CN105464136A - Electric power inspection well - Google Patents

Electric power inspection well Download PDF

Info

Publication number
CN105464136A
CN105464136A CN201510748766.2A CN201510748766A CN105464136A CN 105464136 A CN105464136 A CN 105464136A CN 201510748766 A CN201510748766 A CN 201510748766A CN 105464136 A CN105464136 A CN 105464136A
Authority
CN
China
Prior art keywords
plash
water
suction pump
subsequent use
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510748766.2A
Other languages
Chinese (zh)
Other versions
CN105464136B (en
Inventor
林光琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoyou Excellent Lighting Equipment Factory
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510748766.2A priority Critical patent/CN105464136B/en
Publication of CN105464136A publication Critical patent/CN105464136A/en
Application granted granted Critical
Publication of CN105464136B publication Critical patent/CN105464136B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Physical Water Treatments (AREA)
  • Special Spraying Apparatus (AREA)
  • Air Humidification (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses an electric power inspection well. The electric power inspection well comprises a main body well for arrangement of power equipment and entry of an inspector; a mould-proof water-repelling paint is arranged on the inner surface of the main body well; a water accumulation recess is arranged at the bottom of the main body well; an ultrasonic atomizing device is arranged inside the water accumulation recess and is used for atomizing water in the water accumulation recess; an air evacuating device is arranged above the ultrasonic atomizing device and is used for discharging atomized water; the electric power inspection well also comprises a standby water accumulation tank, a valve and a first water suction pump, wherein the standby water accumulating tank is communicated with the water accumulation recess via the valve; the first water suction pump is arranged in the water accumulation recess and can be used for sucking the water from the water accumulation recess to the standby water accumulating tank.

Description

A kind of power check well
Technical field
The present invention relates to a kind of manhole, especially relate to a kind of power check well.
Background technology
Manhole is structure important in underground pipeline, to the performance of city function, environmental protection and people's lives all importants.Along with the continuous expansion of urban construction, defeated, converting equipment quantity in city are on the increase, and need to build a large amount of electric power facilities.In electric power facility process of deployment, need to bury power check well underground, facilitate maintenance from now on and inspection.
In current power check well, process waterproof is paid little attention to, station equipment long term high temperature runs, well environment affects by rainwater, there is the possibility that ponding produces at any time, if can not draining in time, often produce that CO, CH4 etc. are harmful, fuel gas, when operations staff regularly enter in well make an inspection tour maintenance time, may damage personnel.
In prior art, as the patent of invention of 201110435463.7, usually by arranging water pond in shaft bottom, the mode of regularly carrying out draining to pure water pond carries out draining and the waterproof of electric power well.But what which can not realize water to continue in time drains, and also cannot realize damp proof except mould effect.As improvement, 201410153934.9,201410154187.0 and the patent of invention of 201410154213.X, propose a kind of anti-hydroelectric power well, it scolds water paint by arranging at well body inwall, at sump, ultrasonic atomizing device and fog collecting hood are set, by taking away after the water atomization in plash, thus reach the effect of dehumidifying mildew-resistant.But because plash capacity relative is less, when running into heavy rain, ponding may exceed plash capacity, electric power well internal water accumulation is caused to discharge in time; If need the situation of the larger rainfall of process, need larger plash and high-power ultrasonic atomizing device, thus cause cost to increase; In addition, when the water level of well body is higher, the efficiency of ultrasonic atomizing device also can be affected.
Summary of the invention
The invention provides a kind of power check well of improvement, can realize, under the condition not increasing plash capacity and ultrasonic atomizing device power, also can processing the situation of larger rainfall.
As one aspect of the present invention, provide a kind of power check well, comprising: main body well, it is for arranging power equipment and inspection personnel enters; Described main body well inner surface arranges mildew-resistant and scolds water paint, and bottom arranges plash; In described plash, ultrasonic atomizing device is set, for by the water atomization in plash; Above ultrasonic atomizing device, air extractor is set, for being discharged by the water after atomization; It is characterized in that: also comprise plash for subsequent use, valve and the first suction pump, described plash for subsequent use is communicated with described plash by valve, and described first suction pump is arranged in plash, the water in described plash can be drawn into plash for subsequent use.
Preferably, described plash is inverted trapezoidal structure.
Preferably, the volume of described plash for subsequent use is greater than described plash volume at least twice.
Preferably, when the water level of described main body well exceedes specific first threshold, described valve and the first suction pump are opened, and by the first suction pump, the water in described plash are drawn into described plash for subsequent use; Described valve and the first suction pump when the water level of described main body well is consistent with described plash height, close described first suction pump and described valve after opening.
Preferably, the power of described ultrasonic atomizing device corresponds to the power demand of the water atomization of plash capacity in special time period.
Preferably, also comprise the second suction pump, the water of described plash for subsequent use can be drawn into described plash by described second suction pump; In described plash for subsequent use, water-level gauge is set, when there is ponding in described plash for subsequent use, and when there is no water in described plash, opens described valve and the second suction pump, the water of the specific volume in described plash for subsequent use is drawn into described plash.
Preferably, the water of described specific volume is corresponding to the water yield in the water filled up by the capacity of plash or plash for subsequent use.
Preferably, described ultrasonic atomizing device and air extractor are after work special time period, and quit work special time period.
As another aspect of the present invention, the drainage flow path of above-mentioned power check well is provided, comprise the steps: 1) monitor water level in described main body well, when in main body well, water level is higher than specific first threshold, open described valve and the first suction pump, by described first suction pump, the water in described plash is drawn into described plash for subsequent use; 2) when the water level of described main body well is consistent with described plash height, described first suction pump and described valve is closed; 3) open described ultrasonic atomizing device and described air extractor, make its work special time period, the water atomization in plash is extracted out; 4) open described valve and the second suction pump, when the water yield in described plash for subsequent use is greater than described plash capacity, extract the water of described plash capacity to described plash; 5) described ultrasonic atomizing device and described air extractor are after the special time that quits work, and restart and the water atomization in described plash are extracted out; 6) step 4)-5 is repeated), until the water yield in described plash for subsequent use is less than described plash capacity; 7) remaining water in described plash for subsequent use is drawn in described plash, starts described ultrasonic atomizing device and described air extractor, remaining water atomization is extracted out.
Compared with prior art, advantage is in the present invention: 1) when larger rainfall, can be extracted out by the ponding in main body well in time, avoid the situation that ponding is too much; 2) under the condition not increasing plash capacity and ultrasonic atomizing device power, the ponding exceeding plash height can be processed; 3) avoid water level in well body higher, affect the efficiency of ultrasonic atomizing device; 4) avoid ultrasonic atomizing device to be continuously long-running, cause tired grade for infringement.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the embodiment of the present invention.
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
See accompanying drawing 1, the power check well of the embodiment of the present invention, comprises main body well 1, plash 2, ultrasonic atomizing device 3, air extractor 4 and plash for subsequent use 5.Main body well 1 its for arranging power equipment as cable, transformer etc., be provided with staircase, so that operations staff regularly enters in well make an inspection tour maintenance simultaneously.Main body well 1 inner surface arranges mildew-resistant and scolds water paint, thus can lead water to shaft bottom, and mildew-resistant well known in the prior art can be used to scold water paint, as in 201410153934.9 the coating that uses.
Plash 2 is arranged on the bottom of main body well 1, for receiving the water entered in power check well.In the present embodiment, plash 2 is square, preferably, plash 2 can be set to inverted trapezoidal, thus more be conducive to the collection of ponding.
Ultrasonic atomizing device 3 is set in plash 2, can by the water atomization in plash 2.Air extractor 4 being set above ultrasonic atomizing device 3, for being discharged by the water after atomization, thus manhole can being made to keep dry.
It is other that plash 5 for subsequent use is arranged on plash 2, communicated with plash 2 by first passage 6.First passage 6 is provided with valve 7, can control plash 5 for subsequent use and being communicated with between plash 2 by unlatching and valve-off 7.First suction pump 8 is arranged in plash 2, opens the first suction pump 8 and valve 7, the water in plash 2 can be extracted in plash 5 for subsequent use.When the water level in main body well exceedes specific first threshold, Open valve 7 and the first suction pump 8, be drawn into plash 5 for subsequent use by the first suction pump 8 by the water in plash 3, and described specific first threshold is lower than the height of ultrasonic atomizing device 3.Valve 7 and the first suction pump 8 when the water level of main body well 1 is down to the height of plash 2, close described first suction pump 8 and valve 7 after opening.
Second suction pump (not shown) is set in plash 5 for subsequent use, the water in plash 5 for subsequent use can be drawn in plash 2; Arrange water-level gauge in plash 5 for subsequent use, when there is ponding in plash 5 for subsequent use, and when not having water in plash 2, Open valve 7 and the second suction pump, fill up plash 2 by the water in plash 5 for subsequent use simultaneously.
By the power setting of ultrasonic atomizing device 3 be work special time as 1 ~ 2 hour, can by complete for the water atomization of plash 2 capacity.Due to unnecessary water can be stored by plash 5 for subsequent use, do not need disposable for water atomization, ultrasonic atomizing device 3 and air extractor 4 can be set to after the above-mentioned special time period of work, the special time period that quits work, as 1 hour, can avoid the fatigue that overtime work causes.
The drainage flow path of the power check well of the embodiment of the present invention, comprise the steps: 1) water level in monitoring main body well 1, when in main body well 1, water level is higher than specific first threshold, Open valve 7 and the first suction pump 8, be drawn into plash 5 for subsequent use by the first suction pump 8 by the water in plash 2; 2) when the water level of main body well 1 is highly consistent with plash 2, the first suction pump 8 and valve 7 is closed; 3) open ultrasonic atomizing device 3 and air extractor 4, make its work special time period, the water atomization in plash 2 is extracted out; 4) Open valve 7 and the second suction pump, when the water yield in plash 5 for subsequent use is greater than plash 2 capacity, extracts the water of plash capacity to plash 2; 5) ultrasonic atomizing device 3 and air extractor 4 are after the special time that quits work, and restart and the water atomization in plash 2 are extracted out; 6) step 4)-5 is repeated), until the water yield in plash for subsequent use 5 is less than plash capacity; 7) remaining water in plash 5 for subsequent use is drawn in plash 2, starts ultrasonic atomizing device 3 and air extractor 4, remaining water atomization is extracted out.
In above-described embodiment only for exemplary expression content of the present invention.In addition, those skilled in the art also can do other change in spirit of the present invention, as long as it does not depart from technique effect of the present invention.These changes done according to the present invention's spirit, all should be included within the present invention's scope required for protection.

Claims (7)

1. a power check well, comprising: main body well, and it is for arranging power equipment and inspection personnel enters; Described main body well inner surface arranges mildew-resistant and scolds water paint, and bottom arranges plash; In described plash, ultrasonic atomizing device is set, for by the water atomization in plash; Above ultrasonic atomizing device, air extractor is set, for being discharged by the water after atomization; It is characterized in that: also comprise plash for subsequent use, valve and the first suction pump, described plash for subsequent use is communicated with described plash by valve, and described first suction pump is arranged in plash, the water in described plash can be drawn into plash for subsequent use.
2. power check well according to claim 1, is characterized in that: described plash is inverted trapezoidal structure.
3. power check well according to claim 2, is characterized in that: the volume of described plash for subsequent use is greater than described plash volume at least twice.
4. power check well according to claim 3, it is characterized in that: when the water level of described main body well exceedes specific first threshold, described valve and the first suction pump are opened, and by the first suction pump, the water in described plash are drawn into described plash for subsequent use.
5. power check well according to claim 4, is characterized in that: described valve and the first suction pump when the water level of described main body well is consistent with described plash height, close described first suction pump and described valve after opening.
6. power check well according to claim 5, is characterized in that: the power of described ultrasonic atomizing device corresponds to the power demand of the water atomization of plash capacity in special time period.
7. the drainage flow path of power check well according to claim 6, comprise the steps: 1) monitor water level in described main body well, when in main body well, water level is higher than specific first threshold, open described valve and the first suction pump, by described first suction pump, the water in described plash is drawn into described plash for subsequent use; 2) when the water level of described main body well is consistent with described plash height, described first suction pump and described valve is closed; 3) open described ultrasonic atomizing device and described air extractor, make its work special time period, the water atomization in plash is extracted out; 4) open described valve and the second suction pump, when the water yield in described plash for subsequent use is greater than described plash capacity, extract the water of described plash capacity to described plash; 5) described ultrasonic atomizing device and described air extractor are after the special time that quits work, and restart and the water atomization in described plash are extracted out; 6) step 4)-5 is repeated), until the water yield in described plash for subsequent use is less than described plash capacity; 7) remaining water in described plash for subsequent use is drawn in described plash, starts described ultrasonic atomizing device and described air extractor, remaining water atomization is extracted out.
CN201510748766.2A 2015-11-08 2015-11-08 A kind of power check well Expired - Fee Related CN105464136B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510748766.2A CN105464136B (en) 2015-11-08 2015-11-08 A kind of power check well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510748766.2A CN105464136B (en) 2015-11-08 2015-11-08 A kind of power check well

Publications (2)

Publication Number Publication Date
CN105464136A true CN105464136A (en) 2016-04-06
CN105464136B CN105464136B (en) 2017-10-10

Family

ID=55602255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510748766.2A Expired - Fee Related CN105464136B (en) 2015-11-08 2015-11-08 A kind of power check well

Country Status (1)

Country Link
CN (1) CN105464136B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327001A (en) * 2017-09-05 2017-11-07 竺维彬 A kind of intelligent miniature drainage arrangement and method for being used to handle caisson of toilet ponding

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2268340C1 (en) * 2004-07-07 2006-01-20 Амурский государственный университет Pumping station for sewage system
JP2010174544A (en) * 2009-01-30 2010-08-12 Hayashi Bussan Hatsumei Kenkyusho:Kk Storage and permeation facility for rainwater or the like
CN203174633U (en) * 2013-04-27 2013-09-04 国家电网公司 Water accumulation prevention cable well
CN103953070A (en) * 2014-04-17 2014-07-30 宁海县雁苍山电力设备厂 Waterproof cable well
CN204343333U (en) * 2014-12-25 2015-05-20 上海华群实业股份有限公司 A kind of subway of water proof type connects well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2268340C1 (en) * 2004-07-07 2006-01-20 Амурский государственный университет Pumping station for sewage system
JP2010174544A (en) * 2009-01-30 2010-08-12 Hayashi Bussan Hatsumei Kenkyusho:Kk Storage and permeation facility for rainwater or the like
CN203174633U (en) * 2013-04-27 2013-09-04 国家电网公司 Water accumulation prevention cable well
CN103953070A (en) * 2014-04-17 2014-07-30 宁海县雁苍山电力设备厂 Waterproof cable well
CN204343333U (en) * 2014-12-25 2015-05-20 上海华群实业股份有限公司 A kind of subway of water proof type connects well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327001A (en) * 2017-09-05 2017-11-07 竺维彬 A kind of intelligent miniature drainage arrangement and method for being used to handle caisson of toilet ponding

Also Published As

Publication number Publication date
CN105464136B (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN204662649U (en) A kind of integral intelligent pumping plant
CN105178387A (en) Intelligent control system for comprehensive utilization of rainwater and control method of intelligent control system
CN203755436U (en) Integrated pre-rotating pump station device
CN107268713A (en) Sponge city eaves rainwater treatment device
CN111963357A (en) Roof rainwater recycling power generation system
CN205530582U (en) Urban sewerage and drainage sys tem
CN103835360B (en) Automatic drainage system of box culvert road
CN204212245U (en) A kind of low-pressure drainage system collected for municipal wastewater
CN105464136A (en) Electric power inspection well
CN207499065U (en) A kind of municipal water supply device
CN108181941A (en) A kind of long distance gas pipeline hydrops removes collection device and control method automatically
CN208121951U (en) A kind of municipal works preventing sewers from blocking plug device
CN110407350A (en) Internet of Things type sponge city is regulated and stored purification system and its working method
CN206486924U (en) A kind of construction site Water Sproading, generation comprehensive application system
CN105421492B (en) A kind of power check well
CN206204998U (en) A kind of communication check well with water-tight device
CN205714280U (en) A kind of large shield tunnel local dynamic station dry type waste water pump house
CN109869262A (en) A kind of new energy irrigating apparatus
CN211816801U (en) Anti-overflow device for drainage inspection well
CN207277520U (en) Storage pond under river
CN207567855U (en) A kind of integrated buried type water supply pumping plant
CN106906886A (en) Intelligent central drainage system and method
CN208949850U (en) A kind of draining of pipe well combination wind-light-electricity complementary changes salt system
CN203755435U (en) Integrated prefabricated pump station with large-rubbish removal function
CN208105319U (en) A kind of piping lane main structure intelligence curing system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170904

Address after: 362300, No. 1603, building 2, Yue Yi River District, Nanan, Fujian, Quanzhou

Applicant after: Quanzhou create intellectual property service Co., Ltd.

Address before: 355000 Ningde, Fu'an, South Street, Heshan East Road, No. 29

Applicant before: Lin Guangqin

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191030

Address after: 225654 industrial concentration area of Guo Zhen Town, Jiangsu, Gaoyou

Patentee after: Gaoyou excellent lighting equipment factory

Address before: 362300 No. 2 Building 1603, Ximei Yijiang District, Nanan City, Quanzhou City, Fujian Province

Patentee before: Quanzhou create intellectual property service Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171010

Termination date: 20201108