- CN105427027A CN105427027A CN201510751688.1A CN201510751688A CN105427027A CN 105427027 A CN105427027 A CN 105427027A CN 201510751688 A CN201510751688 A CN 201510751688A CN 105427027 A CN105427027 A CN 105427027A
- Authority
- CN
- China
- Prior art keywords
- module
- quantity calculation
- unit
- electric energy
- generating plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 55
- 230000005540 biological transmission Effects 0.000 claims abstract description 16
- 238000012795 verification Methods 0.000 claims abstract description 7
- 238000004364 calculation method Methods 0.000 claims description 72
- 238000004891 communication Methods 0.000 claims description 10
- 238000012545 processing Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 3
- 238000010248 power generation Methods 0.000 abstract 10
- 238000010586 diagram Methods 0.000 description 5
- 238000007726 management method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000002860 competitive effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides an electricity charge automatic settlement system for a power plant. The system comprises an electric quantity acquisition unit, a power generation management unit, a remote transmission device, a control terminal and an electric quantity settlement unit. The electric quantity acquisition unit acquires metered electric quantity of a plurality of electric energy meters, transmits the acquired metered electric quantity to the power generation management unit; the power generation management unit performs statistics and analysis on each metered electric quantity and obtains total power generation of the power plant, and transmits the total power generation to the remote transmission device; the remote transmission device transmits the total power generation to the control terminal and the electric quantity settlement unit; the control terminal receives and verifies the total power generation; the electric quantity settlement unit obtains electricity charge data of each power plant according to the total power generation after receiving a settlement instruction. The system provided by the invention can automatically acquire metered electric quantity of the electric energy meter of the power plant, perform statistics and analysis on power generation of the power plant, transmits the power generation to a power supply company for verification, and completes electricity charge settlement.
Description
Technical field
The present invention relates to charge calculation field, generating plant, relate to a kind of electricity charge Automated Clearing House system for generating plant particularly.
Background technology
Enter 21 century, power industry to have carried out generating electricity with transmission of electricity be separated reform.In commercialization, power grid enterprises, in the face of complicated internal and external environment, start to move towards modern enterprise management mode from traditional planning management pattern.Wish on the one hand to adopt advanced technology and equipment to improve the safe reliability of electrical network, another aspect is also expected to carry out the competitive power of production control cost enterprise with more reasonably business process.Existing management system is still in Legacy Status, and many links all need manually to carry out, and cause management system unsound, and waste a large amount of human and material resources and time cost.
The step of present electricity charge transaction is as follows: monthly electricity consumption competent authorities need the clearing carrying out the electricity charge with electric company, pays the electricity charge according to the generated energy of electric company.When settling accounts, need the generated energy first determining electric company, then the electricity price agreement of combination and electric company carries out power trade.
Current power trade adopts new forms of energy power plant manual metering, by arranging with electric company, and manually monthly reports this billing cycle generated energy, after company to be powered confirms, pays the electricity charge and completes current transaction.
But manual metering is due to time error of checking meter, make to report and submit data and electric energy meter freezing data inconsistent, report and submit data to need electric company to check in addition, add working strength, reduce data accuracy.
Summary of the invention
The present invention in order to the manual metering data solving the above-mentioned existing power trade mentioned and exist inaccurate, and the shortcoming of waste plenty of time and manpower and materials, a kind of electricity charge Automated Clearing House system for generating plant is provided, it can gather the table quantity calculation of generating plant electric energy meter automatically, and generated energy from a power plant is added up, and generated energy is reported and submitted to electric company's confirmation, complete electricity clearing.
Particularly, the invention provides a kind of electricity charge Automated Clearing House system for generating plant, it comprises electric quantity acquisition unit, generated energy administrative unit, remote transmission device, control terminal and electricity clearing unit, the acquisition module that the collection of described electric quantity acquisition unit comprises control module and is connected with described control module communication respectively, data checking module and data communication module, the input end of described acquisition module connects the output terminal of multiple electric energy meter for obtaining the table quantity calculation of described electric energy meter, the input end of the output terminal connection data inspection module of described acquisition module, for exporting the table quantity calculation of multiple electric energy meter to data checking module, table quantity calculation range threshold is provided with in described data checking module, when the table quantity calculation of described electric energy meter exceeds table quantity calculation range threshold, data checking module sends the alerting signal of Resurvey data to acquisition module, until the table quantity calculation of described electric energy meter meets table quantity calculation range threshold, the summary table quantity calculation of described electric energy meter is sent to generated energy administrative unit by data communication module by acquisition module, described generated energy administrative unit comprises memory module and data processing module, and described data processing module obtains the gross generation being used for generating plant described in each, and this gross generation is sent to remote transmission device, and memory module stores gross generation, gross generation is sent to control terminal and electricity clearing unit by described remote transmission device, described control terminal receives and confirms gross generation, and sending tally order to electricity clearing unit, described electricity clearing unit to process gross generation according to described tally order and obtains the electricity charge data of generating plant.
Preferably, the storage chip for storing described table quantity calculation is provided with in described acquisition module.
Preferably, the GPRS positioning unit for positioning described electric energy meter is provided with in described acquisition module.
Preferably, described acquisition module is provided with multiple collection port, and described acquisition module is provided with multiple collection port, and described each collection port can gather the table quantity calculation of each described electric energy meter be connected.
Preferably, described control module is provided with clock chip and schedule time threshold value, and described clock chip is according to schedule time threshold startup control module, and control module activates the table quantity calculation that rear drive acquisition module gathers multiple electric energy meter.
Preferably, described control terminal is provided with touch screen and identity authenticating unit, and described identity authenticating unit is used for verifying the identity of control terminal keeper, and as being proved to be successful, control terminal keeper operated by touch screen.
Preferably, the verification mode of described identity authenticating unit comprises user cipher checking, fingerprint authentication, video verification and audio authentication.
Preferably, control terminal keeper can be confirmed the gross generation of the generating plant at its place by touch screen.
Preferably, described generated energy administrative unit also comprises generated energy statistic unit, described generated energy statistic unit can be added up the table quantity calculation of multiple electric energy meter, and exports in the mode of form, and this form is sent to described control terminal with the gross generation calculated simultaneously.
Advantage of the present invention is as described below: acquisition module of the present invention can gather the table quantity calculation of multiple electric energy meter automatically, and data checking module can detect the table quantity calculation of electric energy meter, Resurvey is carried out to obvious incorrect data, guarantee that the table quantity calculation of electric energy meter gathered is correct, to ensure the accuracy of the data gathered, and total quantity calculation can be sent to the control terminal of inside, generating plant, after generating plant confirms, calculate the electricity charge of gross generation according to electricity price, and carry out charge calculation transaction.
Accompanying drawing explanation
Fig. 1 is structural schematic block diagram of the present invention;
Fig. 2 is the structural schematic block diagram of electric quantity acquisition unit of the present invention;
Fig. 3 is the structural schematic block diagram of generated energy administrative unit of the present invention;
Fig. 4 is the structural schematic block diagram of control terminal of the present invention; And
Fig. 5 is workflow schematic diagram of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, structure and working principle of the present invention is further explained:
Particularly, the invention provides a kind of electricity charge Automated Clearing House system for generating plant, as shown in Figure 1, it comprises electric quantity acquisition unit 1, generated energy administrative unit 2, remote transmission device 3, control terminal 4 and electricity clearing unit 5.Wherein, electric quantity acquisition unit 1, generated energy administrative unit 2, remote transmission device 3, control terminal 4 are all arranged on the inside of generating plant, electricity clearing unit 5 is arranged in electrical network competent authorities, for calculating the electricity charge of each generating plant, so that carry out charge calculation with each generating plant.
Electric quantity acquisition unit 1 gathers the table quantity calculation of multiple electric energy meter 10, and the table quantity calculation collected is sent to generated energy administrative unit 2.
As shown in Figure 2, electric quantity acquisition unit 1 acquisition module 12, data checking module 13 and the data communication module 14 that comprise control module 11 and be connected with control module 11 communication respectively.The input end of acquisition module 12 connects the output terminal of multiple electric energy meter 10, the input end of the output terminal connection data inspection module 13 of acquisition module 12, for exporting the table quantity calculation of multiple electric energy meter 10 to data checking module 13.Acquisition module 12 is provided with multiple collection port simultaneously, each collection port connects an electric energy meter, multiple collection port can gather the table quantity calculation of multiple electric energy meter simultaneously, to guarantee that the same time can gather the table quantity calculation of multiple different electric energy meter, and is unlikely to the situation occurring delay.
Acquisition module 12 inside is also provided with GPRS positioning unit, for positioning the position of multiple electric energy meter, prevents image data from occurring mistake.
Data checking module 13 inside is provided with table quantity calculation range threshold, table quantity calculation range threshold comprises minimum and mxm., minimum and mxm. are calculated by the mean value of the table quantity calculation of electric energy meter in recent years and minimum table quantity calculation monthly and the highest table quantity calculation, namely show the minimum of quantity calculation range threshold and mxm. be not in any electric energy meter normally work under table quantity calculation scope within, in other words, if the table quantity calculation of the electric energy meter collected is lower than the minimum of table quantity calculation range threshold or the table quantity calculation of electric energy meter that the collects mxm. higher than table quantity calculation range threshold, then illustrate that the data of collection exist mistake, need Resurvey.
When the minimum of table quantity calculation lower than table quantity calculation range threshold of certain electric energy meter 10 or the mxm. higher than table quantity calculation range threshold, data checking module 13 sends the alerting signal of Resurvey data to acquisition module 12, the table quantity calculation of this electric energy meter 10 of acquisition module 12 Resurvey, until the table quantity calculation of all electric energy meters 10 all gathers correctly, the summary table quantity calculation of multiple electric energy meter 10 is sent to generated energy administrative unit 2 by data communication module 14 by acquisition module 12, the checkout procedure of data checking module 13 quickly, therefore image data does not almost have hysteresis quality, the table quantity calculation of multiple electric energy meter 10 is still be transferred into generated energy administrative unit 2 in power trade node within the time needed, and too many impact can not be caused on the power trade of generating plant.
Acquisition module 12 inside is provided with the storage chip for storing generating plant table quantity calculation, and the table quantity calculation of storage chip to generating plant carries out storage and preserve, and storage chip is high-capacity FLASH storage chip, and it can store multiple data and regularly upgrade.
Control module 11 is connected with clock chip, control module 11 inside is provided with schedule time threshold value, clock chip is according to schedule time threshold startup control module 11, control module 11 activates the table quantity calculation that rear drive acquisition module gathers multiple electric energy meter, such as, time threshold can be the electric energy meter quantity calculation acquisition time of every day.
As shown in Figure 3, generated energy administrative unit 2 comprises memory module 21 and data processing module 22, described summary table quantity calculation is carried out the summation that read group total obtains the table quantity calculation of multiple electric energy meter by data processing module 22, and the loss of electricity deducting generating plant obtains the gross generation of generating plant, and this gross generation is sent to remote transmission device 3, memory module 21 pairs of gross generations store, to inquire about.
Generated energy administrative unit 2 also comprises generated energy statistic unit 23, generated energy statistic unit 23 can be added up the loss of electricity of the table quantity calculation of multiple electric energy meter 10 and generating plant, and export in the mode of form, this form is sent to control terminal 4 with the gross generation calculated simultaneously, facilitates the operating personnel of control terminal 4 to check generated energy more intuitively.
Gross generation is sent to control terminal 4 and electricity clearing unit 5 by remote transmission device 3, control terminal 4 receives and confirms gross generation, as correct in confirmed, then send tally order to electricity clearing unit 5, after electricity clearing unit 5 receives tally order, gross generation is calculated to the electricity charge data of generating plant, thus complete the power trade between electrical network competent authorities and generating plant.
As shown in Figure 4, control terminal 4 is provided with touch screen 41 and identity authenticating unit 42, and identity authenticating unit 42 is for verifying the identity of control terminal keeper, and after being proved to be successful, control terminal keeper is operated by touch screen 41.The verification mode of identity authenticating unit 42 comprises user cipher checking, fingerprint authentication, video verification and audio authentication.Control terminal keeper can be confirmed the gross generation of the generating plant at its place by touch screen 41.Only have titular control terminal keeper just by checking, the gross generation of generating plant is confirmed.
Below principle of work of the present invention is further explained:
As shown in Figure 5, comprise the following steps when utilizing the electricity charge Automated Clearing House system of generating plant of the present invention to carry out electricity charge Automatic-settlement:
The input end of S1, acquisition module 12 connects the output terminal of multiple electric energy meter 10, gathers the table quantity calculation of multiple electric energy meter 10;
S2, the data checking module 13 table quantity calculation to multiple electric energy meter 10 detects, when the minimum of table quantity calculation lower than table quantity calculation range threshold of certain electric energy meter 10 or the mxm. higher than table quantity calculation range threshold, data checking module 13 sends the alerting signal of Resurvey data to acquisition module 12, the table quantity calculation of this electric energy meter 10 of acquisition module 12 Resurvey, until the table quantity calculation of all electric energy meters 10 all gathers correctly, the summary table quantity calculation of multiple electric energy meter 10 is sent to generated energy administrative unit 2 by data communication module 14 by acquisition module 12;
Described summary table quantity calculation is carried out the summation that read group total obtains the table quantity calculation of multiple electric energy meter by S3, data processing module 22, and the loss of electricity deducting generating plant obtains the gross generation of generating plant, and this gross generation is sent to remote transmission device 3;
Gross generation is sent to control terminal 4 and electricity clearing unit 5 by S4, remote transmission device 3, control terminal 4 receives and confirms gross generation, as correct in confirmed, then send tally order to electricity clearing unit 5, as confirmed mistake, then repeat step S1-S3, again obtain the gross generation of generating plant until confirm correct; And
After S5, electricity clearing unit 5 receive tally order, statistics and analysis is carried out to obtain the electricity charge data of generating plant to gross generation.
Last it is noted that above-described each embodiment is only for illustration of technical scheme of the present invention, be not intended to limit; Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in previous embodiment, or to wherein partly or entirely technical characteristic carry out equivalent replacement; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of various embodiments of the present invention technical scheme.
Claims (9)
1., for an electricity charge Automated Clearing House system for generating plant, it comprises electric quantity acquisition unit, generated energy administrative unit, remote transmission device, control terminal and electricity clearing unit, it is characterized in that:
The acquisition module that the collection of described electric quantity acquisition unit comprises control module and is connected with described control module communication respectively, data checking module and data communication module, the input end of described acquisition module connects the output terminal of multiple electric energy meter for obtaining the table quantity calculation of described electric energy meter, the input end of the output terminal connection data inspection module of described acquisition module, for exporting the table quantity calculation of multiple electric energy meter to data checking module, table quantity calculation range threshold is provided with in described data checking module, when the table quantity calculation of described electric energy meter exceeds described table quantity calculation range threshold, described data checking module sends the alerting signal of Resurvey data to described acquisition module, until the table quantity calculation of described electric energy meter meets described table quantity calculation range threshold, the summary table quantity calculation of described electric energy meter is sent to generated energy administrative unit by data communication module by acquisition module,
Described generated energy administrative unit comprises memory module and data processing module, and described data processing module obtains the gross generation being used for generating plant described in each, and described gross generation is sent to remote transmission device, and memory module stores gross generation;
Gross generation is sent to control terminal and electricity clearing unit by described remote transmission device, and described control terminal receives and confirms gross generation, and sends tally order to electricity clearing unit,
Described electricity clearing unit to process gross generation according to described tally order and obtains the electricity charge data of generating plant.
2. the electricity charge Automated Clearing House system for generating plant according to claim 1, is characterized in that: be provided with the storage chip for storing described table quantity calculation in described acquisition module.
3. the electricity charge Automated Clearing House system for generating plant according to claim 2, is characterized in that: arrange the GPRS positioning unit being used for positioning described electric energy meter in described acquisition module.
4. the electricity charge Automated Clearing House system for generating plant according to claim 3, it is characterized in that: described acquisition module is provided with multiple collection port, described each collection port can gather the table quantity calculation of each described electric energy meter be connected.
5. the electricity charge Automated Clearing House system for generating plant according to claim 1, it is characterized in that: described control module is provided with clock chip and schedule time threshold value, described clock chip is according to schedule time threshold startup control module, and control module activates the table quantity calculation that rear drive acquisition module gathers multiple electric energy meter.
6. the electricity charge Automated Clearing House system for generating plant according to claim 1, it is characterized in that: described control terminal is provided with touch screen and identity authenticating unit, described identity authenticating unit is used for verifying the identity of control terminal keeper, and as being proved to be successful, control terminal keeper operated by touch screen.
7. the electricity charge Automated Clearing House system for generating plant according to claim 6, is characterized in that: the verification mode of described identity authenticating unit comprises user cipher checking, fingerprint authentication, video verification or audio authentication.
8. the electricity charge Automated Clearing House system for generating plant according to claim 6, is characterized in that: control terminal keeper can be confirmed the gross generation of the generating plant at its place by touch screen.
9. the electricity charge Automated Clearing House system for generating plant according to claim 1, it is characterized in that: described generated energy administrative unit also comprises generated energy statistic unit, described generated energy statistic unit can be added up the table quantity calculation of multiple electric energy meter, and export in the mode of form, this form is sent to described control terminal with the gross generation calculated simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510751688.1A CN105427027A (en) | 2015-11-06 | 2015-11-06 | Electricity charge automatic settlement system for power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510751688.1A CN105427027A (en) | 2015-11-06 | 2015-11-06 | Electricity charge automatic settlement system for power plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105427027A true CN105427027A (en) | 2016-03-23 |
Family
ID=55505220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510751688.1A Pending CN105427027A (en) | 2015-11-06 | 2015-11-06 | Electricity charge automatic settlement system for power plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105427027A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107563740A (en) * | 2017-10-17 | 2018-01-09 | 北京博望华科科技有限公司 | Electricity transaction power purchase management platform system and meter collecting method |
CN111768611A (en) * | 2018-06-12 | 2020-10-13 | 广东电网有限责任公司 | Ammeter data checking method and device |
CN112348582A (en) * | 2020-11-03 | 2021-02-09 | 国网山东省电力公司日照供电公司 | Distributed photovoltaic electricity price auditing method and system |
CN112578330A (en) * | 2020-11-24 | 2021-03-30 | 西安西热电站信息技术有限公司 | Full-automatic electric quantity acquisition method, system, equipment and readable storage medium |
CN115564404A (en) * | 2022-12-06 | 2023-01-03 | 江苏华鹏智能仪表科技股份有限公司 | Processing method for electric energy meter settlement bill and electric energy meter |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1256465A (en) * | 1999-12-06 | 2000-06-14 | 欧阳永熙 | Control of power output from one generator set to power network and corresponding settlement method in power market |
CN104569578A (en) * | 2015-01-04 | 2015-04-29 | 阳江核电有限公司 | Nuclear power plant electric energy monitoring system |
CN104809592A (en) * | 2015-05-12 | 2015-07-29 | 中国电力科学研究院 | Multi-level settlement coordination control method applicable to centralized deployment |
-
2015
- 2015-11-06 CN CN201510751688.1A patent/CN105427027A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1256465A (en) * | 1999-12-06 | 2000-06-14 | 欧阳永熙 | Control of power output from one generator set to power network and corresponding settlement method in power market |
CN104569578A (en) * | 2015-01-04 | 2015-04-29 | 阳江核电有限公司 | Nuclear power plant electric energy monitoring system |
CN104809592A (en) * | 2015-05-12 | 2015-07-29 | 中国电力科学研究院 | Multi-level settlement coordination control method applicable to centralized deployment |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107563740A (en) * | 2017-10-17 | 2018-01-09 | 北京博望华科科技有限公司 | Electricity transaction power purchase management platform system and meter collecting method |
CN107563740B (en) * | 2017-10-17 | 2023-06-20 | 北京博望华科科技有限公司 | Electric power transaction electricity purchasing management platform system and meter data acquisition method |
CN111768611A (en) * | 2018-06-12 | 2020-10-13 | 广东电网有限责任公司 | Ammeter data checking method and device |
CN111768611B (en) * | 2018-06-12 | 2021-05-11 | 广东电网有限责任公司 | Ammeter data checking method and device |
CN112348582A (en) * | 2020-11-03 | 2021-02-09 | 国网山东省电力公司日照供电公司 | Distributed photovoltaic electricity price auditing method and system |
CN112578330A (en) * | 2020-11-24 | 2021-03-30 | 西安西热电站信息技术有限公司 | Full-automatic electric quantity acquisition method, system, equipment and readable storage medium |
CN115564404A (en) * | 2022-12-06 | 2023-01-03 | 江苏华鹏智能仪表科技股份有限公司 | Processing method for electric energy meter settlement bill and electric energy meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105427027A (en) | Electricity charge automatic settlement system for power plant | |
CN103038971B (en) | Method for controlling PV installations in an electrical grid | |
CN103198420A (en) | Real-time interactive long-distance fee-control management system and method | |
EP2650651A1 (en) | Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities | |
CN104464100A (en) | Realtime control system for realtime payment management of power clients | |
CN110027437B (en) | Electric automobile fills electric pile online calibration system | |
CN110728836A (en) | Concentrator meter reading abnormity analysis method and system | |
CN102857737A (en) | Remote electric energy information collection system and method based on image recognition | |
CN102419903B (en) | Semiautomatic meter reading device and meter reading method thereof | |
CN112346000B (en) | Intelligent electric energy meter operation error data statistical processing system and method | |
CN103312563A (en) | Automatic information collection method and system based on power line carrier communication | |
CN107657544A (en) | A kind of automatic paying method of the improved electricity charge and system | |
CN203192083U (en) | Real-time interactive remote fee control management system | |
CN104569578A (en) | Nuclear power plant electric energy monitoring system | |
CN202759542U (en) | Remote electric energy information collection system based on image identification | |
CN109685993B (en) | Accounting management method for power consumption of charging pile | |
CN105867274A (en) | Missorting prevention intelligent residential district fitted sheet electrical connection control system and method based on remote cost control | |
KR101190706B1 (en) | Remote inspection of a meter reading based on photographing means and device for Remote inspection using a remote inspection of a meter reading based on photographing means and method thereof | |
CN205827195U (en) | Electric control system is connect based on remote bill control, the anti-intelligent residential district dress table visited one house after another | |
CN104699553A (en) | Clock self-recovery method after failure in acquiring terminal clock battery with electrical information | |
CN116228495A (en) | Method and acquisition device for determining dynamic carbon emission factors of multifunctional complementary enterprises | |
CN104008194B (en) | A kind of electric energy meter rotation data handling system based on PDA | |
CN102737296A (en) | Workflow managing and controlling system | |
CN208158632U (en) | Electric energy metering system data intelligence processing system | |
CN203465753U (en) | Management system of warehouse-returned electricity meter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160323 |