CN105464053B - Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body - Google Patents

Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body Download PDF

Info

Publication number
CN105464053B
CN105464053B CN201511029150.6A CN201511029150A CN105464053B CN 105464053 B CN105464053 B CN 105464053B CN 201511029150 A CN201511029150 A CN 201511029150A CN 105464053 B CN105464053 B CN 105464053B
Authority
CN
China
Prior art keywords
dam
dam body
sand gravel
gravel material
throwing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511029150.6A
Other languages
Chinese (zh)
Other versions
CN105464053A (en
Inventor
位敏
杨启贵
谭界雄
高大水
秦明海
胡林
朱光平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201511029150.6A priority Critical patent/CN105464053B/en
Publication of CN105464053A publication Critical patent/CN105464053A/en
Application granted granted Critical
Publication of CN105464053B publication Critical patent/CN105464053B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a lower dam body with gravel sand through throwing and a construction method for increasing the relative density of the dam body. The dam body comprises an upstream dam toe and a downstream dam toe. The space between the dam toes is filled with the formed gravel sand dam body in a thrown manner. The gravel sand dam body comprises a gravel sand dam main body below the water surface and a gravel sand dam main body above the water surface. A plurality of rows of vibroflotation compaction holes are drilled in the dam top of the gravel sand dam main body above the water surface. Every two close rows of vibroflotation compaction holes are distributed in a staggered manner. Each row of vibroflotation compaction holes are formed by first-sequence vibroflotation compaction holes and second-sequence vibroflotation compaction holes alternately. Reasonable hole distribution, hole manufacturing, vibroflotation compaction and continuous filling are performed on the dam main body, with water filled with grave sand above the water surface through throwing, of a low dam, and the relative density of the dam body with water filled with grave sand through throwing is increased and not smaller than 0.75 regulated in design standards of a current rolled earth-rock dam so that dam body deformation can be controlled and stability and safety of the dam body can be guaranteed.

Description

The construction of throwing sand gravel material weir dam body and its raising dam body relative density in water Method
Technical field
The present invention relates to hydro-structure field, in particular to throwing sand gravel material weir dam body in a kind of water and its raising dam The construction method of body relative density.
Background technology
Earth and rockfill dam is generally divided into rolling earth-rock dam, throwing formula rock-fill dams, directed blasting rockfill dam and water by construction method Power filling dam etc., rolling earth-rock dam is the leading dam type of current earth and rockfill dam, needs first to build cofferdam water conservancy diversion before usual dam embankment, Then dam body is filled from foundation plane layered rolling under the conditions of dry ground, the progress of filling must meet Planning of construction periods or safety of dam body is passed the flood period Deng requirement.
Three Gorges Projects are run after building up by 175-156-145m (Wusong) water level, in spring, summer, three season of the autumn low water of Three Gorges Reservoir Position operation, the operation of winter Three Gorges Reservoir high water level, its reservoir area forms depth up to the falling zone of 30m or so.For falling zone storehouse tail Area is larger, the open flat site of physical features produces serious ecology, environmental problem, builds comprehensively treating ecological environment Engineering Control Reservoir level disappears drop height degree, and engineering in general takes low gate dam scheme, and dam body is paid the utmost attention to use local material dam.
Falling zone is influenceed by Impoundment of Three Gorges Reservoir, and dam body is filled using layered rolling under the conditions of dry ground, must be upper and lower in dam body The antiseepage cofferdam suitable with dam body length, height basis is built in trip side, and coffering amount is big, economically unreasonable;Using attacking and occupying Method is gradually advanced from bank slope to riverbed direction, in water directly throwing sand gravel material (sand gravel material quality is hard, and level is small with preferable 30% is less than in 5mm particle size contents, less than 0.075mm particle size contents less than 8%) to more than the water surface building a dam, dam body is taken into account itself Diversion function, does not build antiseepage cofferdam, but throwing sand gravel material dam body relative density is relatively low, about 0.65 or so, the change of dam body Shape, stabilization safety are difficult to ensure that.Existing《Water power hydraulic engineering vibroflotation foundation treatment technology specification》Applied suitable for vibroflotation Foundation treatment engineering within work treatment depth 20m, throwing sand gravel material dam body relative density does not have code in how improving water Specification can be used.
The content of the invention
It is an object of the invention to provide throwing sand gravel material weir dam body in a kind of water and its improve dam body relative density Construction method;The method uses for weir and rational arrangement bores is carried out to the dam body more than throwing sand gravel material to water surface in water, is made Hole, vibroflotation compaction and continuous filler, the relative density of raising throwing sand gravel material dam body are not less than existing rolling earth-rock dam and set The 0.75 of meter specification regulation, to control dam deformation, it is ensured that dam stabilization safety.
To achieve the above object, throwing sand gravel material weir dam body in a kind of water that the present invention is provided, the dam body includes The base of dam of upstream and downstream, the sand gravel material dam body that throwing is formed between the base of dam, the sand gravel material dam body includes the water surface Sand gravel material dam body more than following sand gravel material dam body and the water surface, the dam crest of the sand gravel material dam body more than water surface is bored There is the vibroflotation compaction hole interlaced arrangement of multiple rows of vibroflotation compaction hole and close two row, it is by the Ith order vibroflotation often to arrange vibroflotation compaction hole Encryption hole and the IIth order vibroflotation compaction hole alternately constitute;The dam crest placement grinding of the sand gravel material dam body more than water surface has Placement in layers rolls sandy gravel dam body.
Further, the height of base of dam isThe slope ratio of base of dam upstream and downstream is 1 ︰ 2.0~2.5.
Yet further, sand gravel material dam body upstream and downstream slope ratio is control in 1 ︰ 2.5~2.75.
Yet further, the pitch-row a in the Ith order vibroflotation compaction hole and the IIth order vibroflotation compaction hole for 3.0~ 3.5m;Often arranging the array pitch b encrypted between hole isPitch-row.
Yet further, vertical concrete cut is poured on the dam body axis of dam.
The construction method that throwing sand gravel material weir dam body relative density in a kind of raising water is also provided of the invention, including with Lower step:
1) compile analysis dam technical data and the preparation such as carry out equipment, get the raw materials ready;
2) regarding the dam site depth of water, first use is attacked and occupied method and is gradually advanced to riverbed direction from bank slope or waterborne vessel method throwing dam body Upstream and downstream base of dam block building stones, form base of dam;Wherein, the height of base of dam is
3) use is attacked and occupied method and is gradually advanced more than throwing dam body sand gravel material to the water surface to riverbed direction from bank slope, obtains height Go out the sand gravel material dam body of 2.0~2.5m of the water surface;Wherein sand gravel material dam body includes the sand gravel material dam body and water below the water surface Sand gravel material dam body more than face;
4) sand gravel material dam body more than throwing in water to the water surface is measured, vibroflotation is carried out by control line of the axis of dam Encryption arrangement of boring holes;Vibroflotation compaction hole arranges along the axis of dam point row point sequence, wherein, the Ith order vibroflotation compaction hole and the IIth order Vibroflotation compaction hole is into being alternately arranged;
5) from hydraulic pressure frequency modulation vibrating impacter and the lifting appliance of satisfaction lifting load and vibroflotation compaction maximum hole depth, carry out existing Field vibroflotation compaction industrial experimentation;
6) pore-creating is carried out using truck crane or crawler crane lifting hydraulic pressure frequency modulation vibrating impacter alignment hole position, pore-creating hole position error is small In 10cm, pore-creating aperture by actually use hydraulic pressure frequency modulation vibrating impacter model vibroflotation dam body sand gravel material when automatically determine, pore-creating Should keep vertical during injection dam body, control degree of skewness is not more than 3%;
7) filler vibroflotation compaction is carried out to dam body after vibrating impacter pore-creating to projected depth;Vibroflotation compaction is piecewise since bottom hole Upward sectional encryption, encrypts 0.3~0.5m of segment length, and continuous to filler in hole during encryption, filler requirement is the gravel of 20~150mm Material, 1.5~2.0m of reciprocal lifting vibrating impacter when vibroflotation feeds;After vibrating impacter vibroflotation compaction reaches construction technology technical parameter, Being lifted up vibrating impacter carries out next encrypted section construction, so repeatedly until dam body top;
8) to the exposed water surface above dam body surface positioning all vibroflotation compaction holes point sequence carry out vibroflotation compaction, after the completion of it is right Vibroflotation compaction dam body carries out relative density quality examination, that is, obtain throwing sand gravel material weir dam body;
9) axis of dam position dam body dam foundation concrete cut and wall are carried out at the top of the sand gravel material dam body more than the water surface Lower Curtain Grouting Construction, after the completion of carry out layered rolling construction again, complete placement in layers and roll sandy gravel dam body;
10) during weir dam construction, depending on falling zone range of stage situation, weir dam body slope trimming and training are completed Slope, that is, complete the construction of throwing sand gravel material weir dam body in water.
Further, the step 2) in, the slope ratio of base of dam upstream and downstream is 1 ︰ 2.0~2.5;Block building stones saturation resistance to compression Intensity is 30~160MPa, and the particle diameter of block stone is less than 70cm, wherein, block stone weight of the particle diameter less than 0.1mm is in block stone gross weight Middle accounting is less than 5%.
Yet further, the step 3) in, sand gravel material dam body upstream and downstream slope ratio is control in 1 ︰ 2.5~2.75;Sand The particle diameter of gravel material is less than 150mm, wherein, the particle diameter accounting in sand gravel material gross weight of the sand gravel material weight less than 5mm is small In 30%, sand gravel material weight of the particle diameter less than 0.075mm accounting in sand gravel material gross weight is less than 8%.
Yet further, the step 4) in, the pitch-row a in the Ith order vibroflotation compaction hole and the IIth order vibroflotation compaction hole It is 3.0~3.5m;Often arranging the array pitch b encrypted between hole isPitch-row.
Yet further, the step 6) in, construction technology technical parameter is shown in Table 1 during pore-creating.
The hydraulic pressure frequency modulation vibrating impacter vibroflotation compaction sand gravel material construction technology technical parameter table of table 1
Yet further, described filler is the gravel material that particle diameter is 20~150mm.
The beneficial effects of the present invention are:
When the present invention using sand gravel material dry ground layered rolling for dam body is filled, need to build and dam body length, height base This consistent interim antiseepage cofferdam is met under the conditions of construction diversion, is taken into account construction using the throwing sand gravel material dam body in water and is led Stream, vibroflotation compaction improves the construction process of dam body relative density, and the method is easy to operate, greatly reduces dam body dry ground roller compaction construction Cofferdam is filled and seepage control project investment, shortens the duration, while in turn ensure that dam deformation and stabilization safety.
Brief description of the drawings
Fig. 1 is that vibroflotation compaction throwing sand gravel material weir of the invention improves dam body relative density method profile;
Fig. 2 is vibroflotation compaction hole horizontal layout schematic diagram;
In figure:Gravel more than the sand gravel material dam body 2.1, water surface below base of dam 1, the throwing sand gravel material dam body 2, water surface Building stones dam body 2.2, placement in layers is rolled under sandy gravel dam body 3, vibroflotation compaction hole 4, side slope 5, dam concrete cut-pff wall 6, wall Grout curtain 7, falling zone eulittoral zone 8, the axis of dam 9,The-the II order vibroflotation of-the I order vibroflotation compaction hole 4.1, ● Encryption hole 4.2, a. vibroflotation compactions hole pitch-row, b. vibroflotation compactions hole array pitch, H be dam body highly.
Specific embodiment
In order to preferably explain the present invention, below in conjunction with the specific embodiment main contents that the present invention is furture elucidated, but Present disclosure is not limited solely to following examples.
Comprehensively treating ecological environment water level regulation dam engineering in Three Gorges Reservoir Kai Xian falling zone is located at reservoir area of Three Gorges afterbody, by water Position regulating barrage and ecology in reservoir area construction project composition, engineering construction reduce falling zone to reduce Three Gorges Reservoir Area tail falling zone area Range of stage, improves the ecological environment on Kai Xian city and its periphery.Water level regulation dam uses gate dam dam type, by earth and rockfill dam, sluices The buildings such as lock, non-overflow dam, fish pass are constituted.Earth and rockfill dam is that, using the sand-gravel dam of concrete cut, dam crest is about 244m, Maximum height of dam 24m, pushes up crest level 177.78m, and dam crest 7.0m wide, upstream and downstream dam slope slope ratio is 1:2.5, dam body and dam foundation sand Cobble uses concrete cut antiseepage.Due to Three Gorges Reservoir impoundment ahead to 168m, earth and rockfill dam is using dry ground layered rolling Filling construction need thereon, downstream respectively build and Earth-rockfill Dam length, highly basically identical cofferdam, interim antiseepage cofferdam is thrown Money is about 1.8 times of earth and rockfill dam dam body investment, is investment reduction, shortens the duration, adjusts earth and rockfill dam dam body structure type and construction Method, earth and rockfill dam dam body itself takes into account construction time diversion function, and upstream and downstream cofferdam is not built, using the sluice gate built in advance Excessively stream, earth and rockfill dam dam body is using throwing quality in water is hard, level with preferably, less than 5mm particle size contents less than 30%, be less than It is more than sand gravel material to the water surface of the 0.075mm particle size contents less than 8% that dry work is carried out again after 3.0~4.0m.By Three Gorges water Storehouse impoundment ahead and upland water influence, it is considered to which range of stage determines that below dam body elevation 173.78m is used from bank slope to riverbed The method throwing that direction gradually advances, elevation 173.78m above dam body is filled using dry ground layered rolling, dam concrete antiseepage Wall is constructed in elevation 174m.Throwing sand gravel material dam body relative density is relatively low, and the deformation of dam body, stabilization safety are difficult to ensure that Engineering safety runs, according to the specific actual conditions of engineering and construction condition, with reference to existing《Rolling earth-rock dam design rule Model》, the method that its relative density is improved using throwing sand gravel material dam body in vibroflotation compaction water is researched and proposed, i.e., to throwing in water Sand gravel material dam body reasonable Arrangement vibroflotation compaction hole, improves dam body sand gravel material relatively close by pore-creating, filler and vibroflotation compaction Degree is not less than 0.75, so as to ensure deformation and the stabilization safety of dam body.
Comprehensively treating ecological environment water level regulation dam engineering earth and rockfill dam in Three Gorges Reservoir Kai Xian falling zone is using throwing in raising water Back-up sand gravel material weir dam body, the dam body includes the base of dam 1 of upstream and downstream, the gravel that throwing is formed between the base of dam 1 Building stones dam body 2, the sand gravel material dam body 2 includes the sand gravel material dam body 2.1 below the water surface and the sand gravel material more than water surface Dam body 2.2, the dam crest of the sand gravel material dam body 2.2 more than water surface is drilled with shaking for multiple rows of vibroflotation compaction hole 4 and close two row The punching encryption interlaced arrangement of hole 4, it is by the Ith order vibroflotation compaction hole 4.1 and the IIth order vibroflotation compaction hole often to arrange vibroflotation compaction hole 4 4.2 alternately constitute;The dam crest placement grinding of the sand gravel material dam body 2.2 more than water surface has placement in layers to roll sandy gravel dam Body 3.
The height of base of dam 1 isThe slope ratio of the upstream and downstream of base of dam 1 is 1 ︰ 2.0~2.5.
The upstream and downstream slope ratio of sand gravel material dam body 2 is control in 1 ︰ 2.5~2.75.
The pitch-row a in the Ith order vibroflotation compaction hole 4.1 and the IIth order vibroflotation compaction hole 4.2 is 3.0~3.5m;Often row adds Array pitch b between close hole isPitch-row.Its construction method, specific implementation is comprised the following steps:
(1) analysis dam technical data and design document are compiled, the preparation such as equipment is carried out, get the raw materials ready;
(2) regarding the dam site depth of water, first use is attacked and occupied method and is gradually advanced to riverbed direction from bank slope or waterborne vessel method throwing dam body Upstream and downstream base of dam block building stones, form base of dam 1;Wherein, the height of base of dam is
(3) use is attacked and occupied method and is gradually advanced more than throwing dam body sand gravel material to the water surface to riverbed direction from bank slope, obtained It is higher by the sand gravel material dam body 2 of 2.0~2.5m of the water surface;Wherein sand gravel material dam body 2 includes the sand gravel material dam body below the water surface 2.1 and the water surface more than sand gravel material dam body 2.2;
(4) sand gravel material dam body 2.2 more than throwing in water to the water surface is measured, is carried out by control line of the axis of dam Vibroflotation compaction arrangement of boring holes.It is more than 19m positions vibroflotation compaction hole pitch-row 3.5m, array pitch for dam body height (vibroflotation compaction hole depth) 3.0m, is divided to two sequences to construct;19m positions vibroflotation compaction hole pitch-row 3.0m, array pitch are less than for dam body height (vibroflotation compaction hole depth) 2.6m, is divided to two sequences to construct.
(5) productivity examination is carried out using 50t pedrail cranes lifting 200kw hydraulic vibroflotation devices throwing dam body top surface in water Test, verify construction technology technical parameter.
(6) pedrail crane lifting vibrating impacter, makes vibrating impacter be in plumbness and is directed at hole position, Opening pressure water pump and vibroflotation Device, in 0.8~1.0MPa, pore-creating oil pressure is 20~24MPa to control pore-creating hydraulic pressure, and pore-creating blast is 0.8~1.5MPa, slowly under Putting vibrating impacter carries out vibroflotation compaction pore-creating.
(7) after vibrating impacter pore-creating to projected depth, vibroflotation compaction is proceeded by from bottom hole, it is continuous to dam crest during vibroflotation compaction Dose the gravel material that particle diameter is 20~150mm in hole, when vibroflotation feeds encrypted section position back and forth lifted vibrating impacter 1.5~ 2.0m, when vibrating impacter vibroflotation compaction oil pressure reaches 20MPa, encryption hydraulic pressure reaches 0.5MPa, load time up to 8~10s, will shake Rush device and above carry and proceed next encrypted section construction.
(8) previous step work is repeated, from top to bottom, until being encrypted into throwing dam body cope level.
(9) all vibroflotation compaction holes point sequence to exposed water surface above dam body surface positioning carries out pore-creating, vibroflotation compaction, complete Relative density quality examination is carried out to vibroflotation compaction dam body into rear, that is, obtains throwing sand gravel material weir dam body;
(10) axis of dam position dam body dam foundation concrete is carried out at the top of the sand gravel material dam body dam body 2.2 more than the water surface to prevent Grout curtain 7 is constructed under oozing wall 6 and wall, after the completion of carry out layered rolling construction again, complete placement in layers and roll sandy gravel dam body 3;
(11) during weir dam construction, depending on falling zone range of stage situation, complete weir dam body side slope 5 and repair and train Slope, that is, complete the construction of throwing sand gravel material weir dam body in water.
Throwing sand gravel material dam body shakes in Kai Xian falling zone comprehensively treating ecological environment water level regulation dam engineering earth and rockfill dam water Punching encryption construction 48 days, completes vibroflotation compaction pore-creating 718, vibroflotation compaction total footage 9318m altogether.Examined through live third party's mass Survey, throwing sand gravel material dam body relative density is all higher than 0.75 in vibroflotation compaction water, meets design requirement.
Using throwing sand gravel material in water, vibroflotation compaction improves dam body relative density method Successful Practice first, reduces Dam body dry ground roller compaction construction cofferdam is filled and seepage control project measure, saves 11,660,000 yuan of construction investment, in advance duration about 4 months, Remarkable benefit.After engineering is built up, earth and rockfill dam dam body items Monitoring Data shows its stabilization, operational excellence.
Other unspecified parts are prior art.Although above-described embodiment is made that to the present invention and retouch in detail State, but it is only a part of embodiment of the invention, rather than whole embodiments, people can also according to the present embodiment without Other embodiment is obtained under the premise of creativeness, these embodiments belong to the scope of the present invention.

Claims (5)

1. it is a kind of improve water in throwing sand gravel material weir dam body relative density construction method, it is characterised in that:Including following Step:
1) compile analysis dam technical data and carry out equipment, preparation of getting the raw materials ready;
2) regarding the dam site depth of water, first using attacking and occupying, method is gradually advanced from bank slope to riverbed direction or waterborne vessel method throwing dam body is upper and lower Trip base of dam block building stones, form base of dam (1);Wherein, the height of base of dam isH be dam body highly;
3) use is attacked and occupied method and is gradually advanced more than throwing dam body sand gravel material to the water surface to riverbed direction from bank slope, obtains water outlet high The sand gravel material dam body (2) of 2.0~2.5m of face;Wherein sand gravel material dam body (2) includes the sand gravel material dam body below the water surface (2.1) the sand gravel material dam body (2.2) and more than the water surface;
4) sand gravel material dam body (2.2) more than throwing in water to the water surface is measured, is shaken by control line of the axis of dam Punching encryption hole (4) position arrangement;Vibroflotation compaction hole divides sequence to arrange along the axis of dam point row, wherein, the Ith order vibroflotation compaction hole (4.1) With the IIth order vibroflotation compaction hole (4.2) into being alternately arranged;
5) from hydraulic pressure frequency modulation vibrating impacter and the lifting appliance of satisfaction lifting load and vibroflotation compaction maximum hole depth, development scene shakes Punching encryption industrial experimentation;
6) pore-creating is carried out using truck crane or crawler crane lifting hydraulic pressure frequency modulation vibrating impacter alignment hole position, pore-creating hole position error is less than 10cm, pore-creating aperture by actually use hydraulic pressure frequency modulation vibrating impacter model vibroflotation dam body sand gravel material when automatically determine, pore-creating is passed through Should keep vertical when entering dam body, control degree of skewness is not more than 3%;
7) filler vibroflotation compaction is carried out to dam body after vibrating impacter pore-creating to projected depth;Vibroflotation compaction is upward paragraph by paragraph since bottom hole Sectional encryption, encrypts 0.3~0.5m of segment length, and continuous to filler in hole during encryption, filler requirement is the gravel material of 20~150mm, 1.5~2.0m of reciprocal lifting vibrating impacter when vibroflotation feeds;After vibrating impacter vibroflotation compaction reaches construction technology technical parameter, upwards Lifting vibrating impacter carries out next encrypted section construction, so repeatedly until dam body top;
8) to the exposed water surface above dam body surface positioning all vibroflotation compaction holes point sequence carry out vibroflotation compaction, after the completion of to vibroflotation Encryption dam body carries out relative density quality examination, that is, obtain throwing sand gravel material weir dam body;
9) sand gravel material dam body (2.2) top more than the water surface carries out axis of dam position dam body dam foundation concrete cut (6) And grout curtain (7) construction under wall, after the completion of carry out layered rolling construction again, complete placement in layers and roll sandy gravel dam body (3);
10) during weir dam construction, depending on falling zone range of stage situation, weir dam body side slope (5) finishing and training slope are completed, Complete the construction of throwing sand gravel material weir dam body in water.
2. the construction method of throwing sand gravel material weir dam body relative density in water, its feature are improved according to claim 1 It is:The step 2) in, the slope ratio of base of dam (1) upstream and downstream is 1 ︰ 2.0~2.5;Block building stones saturation compression strength is 30 ~160MPa, the particle diameter of block stone is less than 70cm, wherein, the particle diameter accounting in block stone gross weight of the block stone weight less than 0.1mm is small In 5%.
3. the construction method of throwing sand gravel material weir dam body relative density in water, its feature are improved according to claim 1 It is:The step 3) in, sand gravel material dam body (2) upstream and downstream slope ratio is control in 1 ︰ 2.5~2.75;The grain of sand gravel material Footpath is less than 150mm, wherein, sand gravel material weight of the particle diameter less than 5mm accounting in sand gravel material gross weight is less than 30%, particle diameter Sand gravel material weight less than the 0.075mm accounting in sand gravel material gross weight is less than 8%.
4. the construction method of throwing sand gravel material weir dam body relative density in water, its feature are improved according to claim 1 It is:The step 4) in, the Ith order vibroflotation compaction hole (4.1) is 3.0 with the pitch-row a in the IIth order vibroflotation compaction hole (4.2) ~3.5m;Often arranging the array pitch b encrypted between hole isPitch-row.
5. the construction method of throwing sand gravel material weir dam body relative density in water, its feature are improved according to claim 1 It is:The step 6) in, construction technology technical parameter is shown in Table 1 during pore-creating;
The hydraulic pressure frequency modulation vibrating impacter vibroflotation compaction sand gravel material construction technology technical parameter table of table 1
CN201511029150.6A 2015-12-31 2015-12-31 Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body Active CN105464053B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511029150.6A CN105464053B (en) 2015-12-31 2015-12-31 Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511029150.6A CN105464053B (en) 2015-12-31 2015-12-31 Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body

Publications (2)

Publication Number Publication Date
CN105464053A CN105464053A (en) 2016-04-06
CN105464053B true CN105464053B (en) 2017-05-24

Family

ID=55602173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511029150.6A Active CN105464053B (en) 2015-12-31 2015-12-31 Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body

Country Status (1)

Country Link
CN (1) CN105464053B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1728344A1 (en) * 1990-07-09 1992-04-23 Среднеазиатское Отделение Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Объединения "Гидропроект" Им.С.Я.Жука Earth dam on water permeable foundation
CN101487246A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 Non-foundation ditch construction method for earth and rockfill dam
CN202117030U (en) * 2011-03-16 2012-01-18 华北水利水电学院 Sand-gravel dam with steel structure panel
CN205369167U (en) * 2015-12-31 2016-07-06 长江勘测规划设计研究有限责任公司 Back -up sand gravel material weir dam body is thrown to aquatic

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1728344A1 (en) * 1990-07-09 1992-04-23 Среднеазиатское Отделение Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Объединения "Гидропроект" Им.С.Я.Жука Earth dam on water permeable foundation
CN101487246A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 Non-foundation ditch construction method for earth and rockfill dam
CN202117030U (en) * 2011-03-16 2012-01-18 华北水利水电学院 Sand-gravel dam with steel structure panel
CN205369167U (en) * 2015-12-31 2016-07-06 长江勘测规划设计研究有限责任公司 Back -up sand gravel material weir dam body is thrown to aquatic

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"无基坑水下筑坝技术的探索和实践";陈松滨等;《人民珠江》;20080901(第3期);第31-34页第1-5节 *

Also Published As

Publication number Publication date
CN105464053A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN102733401B (en) Method for treating dump slope of surface mine
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN102493399B (en) Novel method of tailing dry pile process
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN106149625B (en) A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method
CN106088109A (en) Discarded pit slope ecological recovery covers green construction method
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN102080381B (en) Method for managing landslip of side slope landslide for transformer substation
CN111851505A (en) Construction method and structure of pouring type impervious core earth-rock dam
CN208136652U (en) Shallow-layer solidifies Piled Embankments
CN108005104A (en) A kind of combined type retaining wall structure and its construction method
CN205369167U (en) Back -up sand gravel material weir dam body is thrown to aquatic
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN105464053B (en) Low dam body with water filled with gravel sand through throwing and construction method for increasing relative density of dam body
CN206385525U (en) A kind of timber structure for preventing the high backfill earthwork from sinking
CN203007961U (en) Gabion cofferdam structure
CN108396707A (en) A kind of novel ecological channel revetment structure and its construction method
CN107675716A (en) Pollution type side slope with pollution blocking and ecological greening functions and method
CN207525774U (en) A kind of cantilever retaining wall structure
CN206844135U (en) A kind of cofferdam
CN103195077B (en) A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method
CN202202318U (en) Soft soil foundation long-concrete short-gravel pile and preloading combination processing apparatus
CN205917649U (en) River bank slope protection structure
CN203129163U (en) Reinforcing framework structure for dam foundation
CN102312424A (en) Soft soil foundation long-concrete short-gravel (LCSG) pile and preloading combined treatment method and device thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant