CN105464136B - A kind of power check well - Google Patents

A kind of power check well Download PDF

Info

Publication number
CN105464136B
CN105464136B CN201510748766.2A CN201510748766A CN105464136B CN 105464136 B CN105464136 B CN 105464136B CN 201510748766 A CN201510748766 A CN 201510748766A CN 105464136 B CN105464136 B CN 105464136B
Authority
CN
China
Prior art keywords
plash
water
standby
suction pump
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510748766.2A
Other languages
Chinese (zh)
Other versions
CN105464136A (en
Inventor
林光琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoyou excellent lighting equipment factory
Original Assignee
Quanzhou Pinchuang Intellectual Property Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Pinchuang Intellectual Property Services Co Ltd filed Critical Quanzhou Pinchuang Intellectual Property Services Co Ltd
Priority to CN201510748766.2A priority Critical patent/CN105464136B/en
Publication of CN105464136A publication Critical patent/CN105464136A/en
Application granted granted Critical
Publication of CN105464136B publication Critical patent/CN105464136B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Physical Water Treatments (AREA)
  • Special Spraying Apparatus (AREA)
  • Air Humidification (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

A kind of power check well, including:Main body well, it is used to set power equipment and inspection personnel to enter;The mould proof hydrophobic coating of main body well inner surface setting, bottom sets plash;Ultrasonic atomizing device is set in the plash, for by the water atomization in plash;Air extractor is set above ultrasonic atomizing device, for the water after atomization to be discharged;Also include standby plash, valve and the first suction pump, the standby plash is communicated by valve with the plash, and first suction pump is arranged in plash, the water in the plash can be drawn into standby plash.

Description

A kind of power check well
Technical field
The present invention relates to a kind of inspection shaft, more particularly, to a kind of power check well.
Background technology
Inspection shaft is important structures in underground piping, to the performance, environmental protection and people's lives of city function all Important.With the continuous extension of urban construction, defeated, transformer quantity in city are on the increase, it is necessary to build Substantial amounts of electric power facility., it is necessary to embedded power check well, convenient maintenance and inspection from now in electric power facility process of deployment.
In current power check well, processing waterproof is paid little attention to, and environment is by rain in the operation of station equipment long term high temperature, well Water influences, and has the possibility that ponding is produced at any time, if can not draining in time, often produce CO, CH4 etc. be harmful to, combustible gas Personnel, when operations staff, which is periodically into, makes an inspection tour maintenance in well, may be damaged by body.
In the prior art, such as 201110435463.7 patent of invention is periodically right generally by setting water pond in shaft bottom The mode of pure water pond progress draining carries out draining and the waterproof of electricity well.But, which can not be realized continues water in time Drain, can not also realize it is damp proof remove mould effect.As an improvement, 201410153934.9,201410154187.0 and A kind of 201410154213.X patent of invention, it is proposed that waterproof electricity well, its by setting hydrophobic coating in well body inwall, Catch pit sets ultrasonic atomizing device and fog collecting hood, by will be taken away after the water atomization in plash, is removed so as to reach Wet mould proof effect.But it is due to that plash capacity is relatively small, when running into heavy rain, ponding can exceed that plash capacity, Electricity well internal water accumulation is caused not discharge in time;Handle the situation of larger rainfall if desired, it is necessary to bigger plash and High-power ultrasonic atomizing device, so as to cause cost to increase;In addition, when the water level of well body is higher, ultrasonic atomizing device Efficiency can also be affected.
The content of the invention
The invention provides a kind of improved power check well, can realize is not increasing plash capacity and ultrasonic atomizatio Under conditions of rating of set, the situation of larger rainfall can be also handled.
As one aspect of the present invention there is provided a kind of power check well, including:Main body well, it is used to set electric power Equipment and inspection personnel enter;The mould proof hydrophobic coating of main body well inner surface setting, bottom sets plash;The ponding Ultrasonic atomizing device is set in hole, for by the water atomization in plash;Air extractor is set above ultrasonic atomizing device, is used for By the water discharge after atomization;It is characterized in that:Also include standby plash, valve and the first suction pump, the standby ponding Pond is communicated by valve with the plash, and first suction pump is arranged in plash, can be by the plash Water is drawn into standby plash.
It is preferred that, the plash is inverted trapezoidal structure.
It is preferred that, the volume of the standby plash is more than the plash volume at least twice.
It is preferred that, when the water level of the main body well exceedes specific first threshold, the valve and the first suction pump are opened Open, the water in the plash is drawn into by the standby plash by the first suction pump;The valve and first draw water After pump is opened, when the water level of the main body well is highly consistent with the plash, first suction pump is closed and described Valve.
It is preferred that, the power of the ultrasonic atomizing device corresponds to the water atomization of plash capacity in special time period Required power.
It is preferred that, the water of the standby plash can be drawn into by addition to the second suction pump, second suction pump The plash;Water-level gauge is set in the standby plash, when there is ponding, and the ponding in the standby plash When not having water in hole, the valve and the second suction pump are opened, the water of the specific volume in the standby plash is extracted To the plash.
It is preferred that, the water of the specific volume corresponds in the water for filling up the capacity of plash or standby plash Water.
It is preferred that, the ultrasonic atomizing device and air extractor are after work special time period, when being stopped specific Between section.
As another aspect of the present invention there is provided the drainage flow path of above-mentioned power check well, comprise the following steps:1) The water level in the main body well is monitored, when water level is higher than specific first threshold in main body well, the valve and first is opened Suction pump, the standby plash is drawn into by first suction pump by the water in the plash;2)In the main body When the water level of well and the highly consistent plash, first suction pump and the valve are closed;3)Open the ultrasound Atomising device and the air extractor, make its work special time period, and the water atomization in plash is extracted out;4)Open described Valve and the second suction pump, when the water in the standby plash is more than the plash capacity, extract the ponding The water of capacity is cheated to the plash;5)The ultrasonic atomizing device and the air extractor are in the special time that is stopped Afterwards, the water atomization in the plash is extracted in restarting out;6)Repeat step 4)- 5), until in the standby plash Water is less than the plash capacity;7)Remaining water in the standby plash is drawn into the plash, starts institute Ultrasonic atomizing device and the air extractor are stated, remaining water atomization is extracted out.
Compared with prior art, advantage is the present invention:1), can be in time by the ponding in main body well in larger rainfall Extract out, it is to avoid the excessive situation of ponding;2)Under conditions of plash capacity and ultrasonic atomizing device power is not increased, it can locate Ponding of the reason beyond plash height;3)Avoid water level in well body higher, influence the efficiency of ultrasonic atomizing device;4)Avoid ultrasound Atomising device is continuously long-running, and causes fatigue etc. to be damaged.
Brief description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention.
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Referring to accompanying drawing 1, the power check well of the embodiment of the present invention, including main body well 1, plash 2, ultrasonic atomizing device 3, Air extractor 4 and standby plash 5.It is used to set power equipment such as cable, transformer etc. main body well 1, is provided with simultaneously Staircase, maintenance is maked an inspection tour in order to which operations staff is periodically into well.The mould proof hydrophobic coating of the inner surface setting of main body well 1, so as to Enough lead water to shaft bottom, mould proof hydrophobic coating well known in the prior art can be used, as in 201410153934.9 make Coating.
Plash 2 is arranged on the bottom of main body well 1, for receiving the water entered in power check well.Product in the present embodiment Puddle 2 is square, it is preferred that plash 2 can be set into inverted trapezoidal, so as to be more beneficial for the collection of ponding.
Ultrasonic atomizing device 3 is set in plash 2, can be by the water atomization in plash 2.The top of ultrasonic atomizing device 3 Air extractor 4 is set, for the water after atomization to be discharged, so as to make inspection shaft keep drying.
Standby plash 5 is arranged on by plash 2, is communicated by first passage 6 with plash 2.First passage 6 is provided with Valve 7, can control the connection between standby plash 5 and plash 2 by unlatching and closing valve 7.First suction pump 8 It is arranged in plash 2, opens the first suction pump 8 and valve 7, the water in plash 2 can be extracted standby plash 5 In.When the water level in main body well exceedes specific first threshold, the suction pump 8 of Open valve 7 and first passes through the first suction pump Water in plash 3 is drawn into standby plash 5 by 8, and the specific first threshold is less than the height of ultrasonic atomizing device 3.Valve After the suction pump 8 of door 7 and first is opened, when the water level of main body well 1 is down to the height of plash 2, closes described first and draw water Pump 8 and valve 7.
Second suction pump is set in standby plash 5(It is not shown), the water in standby plash 5 can be drawn into ponding In hole 2;Water-level gauge is set in standby plash 5 simultaneously, does not have water when existing in standby plash 5 in ponding, and plash 2 When, the water in standby plash 5 is filled up plash 2 by the suction pump of Open valve 7 and second.
The power setting of ultrasonic atomizing device 3 is work special time such as 1~2 hour, can be by the capacity of plash 2 Water atomization is finished.Due to unnecessary water can be stored by standby plash 5, it is not necessary to which water is disposably atomized, it will can surpass Sound atomising device 3 and air extractor 4 are set to after the above-mentioned special time period that works, and be stopped special time period such as 1 Hour, it can avoid tired caused by overtime work.
The drainage flow path of the power check well of the embodiment of the present invention, comprises the following steps:1)Monitor the water in main body well 1 Position, when water level is higher than specific first threshold in main body well 1, the suction pump 8 of Open valve 7 and first passes through the first suction pump 8 Water in plash 2 is drawn into standby plash 5;2)When water level and the plash 2 of main body well 1 are highly consistent, the is closed One suction pump 8 and valve 7;3)Ultrasonic atomizing device 3 and air extractor 4 are opened, makes its work special time period, by ponding Water atomization in hole 2 is extracted out;4)The suction pump of Open valve 7 and second, when the water in standby plash 5 is more than plash 2 During capacity, the water of plash capacity is extracted to plash 2;5)Ultrasonic atomizing device 3 and air extractor 4 be stopped it is specific After time, restart and extract the water atomization in plash 2 out;6)Repeat step 4)- 5), the water in standby plash 5 Amount is less than plash capacity;7)Remaining water in standby plash 5 is drawn into plash 2, start ultrasonic atomizing device 3 with And air extractor 4, remaining water atomization is extracted out.
Exemplary expression present disclosure is only used in above-described embodiment.In addition, those skilled in the art may be used also In doing other changes in spirit of the invention, without departing from the technique effect of the present invention.These are according to present invention spirit The change done, should all be included within scope of the present invention.

Claims (6)

1. a kind of power check well, including:Main body well, it is used to set power equipment and inspection personnel to enter;The main body The mould proof hydrophobic coating of well inner surface setting, bottom sets plash;Ultrasonic atomizing device is set in the plash, for that will accumulate Water atomization in puddle;Air extractor is set above ultrasonic atomizing device, for the water after atomization to be discharged;It is characterized in that: Also include standby plash, valve and the first suction pump, the standby plash is communicated by valve with the plash, institute State the first suction pump to be arranged in plash, the water in the plash can be drawn into standby plash;The standby product Second suction pump is set in pond, the water in standby plash can be drawn into plash;The ultrasonic atomizing device Power corresponds to the required power of the water atomization of plash capacity in special time period.
2. power check well according to claim 1, it is characterised in that:The plash is inverted trapezoidal structure.
3. power check well according to claim 2, it is characterised in that:The volume of the standby plash is more than the product Puddle volume at least twice.
4. power check well according to claim 3, it is characterised in that:When the water level of the main body well exceedes specific first During threshold value, the valve and the first suction pump are opened, and are drawn into the water in the plash by the first suction pump described Standby plash.
5. power check well according to claim 4, it is characterised in that:After the valve and the first suction pump are opened, When the water level of the main body well is highly consistent with the plash, first suction pump and the valve are closed.
6. the drainage flow path of power check well according to claim 5, comprises the following steps:1)Monitor in the main body well Water level, when water level is higher than specific first threshold in main body well, open the valve and the first suction pump, pass through described the Water in the plash is drawn into the standby plash by one suction pump;2)In the water level and the ponding of the main body well When cheating highly consistent, first suction pump and the valve are closed;3)Open the ultrasonic atomizing device and described take out Device of air, makes its work special time period, and the water atomization in plash is extracted out;4)Open the valve and second draw water Pump, when the water in the standby plash is more than the plash capacity, extracts the water of the plash capacity described in Plash;5)The ultrasonic atomizing device and the air extractor are after the special time that is stopped, and restarting will be described Water atomization in plash is extracted out;6)Repeat step 4)- 5), until the water in the standby plash is less than the ponding Cheat capacity;7)Remaining water in the standby plash is drawn into the plash, start the ultrasonic atomizing device with And the air extractor, remaining water atomization is extracted out.
CN201510748766.2A 2015-11-08 2015-11-08 A kind of power check well Expired - Fee Related CN105464136B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510748766.2A CN105464136B (en) 2015-11-08 2015-11-08 A kind of power check well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510748766.2A CN105464136B (en) 2015-11-08 2015-11-08 A kind of power check well

Publications (2)

Publication Number Publication Date
CN105464136A CN105464136A (en) 2016-04-06
CN105464136B true CN105464136B (en) 2017-10-10

Family

ID=55602255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510748766.2A Expired - Fee Related CN105464136B (en) 2015-11-08 2015-11-08 A kind of power check well

Country Status (1)

Country Link
CN (1) CN105464136B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327001A (en) * 2017-09-05 2017-11-07 竺维彬 A kind of intelligent miniature drainage arrangement and method for being used to handle caisson of toilet ponding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2268340C1 (en) * 2004-07-07 2006-01-20 Амурский государственный университет Pumping station for sewage system
JP2010174544A (en) * 2009-01-30 2010-08-12 Hayashi Bussan Hatsumei Kenkyusho:Kk Storage and permeation facility for rainwater or the like
CN203174633U (en) * 2013-04-27 2013-09-04 国家电网公司 Water accumulation prevention cable well
CN103953070B (en) * 2014-04-17 2015-09-30 宁海县雁苍山电力设备厂 water-proof cable well
CN204343333U (en) * 2014-12-25 2015-05-20 上海华群实业股份有限公司 A kind of subway of water proof type connects well

Also Published As

Publication number Publication date
CN105464136A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN203755436U (en) Integrated pre-rotating pump station device
CN207110015U (en) A kind of integrated prefabricated pumping plant with automatic crushing function
CN107268713A (en) Sponge city eaves rainwater treatment device
CN105464136B (en) A kind of power check well
CN205530582U (en) Urban sewerage and drainage sys tem
CN105113721B (en) Generating rainwater drainage pipe
CN101016877A (en) Hydraulic energy reutilization device for high-rise building
CN105421492B (en) A kind of power check well
CN107125184B (en) Negative pressure fish tank and control system thereof
CN206784542U (en) Subway garage drainage system preventing rainwater from flowing backwards
CN206131521U (en) Earth source heat pump is with well system of recharging
CN108266225A (en) A kind of mobile tunnel construction relay pump drainage water installations
CN208634046U (en) A kind of river water extraction safety device
CN207277520U (en) Storage pond under river
CN203808225U (en) Integrated prefabricated pump station with self-coupling submerged pump
CN107435369A (en) Storage pond under river course
CN106593208A (en) Intelligent top-hung window capable of recycling rainwater and control method thereof
CN208105319U (en) A kind of piping lane main structure intelligence curing system
CN206385459U (en) A kind of portable bridge cleaning device
CN106287885B (en) Power plant centralization central oil flue gas purification system
CN206903688U (en) A kind of tunnel automatic water pumping system
CN206941696U (en) The prefabricated pumping plant of novel all-in-one
CN205088569U (en) Ecological filter equipment is collected to bridge floor rainwater
CN214808659U (en) Vacuum slag suction device
CN205524854U (en) Novel refuse collection of gardens pond device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170904

Address after: 362300, No. 1603, building 2, Yue Yi River District, Nanan, Fujian, Quanzhou

Applicant after: Quanzhou create intellectual property service Co., Ltd.

Address before: 355000 Ningde, Fu'an, South Street, Heshan East Road, No. 29

Applicant before: Lin Guangqin

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191030

Address after: 225654 industrial concentration area of Guo Zhen Town, Jiangsu, Gaoyou

Patentee after: Gaoyou excellent lighting equipment factory

Address before: 362300 No. 2 Building 1603, Ximei Yijiang District, Nanan City, Quanzhou City, Fujian Province

Patentee before: Quanzhou create intellectual property service Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171010

Termination date: 20201108