CN105604229B - A kind of clamping joist duplex integrated ceiling structure - Google Patents

A kind of clamping joist duplex integrated ceiling structure Download PDF

Info

Publication number
CN105604229B
CN105604229B CN201510972238.5A CN201510972238A CN105604229B CN 105604229 B CN105604229 B CN 105604229B CN 201510972238 A CN201510972238 A CN 201510972238A CN 105604229 B CN105604229 B CN 105604229B
Authority
CN
China
Prior art keywords
keel
layer
main joist
clamping
joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510972238.5A
Other languages
Chinese (zh)
Other versions
CN105604229A (en
Inventor
程安顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201510972238.5A priority Critical patent/CN105604229B/en
Publication of CN105604229A publication Critical patent/CN105604229A/en
Application granted granted Critical
Publication of CN105604229B publication Critical patent/CN105604229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/16Connections between non-parallel members of the supporting construction the members lying in different planes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Toys (AREA)

Abstract

The present invention relates to a kind of clamping joist duplex integrated ceiling structure, solve existing compound furred ceiling to cause not connect between the drop-down layer and main joist on upper suction layer periphery using the main joist of height arrangement, the defects of influenceing stability of strutting system, upper suction layer main joist into upper suction layer and pulls down the side layer between layer in upper suction layer peripheral position by keel multi-connector piece clamping triangular keel and fixed lateral plate shape, pull down layer main joist and drop-down layer is formed by keel connecting member clamping triangular keel and fixed decoration panel, keel multi-connector piece has long vertical block, after long vertical block clamping triangular keel connection section bar and pass through section bar connection in it is upper suction layer peripheral position drop-down layer triangular keel.Keel multi-connector piece has a long vertical block, connection section bar and passes through the triangular keel of drop-down layer of the section bar connection in upper suction layer peripheral position after long vertical block bottom clamping triangular keel, it is ensured that above inhale the stable support of layer periphery drop-down layer.

Description

A kind of clamping joist duplex integrated ceiling structure
Technical field
The invention belongs to building decoration area, is related to a kind of assembled ceiling structure, especially a kind of compound collection of clamping joist Into ceiling structure.
Background technology
With developing rapidly for modern architecture industry and new and high technology, modern sense is strong, tall and big grand Architectural Equipment, such as High star hotel, conference centre, theater etc. it is attractive in appearance to interior decoration, especially metal ceiling and decorative ceiling board grand and Durable requirement, through whole building and furnishing fields.
With the development of furred ceiling technology, indoor suspended ceiling uses keel and gypsum board structure system more, and keel are for supporting Moulding, a kind of construction material of fixed structure, indoors using very generally in furred ceiling, indoor suspended ceiling is solid below deck Surely there are suspension rod, the hanging piece connection keel of certain intervals, then plasterboard is installed below in keel, plasterboard is formed one completely Furred ceiling face.
Compound furred ceiling makes furred ceiling have stereovision, protrudes its distinctive architectonic beauty because of its duplex.Main joist is solid A plane is in when determining, but the level of compound furred ceiling causes main joist with the distance between upper suction layer and drop-down layer no Together, it is different also to result in the downward amount of force that main joist is born.It is identical in order to ensure the stress of main joist, by main joist Be fixed according to upper suction layer and the difference in height for pulling down layer, but cause to inhale layer opposite sides drop-down layer and main joist it Between do not connect, influence stability of strutting system.
To reduce the load-bearing of suspension rod burden, on the premise of intensity is not influenceed, reduce the weight of each component as far as possible.In order to The weight of main joist is reduced, existing main joist uses bathtub construction, and opens up punching on the two side of groove, such as:China Patent Office discloses a CN2895581Y documents on May 2nd, 2007, a kind of entitled Snap-type keel, including body, Buckle, elongated hole, bayonet socket, hole clipping, lap joint and lifting hole(eyelet), lap joint two sides are provided with the large semi-circular buckle of outwardly convex, on Plane setting is fluted, in the direct clamping of false keel and bayonet socket.
But downward active force is born after main joist installation, the structure of flute profile easily changes the A/F of groove, caused Main joist is bent downwardly deformation, influences the quality and security of furred ceiling, and after false keel and main joist clamping, can not be to main dragon Bone plays a part of stable and safeguard protection.
The content of the invention
The present invention solves the drop-down layer that existing compound furred ceiling causes upper suction layer periphery using the main joist of height arrangement It is not connected between main joist, the defects of influenceing stability of strutting system, there is provided a kind of clamping joist duplex integrated ceiling structure, on Inhale and be attached between layer periphery and main joist by keel multi-connector piece, it is ensured that above inhale the stable branch of layer periphery drop-down layer Support.
This invention also solves existing main joist to use bathtub construction, and main joist is easily caused groove by downward active force Mouthful width changes, and causes main joist to be bent downwardly deformation, the defects of influenceing furred ceiling quality and security, there is provided a kind of clamping joist Duplex integrated ceiling structure, connector is installed on main joist, is provided with the limited block of side of keel on connector, connector with During main joist clamping, limited block limits side of keel position, it is ensured that keel rabbet width is constant.
This invention also solves existing main joist to be directly connected to false keel, and stable and safety can not be played to main joist and is protected The defects of shield acts on, there is provided a kind of clamping joist duplex integrated ceiling structure, be provided with connector, connector and three on main joist Wall angle is connected, and the limited block of side of keel is provided with connector, and when connector is with main joist clamping, limited block limits master Side of keel position, so as to stablize main joist and play a part of safeguard protection.
The technical solution adopted for the present invention to solve the technical problems is:A kind of clamping joist duplex integrated ceiling structure, Including be connected with roof suspension rod main joist, be connected the triangular keel of decoration panel, main joist according to the upper suction layer of furred ceiling with The height of drop-down layer, which is divided into, inhales layer main joist and drop-down layer main joist, wherein, upper suction layer main joist passes through keel connecting member card Connect triangular keel and fixed decoration panel forms suction layer, upper suction layer main joist passes through the compound company of keel in upper suction layer peripheral position Fitting clamping triangular keel simultaneously fixes lateral plate shape into upper suction layer and pulls down the side layer between layer, and drop-down layer main joist passes through dragon Bone connector clamping triangular keel simultaneously fixes decoration panel formation drop-down layer, and keel multi-connector piece has long vertical block, long vertical block After clamping triangular keel connection section bar and pass through section bar connection in it is upper suction layer peripheral position drop-down layer triangular keel.Upper suction It is attached between layer periphery and main joist by keel multi-connector piece, keel multi-connector piece has long vertical block, passes through length Vertical block adapts to upper suction layer and pulls down the difference in height between layer, connection section bar and passes through after long vertical block bottom clamping triangular keel The triangular keel of drop-down layer of the section bar connection in upper suction layer peripheral position, it is ensured that above inhale the stable support of layer periphery drop-down layer.
Preferably, main joist uses bathtub construction, the edge of the side wall of flute profile is provided with some bayonet sockets, keel connecting member With the grab that is engaged with bayonet socket is provided with keel multi-connector piece, be provided with below keel connecting member and be connected with triangular keel What is connect mounts groove, keel multi-connector piece lateral location be provided be connected with triangular keel mount groove.
Preferably, the grab on keel connecting member and keel multi-connector piece is two, and two grab local inclinations, card The length of hook is more than the width of main joist.
Preferably, bayonet socket on main joist is multiple, be symmetricly set on the two side of flute profile, between two grabs away from It is adapted from the distance between main joist upper latch notch relative side.
Preferably, keel connecting member and keel multi-connector piece include a horizontal block, horizontal block end positions are hung down Straight to be bent with vertical block, the end edge position bending of vertical block is connected with grab.
Preferably, two side positions of horizontal block are vertically bent with the block mutually positioned with main joist two side, and at this The vertical bending of both sides position-reversed mount block formed be connected with triangular keel mount groove.Keel connecting member and the compound company of keel When fitting is with main joist clamping, block limits main joist sidewall locations, so as to stablize main joist and play a part of safeguard protection.
Preferably, grab is perpendicular with block, the length of grab is more than the distance between two blocks.
Preferably, the distance between two blocks are corresponding with the insied width of the notch of main joist flute profile, keel connecting member During with keel multi-connector piece and main joist clamping, block is inserted into the notch of main joist and is engaged with the inner surface of two side It is and spacing.
Preferably, the two of the same side of keel multi-connector piece mount in block, there is one piece of length for mounting block to be more than another One piece, the big block that mounts of length forms long vertical block, and respectively there are a long vertical block, two long vertical block directions in the side of keel multi-connector piece two Another side for mounting block, which is set, mounts groove.
Preferably, the groove that mounts of keel multi-connector piece side is divided into upper and lower two groups, distance in-between and side The distance between the triangular keel of layer is corresponding.
The beneficial effects of the invention are as follows:It is attached between upper suction layer periphery and main joist by keel multi-connector piece, Keel multi-connector piece has long vertical block, and upper suction layer is adapted to by long vertical block and pulls down the difference in height between layer, under long vertical block After end clamping triangular keel connection section bar and by section bar connection in it is upper suction layer peripheral position drop-down layer triangular keel, Ensure the stable support of upper suction layer periphery drop-down layer.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention;
Fig. 2 is a kind of main keel structure schematic diagram of the present invention;
Fig. 3 is a kind of keel connecting member structural representation of the present invention;
Fig. 4 is a kind of structural representation of keel multi-connector piece of the present invention;
In figure:1st, main joist, 2, suspension rod, 3, triangular keel, 4, decoration panel, 5, section bar, 6, keel multi-connector piece, 7, Connecting hole, 8, bayonet socket, 9, edge, 10, through hole, 11, keel connecting member, 12, grab, 13, vertical block, 14, mount block, 15, hang Portion, 16, mount groove, 17, horizontal block, 18, block, 19, long vertical block.
Embodiment
Below by specific embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.
Embodiment:A kind of clamping joist duplex integrated ceiling structure(Referring to Fig. 1), including be connected with roof suspension rod 2 Main joist 1, the triangular keel 3 for connecting decoration panel 4, main joist are divided into upper suction according to the height of the upper suction layer and drop-down layer of furred ceiling Layer main joist and drop-down layer main joist.Upper suction layer main joist passes through the clamping triangular keel of keel connecting member 11 and fixed decoration panel Layer is inhaled in formation, upper suction layer main joist passes through the clamping triangular keel of keel multi-connector piece 6 and fixation in upper suction layer peripheral position Lateral plate shape is into upper suction layer and pulls down the side layer between layer, drop-down layer main joist by keel connecting member clamping triangular keel simultaneously Fixed decoration panel forms drop-down layer.
Main joist(Referring to Fig. 2)Using bathtub construction, the edge of the two side of flute profile is provided with some bayonet sockets 8, two side On bayonet socket be symmetrical arranged with respect to the center line of main joist, the inner side edge of bayonet socket is arc, and the opening of bayonet socket sets oriented card The edge 9 of mouth center line extension.Some through holes 10 are provided with the two side of main joist, the bottom of the flute profile of main joist, which is provided with, hangs Lever attachment hole 7, the bottom of main joist are alongst also evenly equipped with some through holes.
Keel connecting member is connected between the side that two bayonet sockets are relative on main joist, keel connecting member(Referring to Fig. 3)Including Horizontal block 17, the both ends of horizontal block are vertically bent with vertical block 13 upwards, and the upper end edge of vertical block sets oriented keel connecting member The grab 12 of center line direction bending, the overbending direction of grab is relative, and grab is in the arc shape to raise up in the present embodiment.It is horizontal The middle part of the side of block two is vertically bent with block 18 upwards, and the two-end part downward bending of the side of horizontal block two mounts block 14, the two of same side mounts to be formed between block and mounts groove 16, and the same side two, which mounts the relative end set of block, the extension of protrusion Portion 15, two width for mounting the relative opening for mounting groove formed of block are less than the width for mounting trench bottom.The length of grab is more than The width of main joist, also greater than the distance between two blocks, the vertical block of keel connecting member is inserted into the bayonet socket of main joist, vertical block On grab and the edge phase hook of bayonet socket side hold.The distance between two blocks are relative with the width of the notch of main joist flute profile Should, after keel connecting member and main joist clamping, two blocks are inserted into the notch of main joist, with the two side of main joist flute profile Interior table matching is simultaneously spacing.Triangular keel snaps onto the mounting in groove of keel connecting member, and triangular keel is perpendicular with main joist.
Keel multi-connector piece 6(Referring to Fig. 4)Including horizontal block 17, the both ends of horizontal block are vertically bent with vertical block upwards 13, the upper end edge of vertical block sets the grab 12 of oriented keel connecting member center line direction bending, and the overbending direction of grab is relative, Grab is in the arc shape to raise up in the present embodiment.The middle part of the side of horizontal block two is vertically bent with block 18 upwards, The two-end part downward bending of the side of horizontal block two mounts block 14, and the two of same side mounts to be formed between block and mount groove 16, The same side two, which mounts the relative end set of block, the extension portion 15 of protrusion, and two mount the width of the relative opening for mounting groove formed of block Degree is less than the width for mounting trench bottom.The length of grab is more than the width of main joist, also greater than the distance between two blocks, keel The vertical block of connector is inserted into the bayonet socket of main joist, and the grab in vertical block and the edge phase hook of bayonet socket side are held.Two blocks it Between distance it is corresponding with the width of the notch of main joist flute profile, after keel connecting member and main joist clamping, two blocks are inserted into In the notch of main joist, match with the interior table of the two side of main joist flute profile and spacing.The same side of keel multi-connector piece Two mount in block, have one piece of length for mounting block to be more than another piece, the big block elongation position that mounts of length forms long vertical block 19, dragon Respectively there is a long vertical block side of bone multi-connector piece two, is provided with up and down towards another side for mounting block in each long vertical block Two mount groove 16, and distance in-between is corresponding with the distance between the triangular keel of side layer.Section bar has horizontal flanging With vertical flanging, what is be below mounts horizontal flanging of the groove by triangular keel connection section bar, and vertical flanging is with pulling down in layer It is connected near the triangular keel of side layer and supports the triangular keel.
Embodiment described above is a kind of preferred version of the present invention, not makees any formal limit to the present invention System, there are other variants and remodeling on the premise of without departing from the technical scheme described in claim.

Claims (10)

1. a kind of clamping joist duplex integrated ceiling structure, including be connected with roof suspension rod main joist, be connected decoration panel Triangular keel, main joist is divided into upper suction layer main joist according to the height of the upper suction layer of furred ceiling and drop-down layer and pulls down the main dragon of layer Bone, it is characterised in that above inhale layer main joist and upper suction layer is formed by keel connecting member clamping triangular keel and fixed decoration panel, Upper suction layer main joist is in upper suction layer peripheral position by keel multi-connector piece clamping triangular keel and fixed lateral plate shape into upper Inhale layer and pull down the side layer between layer, drop-down layer main joist passes through keel connecting member clamping triangular keel and fixed decoration panel Drop-down layer is formed, keel multi-connector piece has a long vertical block, connection section bar and connects after long vertical block clamping triangular keel by section bar Connect the triangular keel of the drop-down layer in upper suction layer peripheral position;Main joist uses bathtub construction, the edge of the two side of flute profile It is provided with some bayonet sockets, the bayonet socket on two side is symmetrical arranged with respect to the center line of main joist, and the inner side edge of bayonet socket is arc, bayonet socket Opening the edge of oriented bayonet socket center line extension is set.
A kind of 2. clamping joist duplex integrated ceiling structure according to claim 1, it is characterised in that keel connecting member and The grab being engaged with bayonet socket is provided with keel multi-connector piece, is provided with below keel connecting member and is connected with triangular keel Mount groove, keel multi-connector piece lateral location be provided be connected with triangular keel mount groove.
A kind of 3. clamping joist duplex integrated ceiling structure according to claim 2, it is characterised in that keel connecting member and Grab on keel multi-connector piece is two, two grab local inclinations, and the length of grab is more than the width of main joist.
4. a kind of clamping joist duplex integrated ceiling structure according to claim 2, it is characterised in that between two grabs The distance between distance and main joist upper latch notch relative side are adapted.
A kind of 5. clamping joist duplex integrated ceiling structure according to claim 1 or 2 or 3 or 4, it is characterised in that keel Connector and keel multi-connector piece include a horizontal block, and horizontal block end positions are vertically bent with vertical block, the end of vertical block The bending of side position is connected with grab.
A kind of 6. clamping joist duplex integrated ceiling structure according to claim 5, it is characterised in that the both sides of horizontal block Position is vertically bent with the block mutually positioned with main joist two side, and mounts block in the vertical bending of both sides position-reversed and formed What is be connected with triangular keel mounts groove.
7. a kind of clamping joist duplex integrated ceiling structure according to claim 6, it is characterised in that grab and block phase Vertically, the length of grab is more than the distance between two blocks.
8. a kind of clamping joist duplex integrated ceiling structure according to claim 6, it is characterised in that between two blocks Distance is corresponding with the insied width of the notch of main joist flute profile, keel connecting member and keel multi-connector piece and main joist clamping When, block be inserted into the notch of main joist merge with the inner surface matching of two side it is spacing.
A kind of 9. clamping joist duplex integrated ceiling structure according to claim 6, it is characterised in that the compound connection of keel The two of the same side of part are mounted in block, have one piece of length for mounting block to be more than another piece, and the big block that mounts of length forms long vertical block, Respectively there is a long vertical block side of keel multi-connector piece two, and two long vertical blocks set towards another side for mounting block and mount groove.
A kind of 10. clamping joist duplex integrated ceiling structure according to claim 9, it is characterised in that the compound connection of keel The groove that mounts of part side is divided into two groups up and down, and distance in-between is corresponding with the distance between the triangular keel of side layer.
CN201510972238.5A 2015-12-22 2015-12-22 A kind of clamping joist duplex integrated ceiling structure Active CN105604229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510972238.5A CN105604229B (en) 2015-12-22 2015-12-22 A kind of clamping joist duplex integrated ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510972238.5A CN105604229B (en) 2015-12-22 2015-12-22 A kind of clamping joist duplex integrated ceiling structure

Publications (2)

Publication Number Publication Date
CN105604229A CN105604229A (en) 2016-05-25
CN105604229B true CN105604229B (en) 2017-11-24

Family

ID=55984528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510972238.5A Active CN105604229B (en) 2015-12-22 2015-12-22 A kind of clamping joist duplex integrated ceiling structure

Country Status (1)

Country Link
CN (1) CN105604229B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023180752A1 (en) * 2022-03-24 2023-09-28 Zentia Limited An architectural system for creating an array of panels

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211114248U (en) * 2018-10-29 2020-07-28 广东天赐湾实验室装备制造有限公司 Panel connector with improved structure and hanging type partition wall applied to panel connector
CN112049307A (en) * 2020-08-31 2020-12-08 浙江亚厦装饰股份有限公司 Novel structure for connecting vertical frame plate with side hanging plate and mounting method thereof
GB2621924B (en) * 2022-03-24 2024-09-18 Zentia Ltd A hook for an architectural system for creating an array of panels
GB2621925B (en) * 2022-03-24 2024-09-18 Zentia Ltd A two-part hook for an architectural system for creating an array of panels

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2369082A2 (en) * 2010-03-25 2011-09-28 Protektorwerk Florenz Maisch GmbH & Co. KG Connection system for two crossing C-profiles
CN103669675A (en) * 2013-11-20 2014-03-26 浙江亚厦装饰股份有限公司 Connecting device for suspended ceiling
CN104727478A (en) * 2015-03-21 2015-06-24 浙江移动电气股份有限公司 Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof
CN204609091U (en) * 2014-12-30 2015-09-02 奉涛 A kind of secondary furred ceiling connector
CN205296539U (en) * 2015-12-22 2016-06-08 浙江亚厦装饰股份有限公司 Integrated furred ceiling structure of card formula fossil fragments double entry

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101307544B1 (en) * 2012-11-02 2013-09-12 주식회사 조은데코 Apparatus for finishing a ceiling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2369082A2 (en) * 2010-03-25 2011-09-28 Protektorwerk Florenz Maisch GmbH & Co. KG Connection system for two crossing C-profiles
CN103669675A (en) * 2013-11-20 2014-03-26 浙江亚厦装饰股份有限公司 Connecting device for suspended ceiling
CN204609091U (en) * 2014-12-30 2015-09-02 奉涛 A kind of secondary furred ceiling connector
CN104727478A (en) * 2015-03-21 2015-06-24 浙江移动电气股份有限公司 Two-layer suspension ceiling structure of integrated suspension ceiling and installation method thereof
CN205296539U (en) * 2015-12-22 2016-06-08 浙江亚厦装饰股份有限公司 Integrated furred ceiling structure of card formula fossil fragments double entry

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023180752A1 (en) * 2022-03-24 2023-09-28 Zentia Limited An architectural system for creating an array of panels

Also Published As

Publication number Publication date
CN105604229A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN105625625B (en) A kind of clamping joist assembled ceiling structure and installation method
CN105604229B (en) A kind of clamping joist duplex integrated ceiling structure
CN207003781U (en) A kind of Integral ceiling
CN209509297U (en) The assembled furred ceiling of decoration panel is plugged and fixed
CN108240065A (en) European drop level furred ceiling and installation method
CN205382610U (en) Abnormal shape suspended ceiling structure
CN206987154U (en) A kind of aluminium side being easily installed leads to grille ceiling furred ceiling
CN105064588B (en) A kind of completely newly compound furred ceiling and its installation method
CN110259023A (en) A kind of cladding wall brick structure and its construction method
CN213390785U (en) Lamp area node structure is hidden at furred ceiling system limit portion
CN206457978U (en) A kind of ventilation ceilings furred ceiling
CN109537793A (en) It is easily installed the ceiling structure and its installation method of leveling
CN207513077U (en) Wooden formula panel dried hanging hang structure
CN106149948A (en) A kind of sound-absorbing ceiling suspension system
CN205296539U (en) Integrated furred ceiling structure of card formula fossil fragments double entry
CN212957199U (en) Semi-exposed frame ceiling structure
CN203821680U (en) Fully invisible frame system structure
CN205530909U (en) Piece is hung in city furred ceiling installation combination
CN210395810U (en) Suspended ceiling mounting structure
CN205296535U (en) Integrated furred ceiling card formula fossil fragments mounting structure
CN210049471U (en) Novel suspended ceiling plate and mounting structure thereof
CN108797880A (en) A kind of plaster tablet suspended ceiling structure
CN206346375U (en) A kind of grafting suspension member of hang ceiling panel plate stitch leveling installation
CN209261015U (en) A kind of ceiling structure
CN208267215U (en) Partly hang the multilayer mounting structure on integrated top

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant