CN104727478B - Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof - Google Patents
Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof Download PDFInfo
- Publication number
- CN104727478B CN104727478B CN201510123973.9A CN201510123973A CN104727478B CN 104727478 B CN104727478 B CN 104727478B CN 201510123973 A CN201510123973 A CN 201510123973A CN 104727478 B CN104727478 B CN 104727478B
- Authority
- CN
- China
- Prior art keywords
- layers
- ceiling
- triangular keel
- layer
- screw mandrel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention provides a two-layer suspension ceiling structure of an integrated suspension ceiling and an installation method thereof. The integrated ceiling is mainly composed of triangular keels and plane buckle plates buckled to the triangular keels. The triangular keels are fixedly installed on main keels which are transversely arranged relative to the triangular keels through connecting pieces. The main keels are fixed to a ceiling of a roof through suspension rods. The two-layer suspension ceiling structure mainly comprises a two-layer suspension ceiling frame which is formed by four two-layer-ceiling aluminum sectional materials through special corner connectors and screws. The whole two-layer suspension ceiling frame is fixedly installed on the ceiling of the floor through combined lead screw suspension pieces. The upper portion of each two-layer-ceiling aluminum sectional material is provided with an inner transverse 90-degree U-shaped groove. The middle portion of the two-layer suspension ceiling frame is fixedly connected with upper triangular keels in an inserted mode through two opposite 90-degree U-shaped grooves, and the upper triangular keels are used for installation of two-layer-ceiling buckle plates. The two-layer-ceiling buckle plates forming a two-layer ceiling are buckled to the upper triangular keels. The two-layer suspension ceiling structure has the advantages of being simple in structure and capable of simplifying an installation structure, reducing installation and operation difficulty coefficients, relieving labor intensity, reducing material waste and the like.
Description
Technical field
The present invention relates to two layers of ceiling structure and installation method of a kind of Integral ceiling for simplifying installation, belong to integrated and hang
Top technical field.
Background technology
At present, in Integral ceiling field, to realize that the installation that two layers of ceiling structure have always following two aspects lacks
Fall into:
One is complex structure and operation difficulty degree aspect:At present in Integral ceiling industry, two layers of ceiling structure are realized
In, the triangular keel fixed form of two-layer be it is the same, and the triangular keel and main joist of each layer be it is independent mutually, mutually
Without association, and actual installation result is to ensure that each layer is parallel, so installing, difficulty is larger, debug time needs
It is very long;
Two is cost and material aspect:The main joist of each layer, triangular keel structure are separate, so each layer will
There are the accessory of same ratio, such as main joist, swell fixture, screw mandrel, the material of waste is more, and installation difficulty is big, man-hour
Many, cost of labor will height.
The content of the invention
It is an object of the invention to overcome the shortcomings of that prior art is present, and a kind of simple structure is provided, installation can be simplified
Structure, reduce installation operation degree-of-difficulty factor, reduce labour intensity, reduce waste of material Integral ceiling two layers of ceiling structure and
Installation method.
The purpose of the present invention by following technical solution completing, a kind of two layers of ceiling structure of Integral ceiling, institute
The Integral ceiling stated mainly by triangular keel and snaps onto the plane buckle on triangular keel and constitutes, and described triangular keel passes through
Connector is fixedly mounted on the main joist of relative triangular keel lateral arrangement, and described main joist is fixed on by hanger rod component
On the ceiling on roof, two layers of described ceiling structure mainly include that one pushes up aluminium section bar by special corner brace and spiral shell by four two layers
Two layers of furred ceiling frame of nail composition, and the day that roof is fixedly mounted on entirely through combination screw mandrel hanging piece of two layers of described furred ceiling frame
On card;The top of two layers of top aluminium section bar is provided with 90 degree of U-type grooves of laterally inboard, passes through in the centre of two layers of furred ceiling frame
Two 90 degree of relative U-type grooves are fixed and are plugged with the upper triangular keel for installing two layers of top clip plate, and the snapping on upper triangular keel
By two layers of top clip plate for constituting two layers of top.
Hanger rod component of the present invention includes screw connecting piece, screw mandrel and fixing nut and swell fixture;Described
Combination screw mandrel hanging piece includes swell fixture, nut and screw mandrel hanging piece;It is provided with the lower outside of two layers of described top aluminium section bar
The snapping side being buckled on adjacent triangular keel.
A kind of installation method of two layers of ceiling structure of Integral ceiling as described above, described installation method includes following step
Suddenly:
a)Middle two layers of top by four length as needed customized two layers of good top aluminium section bar by special corner brace and screw
Two layers of top frame structure of composition, the mount structure for then constituting is solid entirely through the accessory such as screw mandrel and swell fixture, nut, special hanging piece
It is scheduled on the ceiling on roof, after screw mandrel is fixed, the height and level of overall frame is adjusted by fixed nut;
b)The triangular keel in face frame on the region that overall two layers of top frame structure are framed, using setting on two layers of top aluminium section bar
90 degree of U-type grooves of laterally inboard, fixedly mount the upper triangular keel for two layers of top clip plate grafting;
c)Lower floor's ceiling structure laying main joist, triangular keel, and matched somebody with somebody with each connector, screw, screw mandrel, swell fixture etc.
Part is fixed on roof ceiling, and regulates height and level, makes lower floor's ceiling structure and two layers of top entirety frame lower plane rank
Connect.
Currently preferred technical scheme is:In described step, wherein:
Step a)In, need to be determined by the length of aluminium section bar with accessory, the quantity of screw mandrel and spacing per two layers of top aluminium section bar of root,
Of length no more than 2 meters, to fix with two screw mandrels and respective accessory lifting, every aluminium section bar length often increases more than 2 meters
1.5 meters, then the accessory for lifting screw mandrel 1 and matching is further added by, by that analogy;
Step b)In, the Specific construction of two layers of roof construction is:The buckle quantity of two layers of roof construction is calculated, two are then calculated
The total length and width of layer top middle boxes, the then triangular keel in shorter width laying, the length of keel must be in
Width exceeds 25 ± 1mm, when being put in 90 degree of U-type grooves, first upper triangular keel is inclined certain angle, above triangular keel energy
On the basis of lying in completely in groove plane, first U-type groove is inserted in upper triangular keel one end, then again the upper triangular keel other end
In insertion U-type groove, until all upper triangular keel laying is completed,
Step c)In, the matching principle of main joist and screw mandrel is:Main joist spacing is usually main joist between 1.5 to 2 meters
The spacing of upper lifting screw mandrel is also between 1.5 to 2 meters.
The present invention changes in the structure of " multi-layer top structure aluminium section bar is realized in Integral ceiling " to realize, the new structure of here
In, a U-type groove for having turned 90 degree arranged at the top of section bar, the size of this groove just with the cross section geometric shape chi of triangular keel
It is very little to match, when the frame that triangular keel insertion is combined into by four " the new aluminium section bar of multilayer roof construction is realized in Integral ceiling ",
Triangular keel just with the U-type groove tight fit turning 90 degrees, so as to reach fixed purpose, be not required to again use main joist, screw mandrel, connection
Fixing two layers of upper triangular keel, load-bearing directly " realizes that multi-layer top is tied to the accessories such as part, swell fixture by fixation in Integral ceiling
The structure of the new aluminium section bar of structure " frame is realizing.
The present invention has simple structure, can simplify mounting structure, reduces installation operation degree-of-difficulty factor, reduces labour intensity,
The features such as reducing waste of material.
Description of the drawings
Fig. 1 is two layers of top of the present invention overall appearance structural representation.
Fig. 2 is two layers of top of the present invention overall structure appearance parts sectional view.
Fig. 3 is A portions mplifying structure schematic diagram in Fig. 2.
Fig. 4 is the structural representation of two layers of top of the present invention aluminium section bar.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention will be described in detail:Shown in Fig. 1-4, a kind of Integral ceiling of the present invention
Two layers of ceiling structure, described Integral ceiling mainly by triangular keel 1 and snaps onto the plane buckle 2 on triangular keel 1 and constitutes,
Described triangular keel 1 is fixedly mounted on the main joist 4 of relative triangular keel lateral arrangement by connector 3, described master
Keel 4 are fixed on the ceiling on roof by hanger rod component 5, and two layers of described ceiling structure mainly include one by four two layers
Top aluminium section bar 7 by special corner brace 8 and screw composition two layers of furred ceiling frame, and two layers of described furred ceiling frame entirely through combination
Screw mandrel hanging piece 9 is fixedly mounted on the ceiling on roof;The top of two layers of top aluminium section bar is provided with 90 degree of U of laterally inboard
Type groove 10, is plugged with two layers of top clip plate 11 of installation and uses in the centre of two layers of furred ceiling frame by two relative 90 degree of U-type grooves 10 fixations
Upper triangular keel 12, and be snapped with upper triangular keel 12 composition two layers top two layers of top clip plate 11.
Shown in figure, described hanger rod component 5 includes screw connecting piece 51, screw mandrel 52 and fixing nut 53 and expanding screw
Nail 54;Described combination screw mandrel hanging piece 9 includes swell fixture 91, nut 92 and screw mandrel hanging piece 93;Two layers of described top aluminium section bar
Lower outside on be provided with the snapping side 13 being buckled on adjacent triangular keel 1.
A kind of installation method of two layers of ceiling structure of Integral ceiling as described above, described installation method includes following step
Suddenly:
a)Middle two layers of top by four length as needed customized two layers of good top aluminium section bar by special corner brace and screw
Two layers of top frame structure of composition, the mount structure for then constituting is solid entirely through the accessory such as screw mandrel and swell fixture, nut, special hanging piece
It is scheduled on the ceiling on roof, after screw mandrel is fixed, the height and level of overall frame is adjusted by fixed nut;
b)The triangular keel in face frame on the region that overall two layers of top frame structure are framed, using setting on two layers of top aluminium section bar
90 degree of U-type grooves of laterally inboard, fixedly mount the upper triangular keel for two layers of top clip plate grafting;
c)Lower floor's ceiling structure laying main joist, triangular keel, and matched somebody with somebody with each connector, screw, screw mandrel, swell fixture etc.
Part is fixed on roof ceiling, and regulates height and level, makes lower floor's ceiling structure and two layers of top entirety frame lower plane rank
Connect.
A preferred embodiment of the present invention is:In described step, wherein:
Step a)In, need to be determined by the length of aluminium section bar with accessory, the quantity of screw mandrel and spacing per two layers of top aluminium section bar of root,
Of length no more than 2 meters, to fix with two screw mandrels and respective accessory lifting, every aluminium section bar length often increases more than 2 meters
1.5 meters, then the accessory for lifting screw mandrel 1 and matching is further added by, by that analogy;
Step b)In, the Specific construction of two layers of roof construction is:The buckle quantity of two layers of roof construction is calculated, two are then calculated
The total length and width of layer top middle boxes, the then triangular keel in shorter width laying, the length of keel must be in
Width exceeds 25 ± 1mm, when being put in 90 degree of U-type grooves, first upper triangular keel is inclined certain angle, above triangular keel energy
On the basis of lying in completely in groove plane, first U-type groove is inserted in upper triangular keel one end, then again the upper triangular keel other end
In insertion U-type groove, until all upper triangular keel laying is completed,
Step c)In, the matching principle of main joist and screw mandrel is:Main joist spacing is usually main joist between 1.5 to 2 meters
The spacing of upper lifting screw mandrel is also between 1.5 to 2 meters.
Claims (4)
1. a kind of two layers of ceiling structure of Integral ceiling, described Integral ceiling mainly by triangular keel and snaps onto triangular keel
On plane buckle composition, described triangular keel is fixedly mounted on the main dragon of relative triangular keel lateral arrangement by connector
On bone, described main joist is fixed on the ceiling on roof by hanger rod component, it is characterised in that described two layers of furred ceiling knot
Structure mainly includes that one pushes up two layers of furred ceiling frame that aluminium section bar is consisted of special corner brace and screw, and described two layers by four two layers
Furred ceiling frame entirely through combination screw mandrel hanging piece be fixedly mounted on the ceiling on roof;The top of two layers of top aluminium section bar sets
90 degree of U-type grooves of laterally inboard are equipped with, are fixed by two 90 degree of relative U-type grooves in the centre of two layers of furred ceiling frame and is plugged with installation
The upper triangular keel of two layers of top clip plate, and two layers of top clip plate on two layers of top of composition are snapped with upper triangular keel.
2. two layers of ceiling structure of the Integral ceiling according to claim 1, it is characterised in that described hanger rod component includes
Screw connecting piece, screw mandrel and fixing nut and swell fixture;Described combination screw mandrel hanging piece includes swell fixture, nut and silk
Bar hanging piece;The snapping side being buckled on adjacent triangular keel is provided with the lower outside of two layers of described top aluminium section bar.
3. a kind of installation method of two layers of ceiling structure of Integral ceiling as claimed in claim 1 or 2, it is characterised in that described
Installation method comprises the steps:
a)By four length, as needed customized two layers of good top aluminium section bar are consisted of special corner brace and screw on middle two layers of top
Two layers of top frame structure, the mount structure for then constituting is fixed on roof entirely through screw mandrel and swell fixture, nut, special hanging piece
On ceiling, after screw mandrel is fixed, the height and level of overall frame is adjusted by fixed nut;
b)The triangular keel in face frame on the region that overall two layers of top frame structure are framed, using the horizontal stroke arranged on two layers of top aluminium section bar
To 90 degree of inner side U-type groove, the upper triangular keel for two layers of top clip plate grafting is fixedly mounted;
c)Lower floor's ceiling structure laying main joist, triangular keel, and it is fixed on room with each connector, screw, screw mandrel, swell fixture
On the ceiling of top, and height and level are regulated, lower floor's ceiling structure is connected with two layers of top entirety frame lower plane.
4. the installation method of two layers of ceiling structure of Integral ceiling according to claim 3, it is characterised in that described step
In, wherein:
Step a)In, need to be determined by the length of aluminium section bar with accessory, the quantity of screw mandrel and spacing per two layers of top aluminium section bar of root, length
Less than 2 meters, fix with two screw mandrels and respective accessory lifting, every aluminium section bar length increases by 1.5 meters more than 2 meters, often,
The accessory for lifting screw mandrel 1 and matching then is further added by, by that analogy;
Step b)In, the Specific construction of two layers of roof construction is:The buckle quantity of two layers of roof construction is calculated, two layers of top are then calculated
The total length and width of middle boxes, the then triangular keel in shorter width laying, the length of keel must be in width
Beyond 25 ± 1mm, when being put in 90 degree of U-type grooves, first upper triangular keel is inclined certain angle, above triangular keel can be completely
On the basis of lying in groove plane, first U-type groove is inserted in upper triangular keel one end, then again the insertion of the upper triangular keel other end
In U-type groove, until all upper triangular keel laying is completed,
Step c)In, the matching principle of main joist and screw mandrel is:Main joist spacing is usually that between 1.5 to 2 meters, main joist is hung oneself
The spacing of dress screw mandrel is also between 1.5 to 2 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510123973.9A CN104727478B (en) | 2015-03-21 | 2015-03-21 | Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510123973.9A CN104727478B (en) | 2015-03-21 | 2015-03-21 | Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104727478A CN104727478A (en) | 2015-06-24 |
CN104727478B true CN104727478B (en) | 2017-05-10 |
Family
ID=53451834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510123973.9A Active CN104727478B (en) | 2015-03-21 | 2015-03-21 | Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104727478B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104989024A (en) * | 2015-07-01 | 2015-10-21 | 胡崇亮 | Dismounting and mounting type corner suspended ceiling layer and forming method thereof |
CN105604229B (en) * | 2015-12-22 | 2017-11-24 | 浙江亚厦装饰股份有限公司 | A kind of clamping joist duplex integrated ceiling structure |
CN108442636B (en) * | 2018-02-12 | 2023-08-25 | 浙江顶上集成家居股份有限公司 | Top high-low staggered floor mounting structure of integrated wall panel |
CN108252446B (en) * | 2018-03-26 | 2022-12-27 | 浙江美赫集成家居股份有限公司 | Liftable sucker type integrated ceiling |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4804065B2 (en) * | 2005-08-05 | 2011-10-26 | Sus株式会社 | Ceiling structure and ceiling construction method |
CN102071768B (en) * | 2010-12-24 | 2012-03-28 | 上海构思装饰材料有限公司 | Edge keel structure |
CN102383612A (en) * | 2011-09-14 | 2012-03-21 | 浙江来斯奥电气有限公司 | Method and component for mounting three-dimensional suspended ceiling |
CN102400514B (en) * | 2011-11-21 | 2014-02-05 | 海盐法狮龙建材科技有限公司 | Integrated ceiling formed by installing ceiling panels in layered mode |
CN202767321U (en) * | 2012-05-13 | 2013-03-06 | 王建培 | Three-dimensional integrated ceiling |
CN202595991U (en) * | 2012-05-18 | 2012-12-12 | 浙江楚乔电气有限公司 | Combined multi-floor duplex roof |
CN204456576U (en) * | 2015-03-21 | 2015-07-08 | 浙江移动电气股份有限公司 | A kind of two layers of ceiling structure of Integral ceiling |
-
2015
- 2015-03-21 CN CN201510123973.9A patent/CN104727478B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104727478A (en) | 2015-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104727478B (en) | Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof | |
CN202227644U (en) | Three-dimensional adjustable hanging piece device for decoration wallboard | |
US20180153301A1 (en) | Tabletop-equipped article of furniture | |
CN202595991U (en) | Combined multi-floor duplex roof | |
CN102900193B (en) | Cellular board ceiling system | |
CN207110189U (en) | One kind falls a grade furred ceiling | |
US20130240813A1 (en) | U-section for mounting a railing panel in a fixed manner | |
CN206815643U (en) | A kind of easy-to-mount ceiling structure | |
CN207194279U (en) | Integrated top mounting structure | |
CN204456576U (en) | A kind of two layers of ceiling structure of Integral ceiling | |
CN107060184A (en) | A kind of integrated top mounting structure | |
CN208748981U (en) | A kind of wind resistance roofing reinforcement system | |
US9470039B2 (en) | Architectural mesh framing system | |
CN206957022U (en) | A kind of assembled ceiling structure | |
CN108589987A (en) | A kind of hanging fast assembling wall slab mounting assembly | |
CN208183963U (en) | A kind of Foldable prefabricated house | |
CN102677844A (en) | Combined type multilayer duplex roof | |
CN206448479U (en) | A kind of structure of integrated wall Fast Installation | |
CN105952081B (en) | A kind of novel wall and its installation method | |
CN207260411U (en) | A kind of fixed structure of installation of ceiling connector and furred ceiling section bar | |
CN206072036U (en) | It is a kind of that there is lock function steel structure connecting member | |
CN207744942U (en) | Component is built in a kind of exhibition booth | |
CN209907858U (en) | Ceiling expansion joint decoration | |
CN110258901A (en) | A kind of fixed furred ceiling of tapping screw and its mounting structure | |
CN208885586U (en) | A kind of ventilation equipment of more mounting means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230410 Address after: 314001, 1st Floor, Building 1, East Side of Jing'er Road, Yuxin Town, Nanhu District, Jiaxing City, Zhejiang Province Patentee after: Zhejiang Dingshang Integrated Home Furnishing Co.,Ltd. Address before: 4th Floor, Fuyue Office Building, No. 8 Zhonghuan West Road, Jiaxing City, Zhejiang Province, 314011 Patentee before: ZHEJIANG MOBILE ELECTRIC CO.,LTD. |
|
TR01 | Transfer of patent right |