CN105442763A - Construction method for preventing and controlling cracks of roof surface course - Google Patents

Construction method for preventing and controlling cracks of roof surface course Download PDF

Info

Publication number
CN105442763A
CN105442763A CN201510997774.0A CN201510997774A CN105442763A CN 105442763 A CN105442763 A CN 105442763A CN 201510997774 A CN201510997774 A CN 201510997774A CN 105442763 A CN105442763 A CN 105442763A
Authority
CN
China
Prior art keywords
surface layer
lath
construction
dividing joint
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510997774.0A
Other languages
Chinese (zh)
Inventor
张�林
于国帅
姜坤
于海亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WANXIN CONSTRUCTION CO Ltd
Original Assignee
SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WANXIN CONSTRUCTION CO Ltd filed Critical SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority to CN201510997774.0A priority Critical patent/CN105442763A/en
Publication of CN105442763A publication Critical patent/CN105442763A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D7/00Roof covering exclusively consisting of sealing masses applied in situ; Gravelling of flat roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention belongs to the technical field of building construction, and particularly relates to a construction method for preventing and controlling cracks of a roof surface course. The method comprises the following steps of 1 locating and paying-off, 2 batten machining, 3 batten pasting, 4 surface course pouring, 5 laitance cleaning, 6 crack baking and 7 caulking, wherein the step of caulking comprises the steps that adhesive tape is pasted along the outer edges of measured dividing joints, caulking construction is conducted on the dividing joints through asphalt waterproof caulking paste, each crack is 10 mm-15 mm high from the upper horizontal line of the surface course, than caulking is conducted through a weatherproof adhesive of a silicone structure till the height of each crack reaches the upper horizontal line of the roof surface course, and the adhesive tape is removed after caulking is completed. The construction method for preventing and controlling the cracks of the roof surface course can improve the construction efficiency, improve the construction quality, reduce the labor intensity, save the construction cost and reduce the difficulties in the construction process.

Description

Construction method is split in the prevention and control of roofing surface layer
Technical field
The present invention relates to the prevention and control of a kind of roofing surface layer and split construction method, belong to technical field of building construction, be applicable to the construction of roofing mortar surface layer, pea gravel concreten surface layer.
Background technology
Present stage major part house, office building roofing adopts flat roof deck design, structure often arranged on waterproof coiled material mortar or pea gravel concreten topping as roofing surface layer.At present, the construction method of roofing surface layer is for having built mortar or pea gravel concreten, and after its final set, bullet is surveyed in length and breadth to lattice suture, with cutting machine along Linear cut dividing joint two sidelines, then with manually digging out mortar or concrete in dividing joint.According to drawing and code requirement, during roofing surface layer employing cement mortar, dividing joint lattice area is preferably 1 square metre; When adopting pea gravel concreten, dividing joint in length and breadth spacing should not be greater than 6m, and the width of dividing joint is preferably 10mm ~ 20mm, ftractures to prevent roofing surface layer.The method is very strict to dividing joint cutting time requirement, and too early, mortar or pea gravel concreten do not reach requirement in cutting, easily causes lattice tape edge mortar or pea gravel concreten breakage during cutting; Cut and easily cause evening surface layer to crack.Manually pick cutter dividing joint inner concrete difficulty of construction large, adopt the method to have impact on construction quality and economic benefit greatly, how better to control roofing surface layer crack problem, quickening speed of application has become a national Extensive difficult problem urgently to be resolved hurrily.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of accelerating construction progress, ensure construction quality, construction method is split in the roofing surface layer prevention and control of technical feasibility.
Construction method is split in roofing surface layer of the present invention prevention and control, adopts following steps:
1) line setting: dividing joint center line surveyed by bullet;
2) lath processing: the extruded polystyrene board selecting condition of equivalent thickness, cuts into lath by extruded polystyrene board;
3) paste lath: the dividing joint center line surveyed according to bullet, paste extruded polystyrene board lath with 108 glue mud;
4) surface layer is built: after 108 glue cement slurry sets, build surface layer mortar or pea gravel concreten, mortar or pea gravel concreten blanking point are seam center of a lattice, first lath both sides are protected with mortar or pea gravel concreten when surface layer is built, lath is prevented to be shifted, then surface construction is carried out, with smearing with press polish during construction;
5) clear up laitance: lath and mortar or pea gravel concreten joint part form induced fractures, clear up extruded polystyrene board lath top laitance with little scoop along attractive joint;
6) roasting seam: baking extruded polystyrene board lath, the pre-thermal contraction of lath forms dividing joint;
7) filleting: the dividing joint outer edge surveyed along bullet pastes Pressure sensitive adhesive tape, carry out filleting construction with bituminous waterproofing caulked joint ointment to dividing joint, filleting height, apart from flat 10mm ~ 15mm on surface layer, is then put down with on silicone structure weather-resistant glue filleting to roofing surface layer, after filleting completes, Pressure sensitive adhesive tape is removed.
Described step 1) in mortar roofing surface layer dividing joint in length and breadth spacing be less than or equal to 1m × 1m; Pea gravel concreten roofing surface layer dividing joint in length and breadth spacing is less than or equal to 3m × 3m.According to roofing size, select suitable dividing joint width, and the center line of dividing joint surveyed by bullet, the width of dividing joint is preferably 10mm ~ 20mm.
Described step 2) in extruded polystyrene board cutting after width of sheet be 15mm.
Described step 3) in 108 glue simulated mud be cement: 108 glue: water=1:0.2:0.4 is mixed.
Described step 6) middle with liquefied gas spray gun baking extruded polystyrene board lath.
Described step 6 and step 7) between dividing joint corner is repaired: 2mm bullet outer edge of going out along dividing joint sideline, grinds 45 ° of oblique angles with sanding machine limit along the line, and with hair-dryer in dividing joint dust remove.
Described step 7) in Pressure sensitive adhesive tape width be not less than 20mm.
The invention has the beneficial effects as follows:
Can efficiency of construction be improved, and can construction quality be improved, reduce labour intensity, save construction cost, reduce the difficulty in work progress.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the longitudinal cross-section schematic diagram of the dividing joint in Fig. 1 before roasting seam.
Fig. 3 is the longitudinal cross-section schematic diagram of the dividing joint in Fig. 1 after filleting.
In figure: 1, lath 2, surface layer 3,108 glue mud 4, silicone structure weather-resistant glue 5, bituminous waterproofing caulked joint ointment.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described further:
As shown in FIG. 1 to 3, construction method is split in roofing surface layer of the present invention prevention and control, takes following steps:
1) line setting: according to roofing size, selects suitable dividing joint width, and mortar roofing surface layer dividing joint in length and breadth spacing is not more than 1m × 1m; Pea gravel concreten roofing surface layer dividing joint in length and breadth spacing is not more than 3m × 3m, and dividing joint center line surveyed by bullet, and the width of dividing joint is preferably 10mm ~ 20mm.。
2) lath processing: according to the thickness of roofing surface layer, selects the extruded polystyrene board of condition of equivalent thickness, extruded polystyrene board is cut into the lath 1 of 15mm width.
3) lath is pasted: the dividing joint center line surveyed according to bullet is cement by proportioning: 108 glue: the 108 glue mud 3 of water=1:0.2:0.4 paste extruded polystyrene board lath 1.
4) build surface layer: after 108 glue cement slurry sets, build surface layer 2 mortar or pea gravel concreten, mortar or pea gravel concreten blanking point are a point center of a lattice, get appropriate amount of material and protect lath 1 both sides, prevent lath 1 to be shifted, then carry out large face surface layer 2 and construct, with smearing with press polish during construction.
5) clear up laitance: after surface layer 2 mortar or pea gravel concreten intensity reach designing requirement, lath 1 can form induced fractures with mortar or pea gravel concreten joint part, with little scoop along attractive joint cleaning extruded polystyrene board lath 1 top laitance.
6) roasting seam: with liquefied gas spray gun baking extruded polystyrene board lath 1, the pre-thermal contraction of lath 1 forms dividing joint.
7) dividing joint corner finishing: 2mm bullet outer edge of going out along dividing joint sideline, grinds 45 ° of oblique angles with sanding machine limit along the line, and with hair-dryer, dust in dividing joint is removed.
8) filleting: the dividing joint outer edge surveyed along bullet pastes 20mm width Pressure sensitive adhesive tape, filleting construction is carried out with bituminous waterproofing caulked joint ointment 5 pairs of partition seams, filleting height is apart from flat 10mm ~ 15mm on surface layer 2, then with flat on silicone structure weather-resistant glue 4 filleting to roofing surface layer 2, after filleting completes, Pressure sensitive adhesive tape is removed.

Claims (7)

1. a construction method is split in the prevention and control of roofing surface layer, it is characterized in that adopting following steps:
1) line setting: dividing joint center line surveyed by bullet;
2) lath processing: the extruded polystyrene board selecting condition of equivalent thickness, cuts into lath (1) by extruded polystyrene board;
3) paste lath: the dividing joint center line surveyed according to bullet, paste lath (1) with 108 glue mud (3);
4) surface layer is built: after 108 glue mud (3) solidify, build surface layer (2) mortar or pea gravel concreten, mortar or pea gravel concreten blanking point are a point center of a lattice, first lath (1) both sides are protected with mortar or pea gravel concreten when surface layer (2) is built, lath (1) is prevented to be shifted, then surface layer (2) construction is carried out, with smearing with press polish during construction;
5) laitance is cleared up: lath (1) forms induced fractures with mortar or pea gravel concreten joint part, clears up lath (1) top laitance with little scoop along attractive joint;
6) roasting seam: baking lath (1), the pre-thermal contraction of lath (1) forms dividing joint;
7) filleting: the dividing joint outer edge surveyed along bullet pastes Pressure sensitive adhesive tape, with bituminous waterproofing caulked joint ointment (5), filleting construction is carried out to dividing joint, filleting height is apart from the upper flat 10mm ~ 15mm of surface layer (2), then use silicone structure weather-resistant glue (4) filleting upper flat to roofing surface layer (2), after filleting completes, Pressure sensitive adhesive tape is removed.
2. construction method is split in roofing surface layer according to claim 1 prevention and control, it is characterized in that: step 1) in mortar roofing surface layer dividing joint in length and breadth spacing be less than or equal to 1m × 1m; Pea gravel concreten roofing surface layer dividing joint in length and breadth spacing is less than or equal to 3m × 3m.
3. construction method is split in roofing surface layer according to claim 1 prevention and control, it is characterized in that: step 2) in extruded polystyrene board cutting after lath (1) width be 15mm.
4. construction method is split in roofing surface layer according to claim 1 prevention and control, it is characterized in that: step 3) in 108 glue mud (3) proportionings be cement: 108 glue: water=1:0.2:0.4 is mixed.
5. construction method is split in roofing surface layer according to claim 1 prevention and control, it is characterized in that: step 6) middle with liquefied gas spray gun baking lath (1).
6. construction method is split in roofing surface layer according to claim 1 prevention and control, it is characterized in that: step 6 and step 7) between dividing joint corner is repaired: 2mm bullet outer edge of going out along dividing joint sideline, grind 45 ° of oblique angles with sanding machine limit along the line, and with hair-dryer, dust in dividing joint is removed.
7. construction method is split in roofing surface layer according to claim 1 prevention and control, it is characterized in that: step 7) in Pressure sensitive adhesive tape width for being not less than 20mm.
CN201510997774.0A 2015-12-24 2015-12-24 Construction method for preventing and controlling cracks of roof surface course Pending CN105442763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510997774.0A CN105442763A (en) 2015-12-24 2015-12-24 Construction method for preventing and controlling cracks of roof surface course

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510997774.0A CN105442763A (en) 2015-12-24 2015-12-24 Construction method for preventing and controlling cracks of roof surface course

Publications (1)

Publication Number Publication Date
CN105442763A true CN105442763A (en) 2016-03-30

Family

ID=55553354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510997774.0A Pending CN105442763A (en) 2015-12-24 2015-12-24 Construction method for preventing and controlling cracks of roof surface course

Country Status (1)

Country Link
CN (1) CN105442763A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255169A (en) * 2020-01-16 2020-06-09 中国十七冶集团有限公司 Construction method for setting roof dividing joint
CN111364696A (en) * 2020-03-14 2020-07-03 山西四建集团有限公司 Construction method for expansion joint of fine stone concrete flat roof
CN114934637A (en) * 2022-05-31 2022-08-23 中国十七冶集团有限公司 Construction method of large-area accessible roof waterproof protection surface layer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4226060A (en) * 1977-11-26 1980-10-07 Shintaro Sato Floor plate for forming a foot path and method of laying a walking surface on a roof
KR100761939B1 (en) * 2006-11-24 2007-10-01 케이 이 티 주식회사 Air vent structure with porous fabric seat for waterproof construction and construction method using it
CN101078241A (en) * 2007-07-19 2007-11-28 河北建设集团有限公司 Pouring concrete separating crack structure and construction method thereof
CN201738504U (en) * 2010-08-10 2011-02-09 朱奎 Dividing joint construction used for rigid waterproof roof
CN102787698A (en) * 2012-07-24 2012-11-21 张云麟 Method for producing cast-in-situ insulation roof
CN203383409U (en) * 2013-07-31 2014-01-08 陕西建工集团第七建筑工程有限公司 Caulking construction structure for surface layer dividing joints of building roof
CN204311659U (en) * 2014-08-25 2015-05-06 中建二局第一建筑工程有限公司 A kind of roof covering water-proof structure using extruded polystyrene board as fish tail and waterproof layer dividing strip
US20150331414A1 (en) * 2014-05-14 2015-11-19 Tamko Building Products, Inc. Dynamically Calculated Refractive Index for Determining the Thickness of Roofing Materials

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4226060A (en) * 1977-11-26 1980-10-07 Shintaro Sato Floor plate for forming a foot path and method of laying a walking surface on a roof
KR100761939B1 (en) * 2006-11-24 2007-10-01 케이 이 티 주식회사 Air vent structure with porous fabric seat for waterproof construction and construction method using it
CN101078241A (en) * 2007-07-19 2007-11-28 河北建设集团有限公司 Pouring concrete separating crack structure and construction method thereof
CN201738504U (en) * 2010-08-10 2011-02-09 朱奎 Dividing joint construction used for rigid waterproof roof
CN102787698A (en) * 2012-07-24 2012-11-21 张云麟 Method for producing cast-in-situ insulation roof
CN203383409U (en) * 2013-07-31 2014-01-08 陕西建工集团第七建筑工程有限公司 Caulking construction structure for surface layer dividing joints of building roof
US20150331414A1 (en) * 2014-05-14 2015-11-19 Tamko Building Products, Inc. Dynamically Calculated Refractive Index for Determining the Thickness of Roofing Materials
CN204311659U (en) * 2014-08-25 2015-05-06 中建二局第一建筑工程有限公司 A kind of roof covering water-proof structure using extruded polystyrene board as fish tail and waterproof layer dividing strip

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
关坤: "《建筑工程质量常见问题与防治400例》", 30 June 2015 *
单健潮: "浅谈屋面现浇细石混凝土防水层的施工", 《福建建筑》 *
周胜: "《建筑设计常用数据速查手册》", 31 October 2015 *
程宏伟、 薛强: "谈建筑防水油膏的技术应用特性", 《黑龙江科技信息》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255169A (en) * 2020-01-16 2020-06-09 中国十七冶集团有限公司 Construction method for setting roof dividing joint
CN111364696A (en) * 2020-03-14 2020-07-03 山西四建集团有限公司 Construction method for expansion joint of fine stone concrete flat roof
CN114934637A (en) * 2022-05-31 2022-08-23 中国十七冶集团有限公司 Construction method of large-area accessible roof waterproof protection surface layer

Similar Documents

Publication Publication Date Title
CN100396859C (en) Pouring concrete separating crack structure and construction method thereof
CN108412093B (en) Modern landscape decorative rammed earth wall and construction method thereof
CN105649285A (en) Construction method for heat insulation layer combined type exhaust hole of accessible roof
CN107313560B (en) Reinforced waterproof roof of archaize building and construction method thereof
CN105442763A (en) Construction method for preventing and controlling cracks of roof surface course
CN207228171U (en) Concrete floor waterproofing node is worn under a kind of steel column
CN103206085A (en) Construction method for heat-insulation waterproofing system of roof comprising foam glass plates
CN103410331A (en) Wet combining process for vitrified porcelain tiles
CN109208830A (en) A kind of construction method and structure of parapet of roofing flashing
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN210713552U (en) Roof structure with inverted concrete slab protection layer
CN102486048A (en) Construction method for exterior heat preserving wall surface of exterior wall of high-rise building
CN106401083A (en) Roofing project system structure and construction method thereof
CN105714992A (en) Pottery tile laying structure and laying method thereof
CN203716410U (en) Novel roof grid seam
CN105625650A (en) Construction method for roofing parapet wall flashing protective layer
CN207079914U (en) The multi-ribbed plate putamina construction installed for beam bottom mother plate
CN103362146B (en) Floor slab waterproof protective layer construction method
CN209114753U (en) A kind of roofing rigid course dividing joint
CN106401146A (en) Integral lattice bar structure piece used for preventing terrazzo floor fracturing
CN113668885B (en) Plastering anti-cracking construction method for large-area arc-shaped stand
CN105089213A (en) Water-proof construction method with advantages of energy conservation and environment protection for conventional roof
CN211949245U (en) Roof stone flashing structure
CN103046698A (en) Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures
CN102605895B (en) Installation and construction method of ceiling board heat insulation mortar prefabricated block

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330