CN108266225A - A kind of mobile tunnel construction relay pump drainage water installations - Google Patents

A kind of mobile tunnel construction relay pump drainage water installations Download PDF

Info

Publication number
CN108266225A
CN108266225A CN201810110111.6A CN201810110111A CN108266225A CN 108266225 A CN108266225 A CN 108266225A CN 201810110111 A CN201810110111 A CN 201810110111A CN 108266225 A CN108266225 A CN 108266225A
Authority
CN
China
Prior art keywords
water
header tank
tunnel construction
level switch
water level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810110111.6A
Other languages
Chinese (zh)
Inventor
卢伟
姚红伟
段小龙
申永江
张辉
罗斌智
黄久宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
Central South University
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, China Railway Tunnel Group Co Ltd CRTG filed Critical Central South University
Priority to CN201810110111.6A priority Critical patent/CN108266225A/en
Publication of CN108266225A publication Critical patent/CN108266225A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00—Drainage
    • E21F16/02—Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

A kind of mobile tunnel construction relay pump drainage water installations, including header tank, the header tank is connected with water inlet pipe and drainpipe, the one end of the water inlet pipe far from header tank is connect with water pump, bottom is equipped with immersible pump in the header tank, connection outlet pipe at the top of the immersible pump, the control dial plate that control immersible pump opens and closes is provided on the header tank side wall, low water level electronic level switch and high water level electronic level switch, described four angles in header tank bottom in the control dial plate electrical connection header tank are equipped with universal wheel and wheel clamp device.Beneficial effects of the present invention are:It can achieve the purpose that lasting draining, catch pit is replaced with header tank, breach limitation of the catch pit because of all many conditions such as terrain;It is simple in structure, easy to make, easy to remove, floor space is small, can be repeatedly used for a long, and efficiently solve long range counter-slope drainage problem, improve constructing tunnel efficiency.

Description

一种移动式隧道施工接力抽排水装置A mobile tunnel construction relay pumping and drainage device

技术领域technical field

本发明涉及隧道反坡施工领域,特别是一种移动式隧道施工接力抽排水装置。The invention relates to the field of tunnel reverse slope construction, in particular to a mobile relay pumping and drainage device for tunnel construction.

背景技术Background technique

隧道建设一般包括公路、铁路、水利、电力等的隧道建设工程,当隧道在富水区域中施工时,会有大量地下水深入隧道,而根据目前施工能力以及“长隧短打”的现有技术,长大隧道一般设置1~5个斜井,该斜井施工至正洞一般为反坡施工,即通过斜井进入正洞施工,在斜井与正洞相交处设置水仓(集水井),将正洞的水引入水仓,再把水仓中的集水分级排出斜井。分级排水一般需要在斜井中设置集水坑,集水坑的设置不仅费时费力,而且会因集水抽排不及时造成污水横流,影响洞内施工环境。Tunnel construction generally includes tunnel construction projects such as roads, railways, water conservancy, and electric power. When a tunnel is constructed in a water-rich area, a large amount of groundwater will penetrate into the tunnel. Generally, 1 to 5 inclined shafts are set up in long tunnels, and the construction from the inclined shaft to the main tunnel is generally reverse slope construction, that is, the inclined shaft enters the main tunnel for construction, and a water tank (water collection well) is set at the intersection of the inclined shaft and the main tunnel. The water in the main hole is introduced into the water tank, and then the collected water in the water tank is discharged out of the inclined shaft in stages. Grading drainage generally needs to set up a sump in the inclined shaft. The setting of the sump is not only time-consuming and laborious, but also causes cross-flow of sewage due to untimely collection and drainage, which affects the construction environment in the cave.

发明内容Contents of the invention

本发明的目的就是提供一种移动式隧道施工接力抽排水装置,其有效解决上述问题,提高隧道施工效率。The purpose of the present invention is to provide a mobile tunnel construction relay pumping and drainage device, which can effectively solve the above problems and improve tunnel construction efficiency.

为了实现上述目的,本发明所采用的技术方案是:In order to achieve the above object, the technical solution adopted in the present invention is:

本发明涉及一种移动式隧道施工接力抽排水装置,包括集水箱,所述集水箱连接有进水管和排水管,所述进水管远离集水箱的一端与水泵连接,所述集水箱内底部设有潜水泵,所述潜水泵顶部连接出水管,所述集水箱侧壁上设置有控制潜水泵启闭的控制表盘,所述控制表盘电连接集水箱内的低水位电子式水位开关和高水位电子式水位开关,所述集水箱底部四个角均设有万向轮以及轮子紧固装置。The invention relates to a mobile tunnel construction relay pumping and drainage device, comprising a water collecting tank, the water collecting tank is connected with a water inlet pipe and a drain pipe, the end of the water inlet pipe far away from the water collecting tank is connected with a water pump, and the inner bottom of the water collecting tank is provided There is a submersible pump, the top of the submersible pump is connected to the water outlet pipe, and a control dial for controlling the opening and closing of the submersible pump is arranged on the side wall of the water collection tank. The control dial is electrically connected to the low water level electronic water level switch and the high water level switch in the water collection tank. Electronic water level switch, universal wheels and wheel fastening devices are provided at the four corners of the bottom of the water collection tank.

所述集水箱连接出水管的侧面设有泄水口和溢流口,泄水口在集水箱侧面的下部,溢流口在集水箱侧面的上部。The side of the water collecting box connected to the outlet pipe is provided with a drain port and an overflow port, the drain port is at the bottom of the side of the water collecting tank, and the overflow port is at the top of the side of the water collecting tank.

所述低位电子式水位开关与潜水泵底面位于同一水平面,所述高水位电子式水位开关与溢流口下端位于同一水平面。The low-level electronic water level switch is located on the same level as the bottom surface of the submersible pump, and the high-level electronic water level switch is located on the same level as the lower end of the overflow port.

所述集水箱上盖上设有把手Ⅰ、把手Ⅱ和通气孔。The upper cover of the water collection tank is provided with a handle I, a handle II and a ventilation hole.

与现有隧道反坡抽排水技术相比,本发明的有益效果是:本发明 结构简单、移动方便、容易安装,在满足隧道反坡排水需要的同时,可多次利用,较少成本,缩短建设工期。Compared with the existing reverse-slope pumping and drainage technology for tunnels, the beneficial effects of the present invention are: the present invention is simple in structure, convenient to move, easy to install, and can be used multiple times while meeting the needs of tunnel reverse-slope drainage, with less cost and shortened construction period.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为本发明在斜井中位置示意图。Fig. 2 is a schematic diagram of the position of the present invention in an inclined well.

图中,1、集水箱;2、进水管;3、出水管;4、泄水口;5、溢流口;6、通气孔;7、潜水泵;8、控制表盘;9、低水位电子式水位开关;10、高水位电子式水位开关;11、把手Ⅰ;12、把手Ⅱ;13、万向轮;14、轮子紧固装置;15、水泵。In the figure, 1. Water collection tank; 2. Water inlet pipe; 3. Water outlet pipe; 4. Drainage port; 5. Overflow port; 6. Ventilation hole; 7. Submersible pump; 8. Control dial; Water level switch; 10. High water level electronic water level switch; 11. Handle I; 12. Handle II; 13. Universal wheel; 14. Wheel fastening device; 15. Water pump.

具体实施方式Detailed ways

下面结合附图说明和具体实施方式对本发明做进一步详细说明:The present invention will be described in further detail below in conjunction with accompanying drawing description and specific embodiment:

如图所示,一种移动式隧道施工接力抽排水装置,包括集水箱1,所述集水箱1连接有进水管2和排水管3,所述进水管2远离集水箱1的一端与水泵15连接,所述集水箱1内底部设有潜水泵7,所述潜水泵7顶部连接出水管3,所述集水箱1侧壁上设置有控制潜水泵7启闭的控制表盘8,所述控制表盘8电连接集水箱1内的低水位电子式水位开关9和高水位电子式水位开关10,所述集水箱1底部四个角均设有万向轮13以及轮子紧固装置14。As shown in the figure, a mobile tunnel construction relay pumping and drainage device includes a water collection box 1, the water collection box 1 is connected with a water inlet pipe 2 and a drainage pipe 3, and the end of the water inlet pipe 2 far away from the water collection box 1 is connected to a water pump 15 connection, the bottom of the water collection tank 1 is provided with a submersible pump 7, the top of the submersible pump 7 is connected to the outlet pipe 3, and the side wall of the water collection tank 1 is provided with a control dial 8 for controlling the opening and closing of the submersible pump 7. The dial 8 is electrically connected to the low water level electronic water level switch 9 and the high water level electronic water level switch 10 in the water collecting tank 1 , and the bottom four corners of the water collecting tank 1 are provided with universal wheels 13 and wheel fastening devices 14 .

所述集水箱1连接出水管3的侧面设有泄水口4和溢流口5,泄水口4在集水箱1侧面的下部,溢流口5在集水箱1侧面的上部。The side of the water collecting box 1 connected to the outlet pipe 3 is provided with a drain port 4 and an overflow port 5, the drain port 4 is at the bottom of the water collecting tank 1 side, and the overflow port 5 is at the top of the water collecting box 1 side.

所述低位电子式水位开关9与潜水泵7底面位于同一水平面,所述高水位电子式水位开关10与溢流口5下端位于同一水平面。The low-level electronic water level switch 9 is located at the same level as the bottom surface of the submersible pump 7 , and the high-level electronic water level switch 10 is located at the same level as the lower end of the overflow port 5 .

所述集水箱上盖上设有把手Ⅰ11、把手Ⅱ12和通气孔6。The upper cover of the water collecting tank is provided with a handle I11, a handle II12 and a ventilation hole 6.

本发明设置于隧道斜井适当位置,数量可根据需要确定,用于隧道施工接力抽排水。隧道内渗水及施工用水由水泵15抽取经进水管2进入集水箱1内,集水箱1上安装有控制表盘8,可显示集水箱1内水位情况,随着集水箱1内水位的升高,当水位达到高位电子式水位开关10时,潜水泵7自动开启进行排水,当水位降低到低位电子式水位开关9时,潜水泵7自动停止,也可通过控制表盘8人工控制潜水泵7的启、停。The invention is arranged at a proper position of the inclined shaft of the tunnel, and the quantity can be determined according to the requirement, and is used for relay pumping and drainage in tunnel construction. The seepage water and construction water in the tunnel are pumped by the water pump 15 and enter the water collection tank 1 through the water inlet pipe 2. A control dial 8 is installed on the water collection tank 1, which can display the water level in the water collection tank 1. As the water level in the water collection tank 1 rises, When the water level reaches the high level electronic water level switch 10, the submersible pump 7 will automatically start to discharge water, and when the water level drops to the low level electronic water level switch 9, the submersible pump 7 will automatically stop, and the start of the submersible pump 7 can also be controlled manually through the control dial 8. ,stop.

通过集水箱1内的潜水泵7将集水箱1内的水通过出水管3抽排出隧道,集水箱1内残余的水可通过泄水口4排出;当水泵15通过进水管2抽取到集水箱1的施工用水超过溢流口5时,集水箱1内的水可以从溢水口5流出,防止集水箱1内的水溢满;集水箱1上盖可开启,通过把手Ⅰ11开启上盖后可清理集水箱1内的污物或检修潜水泵7;集水箱1底部安装有四个万向轮13和轮子紧固装置14,以方便集水箱的移动及固定;集水箱1上盖上安装有把手Ⅱ12,方便吊装或拖拽。Through the submersible pump 7 in the water collection tank 1, the water in the water collection tank 1 is pumped out of the tunnel through the outlet pipe 3, and the residual water in the water collection tank 1 can be discharged through the water outlet 4; when the water pump 15 is pumped into the water collection tank 1 through the water inlet pipe 2 When the construction water exceeds the overflow port 5, the water in the water collection tank 1 can flow out from the overflow port 5 to prevent the water in the water collection tank 1 from overflowing; the upper cover of the water collection tank 1 can be opened, and can be cleaned after opening the upper cover through the handle I11 The dirt in the water collection tank 1 or the maintenance submersible pump 7; four universal wheels 13 and wheel fastening device 14 are installed at the bottom of the water collection tank 1 to facilitate the movement and fixing of the water collection tank; a handle is installed on the water collection tank 1 upper cover Ⅱ12, convenient for hoisting or dragging.

本发明的有益效果为:可以达到持续排水的目的,用集水箱代替集水坑,突破了集水坑因地形地势等诸多条件的限制;结构简单、制作方便、便于移动、占地面积小,可长期反复使用,并有效地解决了长距离反坡排水问题,提高隧道施工效率。The beneficial effects of the present invention are: the purpose of continuous drainage can be achieved, and the sump pit is replaced by the sump tank, which breaks through the limitations of the sump pit due to terrain and terrain; the structure is simple, easy to manufacture, easy to move, and the floor area is small. It can be used repeatedly for a long time, and effectively solves the problem of long-distance reverse slope drainage and improves the efficiency of tunnel construction.

以上内容中未细述部份为现有技术,故未做细述。The part not described in detail in the above content is prior art, so it is not described in detail.

Claims (4)

1.一种移动式隧道施工接力抽排水装置,包括集水箱(1),其特征在于:所述集水箱(1)连接有进水管(2)和排水管(3),所述进水管(2)远离集水箱(1)的一端与水泵(15)连接,所述集水箱(1)内底部设有潜水泵(7),所述潜水泵(7)顶部连接出水管(3),所述集水箱(1)侧壁上设置有控制潜水泵(7)启闭的控制表盘(8),所述控制表盘(8)电连接集水箱(1)内的低水位电子式水位开关(9)和高水位电子式水位开关(10),所述集水箱(1)底部四个角均设有万向轮(13)以及轮子紧固装置(14)。1. A mobile tunnel construction relay pumping and drainage device, including a water collection box (1), characterized in that: the water collection box (1) is connected with a water inlet pipe (2) and a drainage pipe (3), and the water inlet pipe ( 2) The end far away from the water collection tank (1) is connected to the water pump (15). The inner bottom of the water collection tank (1) is provided with a submersible pump (7), and the top of the submersible pump (7) is connected to the outlet pipe (3). The side wall of the water collection tank (1) is provided with a control dial (8) for controlling the opening and closing of the submersible pump (7). The control dial (8) is electrically connected to the low water level electronic water level switch (9) in the water collection tank (1). ) and a high water level electronic water level switch (10), the bottom four corners of the water collection tank (1) are equipped with universal wheels (13) and wheel fastening devices (14). 2.根据权利要求1所述一种移动式隧道施工接力抽排水装置,其特征在于:所述集水箱(1)连接出水管(3)的侧面设有泄水口(4)和溢流口(5),泄水口(4)在集水箱(1)侧面的下部,溢流口(5)在集水箱(1)侧面的上部。2. A mobile tunnel construction relay pumping and drainage device according to claim 1, characterized in that: the side of the water collecting tank (1) connected to the outlet pipe (3) is provided with a drain port (4) and an overflow port ( 5), the drain port (4) is at the lower part of the side of the water collecting tank (1), and the overflow port (5) is at the upper part of the side of the water collecting tank (1). 3.根据权利要求1所述一种移动式隧道施工接力抽排水装置,其特征在于:所述低位电子式水位开关(9)与潜水泵(8)底面位于同一水平面,所述高水位电子式水位开关(10)与溢流口(5)下端位于同一水平面。3. A mobile tunnel construction relay pumping and drainage device according to claim 1, characterized in that: the low-level electronic water level switch (9) is located on the same level as the bottom surface of the submersible pump (8), and the high-level electronic water level switch The water level switch (10) is located at the same level as the lower end of the overflow port (5). 4.根据权利要求1所述一种移动式隧道施工接力抽排水装置,其特征在于:所述集水箱(1)上盖上设有把手Ⅰ(11)、把手Ⅱ(12)和通气孔(6)。4. A mobile tunnel construction relay pumping and drainage device according to claim 1, characterized in that: the upper cover of the water collecting tank (1) is provided with a handle I (11), a handle II (12) and a ventilation hole ( 6).
CN201810110111.6A 2018-02-02 2018-02-02 A kind of mobile tunnel construction relay pump drainage water installations Pending CN108266225A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810110111.6A CN108266225A (en) 2018-02-02 2018-02-02 A kind of mobile tunnel construction relay pump drainage water installations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810110111.6A CN108266225A (en) 2018-02-02 2018-02-02 A kind of mobile tunnel construction relay pump drainage water installations

Publications (1)

Publication Number Publication Date
CN108266225A true CN108266225A (en) 2018-07-10

Family

ID=62773706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810110111.6A Pending CN108266225A (en) 2018-02-02 2018-02-02 A kind of mobile tunnel construction relay pump drainage water installations

Country Status (1)

Country Link
CN (1) CN108266225A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852558A (en) * 2020-07-08 2020-10-30 武子夜 Subway construction drainage structures
CN112012789A (en) * 2020-07-26 2020-12-01 中铁二院工程集团有限责任公司 Collection and Drainage System at Bottom of Long Inclined Shaft in Railway Tunnel

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2648073Y (en) * 2003-09-27 2004-10-13 河南矿山抢险救灾排水站 Inclined shaft trackless drainage device
CN2809221Y (en) * 2005-04-15 2006-08-23 中国矿业大学 Automatic dredging treatment equipment for fine coal slime in mine sump
CN202132072U (en) * 2011-06-24 2012-02-01 中铁十七局集团第四工程有限公司 Automatic water pumping and draining device
CN202832651U (en) * 2012-10-09 2013-03-27 中国葛洲坝集团股份有限公司 Small-size movable water-draining device
CN204024704U (en) * 2014-05-29 2014-12-17 长沙佳能通用泵业有限公司 A kind of mine emergency dewatering system
CN204754983U (en) * 2015-06-11 2015-11-11 龙腾 Float in device of drainage from top to bottom of surface of water
CN205036407U (en) * 2015-10-09 2016-02-17 北京高安诺技术开发有限公司 Quick drainage system of shaft
CN205277491U (en) * 2015-12-30 2016-06-01 神华集团有限责任公司 Mine drainage rescue device
CN205677666U (en) * 2016-04-22 2016-11-09 王奎栋 A kind of for the self-draining electromechanical equipment of underground coal mine
CN106121719A (en) * 2016-08-24 2016-11-16 河南矿山抢险救灾中心 A mine combined drainage and sewage system and method
CN205874889U (en) * 2016-06-27 2017-01-11 安徽忠明建设工程有限公司 Highway road surface drainage water -collection device
CN206092063U (en) * 2016-09-27 2017-04-12 广东电网有限责任公司珠海供电局 Portable tunnel pumping device
CN206409273U (en) * 2016-12-22 2017-08-15 中铁十二局集团有限公司 Constructing tunnel major long tunnel negative pressure pump drainage water system
CN107313912A (en) * 2017-06-27 2017-11-03 深圳市诚骋科技有限公司 A kind of dual-purpose tunnel water plug
CN208073549U (en) * 2018-02-02 2018-11-09 中铁隧道局集团有限公司 A kind of mobile tunnel construction relay pump drainage water installations

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2648073Y (en) * 2003-09-27 2004-10-13 河南矿山抢险救灾排水站 Inclined shaft trackless drainage device
CN2809221Y (en) * 2005-04-15 2006-08-23 中国矿业大学 Automatic dredging treatment equipment for fine coal slime in mine sump
CN202132072U (en) * 2011-06-24 2012-02-01 中铁十七局集团第四工程有限公司 Automatic water pumping and draining device
CN202832651U (en) * 2012-10-09 2013-03-27 中国葛洲坝集团股份有限公司 Small-size movable water-draining device
CN204024704U (en) * 2014-05-29 2014-12-17 长沙佳能通用泵业有限公司 A kind of mine emergency dewatering system
CN204754983U (en) * 2015-06-11 2015-11-11 龙腾 Float in device of drainage from top to bottom of surface of water
CN205036407U (en) * 2015-10-09 2016-02-17 北京高安诺技术开发有限公司 Quick drainage system of shaft
CN205277491U (en) * 2015-12-30 2016-06-01 神华集团有限责任公司 Mine drainage rescue device
CN205677666U (en) * 2016-04-22 2016-11-09 王奎栋 A kind of for the self-draining electromechanical equipment of underground coal mine
CN205874889U (en) * 2016-06-27 2017-01-11 安徽忠明建设工程有限公司 Highway road surface drainage water -collection device
CN106121719A (en) * 2016-08-24 2016-11-16 河南矿山抢险救灾中心 A mine combined drainage and sewage system and method
CN206092063U (en) * 2016-09-27 2017-04-12 广东电网有限责任公司珠海供电局 Portable tunnel pumping device
CN206409273U (en) * 2016-12-22 2017-08-15 中铁十二局集团有限公司 Constructing tunnel major long tunnel negative pressure pump drainage water system
CN107313912A (en) * 2017-06-27 2017-11-03 深圳市诚骋科技有限公司 A kind of dual-purpose tunnel water plug
CN208073549U (en) * 2018-02-02 2018-11-09 中铁隧道局集团有限公司 A kind of mobile tunnel construction relay pump drainage water installations

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852558A (en) * 2020-07-08 2020-10-30 武子夜 Subway construction drainage structures
CN111852558B (en) * 2020-07-08 2021-07-20 广东省源天工程有限公司 Subway construction drainage structures
CN112012789A (en) * 2020-07-26 2020-12-01 中铁二院工程集团有限责任公司 Collection and Drainage System at Bottom of Long Inclined Shaft in Railway Tunnel

Similar Documents

Publication Publication Date Title
CN104532947B (en) Underground open type storage pond
CN207812587U (en) A kind of effective anti-block apparatus of construction drainage
CN204781084U (en) Processing system is collected from cleaning function's first rain in area
CN207392409U (en) A kind of Mobyneb Vatch basin system
CN104196118B (en) A kind of pond automatic vacuum rinses Accrete clearing device and method
CN212104426U (en) Miniature piping lane drainage system
CN103806525A (en) Gantry self-flushing device for rainwater storage tank
CN208685753U (en) A kind of municipal box culvert sewage converging system
CN106930397B (en) A kind of biological delaying basin that initial rainwater can be persistently handled within the dry spell
CN208073549U (en) A kind of mobile tunnel construction relay pump drainage water installations
CN105442686A (en) Integrated device for collecting and conveying sewage and rainwater
CN103452124A (en) Method and device for removing accumulated water in foundation pit
CN115324182A (en) Rain and sewage diversion pipe network and construction method thereof
CN104790517A (en) Initial rainwater overflowing grille with vacuum suction and slag removal functions
CN221074352U (en) Automatic water dispenser
WO2019015180A1 (en) Rainwater pumping station for municipal construction engineering
CN219865147U (en) Automatic drainage system for tunnel reverse slope
CN202038935U (en) Oil separating and lifting integrated equipment
CN204919761U (en) Automatic siphon rinse -system of sewer line
CN206538860U (en) A kind of full automatic cable ditch water discharge system
CN204401774U (en) Underground open type storage pond
CN204932956U (en) Integrated sewage water lifting device
CN209397699U (en) Integrated prefabricated rainfall pumping station
TWI751531B (en) Building rainwater recycling and reuse initial rainwater without electricity autonomous diversion and drainage system
CN204212169U (en) Sump automatic water pumping device for water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710