentioned technical proposal, its beneficial has technical effect that:
1. it is that this not only can be by means of the described first lifting because the described first lifting plate is in section bar shape and vertically extending A vertical facade or vertical exposed facade of the plate shape into the corner furred ceiling, and can will have the described first lifting After the section bar of plate cross section can be by extruding disposal molding, then cut any according to the structure in house at the scene but be adapted to The first lifting plate of length, so not only make the process standardization of extruding manufacture the first lifting plate, and energy one Secondary property installation positioning the first lifting plate.
2. due to being provided with side direction extension inwardly on the inner side of the bottom of the described first lifting plate or middle part First extension edge, the furred ceiling laminate can be shelved by means of first extension edge for this.
It is that this can be by means of the colligator by the furred ceiling layer 3. being erect because the colligator is attached on metope Plate is navigated on the setting metope, and can substantially position the furred ceiling layer on lateral attitude without limitation Plate.
4. it is that this can be set in the inner or outer side of the described first lifting plate because the described first lifting plate is in section bar shape There is the neck of various functions, and then these necks can be utilized to be connected various trim components such as ornament lamp, decoration panel.
5. because the described first lifting plate is in the section bar shape not only vertically extending but also edge below the top layer facade Horizontal direction extends, and has pitch space between the first lifting plate and the setting metope, for this described pitch space only Limitation substantially only is made to the width of the furred ceiling laminate and does not make any restrictions, the furred ceiling layer in length direction The length of plate can arbitrarily be set(Certainly no more than the length of the pitch space), so as to utilize various dalles As the furred ceiling laminate in the pitch space without being limited by various standard buckles, installation effect is not only substantially increased Rate and also enhance the personalization of decoration using the flexibility of material.
Further technical scheme is also possible that the colligator also includes vertical wall body, the vertically wall body with it is described Longitudinal support arm arranges to form the substantially L-shaped cavity wall in cross section and then have vallecular cavity in certain angle, and the vallecular cavity is located at Towards lateral direction, being snapped with the cavity wall of the vallecular cavity can for the lower section of longitudinal support arm and the accent of the vallecular cavity Cover the cover plate of the vallecular cavity.So, because the colligator has the substantially L-shaped cavity wall in cross section, not only greatly improve The mechanical strength of the colligator, and because the vertical walls body is located at the lower section of longitudinal support arm, so as to described Vertical walls body, which can act directly against, to be erect on metope so as to can also allow the vertical wall body to share the bearing capacity of the snap arm.Its Secondary, the colligator also form the edge closing bar of the corner position below the furred ceiling laminate, add the corner position Three-dimensional decorative property.
Further technical scheme is also possible that the colligator also includes upper clip arm, and the upper clip arm is positioned at described The top of longitudinal support arm and combination form the jaws of open-like shape, and the oral area of the jaws is towards lateral direction, the furred ceiling layer The medial extremity of plate is inserted among the jaws.The medial extremity of the furred ceiling laminate can be so clamped by means of the jaws The furred ceiling laminate will not be jacked up easily by the similar external force such as wind.
Further technical scheme is also possible that the upper clip arm with longitudinal support arm in medial extremity integrated molding And form the jaws with level altitude.
Further technical scheme, which is also possible that on the upper clip arm, is provided with the first spring, the bullet of first spring Property support arm is extended in the jaws.So when the furred ceiling laminate is inserted into the jaws, the elastic support arm is with regard to energy The medial extremity of the furred ceiling laminate is suppressed, so as to which it will not be beated up and down with blast, can also be applicable the described of different-thickness Furred ceiling laminate.
Further technical scheme is also possible that the upper clip arm and longitudinal support arm are two components separated, Formed and connected by set screw between the upper clip arm and longitudinal support arm, and the upper clip arm is held with the longitudinal direction Adjustable for height jaws is formed by the regulation of the set screw between trailing arm;The colligator also includes vertical wall body, institute Vertical wall body and longitudinal support arm is stated to arrange to form the substantially L-shaped cavity wall in cross section and then there is groove in certain angle Chamber, the vallecular cavity is located at the lower section of longitudinal support arm and the accent of the vallecular cavity is towards lateral direction, the vallecular cavity The cover plate of the vallecular cavity can be covered by being snapped with cavity wall, and the screw terminal of the set screw is collected in the vallecular cavity.So, Because the colligator includes the upper clip arm and described longitudinal two components that can be separated of support arm, and the upper folder The jaws with adjustment height is formed by the regulation of the set screw between arm and longitudinal support arm, can be borrowed for this Help the upper clip arm and at least clamp the medial extremity of the furred ceiling laminate with longitudinal support arm;In turn when needs are torn open And can is easily dismantled when unloading, changing the furred ceiling laminate.Importantly, when installing the furred ceiling laminate, can be by institute The medial extremity that colligator is pre-installed into the furred ceiling laminate by the jaws of the adjustment height is stated, has been blocked in the colligator Be connected on the positioning base and the furred ceiling laminate installed it is in place after, then tighten up the set screw and then fasten institute State furred ceiling laminate.And the vallecular cavity and can enough collects the set screw so that can not be direct from outside after the cover plate is covered It was observed that the set screw.
Further technical scheme, which is also possible that to be provided with the inside of the first lifting plate, is capable of grafting corner corner brace Corner brace neck, it is described first lifting plate on the inside or outside of be additionally provided with the lamp neck for being capable of grafting ornament lamp.The corner angle The connection and fixation that code is used between the first lifting plate of rotation angle position;The lamp neck can expand described first significantly Lift the application function of plate.Such as when the regional area of the furred ceiling laminate is light-passing board, plate can be lifted described first Inner side lamp neck in inserting ornament lamp, so as to allow the furred ceiling laminate plane also to have plane of illumination.
Further technical scheme is also possible that is additionally provided with side inwardly on the inner side of the described first lifting plate The second extension edge to extending and for limiting the furred ceiling laminate, second extension edge are located at the upper of first extension edge Side, the spacing between second extension edge and first extension edge are more than the thickness of the furred ceiling laminate.
Further technical scheme, which is also possible that above first extension edge, is additionally provided with least one elasticity dress Put, elastic arm possessed by the elastic device extends to the described first extension edge direction.
Further technical scheme be also possible that the described first lifting plate and the setting metope or the colligator it Between the first longitudinal pull bar is set.
Further technical scheme is also possible that on the first lifting plate includes being combined with top layer facade first Plate body and the first lower body that can be combined with the furred ceiling laminate, clamping company between first upper plate body and the first lower body Connect, first extension edge is arranged on the inner side of first lower body.
Further technical scheme, which is also possible that on first lower body, is additionally provided with the upholstery border to stretch out, institute State the height that the height that upholstery border upwardly extends is more than first lower body.It can not only so be hidden by means of the upholstery border The seam covered between first upper plate body and first lower body and the first lifting plate can be strengthened formed outside The three-dimensional decorative effect of facade;When being further provided with ornament lamp in the cavity on the inside of the decorative panel, the decorative panel The light of the ornament lamp can be allowed to be pointed into top layer facade and then turn into wash ceiling light.
Further technical scheme is also possible that and set in pitch space of the described first lifting plate with the setting metope It is equipped with least two blocks furred ceiling laminates being arranged side by side, ornamental strip is provided with the gap between two blocks of furred ceiling laminates. The ornamental strip can not only make up the gap and the decoration of a protrusion can be formed in the furred ceiling laminate facade Body.On the whole can be with T-shaped for ornamental strip this described, one can also be arranged at T-shaped horizontal edge position has rectangular cavity It is three-dimensional.
Further technical scheme is also possible that the ornamental strip includes the intermediolateral column being inserted into the gap Body, second spring is provided with the intermediate cylinder of the ornamental strip;Wherein described second spring include middle circle body portion and The two free ends extended from the middle circle body portion, are provided with a pair of positioning on the intermediate cylinder of the ornamental strip Arm, the middle circle body portion are installed in a pair of registration arm;During installation, the two free ends of the second spring are tightened up And allow the intermediate cylinder of the second spring and the ornamental strip to be inserted from the gap between two blocks of furred ceiling laminates, it is described Two wing sides of ornamental strip are adjacent on the lower surface of the furred ceiling laminate by means of the second spring.
Further technical scheme is also possible that the second lifting plate for also including being attached on top layer facade, described second Lifting plate is in section bar shape and is downwardly extending the replacement face of the setting metope, and the pitch space is also formed in described second Lift between plate and the first lifting plate, the positioning base and the colligator are arranged under the second lifting plate Portion;Wherein, the positioning base is molded directly within the described second bottom for lifting plate or independent component and is connected to institute State the bottom of the second lifting plate.
Further technical scheme is also possible that on the second lifting plate includes being combined with top layer facade second Plate body and the second lower body that can be connected with longitudinal support arm clamping, between second upper plate body and the second lower body Clamping connects.
Further technical scheme is also possible that has another between the described second lifting plate and the setting metope Clearance space.
Further technical scheme is also possible that is provided with longitudinal direction between the described second lifting plate and the setting metope The second pull bar.
Further technical scheme is also possible that the furred ceiling layer that another level is set in another described clearance space Plate, the short furred ceiling layer between the described second lifting plate and the first lifting plate of furred ceiling laminate of another level Plate.
Further technical scheme is also possible that the furred ceiling layer that another level is set in another described clearance space Plate.
Further technical scheme, which is also possible that on the lateral surface of the furred ceiling laminate or the first lifting plate, sprays dress Decorations enamelled coating is adhesive with wallpaper.
Further technical scheme is also possible that is provided with positioning base, the positioning base on the setting metope It is disposed to extend in section bar shape and in transverse direction on the setting metope, the colligator includes also snap arm, the combination Device is snapped fit onto on the positioning base by the snap arm.
Further technical scheme is also possible that the snap arm interval is arranged, be provided with the positioning base with it is described The avoidance otch of snap arm adaptation;The snap arm is avoided after incision site is entered on the positioning base again to left or right from described Move and then snap fit onto on the positioning base.
Wherein, the colligator includes snap arm, is on the one hand to define the snap arm to have clamping function, secondly also fixed The justice snap arm is provided on the colligator;The clamping at least refers to the part of two mutual clamping connections in clamping Relative it can also move left and right afterwards, and a clamping part is caught in from the end of another part, is this two mutually cards It is in T fonts or I-shaped cross section wherein to have one typically to have in the part connect in succession.And two after grafting or snapping Between part relative move left and right typically is not easy to because adhesion is bigger.According to the understanding of this paper embodiments, the card Arm is a kind of device for being easy to form clamping with other parts outside the colligator, consequently facilitating can by the colligator It is positioned on these other parts.The snap arm can be a pair of L-type projecting arm for extending towards setting so that the snap arm With the interface arrangment or a pair of relatively extended L-type projecting arm for being generally in π shapes so that the snap arm has There is interface arrangment generally in the form of slot.
Wherein, the snap arm of the colligator is connected to the method on the positioning base, and one kind is first by the card Arm snaps fit onto and again sets aside to the furred ceiling laminate on longitudinal support arm of the colligator on the positioning base;It is another Kind it is the medial extremity that the colligator is first clamped to the furred ceiling laminate in advance when the colligator has jaws, then by institute Colligator installation is stated to snap fit onto on the positioning base.In order to realize second of flexible mounting means, it is necessary to assure the knot Clutch can snap fit onto on the positioning base with regard to near-earth, therefore, the positioning base is in section bar shape and extends in transverse direction It is arranged on the setting metope, avoidance otch is provided with the positioning base, the snap arm interval is arranged and from described time Keep away after incision site is entered on the positioning base and to the left or to move right and then snap fit onto on the positioning base again.By institute State positioning base and can not only be extruded for this in section bar shape and manufacture and also allow for disposable installation in batch and navigate to the setting On metope;Due to being provided with avoidance otch on the positioning base, the positioning can be snapped fit onto nearby for this described colligator On base, and can neatly in installation process and installation terminate after maintenance and renovation in can adjust set institute State colligator.
Further technical scheme is also possible that the deburring corner in section bar shape for also including being attached on top layer facade Part, the deburring corner pieces shelter from described the positioned at the outside of the described first lifting plate and along the described first lifting plate extension The top outer side of one lifting plate.So, the deburring corner pieces not only form the corner on the outside of the described first lifting plate The edge closing bar of position, add the three-dimensional decorative property of the top corner position, it is often more important that can block because of top layer facade not The gap that top ends that are smooth and making the first lifting plate occur.
The present invention also provides a kind of forming method for forming the corner furred ceiling layer, it is characterised in for preparing the combination Device, the first lifting plate and the furred ceiling laminate;Described first lifting plate is navigated on top layer facade, makes the first lifting plate Extended laterally below the top layer facade and there is pitch space between setting metope, the outside of the first lifting plate Face forms the corner furred ceiling layer in vertical setting alien invasion;The colligator is set in transverse direction on metope is erect; The furred ceiling laminate is installed, the outboard end of the furred ceiling laminate set aside on the first extension edge of the first lifting plate, it is interior Side is set aside on longitudinal support arm of the colligator.
Further technical scheme be also possible that the described first lifting plate and the setting metope or the colligator it Between the first longitudinal pull bar is set.
Further technical scheme is also possible that the deburring corner in section bar shape for also setting up and being attached on top layer facade Part, the deburring corner pieces shelter from described the positioned at the outside of the described first lifting plate and along the described first lifting plate extension The top outer side of one lifting plate.
Further technical scheme, which is also possible that, is erectting positioning base described in metope lateral arrangement, and the colligator is also Include snap arm and jaws, when the furred ceiling laminate is installed, the outboard end of the furred ceiling laminate is first set aside to described first and hung On first extension edge of loading board, and the furred ceiling laminate is allowed to be in heeling condition so as to allow the furred ceiling laminate and the setting wall There is larger gap between face, the medial extremity of the furred ceiling laminate is inserted into the colligator using the larger gap Jaws in clamped;The medial extremity of the furred ceiling laminate is allowed to be allowed with the colligator while close to the positioning base again The snap arm of the colligator is snapped fit onto on the positioning base.
Further technical scheme, which is also possible that on the positioning base, is provided with avoidance otch;On the colligator The snap arm is arranged in interval shape and is adapted to the avoidance otch, when the medial extremity of the furred ceiling laminate and the colligator are same When close to the positioning base, allow the colligator snap arm entered from the avoidance incision site of the positioning base it is described fixed On the base of position, then to the left or move right the colligator and then snap fit onto the snap arm on the positioning base.
Further technical scheme is also possible that the colligator includes vallecular cavity, and the vallecular cavity is located at the longitudinal direction and held The accent of the lower section of trailing arm and the vallecular cavity is towards lateral direction, snapping upper cover plate in the cavity wall of the vallecular cavity.
Further technical scheme is also possible that the second lifting plate for also setting up and navigating on top layer facade, described second Lifting plate is in section bar shape and extends laterally to form the replacement face for erectting metope, and the pitch space is also formed in described second Lift between plate and the first lifting plate, the positioning base is arranged on the bottom of the second lifting plate.
Further technical scheme is also possible that sets longitudinal direction between the described second lifting plate and the setting metope Second pull bar.
Because the present invention has These characteristics and advantage, may apply to for this in corner furred ceiling.
Brief description of the drawings
Fig. 1 is the cross-sectional view using the first corner furred ceiling of the present invention;
Figure 1A is the cross-sectional view using another corner furred ceiling of the present invention;
Fig. 2 is the furred ceiling laminate distributed architecture schematic diagram in the corner furred ceiling using the present invention;
Fig. 3 is the dimensional structure diagram of the ornamental strip in the corner furred ceiling using the present invention;
Fig. 4 is the schematic diagram using second of structure of the ornamental strip of the corner furred ceiling of the present invention;
Fig. 5 is the first structural representation of first ceiling board in the corner furred ceiling using the present invention;
Fig. 6 is described first in second of structure of first ceiling board in the corner furred ceiling using the present invention The structural representation of upper plate body;
Fig. 7 is that the package assembly of second of structure of first ceiling board in the corner furred ceiling using the present invention is shown It is intended to;
Fig. 8 is that the first cross section structure for implementing structure of the colligator in the corner furred ceiling using the present invention shows It is intended to;
Fig. 9 is that the cross section structure of second of implementation structure of the colligator in the corner furred ceiling using the present invention shows It is intended to;
Figure 10 is that the third cross section structure for implementing structure of the colligator in the corner furred ceiling using the present invention shows It is intended to;
Figure 11 is that the cross section structure of the 4th kind of implementation structure of the colligator in the corner furred ceiling using the present invention shows It is intended to;
Figure 12 is the structural representation that the cover plate is installed on the accent of the colligator;
Figure 13 is the underarm cross section structure schematic diagram using colligator described in corner furred ceiling of the invention;
Figure 14 is the cross section structure schematic diagram using upper clip arm described in the colligator of the invention;
Figure 15 is the cross section structure schematic diagram of the cover plate in the corner furred ceiling using the present invention;
Figure 16 is the structural representation of the positioning base in the corner furred ceiling using the present invention;
Figure 17 is the cross-sectional view using second of corner furred ceiling of the present invention;
Figure 18 is the cross-sectional view using the third corner furred ceiling of the present invention;
Figure 19 is the section knot using the further improved structure of second of implementation structure of the colligator of the present invention Structure schematic diagram.
Embodiment
Colligator 400 to the application present invention, corner furred ceiling layer C structure and the formation corner below in conjunction with the accompanying drawings Furred ceiling layer C method is further described.
The first embodiment:
As shown in figure 1, house indoor, which comprises at least, top layer facade and risers, wherein the top layer in the present embodiment Facade is top floor plate face A, and the risers are to erect metope B;The setting metope B and top floor plate face A substantially hangs down Directly.Angle position between the top floor plate face A and the setting metope B is provided with corner furred ceiling layer C, and the corner is hung Top layer C includes the vertical facade as shown in Figure 1 formed by the described first lifting plate 1 and by described 6 shape of furred ceiling laminate Into horizontal facade.The following structural features of the corner furred ceiling layer C:
One side, as shown in figure 1, the first lifting plate 1 is directly fixedly installed on the top floor plate face A, The unwrapping wire on the top floor plate face A determines the bearing of trend and angle of the first lifting plate 1 in advance, then in unwrapping wire position Pre-set the positioning hole that can position coupler body 7 and pre-fix the coupler body 7 on the top floor plate face A, then by described in First lifting plate 1 is hooked on the coupler body 7, then tightens up the coupler body 7 by screw 71, so as to consequently also just by described first Lifting plate 1 is navigated on the top floor plate face A.
Secondly, the first lifting plate 1 has the geometry of abnormity not only described in section bar shape and then its cross section It is vertically extending and extend in transverse direction below top floor plate face A(Perpendicular to paper direction as shown in Figure 1), it is described First lifting plate 1 is almost parallel with the setting metope B and has pitch space 100.The first lifting plate 1 is mainly used in hanging Fill the furred ceiling laminate 6 and form the corner furred ceiling layer C vertical(Perpendicular to the direction on ground)Alien invasion 10, in institute After stating corner installation of ceiling, people station is able to observe that the lateral surface 10 of the first lifting plate 1 on the ground, also institute for this The lateral surface 10 for stating the first lifting plate 1 forms the partial visual alien invasion of the corner furred ceiling layer C.Certainly, when described first When lifting the antiglare decorative plate 12 for example shown in Fig. 1 of outside setting covering of plate 1, people station may can not on the ground It was observed that whole lateral surfaces of the first lifting plate 1.The first lifting plate 1 can be disposably squeezed into by extrusion process After type, then the first lifting plate 1 that is any but being adapted to length is cut according to the structure in house at the scene, so not only make to squeeze The process standardization of the first lifting plate 1 is made in compacting, and can disposably install positioning the first lifting plate 1.
As shown in Figure 1 and Figure 5, the first lifting plate 1 is integrative-structure, in the lower inside of the described first lifting plate 1 The first extension edge 101 and the second extension edge 102 of side direction extension inwardly are provided with position.First extension edge 101 with The slot 109 inserted for the outboard end of the furred ceiling laminate 6 is formed between second extension edge 102, the slot 109 Notch is highly more than the thickness of the furred ceiling laminate 6.Second extension edge 102 can be as first extension edge 101 It is and the described first lifting integrated molding of plate 1;Certainly as a further improvement structure be, first extension edge 101 with Second extension edge 102 is all respectively independent component and is plugged on 1 on the first lifting plate(The structure is not drawn in figure Go out).Because the notch of the slot 109 is highly more than the thickness of the furred ceiling laminate 6, different thicknesss of slab can be at least improved for this The furred ceiling laminate 6 the scope of application, secondly when inserting the end of the furred ceiling laminate 6 into the slot 109, not only The end of the furred ceiling laminate 6 can rotate certain angle in the slot 109, and can install the furred ceiling layer During plate 6, the outboard end of the furred ceiling laminate 6 can be at least allowed to be rotated using the described first 101 sides of extension as fulcrum so as to past On obliquely lift the furred ceiling laminate 6;But when the furred ceiling laminate 6 is excessively tilted, the and can quilt of furred ceiling laminate 6 Second extension edge 102 is limited, now actually described first, second extension edge(101、102)One kind is formd to clamp down on Mechanism suppresses residence and states furred ceiling laminate 6, consequently facilitating positioning the furred ceiling laminate 6 temporarily in this installation process.When external force is upward Described in jacking during the outboard end of furred ceiling laminate 6, the furred ceiling laminate 6 is also limited by second extension edge 102 will not be easily Ground departs from 1 on the first lifting plate.
In such scheme, further scheme can also be as shown in figure 5, in the top of second extension edge 102 Neck 110 in one spring support 111 of clamping, on the spring support 111 set elastic device 112, the elastic device 112 Elastic arm 113 extend to the direction of the first extension edge 101.So when shelve the furred ceiling laminate 6 to described first extension When on side 101, the outboard end that the elastic arm 113 can suppress the furred ceiling laminate 6 can not be beated by it with blast.
1 top is provided with the top neck 103 for being capable of coupler body 7 described in clamping, the hook on the described first lifting plate Body 7 is a kind of with hook-shaped position and can to pre-install the hook during installation with the L-type component of the clamping of top neck 103 Body 7 is on the top floor plate face A, then lifts on plate 1 by described first and be hooked on the coupler body 7.
Be provided with being capable of the L-shaped corner corner brace part of grafting for 1 lower inside on the described first lifting plate(Do not drawn in figure Go out)Bottom corner brace neck 107, so when formed with turn the corner furred ceiling layer C when, can be by L-shaped The corner corner brace part, which inserts to be formed in the corner brace neck 107 of 1 bottom on the two neighboring first lifting plate respectively, to be turned The connection of angular position.Certain other necks such as neck 110, lamp neck(104、105)And can grafting institute in neck 103 State corner corner brace part.
The inner side and outer side of 1 medium position is also respectively provided with lamp neck on the described first lifting plate(104、105), As shown in figure 1, the lamp neck(104、105)In also clamping is provided with ornament lamp respectively(13、14), with the ornament lamp 13 When the corresponding region of furred ceiling laminate 6 is arranged to light-passing board, the ornament lamp 13, which turns into, is collected in the clearance space 100 In concealed lamp.The ornament lamp 14 can provide illumination for the exterior space of the corner furred ceiling layer, particularly described When lower outside space on one lifting plate 1 sets the antiglare decorative plate 12, the ornament lamp 14 is collected in the shading The inner side of decorative panel 12, irradiation washes top ornament lamp to the ornament lamp 14 as one kind upwards, substantially increases room lighting or light The three-dimensional light sensation of decoration.
For further improved structure as shown in Fig. 1 or Fig. 6, Fig. 7, the first lifting plate 1 is Split type structure, including can With the top floor plate face A the first upper plate bodies 15 combined and the first lower body 16 that can be combined with the furred ceiling laminate 6, institute State clamping between the first upper plate body 15 and the first lower body 16 to connect, first extension edge 101 is arranged on first lower plate The inner side of body 16.Specifically, dop 108 is set in the bottom of first upper plate body 15, in the upper of first lower body 16 Portion sets the neck 106 that is adapted to the dop 108, realizes clamping connection between them.Secondly at least described first is extended Side 101, second extension edge 102, the corner brace neck 107 and the concentrated setting of antiglare decorative plate 12 are under described first On plate body 16, the difficulty for manufacturing the first lifting plate 1 can not only be so substantially reduced, and also allow for neatly arranging institute State the width of the first upper plate body 15(I.e. vertically extending cover degree), you can with the height by mainly adjusting first upper plate body 15 The mode of degree adjusts the height of the whole first lifting plate 1, using first lower body 16 as a kind of standard component next life Produce and produced using first upper plate body 15 as one kind apolegamy part.
The antiglare decorative plate 12 can be and the integrated molding of the first lower body 16 or independent component And then it is plugged on first lower body 16;The lateral direction of the antiglare decorative plate 12 to first lower body 16 is prolonged Stretch, can be horizontal or upwardly extend at an angle, as shown in fig. 7, the height that the antiglare decorative plate 12 upwardly extends is big In the height of first lower body 16, so can not only block completely the lower body 16 of the first upper plate body 15 and first it Seam, and the ornament lamp 14 can be blocked.
Second aspect, as shown in Fig. 1, Figure 1A, Fig. 8 to Figure 16, the colligator 400 for being attached to and erectting on metope B is set, The colligator 400 is disposed to extend along the setting metope B horizontal directions, wherein as shown in figure 1, on the setting metope B It is additionally provided with the positioning base 2 of colligator 400 described in clamping.As shown in figure 16, the positioning base 2 is in its cross section of section bar shape It is disposed to extend in π shapes and in transverse direction on the setting metope B, the positioning base 2 has matrix 20 and from the base The upper and lower chimb extended on body 20(21、22), the chimb(21、22)It is deflected outward;Secondly the punching in described matrix 20 Go out the through hole 23 of strip, in order to position the positioning base 2.As shown in figure 8, it is the first knot of the colligator 400 Structure schematic diagram.The colligator 400 includes longitudinal support arm 31 and vertical wall body 32, longitudinal support arm 31 and vertical walls Body 32 forms the underarm 3 of the colligator 400.The inner side of the vertical wall body 32 is provided with the L-type protrusion of a pair of relative extensions Arm 30, a pair of L-type projecting arm 30 make have interface arrangment generally in the form of slot on the vertical wall body 32, are described in this Interface arrangment actually also forms the snap arm of the colligator 400., can be in advance in institute when the positioning base 2 is so installed State and erect bearing of trend and angle that unwrapping wire on metope B determines the positioning base 2, then in unwrapping wire position by the positioning base 2 are navigated on the setting metope B by screw through the through hole 23, then the colligator 400 is passed through into a pair of L-types The snap arm that projecting arm 30 is formed is snapped fit onto on the positioning base 2.
In addition, two different parts on the positioning base 2 as shown in figure 16(a、b)Upper rotation profile, also The chimb of part can be washed away in the part of wall section on the positioning base 2(21、22)Formed and avoid otch 24.Secondly, The avoidance otch 24 can be arranged on side, can also be arranged in correspondence with two lateral locations in the positioning base 2. Snap arm interval, which is arranged, simultaneously corresponds to the avoidance otch 24, during installation by the snap arm from the avoidance otch 24 deeply again Move left and right and snap fit onto on the positioning base 2.
The cross section of the underarm 3 is L-shaped so as to open vallecular cavity 36, and the accent of the vallecular cavity 36 is towards outside To being covered in the cavity wall of the vallecular cavity 36 has cover plate 5, when the colligator 400 is snapped fit onto on the positioning base 2 and installs institute After stating furred ceiling laminate 6, the cover plate 5 can cover the alien invasion of the whole underarm 3.So described colligator 400 can lead to The snap arm that a pair of L-type projecting arm 30 are formed is crossed to snap fit onto on the positioning base 2, the furred ceiling laminate 6 it is interior Side can be also shelved on longitudinal support arm 31.
At least provided with a colligator 400 on the positioning base 2, can also set multiple.Secondly, it is described fixed Avoidance otch 24 on the base 2 of position can also be one or several, the length and institute that particular number can be according to the positioning base 2 The quantity for stating colligator 400 determines.Field erected trouble is reduced for this, it is just prefabricated with described typically before dispatching from the factory Avoid the positioning base 2 of otch 24.
Another scheme is as shown in Figure 1A, can also to omit the positioning base 2 and directly be incited somebody to action by screw, viscose etc. The colligator 400 is positioned on the setting metope B.Secondly, as shown in Fig. 1 or Figure 1A, in addition to it is attached to top layer facade A On the deburring corner pieces 72 in section bar shape, the deburring corner pieces 72 are positioned at the outside of the described first lifting plate 1 and along described First lifting plate 1 extends, and shelters from the top outer side of the first lifting plate 1.So, the deburring corner pieces 72 not only shape Into the described first edge closing bar for lifting the external wall Angle Position of plate 1 is located at, the three-dimensional decorative property of the top corner position is added, The gap for occurring the top ends of the first lifting plate 1 because of top layer facade out-of-flatness can more importantly be blocked.
The cover plate 5 can be covered on the vallecular cavity 36.As shown in Fig. 1, Fig. 8, the vallecular cavity 36 is located at the furred ceiling Plate 1 is lifted below laminate 6 and towards described first;Direction snaps on the vallecular cavity 36 cover plate 5 from the bottom up.In order to Cover plate 5 described in the snapping of direction from the bottom up can be realized, as shown in figure 8 and 13, in the vertical wall body 32 of the vallecular cavity 36 Substantially tail end position is provided with lower convexity 33, is provided with inwardly at the substantially tail end position of longitudinal support arm 31 of the vallecular cavity 36 Upper raised the 34 of bending, upper raised 34 inner side with inclined spigot surface 37 and upper raised 34 inner side with The inner groovy 35 being recessed in outward direction;The lower convexity 33 and upper raised 34 together form in the cavity wall of the vallecular cavity 36 It is capable of the clip connection device of cover plate 5 described in snapping;Correspondingly, as shown in figure 15, the cover plate 5 includes arc matrix 51, in institute The lower end inside for stating plate matrix 51 is provided with the lower buckle side 52 upwardly extended, and the top of the lower buckle side 52 is in drops, in institute State and be provided with the hook side 54 for tilting extension in outward direction on the inside of the upper end of plate matrix 51.When the cover plate 5 is so installed, It is the installation process schematic diagram of the cover plate 5 as shown in figure 12, due to the substantially tail of longitudinal support arm 31 in the vallecular cavity 36 End position is provided with upper raised the 34 of inside bending, be this first by the hook side 54 on the inside of the upper end of the plate matrix 51 Top from the bottom up along spigot surface 37 snap into advance the vallecular cavity 36 it is upper it is raised 34 inner side inner groovy 35 notch, and The lower buckle side 52 of the lower end inside of plate matrix 51 is allowed to act against the vertically lower convexity 33 at the tail end position of wall body 32 in advance Outside, the pre-mounted state formed between the accent of the cover plate 5 and the vallecular cavity 36, now the lower buckle side 52 may be because Extrude and fraction of elastic deformation occur;Now checking the docking situation of the two-end part of cover plate 5 particularly therewith in one Determine the combination situation between another cover plate of such as 90 ° turnings of angle, continue firmly cover plate 5 described in pushing tow from the bottom up, by It is to tilt extension in outward direction in the hook side 54, allows the hook side 54 to be slid completely into outward direction for this In the inner groovy 35 of depression, now the lower buckle side 52 on the plate matrix 51 also continue to move up snap into completely it is described The outside of the lower convexity 33 on vertical wall body 32, now the drops head elasticity recovery on the top of lower buckle side 52 lean At the top of the lower convexity 33, the cover plate 5 can not be moved down, this completes the cover plate 5 to snap onto the vallecular cavity Snapping bonding state of the installation as shown in Fig. 8, Fig. 9, Figure 10, Figure 11 on clip connection device in 36 cavity walls.Dismantle the cover plate 5 When, it is only necessary to somewhat firmly exerted oneself outward and down in the bottom of the cover plate 5, the cover plate 5 a little deformation displacement of itself is just The lower end of the cover plate 5 can be allowed to depart from the lower convexity 33 on the vertical wall body 32 and then entirely pull down the cover plate 5。
Cell wall body around vallecular cavity 36 is stated in order to be completely covered by residence, further technical scheme is, as shown in figure 15, The lower end of the cover plate 5 sets lower flange side 53, and the lower flange side 53 continues to extend downwardly from the position of lower buckle side 52; The upper end of the cover plate 5 sets convex rim 55, and the convex rim 55 continues up extension from the position of hook side 54. So when the cover plate 5 lid is enclosed on the accent of the vallecular cavity 36, as illustrated in figures 1 and 8, the convex rim 55 can be with The horizontal wall body 31 of the vallecular cavity 36 is covered in, the lower flange side 53 can cover in the vertical wall body 32 of the vallecular cavity 36.
Secondly, the cover plate 5 extends in transverse direction in section bar shape, can cover simultaneously several colligators 400 or Whole colligators 400, so described cover plate 5, the furred ceiling laminate 6 and the described first lifting plate 1 constitute altogether jointly The alien invasion of the corner furred ceiling, it can also utilize the cover plate 5 to cover and modify the colligator 400, and can cover The medial extremity of the furred ceiling laminate 6 and the gap 421 erect between metope B, repair the furred ceiling laminate 6 due to width not The problem of gap 421 is uneven caused by neat., further can also be in institute in order to beautify the alien invasion of the corner furred ceiling State spraying and decorating enamelled coating on the lateral surface of cover plate 5, the furred ceiling laminate 6 or the first lifting plate 1 or paste wallpaper etc..
Due to being particularly 90 ° of turning sites in the turning site of the corner furred ceiling, two cover plates 5 are with certain angle Need to open up the inclined-plane of certain angle in end during the diagonal connection of degree, such as when the angle of turn of the corner furred ceiling is 90 °, need 45 ° of inclined-plane is opened up in the end of the cover plate 5.Also just as such situation, when first by the lid on a direction After plate 5 positions, the cover plate 5 on another direction, which has been not easy to tip in from non-vertical direction, is installed to the colligator On 400.For this for the ease of being mounted directly the cover plate 5 of at an angle to each other two, using installation method from the bottom up, not only It is easy to process the inclined-plane nor with the cover plate 5 repeatedly coordinated on two different directions of adjustment, next is also allowed for Dismantle the cover plate 5.
Disclosed above the first structure of the colligator 400.Second of structure such as Fig. 9 institutes of the colligator 400 Show, unlike the first above-mentioned scheme, the colligator 400 also includes upper clip arm 4, the medial extremity of the upper clip arm 4 Directly it is fixedly installed on the underarm 3 or their integrated moldings.Material is thus formed with described in geometrical clamp open height Colligator 400.The upper clip arm 4 can be a kind of elastic arm or a kind of stiff arm body.In the upper clip arm 4 It is in stiff arm body structure, structure as shown in figure 19 can also be improved to, column 47 is provided with the upper clip arm 4 And the first spring 48 on the column 47 is arranged on, an elastic support arm 49 of first spring 48 is described through being arranged on Extended to after elongate aperture 40 on upper clip arm 4 in the jaws 42 and can top pressure on the furred ceiling laminate 6, so work as institute When stating furred ceiling laminate 6 and being inserted into the jaws 42, the elastic support arm 49 is with regard to that can suppress the inner side of the furred ceiling laminate 6 End, so as to which it will not be beated up and down with blast, can also be applicable the furred ceiling laminate 6 of different-thickness.
Disclosed above second of structure of the colligator 400.The third structure such as Figure 10 institutes of the colligator 400 Show, unlike above-mentioned second scheme, it is two parts that the upper clip arm 4 and the underarm 3 be separately positioned, the upper folder Arm 4 can be the strip structure or short strip shape structure extended laterally, and the upper clip arm 4 does not comprise only pressing arm Body 45, also include vertical setting arm 46, the pressing arm body 45 is with the setting integrated molding of arm 46 and in substantially 90 ° The distribution of angle, the outside of the setting arm 46 is provided with the projecting arm 30 of a pair of relative extensions, so as to which a pair of L-types are convex Going out arm 30 makes have interface arrangment generally in the form of slot on the setting arm 46, and the interface arrangment is that can form clamping The snap arm of connection.The colligator 400 can snap fit onto the upper and lower chimb of the positioning base 2 by the snap arm (21、22)On.
As shown in figs.10 and 14, the upper clip arm 4 includes tail end 44 and pressing arm body 45 in the tabular of height structure, Its width is substantially suitable with longitudinal support arm 31, and as shown in Figure 10, the upper clip arm 4 is located at longitudinal support arm 31 Upper and lower arrangement achieved above, and allow the vallecular cavity 36 to be located at below the furred ceiling laminate 6;As shown in figure 14 on described The tail end 44 of jig arm 4 is provided with screwed hole 440, and corresponding through hole is provided with the horizontal wall body 31(Do not drawn in figure Go out).As shown in Figure 10, the through hole shape is passed through by set screw 41 between the upper clip arm 4 and longitudinal support arm 31 Into the threaded connection with the upper clip arm 4, and between the pressing arm body 45 of the upper clip arm 4 and the horizontal wall body 31 Jaws 42 with adjustment height is formed by the regulation of the set screw 41.So described longitudinal support arm 31 is actually Just turn into the lower clip arm of the jaws 42, i.e., described longitudinal support arm 31 is combined into one with the lower clip arm, the furred ceiling laminate 6 Weight the upper clip arm 4 is just passed to by the underarm 3 and set screw 41 of the colligator 400.The adjustable jaws 42 largest benefit is to be adapted to the furred ceiling laminate 6 of different thickness, and can be pre-installed into the furred ceiling laminate 6 Medial extremity on, and then the colligator 400 install it is in place after finally tighten up the set screw 41 again, be conveniently adjusted described The position of furred ceiling laminate 6.Secondly because the medial extremity of the furred ceiling laminate 6 and the clearance space 421 erect between metope B have Limit, completely can be when the furred ceiling laminate 6 be in inclined pre- position(Larger clearance space during this heeling condition It is far longer than clearance space when being in horizontality)The colligator 400 is pre-installed, allows the jaws 42 of the colligator 400 It is incorporated in advance on the furred ceiling laminate 6.Need not be thus how to be facilitated in narrow space, the combination is quickly installed Device 400 and spend the time.
Because the underarm 3 is usually to act directly against to erect on metope B, the colligator 400 for this shown in Figure 10 it is another One benefit is that the gravity that the snap arm is born can be decomposed by means of the underarm 3.
Disclosed above the third structure of the colligator 400.The 4th kind of structure such as Figure 11 institutes of the colligator 400 Show, unlike the third above-mentioned scheme, the setting arm 46 is not provided with the upper clip arm 4, but by a pair of institutes State the inner side that the snap arm that projecting arm 30 is formed is set directly at the setting wall body 32 of the underarm 3.So described upper folder The structure of arm 4 is with regard to as shown in figure 14.
For the ease of implementing to tighten the action of the set screw 41 in the lower section of the colligator 400, such as Figure 10 and figure Shown in 11, the set screw 41 is set upward allows its screw terminal 43 to be collected in the vallecular cavity 36.The screw terminal 43 is can To combine the position of the operation instruments such as screwdriver, hexagonal handle.
3rd aspect, exactly sets and installs the furred ceiling laminate 6.The large area sheet material for choosing appropriate material is for example wooden Plate, silicon composite plate, plastic plate, composited aluminum and plastic decking or aluminium sheet etc. cut proper width and the small sheet material of length forms the described of needs Furred ceiling laminate 6, a furred ceiling laminate 6 can be set along the amplitude for erectting metope B described in a width, can also allow several pieces The furred ceiling laminate 6 gives split.As shown in figure 1, the outboard end of the furred ceiling laminate 6 sets aside to first extension edge 101 Go up and be inserted into the slot 109 formed between first extension edge 101 and second extension edge 102, medial extremity Set aside to as shown in Figure 8 on longitudinal support arm 31 of the colligator 400, the furred ceiling laminate 6 is in the pitch space 100 Substantially horizontally arrange that there is gap 421 between the furred ceiling laminate 6 and setting metope B.When the colligator 400 is a kind of During product with jaws 42, the medial extremity of the furred ceiling laminate 6 shown in Fig. 9, Figure 10, Figure 11 be inserted into as described in jaws 42 And the colligator 400 can also be installed according to the pre-installation method having already described above.
4th aspect, exactly installs the ornamental strip 63.As shown in Figure 2 and Figure 3, described first lifting plate 1 with it is described Erect to be arranged side by side in metope B pitch space and be provided with least two blocks of furred ceiling laminates(61、62), hung to beautify described in two pieces Top plate(61、62)Between gap, the first scheme is the furred ceiling laminate of will be mutually linked two blocks(61、62)Between Position is configured to the fixing structure mutually overlapped, two blocks of furred ceiling laminates(61、62)Between end is upper and lower is overlapped on one Rise so as to form linking;The seam is exactly the step-like structure for removing the formation of part of wall body.Second scheme is exactly at two pieces The furred ceiling laminate(61、62)Between gap in be provided with the ornamental strip 63.Therefore, further technical scheme is institute State the T-shaped section bar shape of ornamental strip 63 and include the intermediate cylinder 64 being inserted into the gap and two thin wing sides 631, The thickness on the thin wing side 631 is identical with the thickness of first extension edge 101, so that after the ornamental strip 63 is installed, institute The lower flat for stating ornamental strip 63 keeps concordant with first extension edge 101.Secondly, in the intermediate cylinder of the ornamental strip 63 Second spring 65 is provided with 64, wherein the second spring 65 includes middle circle body portion 651 and from the middle circle body portion The two free ends extended on 651(652、653), set on the intermediate cylinder 64 of the ornamental strip 63 and for example pass through punching Technique punching processed goes out a pair of registration arm(641、642), the middle circle body portion 651 is installed on a pair of registration arm(641、 642)On;During installation, the two free ends of the second spring 65 are tightened up(652、653)And allow the second spring 65 and institute The intermediate cylinder 64 of ornamental strip 63 is stated from two blocks of furred ceiling laminates(61、62)Between gap in insert, the ornamental strip 63 Two wing sides 631 be adjacent to respectively in the furred ceiling laminate by means of the second spring 65(61、62)Lower surface on.At this In structure, two thin wing sides 631 of the ornamental strip 63 can be as shown in Figure 2 in thin wall shape structure or such as Fig. 4 Shown is the thick structure of the hollow form wall body with certain thickness and width, and the thick structure of this hollow form wall body is in Fig. 4 In be designated as 632 in addition, thus can be by means of the ornamental strip 63 in the furred ceiling laminate(61、62)Lower surface on shape There is the obvious prominent and furred ceiling laminate into one(61、62)The thick wing side 632 of structure, the lower surface of thick wing side 632 is also It is provided with concavo-convex decoration line 60.
5th aspect, can also set pull rod device.In order to prevent the first lifting plate 1 from going out because of only top positioning Existing downside deflection, further scheme be as shown in figure 1, can also the described first lifting plate 1 and the setting metope B it Between the first longitudinal pull bar 500 is set in space 100, first pull bar 500 is located at the top of the furred ceiling laminate 6, described The outboard end of first pull bar 500 is snapped onto in neck 110.So hung in be related to large span in a lateral direction described first During loading board 1, it can further stablize the first lifting plate 1 and the whole corner furred ceiling layer C.It is naturally appreciated that It is that the medial extremity of first pull bar 500 can also be connected(Such as hook)The colligator 400 or with the positioning bottom On seat 2.Further first pull bar 500 can be a kind of stiff rod body or a kind of flexible pull bar style Such as spring, rubber rope.
According to above-mentioned technical proposal, installing the method for the corner furred ceiling layer C and being summarized as is:
Prepare the colligator 400, first and lift plate 1 and the furred ceiling laminate 6;Described first lifting plate 1 is navigated to On top layer facade A, the first lifting plate 1 is extended laterally below the top layer facade A and have between setting metope B There is pitch space 100, the lateral surface of the first lifting plate 1 forms the corner furred ceiling layer C in vertical setting alien invasion; Erect and the colligator 400 is set in transverse direction on metope B;The furred ceiling laminate 6 is installed, by the outer of the furred ceiling laminate 6 Side is set aside on the first extension edge 101 of the first lifting plate 1, and medial extremity sets aside to the described vertical of the colligator 400 To on support arm 31, the corner furred ceiling layer C has thus been preliminarily formed.
Further scheme is set between the described first lifting plate 1 and the setting metope B or described colligators 400 Put the first longitudinal pull bar 500 and described first lifting plate 1 is tensed to the stability for improving the corner furred ceiling layer C.
Further scheme is to also set up the deburring corner pieces 72 in section bar shape being attached on top layer facade A, described to repair Side corner pieces 72 extend positioned at the outside of the described first lifting plate 1 and along the described first lifting plate 1, shelter from first lifting The top outer side of plate 1.So, the deburring corner pieces 72 are not only formd positioned at the described first lifting plate 1 outside corner position The edge closing bar put, add the three-dimensional decorative property of the top corner position, it is often more important that can block because top layer facade is uneven The gap that top ends that are whole and making the first lifting plate 1 occur.
Further scheme is to erect positioning base 2 described in metope lateral arrangement, the colligator 400 also includes Snap arm and jaws 42, when the furred ceiling laminate 6 is installed, the outboard end of the furred ceiling laminate 6 is first set aside into first lifting On first extension edge 101 of plate 1, and the furred ceiling laminate 6 is allowed to be in heeling condition so as to allow the furred ceiling laminate 6 to be erected with described There is larger gap between the B of wall face, be inserted into the medial extremity of the furred ceiling laminate 6 using the larger gap described Clamped in the jaws 42 of colligator 400;Allow again the furred ceiling laminate 6 medial extremity and the colligator 400 simultaneously it is close The positioning base, the snap arm of the colligator 400 is allowed to snap fit onto on the positioning base 2.
Further scheme is to be provided with to avoid otch 24 on the positioning base 2;It is described on the colligator 400 Snap arm is arranged in interval shape and is adapted to the avoidance otch 24, when medial extremity and the colligator 400 of the furred ceiling laminate 6 Simultaneously close to the positioning base 2, the snap arm of the colligator 400 is allowed to enter from the position of avoidance otch 24 of the positioning base 2 Enter onto the positioning base 2, then to the left or move right the colligator 400 and then the snap arm is snapped fit onto into the positioning bottom On seat 2.
Further technical scheme is also possible that the colligator 400 includes vallecular cavity 36, and the vallecular cavity 36 is positioned at described The lower section of longitudinal support arm 31 and the accent of the vallecular cavity 36 are towards lateral direction;Covered in the cavity wall of the vallecular cavity 36 on snapping Plate 5, direction snaps into the cavity wall of the vallecular cavity 36 cover plate 5 from the bottom up.
Further technical scheme be also possible that the underarm 3 or upper clip arm 4 can respectively by extrusion forming after, Interception is segmented on the section bar of long section.Manufacturing cost can not only so be saved and length can be adapted to according to the needs interception at scene The underarm 3 or upper clip arm 4 of degree.
Second of embodiment:
Unlike embodiment one, as shown in figure 17, the setting metope B is a kind of setting wall for including window B1 Face;The second lifting plate 8 being attached on top floor plate face A is set, had between the second lifting plate 8 and the setting metope B There is another clearance space 300 for avoiding curtain, fenestrate curtain 9 and curtain rail etc. are accommodated in the space 300.Described second hangs Loading board 8 is in section bar shape and is downwardly extending the replacement face of the setting metope B, and the pitch space 100 is formed described the Between two lifting plates 8 and the first lifting plate 1, the positioning base 2 and the colligator 400 are arranged on second lifting The bottom of plate 8.Wherein, the furred ceiling laminate 6 is set in the pitch space 100, and the positioning base 2 can be with straight forming In the bottom of the described second lifting plate 8, the bottom of the second lifting plate 8 can also be connected to.In this scenario, the combination The position of device 400 can also be exchanged to be arranged on below the first lifting plate 1, and first extension edge 101 is also corresponding Ground, which changes, to be located at below the second lifting plate 8, is all a kind of equivalent application.
Further technical scheme is that the second lifting plate 8 is Split type structure, including can be tied with top floor plate face A The second upper plate body 81 closed and the second lower body 82 that can be connected with longitudinal clamping of support arm 3, second upper plate body 81 and second clamping between lower body 82 connect.
On the basis of second above-mentioned of embodiment, it can also further be improved to have the 3rd of two level furred ceiling layer Kind structure, as shown in figure 18, no window on the setting metope B, set another described fixed again on the setting metope B Position base 2 and colligator 400, another extension edge 83 is set in the inner side of the described second lifting plate 8, outside sets another dress Edging 84, another layer is set in the described second lifting plate 8 and described another clearance space 200 erect between metope B Level furred ceiling laminate 91, the furred ceiling laminate 91 it is short in described second lifting plate 8 and it is described first lifting plate 1 between described in Furred ceiling laminate 6.It is described short in referring to the height relative to ground.Secondly it is provided with another described clearance space 200 vertical To the second pull bar 600, second pull bar 600 is located at the top of the furred ceiling laminate 91.One end of second pull bar 600 It is connected on the setting metope B, the other end is connected on the second lifting plate 8.

Claims (26)

1. a kind of reassembling type corner furred ceiling layer, it is characterised in that including the first lifting plate and the combination being attached on top layer facade To the colligator erect on metope, the first lifting plate, colligator are all in section bar shape, and the first lifting plate is not only described Vertically extending and extend in transverse direction below top layer facade, the colligator prolongs along the setting metope horizontal direction Arrangement is stretched, there is pitch space between the first lifting plate and the setting metope, it is approximate horizontal in the pitch space Ground is disposed with furred ceiling laminate;Side direction extension inwardly is provided with the inner side at the bottom of the described first lifting plate or middle part The first extension edge, the colligator includes longitudinal support arm and upper clip arm, and the upper clip arm is located at longitudinal support arm Top, the upper clip arm and longitudinal support arm are two components separated, the upper clip arm and longitudinal support arm Between formed and connect by set screw, and pass through the set screw between the upper clip arm and longitudinal support arm Regulation forms adjustable for height jaws, and the oral area of the jaws is set aside to towards lateral direction, the outboard end of the furred ceiling laminate On first extension edge, the medial extremity of the furred ceiling laminate is inserted among the jaws;The screw terminal of the set screw Positioned at the lower section of longitudinal support arm.
2. corner furred ceiling layer according to claim 1, it is characterised in that the colligator also includes vertical wall body, described Vertical wall body is arranged to form the substantially L-shaped cavity wall in cross section and then have a groove with longitudinal support arm in certain angle Chamber, the vallecular cavity is located at the lower section of longitudinal support arm and the accent of the vallecular cavity is towards lateral direction, the vallecular cavity The cover plate of the vallecular cavity can be covered by being snapped with cavity wall, and the screw terminal of the set screw is collected in the vallecular cavity.
3. corner furred ceiling layer according to claim 1, it is characterised in that being provided with the inside of the first lifting plate can The corner brace neck of grafting corner corner brace, it is described first lifting plate on the inside or outside of be additionally provided with the lamp card for being capable of grafting ornament lamp Groove.
4. corner furred ceiling layer according to claim 1, it is characterised in that on the inner side of the described first lifting plate also It is provided with side direction inwardly and extends and be used for the second extension edge for limiting the furred ceiling laminate, second extension edge is positioned at described The top of first extension edge, the spacing between second extension edge and first extension edge are more than the thickness of the furred ceiling laminate Degree.
5. corner furred ceiling layer according to claim 1, it is characterised in that be additionally provided with above first extension edge At least one elastic device, elastic arm possessed by the elastic device extend to the described first extension edge direction.
6. corner furred ceiling layer according to claim 1, it is characterised in that in the described first lifting plate and the setting metope Or the first longitudinal pull bar is set between the colligator.
7. according to any described corner furred ceiling layer of claim 1 to 6, it is characterised in that the first lifting plate includes can The first upper plate body combined with top layer facade and the first lower body that can be combined with the furred ceiling laminate, first upper plate body Clamping is connected between the first lower body, and first extension edge is arranged on the inner side of first lower body.
8. corner furred ceiling layer according to claim 7, it is characterised in that be additionally provided with first lower body to extension The upholstery border stretched, the height that the upholstery border upwardly extends are more than the height of first lower body.
9. according to any described corner furred ceiling layer of claim 1 to 6, it is characterised in that the described first lifting plate with it is described Erect and at least two blocks furred ceiling laminates being arranged side by side are provided with the pitch space of metope, between two blocks of furred ceiling laminates Gap in be provided with ornamental strip.
10. corner furred ceiling layer according to claim 9, it is characterised in that the ornamental strip, which includes, is inserted into institute The intermediate cylinder in gap is stated, second spring is provided with the intermediate cylinder;Wherein described second spring includes centre Circle body portion and the two free ends extended from the middle circle body portion, are provided with the intermediate cylinder of the ornamental strip A pair of registration arm, the middle circle body portion are installed in a pair of registration arm;During installation, tighten up the second spring two Free end simultaneously allows the intermediate cylinder of the second spring and the ornamental strip from the gap between two blocks of furred ceiling laminates Insertion, two wing sides of the ornamental strip are adjacent on the lower surface of the furred ceiling laminate by means of the second spring.
11. according to any described corner furred ceiling layer of claim 1 to 6, it is characterised in that also include being attached on top layer facade The second lifting plate, the second lifting plate to form the replacement face of the setting metope in section bar shape and extending laterally, between described It is also formed in away from space between the second lifting plate and the first lifting plate,;Also include positioning base, the positioning bottom Seat is in section bar shape and is disposed to extend in transverse direction on the bottom of the described second lifting plate, and the colligator includes also having and blocked Arm, the colligator are snapped fit onto on the positioning base by the snap arm;Wherein, the positioning base is molded directly within described Second lifts the bottom of plate or independent component and is connected to the bottom of the second lifting plate.
12. corner furred ceiling layer according to claim 11, it is characterised in that the second lifting plate includes can be with top layer Facade with reference to the second upper plate body and the second lower body that can be connected with longitudinal support arm clamping, second upper plate body Clamping is connected between the second lower body.
13. corner furred ceiling layer according to claim 11, it is characterised in that in the described second lifting plate and the setting wall There is another clearance space between face.
14. corner furred ceiling layer according to claim 13, it is characterised in that in the described second lifting plate and the setting wall The second longitudinal pull bar is set between face.
15. corner furred ceiling layer according to claim 13, it is characterised in that set in another described clearance space another The furred ceiling laminate of one level.
16. according to any described corner furred ceiling layer of claim 1 to 6, it is characterised in that be provided with the setting metope Positioning base, the positioning base is in section bar shape and is disposed to extend in transverse direction on the setting metope, the colligator Including there is snap arm, the colligator is snapped fit onto on the positioning base by the snap arm.
17. corner furred ceiling layer according to claim 16, it is characterised in that the snap arm interval arrangement, the positioning bottom The avoidance otch being adapted to the snap arm is provided with seat;The snap arm enters the positioning bottom from the avoidance incision site To the left or move right and then snap fit onto on the positioning base again after on seat.
18. according to any described corner furred ceiling layer of claim 1 to 6, it is characterised in that also include being attached on top layer facade The deburring corner pieces in section bar shape, the deburring corner pieces positioned at described first lifting plate outside and along described first lifting Plate extends, and shelters from the top outer side of the first lifting plate.
19. form the method for any corner furred ceiling layer of claim 1 to 18, it is characterised in that prepare the colligator, the One lifting plate and the furred ceiling laminate;Described first lifting plate is navigated on top layer facade, makes the first lifting plate in institute State and extended laterally below top layer facade and there is pitch space between setting metope, the lateral surface shape of the first lifting plate Into corner furred ceiling layer in vertical setting alien invasion;The colligator is set in transverse direction on metope is erect;Described in installation Furred ceiling laminate, the outboard end of the furred ceiling laminate is set aside on the first extension edge of the first lifting plate, medial extremity insertion To among the jaws of the colligator.
20. according to the method for claim 19, it is characterised in that in the described first lifting plate and the setting metope or institute State and the first longitudinal pull bar is set between colligator.
21. according to the method for claim 19, it is characterised in that also set up be attached on top layer facade in section bar shape Deburring corner pieces, the deburring corner pieces are blocked positioned at the outside of the described first lifting plate and along the described first lifting plate extension State the top outer side of the first lifting plate in residence.
22. according to the method for claim 19, it is characterised in that erectting positioning base described in metope lateral arrangement, institute State colligator and also include snap arm, when the furred ceiling laminate is installed, the outboard end of the furred ceiling laminate is first set aside to described On first extension edge of one lifting plate, and the furred ceiling laminate is allowed to be in heeling condition so as to allow the furred ceiling laminate to be erected with described There is larger gap between wall face, the medial extremity of the furred ceiling laminate is inserted into the knot using the larger gap Clamped in the jaws of clutch;The medial extremity of the furred ceiling laminate is allowed again with the colligator while close to the positioning bottom Seat, allows the snap arm of the colligator to snap fit onto on the positioning base.
23. according to the method for claim 22, it is characterised in that avoidance otch is provided with the positioning base;Institute The snap arm on colligator is stated to arrange in interval shape and be adapted to the avoidance otch, when the furred ceiling laminate medial extremity and The colligator allows the snap arm of the colligator from the avoidance incision site of the positioning base simultaneously close to the positioning base Enter on the positioning base, then to the left or move right the colligator and then the snap arm is snapped fit onto into the positioning base On.
24. according to the method for claim 19, it is characterised in that the colligator includes vallecular cavity, and the vallecular cavity is located at The lower section of longitudinal support arm and the accent of the vallecular cavity cover in the cavity wall of the vallecular cavity on snapping towards lateral direction Plate.
25. according to the method for claim 19, it is characterised in that also set up the second lifting navigated on top layer facade Plate, the second lifting plate to form the replacement face of the setting metope in section bar shape and extending laterally, the pitch space also shape Into between the described second lifting plate and the first lifting plate, the positioning base is arranged under the second lifting plate Portion.
26. according to the method for claim 25, it is characterised in that between the described second lifting plate and the setting metope Second pull bar of longitudinal direction is set.
CN201610011070.6A 2015-07-01 2016-01-10 A kind of reassembling type corner furred ceiling layer and forming method thereof Active CN105464280B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610011070.6A CN105464280B (en) 2015-07-01 2016-01-10 A kind of reassembling type corner furred ceiling layer and forming method thereof

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201510376549.5A CN104989024A (en) 2015-07-01 2015-07-01 Dismounting and mounting type corner suspended ceiling layer and forming method thereof
CN2015103765495 2015-07-01
CN201610011070.6A CN105464280B (en) 2015-07-01 2016-01-10 A kind of reassembling type corner furred ceiling layer and forming method thereof

Publications (2)

Publication Number Publication Date
CN105464280A CN105464280A (en) 2016-04-06
CN105464280B true CN105464280B (en) 2018-02-23

Family

ID=54300905

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201510376549.5A Pending CN104989024A (en) 2015-07-01 2015-07-01 Dismounting and mounting type corner suspended ceiling layer and forming method thereof
CN201620015864.5U Withdrawn - After Issue CN205557972U (en) 2015-07-01 2016-01-10 Reassembling type corner furred ceiling layer
CN201610011070.6A Active CN105464280B (en) 2015-07-01 2016-01-10 A kind of reassembling type corner furred ceiling layer and forming method thereof
CN201620178698.0U Active CN205475963U (en) 2015-07-01 2016-03-09 Compound furred ceiling layer structure and second grade furred ceiling layer of using thereof
CN201610132228.5A Active CN105587065B (en) 2015-07-01 2016-03-09 Composite suspended ceiling layer structure and second-level suspended ceiling layer applying same

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201510376549.5A Pending CN104989024A (en) 2015-07-01 2015-07-01 Dismounting and mounting type corner suspended ceiling layer and forming method thereof
CN201620015864.5U Withdrawn - After Issue CN205557972U (en) 2015-07-01 2016-01-10 Reassembling type corner furred ceiling layer

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201620178698.0U Active CN205475963U (en) 2015-07-01 2016-03-09 Compound furred ceiling layer structure and second grade furred ceiling layer of using thereof
CN201610132228.5A Active CN105587065B (en) 2015-07-01 2016-03-09 Composite suspended ceiling layer structure and second-level suspended ceiling layer applying same

Country Status (1)

Country Link
CN (5) CN104989024A (en)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989024A (en) * 2015-07-01 2015-10-21 胡崇亮 Dismounting and mounting type corner suspended ceiling layer and forming method thereof
CN105649256B (en) * 2016-01-10 2018-07-06 佛山力亮科技有限公司 Furred ceiling erects the mounting structure of decorative panel and corner furred ceiling layer
CN106088444A (en) * 2016-06-21 2016-11-09 苏州华鼎建筑装饰工程有限公司 Furred ceiling method to set up
CN106193415A (en) * 2016-08-30 2016-12-07 冯文 A kind of section bar and ceiling structure
CN106760137B (en) * 2016-12-26 2022-11-25 浙江亚厦装饰股份有限公司 Edge folding capable of adjusting decorative panel allowance and application thereof
CN106760414A (en) * 2017-01-17 2017-05-31 优居优住家居装饰(北京)有限公司 A kind of bathroom furred ceiling stealth access hole construction method
CN106958316A (en) * 2017-03-17 2017-07-18 长葛市金福祥金属材料有限公司 The ceiling of boss can be formed
CN107143828B (en) * 2017-06-22 2023-05-26 胡崇亮 Inner clamping assembly for mounting lamp groove and simple suspended ceiling lamp groove
CN108331233A (en) * 2017-07-08 2018-07-27 胡崇亮 It is used to form the plaque section bar component of ceiling system and its ceiling system of application
CN107559778B (en) * 2017-09-29 2023-11-21 广州积科新型建材有限公司 Ceiling lamp groove connection structure
CN107859225B (en) * 2017-09-29 2023-12-12 浙江亚厦装饰股份有限公司 Automatic clamping structure for closing-in plate of ceiling decoration panel
CN107559272A (en) * 2017-10-25 2018-01-09 湖州美诺玻璃有限公司 A kind of European corner pieces
CN108049547A (en) * 2018-02-06 2018-05-18 佛山博亚建材有限公司 A kind of Integral ceiling deburring corner structure
CN108265858B (en) * 2018-02-12 2023-08-25 浙江顶上集成家居股份有限公司 Island staggered layer structure at top of integrated wallboard and mounting method
CN108385864B (en) * 2018-05-11 2023-10-10 浙江爱尔菲集成家居有限公司 Movable row inserts combination wallboard
CN209261108U (en) * 2018-05-17 2019-08-16 山东铝佰汇智能家居科技有限公司 A kind of aluminium alloy furred ceiling that one end is hanging
CN113137028A (en) * 2020-01-19 2021-07-20 上海郎捷建筑科技有限公司 Assembly type decoration universal keel system and installation method thereof
CN111519817A (en) * 2020-04-28 2020-08-11 河南远大可持续建筑科技有限公司 Construction process of secondary ceiling of integrated floor system
CN112252566B (en) * 2020-10-27 2021-11-05 怀化简美装饰设计工程有限公司 Wall corner suspended ceiling structure for interior decoration
CN112443131B (en) * 2020-11-25 2024-06-21 浙江亚厦装饰股份有限公司 Arc-shaped decoration panel capable of being quickly installed, suspended ceiling system and installation method
CN113323233A (en) * 2021-06-28 2021-08-31 浙江亚厦装饰股份有限公司 Bathroom ceiling mounting structure and mounting method thereof
CN113323244A (en) * 2021-06-28 2021-08-31 浙江亚厦装饰股份有限公司 Toilet assembled arc-shaped suspended ceiling and installation method thereof
CN113550484A (en) * 2021-07-23 2021-10-26 广州市广京装饰材料有限公司 Light barrier for building easy to assemble and convenient regulation
CN114961081B (en) * 2022-06-28 2024-01-16 北京金晟源建筑工程有限公司 Decoration node structure at corner of suspended ceiling end and wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3302350A (en) * 1964-03-10 1967-02-07 Reynolds Metals Co Molding construction
CN201065633Y (en) * 2007-07-03 2008-05-28 童明勇 Vertical angle line
CN202840354U (en) * 2012-08-28 2013-03-27 广东电网公司东莞供电局 Busbar for housing of gas insulated switchgear
CN103572876A (en) * 2013-11-05 2014-02-12 浙江鼎美电器有限公司 Integrated lamp trough
CN203583750U (en) * 2013-10-12 2014-05-07 嘉兴安邦绿可木科技有限公司 Second level ceiling
CN104566078A (en) * 2015-02-09 2015-04-29 胡崇亮 Built-in lamp applied to ceiling layer

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH586806A5 (en) * 1975-01-17 1977-04-15 Thermo Acoustic Products Ltd
EP1165902A1 (en) * 1999-04-06 2002-01-02 Georg Haag AG Kit of constructional elements for producing a latticed support structure
CN101509297B (en) * 2009-03-31 2010-12-01 湖南安雅达建材科技有限公司 Stacking keel installation method
CN102678015B (en) * 2012-05-10 2015-01-07 福建省南平铝业有限公司 Heat insulation outward side-hung window sash section and inner section and batten seat combined structure thereof
CN202787616U (en) * 2012-09-14 2013-03-13 浙江宝兰电气有限公司 Indoor suspended ceiling with double-layer structure
CN103953153B (en) * 2014-04-28 2016-05-04 上海市建筑装饰工程集团有限公司 Profiling fretwork model decorative structure and installation method thereof
CN103953150B (en) * 2014-05-13 2016-06-22 佛山市锦绣明天建材有限公司 Combined decoration section bar
CN204001362U (en) * 2014-06-13 2014-12-10 李新平 A kind of smallpox secondary furred ceiling section bar
CN104727478B (en) * 2015-03-21 2017-05-10 浙江移动电气股份有限公司 Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof
CN104989024A (en) * 2015-07-01 2015-10-21 胡崇亮 Dismounting and mounting type corner suspended ceiling layer and forming method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3302350A (en) * 1964-03-10 1967-02-07 Reynolds Metals Co Molding construction
CN201065633Y (en) * 2007-07-03 2008-05-28 童明勇 Vertical angle line
CN202840354U (en) * 2012-08-28 2013-03-27 广东电网公司东莞供电局 Busbar for housing of gas insulated switchgear
CN203583750U (en) * 2013-10-12 2014-05-07 嘉兴安邦绿可木科技有限公司 Second level ceiling
CN103572876A (en) * 2013-11-05 2014-02-12 浙江鼎美电器有限公司 Integrated lamp trough
CN104566078A (en) * 2015-02-09 2015-04-29 胡崇亮 Built-in lamp applied to ceiling layer

Also Published As

Publication number Publication date
CN105464280A (en) 2016-04-06
CN105587065B (en) 2023-02-28
CN104989024A (en) 2015-10-21
CN205557972U (en) 2016-09-07
CN205475963U (en) 2016-08-17
CN105587065A (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN105464280B (en) A kind of reassembling type corner furred ceiling layer and forming method thereof
CN106284779A (en) A kind of bright hidden frame of curtain wall connects auxiliary frame, curtain wall system and construction method thereof
CN202731039U (en) Connecting structure of folding line plane fitting double-curved-surface glass curtain wall system
CN105649256B (en) Furred ceiling erects the mounting structure of decorative panel and corner furred ceiling layer
CN106013586B (en) Compound corner furred ceiling Rotating fields
CN104975673B (en) Clamper applied to the corner furred ceiling of reassembling type
CN201486012U (en) Suspended ceiling margin-ending structure
CN105064588A (en) Novel duplex ceiling and mounting method thereof
CN106013660B (en) A kind of abatvoix and its installation method
CN205475966U (en) Mounting structure and corner furred ceiling layer of decorative board are erect to furred ceiling
CN215829758U (en) Acoustic control light-emitting side hanging plate
CN212336485U (en) Cellular board staggered-layer lap-joint section bar
CN209509365U (en) A kind of inside-corner decoration plate mounting assembly
CN210177867U (en) Soil style of calligraphy wall fossil fragments
CN207406225U (en) A kind of hollow glass interior decoration structure
CN204804139U (en) Brand -new compound furred ceiling
CN204898990U (en) Be applied to holder of corner furred ceiling of reassembling type
CN206337776U (en) A kind of decorating structure of metope
CN2316380Y (en) metal ceiling for building
CN216109324U (en) Split type suspended ceiling panel structure
CN104481098B (en) The structural member of assembly type furred ceiling
CN110439174A (en) Structure is hung on a kind of combined type side of furred ceiling
CN112450706B (en) Novel L-shaped curtain box and installation method
CN203795781U (en) Mounting system for glass wall surface
CN219219515U (en) Integrated keel-free suspended ceiling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180115

Address after: The town of Nanhai District, Guangdong city of Foshan province 528226

Applicant after: Foshan beautiful building material technology Co., Ltd.

Address before: Nanhai District of Guangdong city of Foshan province Luo village 528226 Industrial Zone Building Jinxiu Xiabai tomorrow (Guangxi Dan Luo village next to the traffic police squadron)

Applicant before: Hu Chongliang

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 528226 "Lianshengwei" of Lutang, Luocun, Shishan Town, Nanhai District, Foshan City, Guangdong Province

Patentee after: Guangdong New House Building Materials Co., Ltd.

Address before: 528226 "Lianshengwei" of Lutang, Luocun, Shishan Town, Nanhai District, Foshan City, Guangdong Province

Patentee before: Foshan beautiful building material technology Co., Ltd.