CN105422144B - Waterproof material conveying mechanism for chassis - Google Patents

Waterproof material conveying mechanism for chassis Download PDF

Info

Publication number
CN105422144B
CN105422144B CN201510985928.4A CN201510985928A CN105422144B CN 105422144 B CN105422144 B CN 105422144B CN 201510985928 A CN201510985928 A CN 201510985928A CN 105422144 B CN105422144 B CN 105422144B
Authority
CN
China
Prior art keywords
waterproof material
reel
clamping plate
chassis
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510985928.4A
Other languages
Chinese (zh)
Other versions
CN105422144A (en
Inventor
杨明
曾朝明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deyang Siyuan Heavy Industry Co Ltd
Original Assignee
Deyang Siyuan Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deyang Siyuan Heavy Industry Co Ltd filed Critical Deyang Siyuan Heavy Industry Co Ltd
Priority to CN201510985928.4A priority Critical patent/CN105422144B/en
Publication of CN105422144A publication Critical patent/CN105422144A/en
Application granted granted Critical
Publication of CN105422144B publication Critical patent/CN105422144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Abstract

The invention discloses a kind of waterproof material conveying mechanism for chassis, including bracket and reel, the bracket is arranged on pallet bottom and is used to support waterproof material, and the spool turns are arranged on the waterproof material being used on the walking dolly of chassis on winding cradle.Present invention mainly solves following technical problem:First, rapidly waterproof material can be wound up on walking dolly, reduce the use of manpower and materials;Second, waterproof material Automatic-expanding can be made, automatically form sag, so as to reach the purpose that one-time laying completes a roll of waterproof material, efficiency of construction is improved.

Description

Waterproof material conveying mechanism for chassis
Technical field
The present invention relates to tunnel special mechanical equipment field, relates in particular to a kind of waterproof material for chassis and conveys Mechanism.
Background technology
Quickly development is kept now with communications such as Chinese Railway, highways, particularly in tunnels such as high-speed railway, highways The significant achievement obtained in terms of road construction, promotes the rapid raising of constructing tunnel design and processes technology, causes the mountain ridge The scale of building of Tunnel Engineering structure is unprecedented, the trend of oriented the growing up development in tunnel, and the people of changing over are past Toward because circuit runs into mountain and just gets around circuit show line, shorten length of tunnel as far as possible or do not repair the idea in tunnel, run into now Bent cut-off mode is then taken on the mountain ridge, and so as to cause growing up for tunnel, this illustrates the development of tunnel construction technology to a certain extent It is advanced with constructing tunnel equipment.
Therefore, it is also increasingly stricter with the standard of the communications construction such as railway, highway, in communications such as railway, highways In the work progress in tunnel, water-proofing treatment is most important.At present, composite lining waterproof technique is in existing tunnel waterproofing engineering It is widely applied, its main construction course is successively to lay geotextiles and splash guard etc. at twice on the section in tunnel to prevent Water material, to reach the purpose for preventing the seepage into tunnel of the water in rock stratum.In the prior art, it is anti-to lay usually using chassis Water material, the prior art if China Patent No. is " 201410035985.1 " disclosed a kind of tunnel on April 30th, 2014 Splash guard lays chassis and its laying method, and its technical scheme is that the chassis includes trolley running device, splash guard installation dress Put, lay stand, laying dolly, laying track, described trolley running device includes motor, traveling box, interior telescopic, walking Guide rail, motor bolt are fixed on traveling box upper surface, are connected with the transmission system in traveling box, drive the power train in traveling box System, makes it be walked along walking guide rail;One end of interior telescopic is connected to traveling box upper surface, outer surface and bolt by bearing pin The external extension set being fixed on laying stand coordinates.But in actual application, the patent remains following defect: First, first it is transported to up and down on walking dolly using manual type into the waterproof material of drum, then passes through substantial amounts of manpower and materials And loading machine coordinating operation, waterproof material could be spread out laying and be attached to preliminary bracing surface, this series of form of construction work All it is difficult to meet the requirement of construction and accelerate the progress of construction, simultaneously because construction technology is cumbersome, construction environment is poor, warm in tunnel Degree is higher, dust is larger, and mechanization degree is low, has aggravated the physical demands of operating personnel, has increased labor intensity of operating staff, And construction coordination difficulty is also add, the laying efficiency and construction speed of waterproof material are constrained, is applied under such circumstances Work easily occur waterproof material laying is of poor quality, welding quality can not ensure, leak probability increase, efficiency of construction it is low and anti- Inadequate weld length, breakage in process of deployment be present, hang the hidden danger of quality such as lack of standardization in water material.2nd, the type chassis mesh The preceding laying for being only applicable to 3~4m breadth waterproof materials mostly, it is that mechanical assistance is manually deployed, manually jacking is in place, artificial Dilatory to form sag, human factor influences big on construction quality, it is difficult to which guarantee forms sag requirement, does not solve waterproof well Plate sag formation process and splash guard jacking technique, also without automatic control mode, while limit 6~7m breadth waterproof materials Promote the use of.3rd, the type chassis can only be used to lay waterproof material, can not be used to lay reinforcing bar, in laying reinforcing bar When need other professional equipment, its scope of application is poor.4th, the operation after chassis rise is without locking device, once anticipate Outside, severe safety accident will be caused.
The content of the invention
It is an object of the invention to solve the above-mentioned problems in the prior art, there is provided a kind of waterproof material for chassis Material conveyer structure, present invention mainly solves following technical problem:First, waterproof material rapidly can be wound up into walking dolly On, reduce the use of manpower and materials;Second, waterproof material Automatic-expanding can be made, automatically form sag, it is disposable so as to reach The purpose of a roll of waterproof material is completed in laying, improves efficiency of construction.
To achieve the above object, the technical solution adopted by the present invention is as follows:
A kind of waterproof material conveying mechanism for chassis, it is characterised in that:Including bracket and reel, the bracket is set It is used to support waterproof material in pallet bottom, the spool turns, which are arranged on the walking dolly of chassis, to be used on winding cradle Waterproof material.
The conveying mechanism also includes motor, and the motor is fixed on walking dolly, and the reel is rotated by motor It is arranged on walking dolly.
At least two groups holders for being used for fixed clamp waterproof material are provided with the reel, the holder includes folder Block, clamping plate and fixing bolt are held, the grip block is fixed on reel, and the end of the clamping plate is movably connected on grip block, The fixing bolt is fixedly connected on grip block after passing through clamping plate, and during work, fixing bolt and clip board engagement are by waterproof material Fixed clamp is between reel and clamping plate.
Mounting groove is offered on the reel, the grip block is fixed in mounting groove, is offered on the grip block solid Determine screw, through hole is offered in the middle part of the clamping plate, the fixing bolt is fixed on grip block after passing through the through hole on clamping plate In fixing threaded hole.
The clamping plate include be the clamping face of plane and be arcwall face non-clamping face, and the radius and volume in the non-clamping face The radius of cylinder is identical.
The bracket includes fixing bracket body, slip support body and multiple supporting tables, the fixing bracket body and is fixed on pallet bottom, The slip support body is slidably connected on fixing bracket body, and described multiple supporting tables, which are uniformly fixed on, to be slided on support body, the branch Arc groove is provided with support platform.
Using the advantage of the invention is that:
First,, can be rapidly by waterproof material by bracket and the reel being rotatably arranged on walking dolly in the present invention It is wound up on walking dolly, not only reduces use and the hand labor intensity of manpower and materials, also advantageously improve efficiency of construction. By the cooperation of reel and walking dolly, waterproof material Automatic-expanding can be made, automatically form sag, so as to reach one-time laying The purpose of a roll of waterproof material is completed, efficiency of construction greatly improved.Compared with prior art, the present invention is using said structure After conveying mechanism, maximum can realize disposable winding, expansion and the laying of 6~7m breadth waterproof materials, lay more efficient.
2nd, in the present invention, the structure of reel and motor connection, the auto reeling of waterproof material is realized, is not only contributed to Improve efficiency of construction and reduce hand labor intensity, also advantageously improve the stability of reel winding.
3rd, in the present invention, waterproof material is fixed by least two groups of holders, ensure that the stabilization that waterproof material is fixed Property.And the structure that holder is mainly made up of grip block, clamping plate and fixing bolt, then it is simple in construction, fixed make it that reel has Clamp the advantages of speed is fast and fixed clamp effect is good.
4th, in the present invention, the clamping face of clamping plate is arranged to plane, is advantageous to improve the steadiness of clamping, and clamping plate is non- Clamping face is arranged in overall structure still belong to reel radius identical arcwall face, the then reel for be provided with holder In cylindrical structure, fast winding is so not only contributed to, also waterproof material will not be caused to damage.
5th, in the present invention, by sliding the cooperation of support body and fixing bracket body, quickly waterproof material can not only be placed into In the supporting table for sliding support body, additionally it is possible to the waterproof material placed is positioned, is advantageous to the quick of next rolling step Carry out.And by being arranged on the multiple supporting tables slided on support body, then waterproof material sideslip can be prevented when reel is wound.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention;
Fig. 2 is a kind of dimensional structure diagram of the present invention;
Fig. 3 is another structural representation of the present invention;
Fig. 4 is the mplifying structure schematic diagram at I in Fig. 3;
Fig. 5 is the structural representation of reel in the present invention;
Fig. 6 is Fig. 5 A-A diagrammatic cross-sections;
Fig. 7 is the main structure diagram of push rod in the present invention;
Fig. 8 is the backsight structural representation of push rod in the present invention;
In figure mark for:1st, door frame, 2, walking dolly, 3, arc track, 4, reel, 5, grip block, 6, clamping plate, 7, fixed Bolt, 8, clamping face, 9, non-clamping face, 10, fixing bracket body, 11, slide support body, 12, supporting table, 13, push rod, 14, jacking oil Cylinder, 15, vacuum cup, 16, limited impression, 17, crossover sub, 18, base, 19, guide pillar, 20, hoist cylinder, 21, locking oil Cylinder, 22, locking pin, 23, waterproof material, 24, spring base.
Embodiment
Embodiment 1
A kind of waterproof material conveying mechanism for chassis, including bracket, reel 4 and motor, the bracket are arranged on platform Car bottom is used to support waterproof material 23, and two symmetrical walking dollies 2, the quantity of the motor are provided with the chassis For two, two motors are symmetrically fixed on two walking dollies 2, and the reel 4 is rotatably arranged on two by two motors The waterproof material 23 being used on walking dolly 2 on winding cradle.When winding waterproof material 23, two motor synchronous belt movable reels 4 Waterproof material 23 on auto reeling bracket.
In the present embodiment, at least two groups holders for being used for fixed clamp waterproof material 23, institute are provided with the reel 4 Stating holder includes grip block 5, clamping plate 6 and fixing bolt 7, and the grip block 5 is square block, and it is plane that the clamping plate 6, which includes, Clamping face 8 and for arcwall face non-clamping face 9;Mounting groove is offered on the outer surface of the reel 4, the grip block 5 is logical Cross the mode being welded and fixed to be embedded in mounting groove, the upper end of the clamping plate 6 is connected on grip block 5 by articulate, institute State after fixing bolt 7 passes through clamping plate 6 and be fixedly connected on grip block 5., it is necessary to first by waterproof material before waterproof material 23 is wound On reel 4, specific fixed clamp step is 23 end fixed clamp:The end of waterproof material 23 is first placed on clamping plate Between 6 and reel 4, then adjusting fixing bolt 7 makes clamping plate 6 be moved using its upper end and the junction of grip block 5 as basic point to reel 4 It is dynamic, until by the held tight of waterproof material 23 between reel 4 and the clamping face 8 of clamping plate 6.Wherein, due to the clamping face of clamping plate 6 8 be plane, and in order to ensure the steadiness of clamping, correspondingly, corresponding retaining part is also plane on reel 4.Further, since volume Mounting groove is offered on cylinder 4, in order that reel 4 can also keep complete tube structure after holder is mounted with, preferably will folder The non-clamping face 9 of plate 6 is arranged to the radius identical arcwall face of its radius and reel 4, and reel is just filled up with the non-clamping face 9 Slot area face on 4 is preferred.So, when clamping plate 6 is in clamped position, reel 4 keeps complete circle in overall structure Column structure, fast winding is not only contributed to, also waterproof material 23 will not be caused to damage.
Further, fixing threaded hole is offered on the grip block 5, the middle part of the clamping plate 6 offers through hole, described solid Determine to be fixed in the fixing threaded hole of grip block 5 after bolt 7 passes through the through hole on clamping plate 6, i.e., by adjusting fixing bolt 7 in fixation Position in screw is the clamping and release that waterproof material 23 can be achieved.Wherein, between the through hole of clamping plate 6 and fixing bolt 7 also It is provided with saucer washer.
Further, the quantity of the holder is five groups, and five groups of holders are uniformly arranged on reel 4.
In the present embodiment, the bracket includes fixing bracket body 10, slides support body 11 and multiple supporting tables 12, the fixed mount Body 10 includes two spill guide rails and Duo Gen connectors, and more connectors are fixedly connected on the bottom of chassis, two spills side by side Guide rail is symmetrically fixed on more connectors.The slip support body 11 includes two slide rails that are parallel and being integrally fixed, the cunning Rail is slidably arranged between two spill guide rails of fixing bracket body 10.Described multiple supporting tables 12 are uniformly fixed on slip support body On 11 two one slide rails, arc groove is provided with the supporting table 12.During work, waterproof material 23 is placed on arc groove It is interior.
In the present embodiment, the walking dolly 2 is rotated by electrical control motor drives walking dolly 2 with sprocket wheel chain Arcuately track 3 moves mode, and when arcuately track 3 moves walking dolly 2, two reversions of motor control reel 4 make waterproof Arcuately track 3 deploys material 23.
Embodiment 2
A kind of chassis using above-mentioned waterproof material conveying mechanism, in addition to door frame 1, lifting body, mobile retaining mechanism With two walking dollies 2, two symmetrical arc tracks 3 are provided with the door frame 1, two walking dollies 2 are symmetricly set on On arc track 3, the conveying mechanism is arranged on the bottom of door frame 1;The lifting body is multigroup, and multigroup lifting body is fixed It is used to jack the waterproof material 23 deployed through walking dolly 2 on door frame 1;The mobile retaining mechanism is arranged on the bottom of door frame 1 For the moving horizontally of door frame 1, oscilaltion is mobile and locking positioning during construction.
In the present embodiment, the lifting body includes push rod 13, jacking cylinder 14 and multiple vacuum cups 15, the jacking The quantity of oil cylinder 14 is two sets, and two sets of jacking cylinders 14 are symmetrically fixed on door frame 1, and the push rod 13 is square structure, and it two The piston rod respectively with two sets of jacking cylinders 14 is held to be fixedly connected, described multiple vacuum cups 15 are uniformly fixed on push rod 13 For adsorbing waterproof material 23.Further, vacuum adsorption machine, the vacuum adsorption machine and top are additionally provided with the door frame 1 Multiple vacuum cups 15 on bar 13 connect.During work, walking dolly 2 deploys waterproof material 23 by reel 4, often by one group During lifting body, vacuum adsorption machine controls the vacuum cup 15 on this group of lifting body that waterproof material 23 is adsorbed onto into push rod 13 On, prevent waterproof material 23 from sliding.
Further, in order to prevent from being jacked the waterproof material 23 to tunnel inner wall when vacuum cup 15 loses absorption affinity Slide, multiple spring bases 24 are also evenly arranged with the push rod 13, described spring base 24 is located at push rod with vacuum cup 15 On 13 the same face, and the height of spring base 24 is higher than the height of vacuum cup 15.So, when vacuum cup 15 loses absorption affinity When, spring base 24 takes over vacuum cup 15 and waterproof material 23 is jacked and supported on tunnel inner wall automatically.
Multiple limited impressions 16 for limit steel bar are also uniformly offered in the present embodiment, on the push rod 13, it is described Limited impression 16 be located at the another side corresponding with vacuum cup 15.The structure causes push rod 13 to be used to jack waterproof Material 23, and can are enough in jacking rod, and specific jacking process is:After waterproof material 23 have been laid, control push rod 13 is overturn, Reinforcing bar is placed in the limited impression 16 on multiple push rods 13 again, prevents slip of bar, then passes through jacking cylinder 14 Jacking rod.
Further, it is fixedly connected with crossover sub 17 on the piston rod of the jacking cylinder 14, the two of the push rod 13 End is connected by bearing with two crossover subs 17 respectively, and push rod 13 on crossover sub 17 with being provided with jack, push rod 13 Fixed with crossover sub 17 by latch and jack.In actual use, only it need to take latch that push rod 13 can be achieved by inserting Quick upset.And then the rapid translating of jacking waterproof material 23 and reinforcing bar.
In the present embodiment, the quantity of the lifting body is five groups, and five groups of lifting bodies are in incremental angle cloth by 45 degree Put on door frame 1, concrete arrangement is:First group of lifting body and the 5th group of lifting body distinguish lateral symmetry arrangement, and Both jackings are in opposite direction;3rd group of lifting body is longitudinally arranged, and it jacks direction and the jacking side of first group of lifting body To perpendicular;Second group of lifting body is arranged among first group of lifting body and the 3rd group of lifting body, its jack direction with The jacking direction of first group of lifting body and the jacking direction of the 3rd group of lifting body are in angle of 45 degrees;4th group of lifting body cloth Put among the 5th group of lifting body and the 3rd group of lifting body, its jack the jacking direction in direction and the 5th group of lifting body and The jacking direction of 3rd group of lifting body is in angle of 45 degrees.In jacking, five magnetic lifting body synchronizations of jacking up, this makes it possible to standard Waterproof material 23 and bar one-time jacking are stably really arrived into specified location.
In the present embodiment, the mobile retaining mechanism includes base 18, guide pillar 19, hoist cylinder 20 and locking cylinder 21, The quantity of the base 18 is two sets, and two sets of bases 18 are symmetricly set on the bottom of door frame 1, and the lower section of base 18 is connected with walking Wheel, by controlling road wheel to can control moving horizontally for whole chassis.The quantity of the guide pillar 19 is four, four guide pillars 19 It is symmetrically arranged on two sets of bases 18, one end of the guide pillar 19 is fixed on base 18, and the other end is movably set in door In the guide pin bushing of frame 1, and positioning hole is offered on guide pillar 19 and guide pin bushing.The quantity of the hoist cylinder 20 and locking cylinder 21 is equal For four sets, both are each attached to the bottom of door frame 1, wherein, the piston rod of four sets of hoist cylinders 20 is separately fixed at two sets of bases 18 On, for controlling the oscilaltion of whole chassis;And four lock set locking oil cylinders 21 are then fixed on the bottom of door frame 1, four cover lockings oil Locking pin 22 is fixedly connected with the piston rod of cylinder 21, four locking pins 22 are symmetricly set on the positioning hole of four guide pillars 19 Place, when needing to lock door frame 1, positioning hole and lead that four lock set locking oil cylinders, 21 Synchronization Control, four locking pins 22 are inserted on guide pin bushing Positioning hole on post 19., can be when door frame 1 be increased to specified construction location by the cooperation of locking cylinder 21 and locking pin 22 Automatic locking door frame 1, prevents security incident, working security greatly improved.
In the present invention, platform and cat ladder, the construction up and down of convenient construction personnel are additionally provided with the door frame 1.
In the present invention, including the construction method of the chassis of above-mentioned conveying mechanism, lifting body and mobile retaining mechanism includes The construction method of waterproof material 23 and the construction method of reinforcing bar, it is respectively:
The construction method of waterproof material 23:Preparation, the artificial slip support body 11 that pulls out put coiled waterproof material 23 Put in supporting table 12 and resetted support body 11 is slided, end fixed clamp of the manual operation by holder waterproof material 23 Onto reel 4, control reel 4 being rotated forward by motor and winds waterproof material 23, control walking dolly 2 moves after the completion of winding, and Simultaneously controlled motor reversion, now reel 4 with walking dolly 2 movement arcuately track 3 deploy waterproof material 23, work as expansion Waterproof material 23 after first group of lifting body, start vacuum adsorption machine make vacuum cup 15 by the waterproof material 23 of process Adsorb on the push rod 13 on first group of lifting body, by that analogy, until waterproof material 23 is fully deployed and adsorbed five On the push rod 13 of group lifting body, then unclamped by fixing bolt 7 and clamping plate 6 by the waterproof material 23 of fixed clamp, then lead to Base 18, the horizontal level and height of the adjustment door frame 1 of hoist cylinder 20 are crossed, after the completion of adjustment, will be locked by locking cylinder 21 Whole door frame 1 is locked in the positioning hole that pin 22 is inserted on guide pillar 19 and guide pin bushing, after the completion of locking, starts five groups of jacks At synchronization of jacking up waterproof material 23 to the tunnel contour of jacking cylinder 14 in structure, then vacuum adsorption machine is controlled to be stopped, this When vacuum cup 15 absorption affinity is lost to waterproof material 23, waterproof material 23 continues to be supported on tunnel in the presence of spring base 24 Road inwall, workmen uses the welding gun of portable supersonic bonding machine on the platform on door frame 1, to preparing waterproof material 23 The position welding overlapped with ultrasonic bonding pad, after the completion of welding, jacking cylinder 14 and locking cylinder 21 are reset to starting Position, wait are constructed next time.
The construction method of reinforcing bar:Preparation, control push rod 13 to overturn by latch, make to set limited location recessed on push rod 13 The one side of groove 16 turns into working face, is then placed into reinforcing bar in the push rod 13 in five groups of lifting bodies by the spacing of design code In limited impression 16, after the completion of reinforcing bar is placed, artificial assembling reinforcement, after the completion of colligation, then adjusted by base 18, hoist cylinder 20 The horizontal level and height of whole door frame 1, after the completion of adjustment, locking pin 22 is inserted on guide pillar 19 and guide pin bushing by locking cylinder 21 Positioning hole in whole door frame 1 is locked, after the completion of locking, start the synchronous top of jacking cylinder 14 in five groups of lifting bodies Rising and constructed at reinforcing bar to tunnel contour, after the completion of construction, jacking cylinder 14 and locking cylinder 21 are reset to original position, Wait is constructed next time.
Cooperation of the invention by door frame 1, conveying mechanism, lifting body, mobile retaining mechanism and two walking dollies 2, Realize the auto reeling of waterproof material 23, Automatic-expanding, automatic lifting, automatically adjust the functions such as paving location, automatic support, Have the advantages that laying is more efficient and intelligence degree is higher.

Claims (4)

  1. A kind of 1. waterproof material conveying mechanism for chassis, it is characterised in that:Including bracket and reel(4), the bracket sets Put and be used to support waterproof material in pallet bottom(23), the reel(4)It is rotatably arranged on the walking dolly of chassis(2)On be used for Waterproof material on winding cradle(23);
    The bracket includes fixing bracket body(10), slide support body(11)With multiple supporting tables(12), the fixing bracket body(10)Gu It is scheduled on pallet bottom, the slip support body(11)It is slidably connected at fixing bracket body(10)On, described multiple supporting tables(12) It is even to be fixed on slip support body(11)On, the supporting table(12)On be provided with arc groove;
    The conveying mechanism also includes motor, and the motor is fixed on walking dolly(2)On, the reel(4)Turned by motor It is dynamic to be arranged on walking dolly(2)On.
  2. 2. it is used for the waterproof material conveying mechanism of chassis as claimed in claim 1, it is characterised in that:The reel(4)On set It is equipped with least two groups and is used for fixed clamp waterproof material(23)Holder, the holder includes grip block(5), clamping plate(6) And fixing bolt(7), the grip block(5)It is fixed on reel(4)On, the clamping plate(6)End be movably connected in grip block (5)On, the fixing bolt(7)Through clamping plate(6)After be fixedly connected on grip block(5)On, during work, fixing bolt(7)With Clamping plate(6)Coordinate waterproof material(23)Fixed clamp is in reel(4)With clamping plate(6)Between.
  3. 3. it is used for the waterproof material conveying mechanism of chassis as claimed in claim 2, it is characterised in that:The reel(4)On open Provided with mounting groove, the grip block(5)It is fixed in mounting groove, the grip block(5)On offer fixing threaded hole, the clamping plate (6)Middle part offer through hole, the fixing bolt(7)Through clamping plate(6)On through hole after be fixed on grip block(5)Fixation In screw.
  4. 4. it is used for the waterproof material conveying mechanism of chassis as claimed in claim 2, it is characterised in that:The clamping plate(6)Including For the clamping face of plane(8)With the non-clamping face for arcwall face(9), and the non-clamping face(9)Radius and reel(4)Radius It is identical.
CN201510985928.4A 2015-12-25 2015-12-25 Waterproof material conveying mechanism for chassis Active CN105422144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510985928.4A CN105422144B (en) 2015-12-25 2015-12-25 Waterproof material conveying mechanism for chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510985928.4A CN105422144B (en) 2015-12-25 2015-12-25 Waterproof material conveying mechanism for chassis

Publications (2)

Publication Number Publication Date
CN105422144A CN105422144A (en) 2016-03-23
CN105422144B true CN105422144B (en) 2018-01-19

Family

ID=55500637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510985928.4A Active CN105422144B (en) 2015-12-25 2015-12-25 Waterproof material conveying mechanism for chassis

Country Status (1)

Country Link
CN (1) CN105422144B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843353B (en) * 2018-07-18 2023-08-15 湖南进军隧道智能装备有限公司 Excavation grudging post translation installation mechanism
CN108716413B (en) * 2018-08-30 2019-08-06 中铁一局集团有限公司 A kind of waterproof cloth is laid with and the construction method of lining cutting steel mesh binding
CN110171108B (en) * 2019-06-25 2021-06-25 佛山市力晟塑胶制品有限公司 Injection mold

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1312041A1 (en) * 1985-12-24 1987-05-23 Центральное проектно-конструкторское бюро кузнечно-прессового машиностроения Drum for winding long material
JPH08170498A (en) * 1994-12-19 1996-07-02 Fujimori Kogyo Kk Waterproof sheet stretching device
CN102226402B (en) * 2011-04-08 2014-02-12 中铁三局集团有限公司 Auxiliary device and method used for laying tunnel waterproofing plates
CN203809019U (en) * 2014-04-09 2014-09-03 邓卫东 Tunnel wide waterproof plate mounting platform
CN105084127A (en) * 2015-08-27 2015-11-25 重庆雨帝建材有限公司 Waterproof roll lining
CN205243539U (en) * 2015-12-25 2016-05-18 德阳思远重工有限公司 A waterproof material conveying mechanism for platform truck

Also Published As

Publication number Publication date
CN105422144A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105422143B (en) Constructing tunnel intelligence chassis
CN105422144B (en) Waterproof material conveying mechanism for chassis
CN201010842Y (en) Tyre type span-variable multifunctional rail laying machine
CN107355237B (en) Walking type sliding mode concrete spraying and excavating multifunctional tunnel trolley
CN107988860B (en) A kind of rubber-tyred subway changes paving machine and its becomes across method
CN105736016A (en) Tunnel secondary lining steel bar framework construction equipment and application thereof
CN105443148A (en) Jacking mechanism and trolley using same
CN205243538U (en) Tunnel construction intelligence platform truck
CN109611112B (en) Multi-head rock drilling machine for tunnel excavation and tunneling
CN112918992A (en) Two-way conveying system of concrete prefabricated part upset
CN112610242A (en) Integrative platform truck of cloth is hung to big section reinforcing bar of railway tunnel
CN205243535U (en) A remove locking mechanism for platform truck
CN205578009U (en) Two lined steel bones RACK in tunnel equipment of being under construction
CN205277453U (en) Climbing mechanism and use this climbing mechanism's platform truck
CN102359383A (en) Waterproof cloth laying trolley
CN205243539U (en) A waterproof material conveying mechanism for platform truck
CN112252099A (en) Operating vehicle for railway turnout replacement and operating method thereof
CN104099837A (en) Side-tipping single-sleeper pulling and replacing sleeper replacing method
CN204492846U (en) Movable type with inverted arch lining device crosses car trestle
CN108708397B (en) Frame laying method for standard sections of underground pipe gallery
CN217652749U (en) Installation trolley for tunnel arch frame
CN110700107A (en) Sliding type construction method for hoisting prefabricated anti-collision wall
CN216342142U (en) Pushing structure
CN107964841B (en) A kind of rubber-tyred subway changes paving machine and method for automatically leveling
CN115958344A (en) Railway switch welds rail car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant