CN105438842A - Hot-state slag trackless transport method - Google Patents

Hot-state slag trackless transport method Download PDF

Info

Publication number
CN105438842A
CN105438842A CN201410395892.XA CN201410395892A CN105438842A CN 105438842 A CN105438842 A CN 105438842A CN 201410395892 A CN201410395892 A CN 201410395892A CN 105438842 A CN105438842 A CN 105438842A
Authority
CN
China
Prior art keywords
slag
cinder ladle
trailer
tank car
ladle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410395892.XA
Other languages
Chinese (zh)
Inventor
耿会良
郑峰
张吉胜
李利民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Baosteel Technology Services Co Ltd
Original Assignee
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Baosteel Technology Services Co Ltd filed Critical MCC Baosteel Technology Services Co Ltd
Priority to CN201410395892.XA priority Critical patent/CN105438842A/en
Publication of CN105438842A publication Critical patent/CN105438842A/en
Pending legal-status Critical Current

Links

Landscapes

  • Furnace Details (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention provides a hot-state slag trackless transport method, pertaining to the technical field of hot-state slag. The method comprises following steps: A, slagging slag bags at the slag discharge place; B, loading slag bags to a slag bag trailer; C, conveying slag bags to a slag field by the slag bag trailer; and D, unloading slag bags from the slag bag trailer and pouring slag. At least one slag pot carrier is arranged and used for loading and unloading slag bags at the slag discharge place and the slag field and not used for conveying slag bags between the slag discharge place and the slag field. In the step B, slag bags are loaded to the slag bag trailer. In the step D, sla bags are unloaded from the slag bag trailer and slag is poured. At least one action of the two is finished by the slag pot carrier.By combination use of the slag pot carrier and the slag bag trailer, a hot-state slag trackless conveying system is low in investment cost and operation cost, flexible in transport process route, and low in equipment maintenance cost and management cost.

Description

Hot slag flexible transport method
Technical field
The present invention relates to hot slag technical field of transportation, particularly relate to a kind of hot slag flexible transport method.
Background technology
No matter being ferrous meatal or non-metals, all can producing waste residue when smelting, and the initial condition that waste residue produces is all hot, temperature is often more than 1000 DEG C.These hot waste residues produced need to be transported to slag field and process, and therefore first the hot slag of slagging tap a little will be loaded cinder ladle, then cinder ladle are transported to slag field.The orthodox method that cinder ladle is transported to slag field adopts orbital fashion, be commonly called as rail type technique, rail type technique needs to lay special track, and slag tap a little and slag field all need to configure and load or unload the hoisting crane of cinder ladle, thus cost of investment is high, it is many to take up an area, and operational path is fixed, cannot adjust.
Prior art also has employing flexible transport technique, current flexible transport technique has two kinds: one to be slagged tap a little and slag field does not configure hoisting crane and deslagging equipment, adopt and embrace a tank car and carry out cinder ladle transport and complete deslagging action (embracing tank car can with reference to the utility model patent of Authorization Notice No. CN203112854U: hinged connection type U-shaped slag pot carrier), such technique makes to slag tap a little and slag field need not configure hoisting crane and deslagging equipment, save the deployment cost of hoisting crane and deslagging equipment, and operational path is flexible, but the Integration ofTechnology degree embracing tank car is high, cause its operating cost high, maintenance cost is high, and administer and maintain work complexity, loaded down with trivial details, difficulty is large.Another kind of flexible transport technique adopts cinder ladle trailer to transport, because cinder ladle trailer does not have a tinning and unload tank function, so a palpus of slagging tap configures a hoisting crane, slag field must configure hoisting crane and deslagging equipment, this technique is because of cinder ladle trailer function singleness, and operating cost is low, good economy performance; But slag tap a little and the configuration of slag field hoisting crane and deslagging equipment, make initial economic input cost large, occupation of land is many.
Summary of the invention
The shortcoming of prior art in view of the above, the technical problem to be solved in the present invention is to provide that a kind of cost of investment is low, operating cost is low, operational path hot slag flexible transport method flexibly, to overcome the above-mentioned defect of prior art.
In order to solve the problems of the technologies described above, the invention provides a kind of hot slag flexible transport method, comprise the following steps: A, slag tap put cinder ladle by slag, B, described cinder ladle is loaded on cinder ladle trailer, C, by described cinder ladle trailer, described cinder ladle is transported to slag field, D, described cinder ladle is unloaded from described cinder ladle trailer.Wherein, in step B, cinder ladle is loaded on cinder ladle trailer, or in step D by cinder ladle by cinder ladle trailer unloading and carrying out deslagging, have at least in these two actions an action by embrace a tank car come.
Alternatively, only in slag field, a tank car is embraced in configuration, and in step B, the action be loaded into by cinder ladle on cinder ladle trailer is completed by the hoisting crane of slagging tap a little, and in step D, cinder ladle is unloaded by cinder ladle trailer and the action carrying out deslagging is completed by described armful of tank car.
Alternatively, only embrace a tank car in a configuration of slagging tap, the action be loaded into by cinder ladle in step B on cinder ladle trailer is completed by described armful of tank car, and in step D, cinder ladle is unloaded by cinder ladle trailer and the action carrying out deslagging is completed by the hoisting crane of slag field and deslagging equipment.
Alternatively, slagging tap a little and configuring an armful tank car respectively in slag field, in step B, cinder ladle being loaded into the action on cinder ladle trailer, and in step D, cinder ladle being unloaded by cinder ladle trailer and carry out the action of deslagging, completing by embracing a tank car.
Alternatively, when described cinder ladle is unloaded or load upper cinder ladle trailer by described armful of tank car, described armful of tank car afterbody is relative with described cinder ladle trailer afterbody.
Alternatively, when described cinder ladle is unloaded or load upper cinder ladle trailer by described armful of tank car, described armful of tank car afterbody is relative with the side of described cinder ladle trailer afterbody.
As mentioned above, hot slag flexible transport method of the present invention, has following beneficial effect:
1, when slagging tap a little and slag field, when having a place or all do not possess hoisting crane, cost of investment is adopted to carry out loading, unloading, the deslagging work of corresponding cinder ladle far below armful tank car of hoisting crane, and cinder ladle is by slag tap a little and transport between slag field is low by function singleness, operating cost, the cinder ladle trailer that do not restrict haulway by track completes, thus cost of investment of the present invention is low, operating cost is low, operational path is flexible, and an armful tank car only does in-plant cinder ladle mounting or dismounting work, thus cost of equipment maintenance is low, handling cost is low.
2, embrace tank car and both can to carry out the mounting or dismounting work of cinder ladle in the position that car body ordinate is consistent with cinder ladle trailer, the mounting or dismounting work of cinder ladle can also to be carried out in the position that car body ordinate is perpendicular with cinder ladle trailer, thus use flexibly, to slag tap a little and the space requirement of slag field low.
Accompanying drawing explanation
Fig. 1 is shown as the flow scheme of hot slag flexible transport method of the present invention.
Fig. 2 is shown as in hot slag flexible transport method of the present invention and embraces the tank car afterbody working state schematic representation relative with the side of cinder ladle trailer afterbody.
Fig. 3 is shown as in hot slag flexible transport method of the present invention and embraces the tank car afterbody working state schematic representation relative with cinder ladle trailer afterbody.
Element numbers explanation
100 armfuls of tank cars, 110 armfuls of tank car afterbodys
120 cinder ladle handing device 200 cinder ladle trailers
210 cinder ladle trailer afterbody 300 cinder ladles
310 gudgeons
Detailed description of the invention
By particular specific embodiment, embodiments of the present invention are described below, person skilled in the art scholar the content disclosed by this specification sheets can understand other advantages of the present invention and effect easily.
Refer to Fig. 1 to Fig. 3.Notice, structure, ratio, size etc. that this specification sheets institute accompanying drawings illustrates, content all only in order to coordinate specification sheets to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the present invention, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the present invention can produce and the object that can reach, all should still drop in scope that disclosed technology contents can contain.Simultaneously, quote in this specification sheets as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the present invention.
In view of the hot slag flexible transport technique of prior art, or adopt an armful tank car to complete cinder ladle transport completely, although such technique saves the deployment cost of lifting and deslagging equipment, and operational path is flexible; But it is high to embrace the Integration ofTechnology degree of tank car, cause that its operating cost is high, maintenance cost is high, and administer and maintain work complexity, loaded down with trivial details, difficulty is large.Only adopt cinder ladle trailer to carry out the transport of cinder ladle, then point of slagging tap, slag field all must configure hoisting crane, and slag field also must configure deslagging equipment, although such technique is because of cinder ladle trailer function singleness, thus its operating cost is low, good economy performance; But slag tap a little and the configuration of slag field hoisting crane and deslagging equipment, make initial economic input cost large, occupation of land is many.The present inventor designs a kind of hot slag flexible transport method, tank car and cinder ladle trailer collocation use will be embraced, make to embrace tank car and replace hoisting crane and deslagging equipment, make the cinder ladle transport of cinder ladle trailer only for slagging tap a little and between slag field, thus cost of investment is low, operating cost is low and operational path is flexible.
Below will be described in detail to hot slag flexible transport technique of the present invention by specific embodiment.
First, hot slag flexible transport method of the present invention is summarized, it comprises the following steps: A, slag tap put cinder ladle by slag, B, described cinder ladle is loaded on cinder ladle trailer, C, by described cinder ladle trailer, described cinder ladle is transported to slag field, D, described cinder ladle is unloaded from described cinder ladle trailer.Hot slag flexible transport method of the present invention also configures at least one and embraces tank car, embrace tank car only slagging tap a little or be responsible for the handling labor of cinder ladle in slag field, and not responsible cinder ladle is in the transport work of a little arriving between slag field of slagging tap; Namely in step B, cinder ladle is loaded on cinder ladle trailer, and in step D by cinder ladle by cinder ladle trailer unloading and carrying out deslagging, have at least in these two actions an action by embrace a tank car come.
Embodiment one
Slag tap a little and all newly-built situation in slag field:
As shown in Figure 1 to Figure 3, for point of slagging tap, slag field configure respectively and embrace tank car 100, described armful of tank car 100 comprises cinder ladle handing device 120 and tin turning mechanism (not shown); Another configuration cinder ladle trailer 200 commutes slags tap a little and between slag field; Certainly, also need to be configured for the cinder ladle 300 holding hot slag, the both sides of described cinder ladle 300 upper end are respectively equipped with gudgeon 310.
Then hot slag flexible transport method of the present invention comprises the following steps:
A, slag tap put cinder ladle 300 by slag;
B, embrace tank car 100 coordinating by the gudgeon 310 of its cinder ladle handing device 120 and cinder ladle 300 by slagging tap a little, described cinder ladle 300 is lifted, consider and slag tap a little and the real space situation of slag field, make described armful tank car afterbody 110 relative with described cinder ladle trailer afterbody 210, thus make to embrace tank car 100 consistent with the car body ordinate of cinder ladle trailer 200 (or make described tank car afterbody 110 of embracing relative with the side of described cinder ladle trailer afterbody 210, thus make the car body ordinate of armful tank car 100 and cinder ladle trailer 200 perpendicular); Afterwards, cinder ladle handing device 120 moves down, and installs on cinder ladle trailer 200 by described cinder ladle 300;
C, by described cinder ladle trailer 200, described cinder ladle 300 is transported to slag field;
D, according to the putting position (gudgeon 310 of cinder ladle 300 with the car body ordinate of cinder ladle trailer 200 perpendicular or parallel) of described cinder ladle 300 relative to described cinder ladle trailer 200, tank car 100 of embracing in slag field is moved, make the afterbody 110 embracing tank car 100 in slag field relative with described cinder ladle trailer afterbody 210 (or side of cinder ladle trailer afterbody 210), then, regulate the cinder ladle handing device 120 embracing tank car 100, make coordinating of the gudgeon 310 of cinder ladle handing device 120 and cinder ladle 300, afterwards, drive cinder ladle handing device 120, it is made cinder ladle 300 to be lifted (namely realize from cinder ladle trailer 200 unload action), drive the tin turning mechanism embracing tank car 100 again, complete the deslagging of cinder ladle 300.
Such transportation resources, makes to slag tap a little and slag field need not configure than embracing the much higher hoisting crane of tank car 100 cost of investment and deslagging equipment, thus cost of investment is low, and takes up an area few; The cinder ladle of slagging tap a little and between slag field transports and is completed by cinder ladle trailer 200, and compared to embracing tank car 100, the function singleness of cinder ladle trailer 200, operating cost is low, good economy performance; And the use of cinder ladle trailer 200 achieves flexible transport, haulway can be changed according to actual conditions, and cinder ladle trailer 200 can in other different slagging tap a little and travel between slag field, and operational path is very flexible; Embrace tank car 100 only to do in-plant cinder ladle 300 and install and remove work, thus cost of equipment maintenance is low, handling cost is low.Embracing tank car 100 can when car body ordinate be consistent with cinder ladle trailer 200, handling cinder ladle 300; Also can when car body ordinate be perpendicular, handling cinder ladle 300; Thus work alerting ability high, to slag tap a little and the space requirement of slag field low.
Embodiment two
Slag tap a little newly-built; Slag field is old slag field in the past, has been configured with the situation of hoisting crane and deslagging equipment:
As shown in Figure 1 to Figure 3, in order to slag tap, tank car 100 is embraced in a configuration, and described armful of tank car 100 comprises cinder ladle handing device 120; Another configuration cinder ladle trailer 200 commutes slags tap a little and between slag field; Certainly, also need to be configured for the cinder ladle 300 holding hot slag, the both sides of described cinder ladle 300 upper end are respectively equipped with gudgeon 310.
Then hot slag flexible transport method of the present invention comprises the following steps:
A, slag tap put cinder ladle 300 by slag;
B, embrace tank car 100 coordinating by the gudgeon 310 of its cinder ladle handing device 120 and cinder ladle 300 by slagging tap a little, described cinder ladle 300 is lifted, according to the real space situation of slagging tap a little, make described armful tank car afterbody 110 relative with described cinder ladle trailer afterbody 210, thus it is consistent with the car body ordinate of cinder ladle trailer 200 to make to embrace tank car 100; Or make described armful tank car afterbody 110 relative with the side of described cinder ladle trailer afterbody 210, thus it is perpendicular with the car body ordinate of cinder ladle trailer 200 to make to embrace tank car 100, afterwards, cinder ladle handing device 120 moves down, and installs on cinder ladle trailer 200 by described cinder ladle 300;
C, by described cinder ladle trailer 200, described cinder ladle 300 is transported to slag field;
D, by the hoisting crane of slag field, described cinder ladle 300 to be unloaded from described cinder ladle trailer 200, then complete the deslagging of described cinder ladle 300 by the deslagging equipment of slag field.
Such transportation resources, making to slag tap a little need not configure than embracing the much higher hoisting crane of tank car 100 cost of investment, thus cost of investment is low, and takes up an area few; The cinder ladle of slagging tap a little and between slag field transports and is completed by cinder ladle trailer 200, and compared to embracing tank car 100, the function singleness of cinder ladle trailer 200, operating cost is low, good economy performance; And the use of cinder ladle trailer 200 achieves flexible transport, haulway can be changed according to actual conditions, and cinder ladle trailer 200 can in other different slagging tap a little and travel between slag field, and operational path is very flexible; Embrace tank car 100 and only do the work of in-plant dress cinder ladle, thus cost of equipment maintenance is low, handling cost is low.Embrace tank car 100 and when car body ordinate is consistent, cinder ladle 300 can be loaded upper cinder ladle trailer 200 with cinder ladle trailer 200; Also when car body ordinate is perpendicular, cinder ladle 300 can be loaded upper cinder ladle trailer 200; Thus the alerting ability of work is high, low to the space requirement of slagging tap a little.Old slag field does not need transformation in addition, can continue to use, thus avoids the energy dissipation caused.
Embodiment three
Slagging tap a little slags tap a little for what pass by always, has been configured with hoisting crane; Slag field is newly-built situation:
As shown in Figure 1 to Figure 3, for tank car 100 is embraced in the configuration of slag field, described armful of tank car 100 comprises cinder ladle handing device 120 and tin turning mechanism (not shown); Another configuration cinder ladle trailer 200 commutes slags tap a little and between slag field; Certainly, also need to be configured for the cinder ladle 300 holding hot slag, the both sides of described cinder ladle 300 upper end are respectively equipped with gudgeon 310.
Then hot slag flexible transport method of the present invention comprises the following steps:
A, slag tap put cinder ladle 300 by slag;
B, by the hoisting crane of slagging tap a little, described cinder ladle 300 is installed on described cinder ladle trailer 200, according to the real space situation of slag field, make the gudgeon 310 of cinder ladle 300 perpendicular or parallel with the car body ordinate of cinder ladle trailer 200;
C, by described cinder ladle trailer 200, described cinder ladle 300 is transported to slag field;
D, by slag field embrace a tank car 100 move, make the afterbody 110 embracing tank car 100 in slag field relative with described cinder ladle trailer afterbody 210 (or side of cinder ladle trailer afterbody 210), then, regulate the cinder ladle handing device 120 embracing tank car 100, make coordinating of the gudgeon 310 of cinder ladle handing device 120 and cinder ladle 300, afterwards, drive cinder ladle handing device 120, it is made cinder ladle 300 to be lifted (namely realize from cinder ladle trailer 200 unload action), drive the tin turning mechanism embracing tank car 100 again, complete the deslagging of cinder ladle 300.
Such transportation resources, slag field need not be configured than embracing the much higher hoisting crane of tank car 100 cost of investment and deslagging equipment, thus cost of investment is low, and takes up an area few; The cinder ladle of slagging tap a little and between slag field transports and is completed by cinder ladle trailer 200, and compared to embracing tank car 100, the function singleness of cinder ladle trailer 200, operating cost is low, good economy performance; And the use of cinder ladle trailer 200 achieves flexible transport, haulway can be changed according to actual conditions, and cinder ladle trailer 200 can in other different slagging tap a little and travel between slag field, and operational path is very flexible; Embrace tank car 100 and only do in-plant work of unloading cinder ladle 300 and deslagging bag 300, thus cost of equipment maintenance is low, handling cost is low.Embrace tank car 100 when car body ordinate is consistent, cinder ladle 300 to be unloaded from cinder ladle trailer 200 with cinder ladle trailer 200; Also when car body ordinate is perpendicular, cinder ladle 300 can be unloaded from cinder ladle trailer 200; Thus the alerting ability of work is high, low to the space requirement of slag field.Always slag tap in addition and a little do not need transformation, can continue to use, thus avoid the energy dissipation caused.
In sum, hot slag flexible transport method of the present invention, cost of investment is low, operating cost is low, operational path is flexible, and cost of equipment maintenance is low, handling cost is low, to slag tap a little and the space requirement of slag field low.So the present invention effectively overcomes various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all without prejudice under spirit of the present invention and category, can modify above-described embodiment or changes.Therefore, such as have in art usually know the knowledgeable do not depart from complete under disclosed spirit and technological thought all equivalence modify or change, must be contained by claim of the present invention.

Claims (6)

1. a hot slag flexible transport method, comprise the following steps: A, slag tap put cinder ladle by slag, B, described cinder ladle is loaded on cinder ladle trailer, C, by described cinder ladle trailer, described cinder ladle is transported to slag field, D, described cinder ladle to be unloaded from described cinder ladle trailer, and carry out deslagging; It is characterized in that, in step B, cinder ladle is loaded on cinder ladle trailer, or in step D by cinder ladle by cinder ladle trailer unloading and carrying out deslagging, have at least in these two actions an action by embrace a tank car come.
2. hot slag flexible transport method according to claim 1, it is characterized in that: only in slag field, tank car is embraced in configuration, in step B, the action be loaded into by cinder ladle on cinder ladle trailer is completed by the hoisting crane of slagging tap a little, and in step D, cinder ladle is unloaded by cinder ladle trailer and the action carrying out deslagging is completed by described armful of tank car.
3. hot slag flexible transport method according to claim 1, it is characterized in that: only embrace tank car in a configuration of slagging tap, the action be loaded into by cinder ladle in step B on cinder ladle trailer is completed by described armful of tank car, and in step D, cinder ladle is unloaded by cinder ladle trailer and the action carrying out deslagging is completed by the hoisting crane of slag field and deslagging equipment.
4. hot slag flexible transport method according to claim 1, it is characterized in that: slag tap a little and in slag field respectively configuration embrace a tank car, in step B, cinder ladle is loaded into the action on cinder ladle trailer, and in step D, cinder ladle unloaded by cinder ladle trailer and carry out the action of deslagging, complete by embracing tank car.
5., according to the arbitrary described hot slag flexible transport method of Claims 1-4, it is characterized in that: when described cinder ladle is unloaded or load upper cinder ladle trailer by described armful of tank car, described armful of tank car afterbody is relative with described cinder ladle trailer afterbody.
6., according to the arbitrary described hot slag flexible transport method of Claims 1-4, it is characterized in that: when described cinder ladle is unloaded or load upper cinder ladle trailer by described armful of tank car, described armful of tank car afterbody is relative with the side of described cinder ladle trailer afterbody.
CN201410395892.XA 2014-08-13 2014-08-13 Hot-state slag trackless transport method Pending CN105438842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410395892.XA CN105438842A (en) 2014-08-13 2014-08-13 Hot-state slag trackless transport method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410395892.XA CN105438842A (en) 2014-08-13 2014-08-13 Hot-state slag trackless transport method

Publications (1)

Publication Number Publication Date
CN105438842A true CN105438842A (en) 2016-03-30

Family

ID=55549575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410395892.XA Pending CN105438842A (en) 2014-08-13 2014-08-13 Hot-state slag trackless transport method

Country Status (1)

Country Link
CN (1) CN105438842A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027808A (en) * 1976-03-29 1977-06-07 Thomas Lee Richard Hardwick Receptacle transporting vehicle
CN201825964U (en) * 2010-09-21 2011-05-11 上海宝冶集团有限公司 Transport trolley for large-tonnage slag ladle
CN102285332A (en) * 2010-06-18 2011-12-21 中冶宝钢技术服务有限公司 Large tonnage integral tank truck
CN102690906A (en) * 2011-03-21 2012-09-26 鞍山钢铁集团公司 Metallurgical slag waste heat recovery and utilization technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027808A (en) * 1976-03-29 1977-06-07 Thomas Lee Richard Hardwick Receptacle transporting vehicle
CN102285332A (en) * 2010-06-18 2011-12-21 中冶宝钢技术服务有限公司 Large tonnage integral tank truck
CN201825964U (en) * 2010-09-21 2011-05-11 上海宝冶集团有限公司 Transport trolley for large-tonnage slag ladle
CN102690906A (en) * 2011-03-21 2012-09-26 鞍山钢铁集团公司 Metallurgical slag waste heat recovery and utilization technology

Similar Documents

Publication Publication Date Title
EP1798169B1 (en) A low frame bridge type system with carriers for transferring containers between a shore side crane and a stacking area crane
EP2411315B1 (en) Improved container crane
CN104192576B (en) Container horizontal transportation system
CN110406985B (en) Automatic container terminal loading and unloading system and method
CN105329615A (en) Double-stopping side conveying belt
CN105438842A (en) Hot-state slag trackless transport method
CN105132624A (en) Online refining technology of molten steel
CN105108127A (en) Ladle capping device
CN102774310B (en) Automatic logistics loading and unloading transportation vehicle
CN109466693A (en) A kind of ore carrier cargo hold method of modifying
CN103924015B (en) Realize equipment combination and the method at the interface of steel zero
CN211005450U (en) Slag pot logistics unmanned control system in roller method slag treatment workshop
CN207386546U (en) A kind of flange butterfly valve body processing contains turning barrel with detachable molten iron
CN103771042A (en) Container with cargoes unloaded from bottom
EP1820768A1 (en) A double-trolley container crane capable of lifting dual 40-foot containers
CN202924336U (en) Sand shakeout bucket for steel-casting foundry sand bin
CN106270478A (en) A kind of flexible self-hardening sand molding pours into a mould knockout transportation system
CN205294034U (en) Improvement automated guided transporting vehicle
CN203095191U (en) Coal unloading railway line distribution system of power plant car dumper
CN202716789U (en) Automatic material flow loading and unloading transport vehicle
JP6057888B2 (en) Distribution method of hot metal ladle in hot metal processing plant
CN210795654U (en) Multifunctional forklift
CN203048224U (en) Unloading device for monorail crane
CN202575795U (en) Gantry crane for container
CN206882956U (en) A kind of die casting antenna oscillator welding tooling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330