CN105460906A - 一种安装管槽式分酸器的梁结构 - Google Patents
一种安装管槽式分酸器的梁结构 Download PDFInfo
- Publication number
- CN105460906A CN105460906A CN201511022047.9A CN201511022047A CN105460906A CN 105460906 A CN105460906 A CN 105460906A CN 201511022047 A CN201511022047 A CN 201511022047A CN 105460906 A CN105460906 A CN 105460906A
- Authority
- CN
- China
- Prior art keywords
- acid
- sulfuric acid
- mounting pipe
- girder construction
- bath type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B17/00—Sulfur; Compounds thereof
- C01B17/69—Sulfur trioxide; Sulfuric acid
- C01B17/74—Preparation
- C01B17/76—Preparation by contact processes
- C01B17/80—Apparatus
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B17/00—Sulfur; Compounds thereof
- C01B17/69—Sulfur trioxide; Sulfuric acid
- C01B17/74—Preparation
- C01B17/76—Preparation by contact processes
- C01B17/80—Apparatus
- C01B17/806—Absorbers; Heat exchangers
Landscapes
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Inorganic Chemistry (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Abstract
本发明涉及一种安装管槽式分酸器的梁结构。其特征在于:包括分酸器、塔体以及用于安装分酸器的安装部件,所述的安装部件包括两根平行悬架在上砖台处的边梁,以及若干与边梁连接的上吊杆,所述的上吊杆与扁担钢连接固定。使得分酸器安装结构简单,安装方便,水平调整精确,耐腐蚀性能好,使用寿命长,而且不受硫酸干吸塔内花板和除沫器等条件的钳制,不影响分酸器的分酸效果。
Description
技术领域
本发明涉及一种分酸器部件,具体涉及一种安装管槽式分酸器的梁结构。
背景技术
在制造硫酸的系统设备中,分酸器是干燥塔、吸收塔中的一个重要的组成部件,具体是指分酸器通过对进入干燥塔、吸收塔内的浓硫酸流体进行均匀分流,使均匀向下流动的浓硫酸与来自塔底向上流动的工艺气体在填料层中均匀接触,浓硫酸干燥和吸收工艺气体中的三氧化硫形成更高浓度硫酸。分酸器对气体的吸收率的高低直接影响到整套系统的正常运行,较低的吸收率会导致塔内形成酸雾过多,造成设备的腐蚀过度,成品酸质量不过关,以及过量的三氧化硫排放到大气中会造成大气严重污染。所以,分酸器的作用十分重要。
在制酸系统中,设备长期处于浓酸环境下,对设备的腐蚀是相当大的。近年来,国内外对分酸器的材料以及结构进行过多次的改进,每一次的改进对耐腐蚀性都进行了提升。
但是,对于分酸器在硫酸塔内的安装结构一直都未进行改进过。现有的结构是,分酸器直接吊在硫酸塔内的上盖板,且直接安放在下凸台上。这样就会产生以下的问题:
(1)结构受除沫器等的限制,以及不方便进行水平位置的调整;
(2)直接安防在下凸台处,易造成部分酸气短路的问题,影响分酸效果;
(3)与凸台接触部分,更易腐蚀,影响了安装部件的使用寿命。
发明内容
为了克服背景技术的不足,本发明提供一种安装管槽式分酸器的梁结构,使得分酸器安装结构简单,安装方便,水平调整精确,耐腐蚀性能好,使用寿命长,而且不受硫酸干吸塔内花板和除沫器等条件的钳制,不影响分酸器的分酸效果。
本发明所采用的技术方案是:一种安装管槽式分酸器的梁结构,包括分酸器、塔体以及用于安装分酸器的安装部件,
分酸器,包括酸总管、分酸支管、分酸槽以及落酸管,所述分酸槽两侧设有互相对称的吊耳,该些吊耳连接有下吊杆,每两个互相对称的下吊杆通过扁担钢连接;
塔体,所述塔体上部内边缘处设有上砖台;
安装部件,包括两根平行悬架在上砖台处的边梁,以及若干与边梁连接的上吊杆,所述的上吊杆与扁担钢连接固定。
近一步的,所述的上吊杆与边梁通过抱箍连接。
近一步的,所述的两根边梁之间至少悬架有一根中间梁,所述的中间梁悬挂有梁吊攀,所述的中间梁正下方的酸总管处悬挂有抱箍,所述的抱箍与梁吊攀中间设有吊杆连接。
近一步的,所述的中间梁为一根或两根或三根。
近一步的,所述的吊杆固定在扁担钢的中部。
近一步的,所述的吊杆与抱箍、吊杆与扁担钢、吊杆与吊耳都通过螺栓螺母固定。
近一步的,所述的中间梁与边梁为焊接方式固定。
近一步的,所述的每个分酸槽两侧各设有两个吊耳,两两对称。
本发明的有益效果是:由于采取上述技术方案,使得分酸器安装结构简单,安装方便,水平调整精确,耐腐蚀性能好,使用寿命长,而且不受硫酸干吸塔内花板和除沫器等条件的钳制,不影响分酸器的分酸效果。
附图说明
图1为本发明的结构示意图。
图2为本发明的侧面剖视图。
图中1、分酸器;11、酸总管;12、分酸支管;13、分酸槽;14、落酸管;15、吊耳;16、下吊杆;17、扁担钢;2、塔体;21、上砖台;3、安装部件;31、边梁;32、上吊杆;33、抱箍;34、中间梁;35、梁吊攀。
具体实施方式
下面结合附图对本发明实施例作进一步说明:
如图1结合图2所示,一种安装管槽式分酸器的梁结构,包括分酸器1、塔体2以及用于安装分酸器的安装部件3,
分酸器1,包括酸总管11、分酸支管12、分酸槽13以及落酸管14,所述分酸槽13两侧设有互相对称的吊耳15,该些吊耳15连接有下吊杆16,每两个互相对称的下吊杆16通过扁担钢17连接;
塔体2,所述塔体上部内边缘处设有上砖台21;
安装部件3,包括两根平行悬架在上砖台21处的边梁31,以及若干与边梁31连接的上吊杆32,上吊杆32与边梁31通过抱箍33连接,所述的上吊杆32与扁担钢17连接固定,所述的上吊杆32固定在扁担钢17的中部。
所述的两根边梁31之间至少悬架有一根中间梁34,所述的中间梁34悬挂有梁吊攀35,所述的中间梁34正下方的酸总管11处悬挂有抱箍33,所述的抱箍33与梁吊攀35中间设有吊杆连接。所述的中间梁34为一根或两根或三根。若是一根中间梁34,可以固定在边梁的左中右任意一侧,是为“H”型;若为两根中间梁34,就需固定在边梁的对称两侧,是为“井”型;若为三根的话,就等分固定在边梁左中右三侧,是为“日”型。
所述的吊杆与抱箍33、吊杆与扁担钢17、吊杆与吊耳15都通过螺栓螺母固定。
所述的中间梁34与边梁31为焊接方式固定。
所述的每个分酸槽13两侧各设有两个吊耳15,两两对称。
本发明的有益效果是:由于采取上述技术方案,使得分酸器安装结构简单,安装方便,水平调整精确,耐腐蚀性能好,使用寿命长,而且不受硫酸干吸塔内花板和除沫器等条件的钳制,不影响分酸器的分酸效果。
各位技术人员须知:虽然本发明已按照上述具体实施方式做了描述,但是本发明的发明思想并不仅限于此发明,任何运用本发明思想的改装,都将纳入本专利专利权保护范围内。
Claims (8)
1.一种安装管槽式分酸器的梁结构,包括分酸器、塔体以及用于安装分酸器的安装部件,其特征在于:
分酸器,包括酸总管、分酸支管、分酸槽以及落酸管,所述分酸槽两侧设有互相对称的吊耳,该些吊耳连接有下吊杆,每两个互相对称的下吊杆通过扁担钢连接;
塔体,所述塔体上部内边缘处设有上砖台;
安装部件,包括两根平行悬架在上砖台处的边梁,以及若干与边梁连接的上吊杆,所述的上吊杆与扁担钢连接固定。
2.根据权利要求1所述的安装管槽式分酸器的梁结构,其特征在于:所述的上吊杆与边梁通过抱箍连接。
3.根据权利要求1所述的安装管槽式分酸器的梁结构,其特征在于:所述的两根边梁之间至少悬架有一根中间梁,所述的中间梁悬挂有梁吊攀,所述的中间梁正下方的酸总管处悬挂有抱箍,所述的抱箍与梁吊攀中间设有吊杆连接。
4.根据权利要求3所述的安装管槽式分酸器的梁结构,其特征在于:所述的中间梁为一根或两根或三根。
5.根据权利要求1所述的安装管槽式分酸器的梁结构,其特征在于:所述的吊杆固定在扁担钢的中部。
6.根据权利要求1或4所述的安装管槽式分酸器的梁结构,其特征在于:所述的吊杆与抱箍、吊杆与扁担钢、吊杆与吊耳都通过螺栓螺母固定。
7.根据权利要求3所述的安装管槽式分酸器的梁结构,其特征在于:所述的中间梁与边梁为焊接方式固定。
8.根据权利要求1所述的安装管槽式分酸器的梁结构,其特征在于:所述的每个分酸槽两侧各设有两个吊耳,两两对称。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511022047.9A CN105460906A (zh) | 2015-12-30 | 2015-12-30 | 一种安装管槽式分酸器的梁结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511022047.9A CN105460906A (zh) | 2015-12-30 | 2015-12-30 | 一种安装管槽式分酸器的梁结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105460906A true CN105460906A (zh) | 2016-04-06 |
Family
ID=55599136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511022047.9A Pending CN105460906A (zh) | 2015-12-30 | 2015-12-30 | 一种安装管槽式分酸器的梁结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105460906A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100140143A1 (en) * | 2008-12-05 | 2010-06-10 | Petroleo Brasileiro S.A. -Petrobras | Multiphase multifunctional reactor |
CN201842644U (zh) * | 2010-11-17 | 2011-05-25 | 宣达实业集团有限公司 | 合金管槽式分酸器 |
CN203458818U (zh) * | 2013-06-30 | 2014-03-05 | 金川集团股份有限公司 | 应用于二氧化硫冶炼烟气吸收解析过程的解析塔 |
CN204661325U (zh) * | 2015-05-26 | 2015-09-23 | 江苏奥祺晨特种金属材料集团有限公司 | 高效管式分酸器 |
CN205442642U (zh) * | 2015-12-30 | 2016-08-10 | 浙江宣达特种合金流程装备股份有限公司 | 一种安装管槽式分酸器的梁结构 |
-
2015
- 2015-12-30 CN CN201511022047.9A patent/CN105460906A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100140143A1 (en) * | 2008-12-05 | 2010-06-10 | Petroleo Brasileiro S.A. -Petrobras | Multiphase multifunctional reactor |
CN201842644U (zh) * | 2010-11-17 | 2011-05-25 | 宣达实业集团有限公司 | 合金管槽式分酸器 |
CN203458818U (zh) * | 2013-06-30 | 2014-03-05 | 金川集团股份有限公司 | 应用于二氧化硫冶炼烟气吸收解析过程的解析塔 |
CN204661325U (zh) * | 2015-05-26 | 2015-09-23 | 江苏奥祺晨特种金属材料集团有限公司 | 高效管式分酸器 |
CN205442642U (zh) * | 2015-12-30 | 2016-08-10 | 浙江宣达特种合金流程装备股份有限公司 | 一种安装管槽式分酸器的梁结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205252720U (zh) | 一种除雾器模块的屋脊式安装结构 | |
CN206580442U (zh) | 一种适用于装配式楼梯板预制构件的吊装装置 | |
CN108022011B (zh) | 自然环境中绝缘子积污动态预测方法 | |
CN205442642U (zh) | 一种安装管槽式分酸器的梁结构 | |
CN105040591A (zh) | 一种波形钢腹板的定位装置及其定位方法 | |
CN109826312B (zh) | 一种高层连体结构的分段拼装方法及高层连体结构 | |
CN105460906A (zh) | 一种安装管槽式分酸器的梁结构 | |
CN103630451A (zh) | 模拟海洋浪溅区腐蚀疲劳三点弯曲试验装置 | |
CN205857881U (zh) | 一种铁路通信铁塔监控装置 | |
KR101789124B1 (ko) | 종방향 교량 점검대 | |
CN104612033B (zh) | 一种设置有多功能大悬臂箱梁的斜拉桥 | |
CN208389768U (zh) | 一种烟气脱硫塔内壁的防腐蚀装置 | |
CN203750695U (zh) | 一种卧式电除雾器 | |
CN103785539B (zh) | 管式电除尘器刚性电极用安装总成及安装方法 | |
CN106241625A (zh) | 安装圆盘瞭望台的塔式起重机 | |
CN206289544U (zh) | 一种简易电动吊篮装置 | |
CN209224994U (zh) | 一种防迷流端子预埋定位工装 | |
RU157872U1 (ru) | Стойка опоры линии электропередачи | |
CN208914045U (zh) | 吨级装配平台 | |
CN109736434B (zh) | 一种大跨度异形屋面上大规格檩条安装方法及施工工艺 | |
CN205716027U (zh) | 一种埋地出户管道防沉降系统 | |
AU2013273412B2 (en) | Bubble collector guide and use thereof | |
CN206591419U (zh) | 一种大跨度斜拉桥 | |
CN205442640U (zh) | 一种带稳流装置的管槽式分酸器 | |
CN201842644U (zh) | 合金管槽式分酸器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160406 |
|
WD01 | Invention patent application deemed withdrawn after publication |