CN205243538U - Tunnel construction intelligence platform truck - Google Patents
Tunnel construction intelligence platform truck Download PDFInfo
- Publication number
- CN205243538U CN205243538U CN201521092998.9U CN201521092998U CN205243538U CN 205243538 U CN205243538 U CN 205243538U CN 201521092998 U CN201521092998 U CN 201521092998U CN 205243538 U CN205243538 U CN 205243538U
- Authority
- CN
- China
- Prior art keywords
- fixed
- jacking
- waterproof material
- reel
- locking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型公开了一种隧道施工智能台车,包括门架、输送机构、顶升机构、移动锁紧机构和两台行走小车,门架上固定设置有两条对称的弧形轨道,两台行走小车对称设置在两条弧形轨道上;输送机构包括托架和卷筒,托架设置在门架底部用于支撑防水材料,卷筒转动设置在两台行走小车上用于卷绕托架上的防水材料;顶升机构为多组,多组顶升机构固定在门架上用于顶升防水材料;移动锁紧机构设置在门架下部用于门架的移动和锁紧。本实用新型一是能够快速地将防水材料卷绕到行走小车上;二是能使防水材料自动展开、自动顶升就位、自动形成垂度,达到一次性铺设完成一卷防水材料的目的;三是能够在施工时对台车进行锁定,提高了使用的安全性。
The utility model discloses an intelligent trolley for tunnel construction, which comprises a door frame, a conveying mechanism, a jacking mechanism, a moving locking mechanism and two walking trolleys. The trolleys are arranged symmetrically on two arc-shaped tracks; the conveying mechanism includes a bracket and a reel, the bracket is set at the bottom of the mast to support the waterproof material, and the reel is set on the two trolleys to wind the bracket The waterproof material on the top; the jacking mechanism is multi-group, and the multi-group jacking mechanism is fixed on the mast for jacking up the waterproof material; the mobile locking mechanism is set at the lower part of the mast for moving and locking the mast. The utility model can quickly wind the waterproof material onto the walking trolley; second, it can automatically unfold the waterproof material, automatically lift it into place, and automatically form a sag, so as to achieve the purpose of laying a roll of waterproof material at one time; The third is that the trolley can be locked during construction, which improves the safety of use.
Description
技术领域 technical field
本实用新型涉及隧道专用机械设备领域,具体地说涉及一种隧道施工智能台车。 The utility model relates to the field of special mechanical equipment for tunnels, in particular to an intelligent trolley for tunnel construction.
背景技术 Background technique
目前随着中国铁路、公路等交通业保持快速的发展,特别是在高速铁路、公路等隧道施工建设方面取得的重大成就,促进了隧道施工设计和工艺技术的迅速提高,导致山岭隧道工程结构的修建规模是前所未有的,隧道有向长大化发展的趋势,改变了过去人们往往因为线路遇到大山便使线路展线绕开,尽量缩短隧道长度或不修隧道的观念,现在遇到山岭则采取去曲取直方式从而导致隧道的长大,这在某种程度上说明隧道施工技术的发展和隧道施工设备的先进。 At present, with the rapid development of China's railway, highway and other transportation industries, especially the major achievements in the construction of tunnels such as high-speed railways and highways, the rapid improvement of tunnel construction design and technology has led to the engineering structure of mountain tunnels. The scale of construction is unprecedented. The tunnel has a tendency to grow larger. It has changed the concept that people in the past often bypassed the line because the line encountered a mountain, shortened the length of the tunnel as much as possible or did not build the tunnel. Adopting the method of removing the curvature and straightening leads to the growth of the tunnel, which to some extent shows the development of tunnel construction technology and the advancement of tunnel construction equipment.
为此,随着铁路、公路等交通业建设的标准也越来越严格,在铁路、公路等交通业隧道的施工过程中,防水处理至关重要。目前,复合衬砌防水技术在现有的隧道防水工程中得到了广泛应用,其主要施工过程是在隧道的断面上先后分两次铺设土工布和防水板等防水材料,以达到防止岩层中的水向隧道内渗漏的目的。现有技术中,通常使用台车来铺设防水材料,如中国专利号为“201410035985.1”的现有技术在2014年4月30日公开了一种隧道防水板铺设台车及其铺设方法,其技术方案为所述台车包括台车行走装置、防水板安装装置、铺设台架、铺设小车、铺设轨道,所述的台车行走装置包括电机、行走箱、内伸缩套、行走导轨,电机栓接固定在行走箱上表面,与行走箱内的传动系统连接,驱动行走箱内的传动系统,使其沿着行走导轨行走;内伸缩套的一端通过销轴连接在行走箱上表面,外表面与栓接固定在铺设台架上的外伸缩套配合。但在实际应用过程中,该专利仍然存在着如下缺陷:一、成卷筒状的防水材料先采用人工方式上下搬运到行走小车上,再通过大量的人力物力以及装载机配合作业,才能把防水材料摊开铺设贴到初期支护表面,这一系列的施工方式都很难满足施工的要求和加速施工的进度,同时由于施工工艺繁琐、隧道内施工环境差、温度较高、粉尘较大,机械化程度低,加重了操作人员的体力消耗,增大了操作人员劳动强度,而且还增加了施工协调难度,制约了防水材料的铺设效率和施工进度,在这样的环境下施工容易出现防水材料铺设质量差、焊接质量无法保证、漏水几率增大、施工效率低下以及防水材料在铺设过程中存在焊接长度不够、破损、挂设不规范等质量隐患。二、该类型台车目前大多只适用于3~4m幅宽防水材料的铺设,均为机械辅助人工展开、人工顶升就位、人工拖拉形成垂度,人为因素对施工质量影响大,难以保证形成垂度要求,没有很好地解决防水板垂度形成工艺和防水板顶升工艺,也无自动控制方式,同时限制了6~7m幅宽防水材料的推广使用。三、该类型台车仅仅只能用于铺设防水材料,并不能用于铺设钢筋,在铺设钢筋时需要另外的专业设备,其适用范围较差。四、台车升高后的作业无锁紧装置,一旦发生意外,将造成严重安全事故。 For this reason, as the construction standards of railways, highways and other transportation industries become more and more stringent, waterproof treatment is very important in the construction process of railways, highways and other transportation industry tunnels. At present, the composite lining waterproof technology has been widely used in existing tunnel waterproofing projects. The main construction process is to lay waterproof materials such as geotextiles and waterproof boards on the section of the tunnel twice to prevent water in the rock strata. The purpose of leaking into the tunnel. In the prior art, trolleys are usually used to lay waterproof materials. For example, the prior art with Chinese Patent No. "201410035985.1" disclosed a tunnel waterproof board laying trolley and its laying method on April 30, 2014. Its technology The scheme is that the trolley includes a trolley traveling device, a waterproof board installation device, a laying platform, a laying trolley, and a laying track. The described trolley traveling device includes a motor, a traveling box, an inner telescopic sleeve, a traveling guide rail, and the motor is bolted It is fixed on the upper surface of the walking box, connected with the transmission system in the walking box, and drives the transmission system in the walking box to make it walk along the walking guide rail; one end of the inner telescopic sleeve is connected to the upper surface of the walking box through a pin shaft, and the outer surface and Cooperate with the outer telescopic sleeve bolted and fixed on the laying platform. However, in the actual application process, this patent still has the following defects: 1. The waterproof material in the roll shape is first manually transported up and down on the walking trolley, and then a large amount of manpower and material resources and a loader are used to cooperate with the operation to remove the waterproof material. The materials are spread out and pasted to the initial support surface. This series of construction methods are difficult to meet the construction requirements and speed up the construction progress. At the same time, due to the cumbersome construction technology, poor construction environment in the tunnel, high temperature, and large dust, The low degree of mechanization increases the physical exertion of operators, increases the labor intensity of operators, and also increases the difficulty of construction coordination, which restricts the laying efficiency and construction progress of waterproof materials. In such an environment, the laying of waterproof materials is prone to occur. The quality is poor, the welding quality cannot be guaranteed, the probability of water leakage increases, the construction efficiency is low, and there are quality hidden dangers such as insufficient welding length, damage, and irregular hanging of waterproof materials during the laying process. 2. At present, most of this type of trolley is only suitable for the laying of waterproof materials with a width of 3 to 4 meters. They are all mechanically assisted by manual deployment, manual lifting in place, and manual dragging to form a sag. Human factors have a great impact on the construction quality, and it is difficult to guarantee Forming the sag requirement does not solve the waterproof board sag formation process and waterproof board jacking process well, and there is no automatic control method, and at the same time restricts the popularization and use of 6-7m wide waterproof materials. 3. This type of trolley can only be used for laying waterproof materials, and cannot be used for laying steel bars. Additional professional equipment is required when laying steel bars, and its scope of application is poor. 4. There is no locking device for the operation after the trolley is raised. Once an accident occurs, it will cause serious safety accidents.
实用新型内容 Utility model content
本实用新型的目的在于解决现有技术中存在的上述问题,提供一种隧道施工智能台车,本实用新型主要解决以下技术问题:一是能够快速地将防水材料卷绕到行走小车上,减少了人力物力的使用;二是能使防水材料自动展开、自动顶升就位、自动形成垂度,从而达到一次性铺设完成一卷防水材料的目的,提高了施工效率;三是能够在施工时对台车进行锁定,提高了使用的安全性。 The purpose of this utility model is to solve the above-mentioned problems existing in the prior art, and to provide an intelligent trolley for tunnel construction. It reduces the use of manpower and material resources; second, it can automatically unfold the waterproof material, automatically lift it into place, and automatically form a sag, so as to achieve the purpose of laying a roll of waterproof material at one time and improve the construction efficiency; third, it can be used during construction. The trolley is locked to improve the safety of use.
为实现上述目的,本实用新型采用的技术方案如下: In order to achieve the above object, the technical scheme adopted by the utility model is as follows:
一种隧道施工智能台车,其特征在于:包括门架、输送机构、顶升机构、移动锁紧机构和两台行走小车,所述门架上固定设置有两条对称的弧形轨道,所述的两台行走小车对称设置在两条弧形轨道上;所述输送机构包括托架和卷筒,所述托架设置在门架底部用于支撑防水材料,所述卷筒转动设置在两台行走小车上用于卷绕托架上的防水材料;所述顶升机构为多组,多组顶升机构固定在门架上用于顶升防水材料;所述移动锁紧机构设置在门架下部用于门架的移动和锁紧。 An intelligent trolley for tunnel construction, characterized in that it includes a door frame, a conveying mechanism, a jacking mechanism, a moving locking mechanism and two walking trolleys, and two symmetrical arc-shaped rails are fixedly arranged on the door frame, so that The two walking trolleys described above are symmetrically arranged on two arc-shaped tracks; the conveying mechanism includes a bracket and a reel, the bracket is arranged at the bottom of the door frame to support the waterproof material, and the reel is rotatably arranged on the two The platform walking trolley is used to wind the waterproof material on the bracket; the jacking mechanism is multi-group, and the multi-group jacking mechanism is fixed on the door frame for jacking the waterproof material; the mobile locking mechanism is set on the door The lower part of the frame is used for moving and locking the door frame.
所述输送机构还包括两台电机,两台电机分别固定在两台行走小车上,两台电机的动力输出轴分别与卷筒的两端连接。 The conveying mechanism also includes two motors, the two motors are respectively fixed on the two traveling trolleys, and the power output shafts of the two motors are respectively connected with the two ends of the reel.
所述卷筒上设置有至少两组用于固定夹持防水材料的夹持件,所述夹持件包括夹持块、夹板和固定螺栓,所述夹持块固定在卷筒上,所述夹板的端部活动连接在夹持块上,所述固定螺栓穿过夹板后固定连接在夹持块上,工作时,固定螺栓与夹板配合将防水材料固定夹持在卷筒与夹板之间。 The reel is provided with at least two sets of clamping parts for fixing and clamping the waterproof material. The clamping parts include clamping blocks, splints and fixing bolts, and the clamping blocks are fixed on the reel. The end of the splint is movably connected to the clamping block, and the fixing bolt is fixedly connected to the clamping block after passing through the splint. During work, the fixing bolt cooperates with the splint to clamp the waterproof material between the reel and the splint.
所述卷筒上开设有安装槽,所述夹持块固定在安装槽内,所述夹持块上开设有固定螺孔,所述夹板的中部开设有通孔,所述固定螺栓穿过夹板上的通孔后固定在夹持块的固定螺孔内。 An installation groove is opened on the reel, the clamping block is fixed in the installation groove, a fixing screw hole is opened on the clamping block, a through hole is opened in the middle of the splint, and the fixing bolt passes through the splint The through hole on the back is fixed in the fixing screw hole of the clamping block.
所述夹板包括为平面的夹持面和为弧形面的非夹持面,且该非夹持面的半径与卷筒的半径相同。 The clamping plate includes a plane clamping surface and an arc-shaped non-clamping surface, and the radius of the non-clamping surface is the same as that of the drum.
所述托架包括固定架体、滑动架体和多个支撑台,所述固定架体固定在门架底部,所述滑动架体滑动连接在固定架体上,所述的多个支撑台均匀固定在滑动架体上,所述支撑台上设置有弧形凹槽。 The bracket includes a fixed frame body, a sliding frame body and a plurality of support platforms, the fixed frame body is fixed on the bottom of the door frame, the sliding frame body is slidably connected to the fixed frame body, and the plurality of support platforms are uniform It is fixed on the sliding frame body, and an arc-shaped groove is arranged on the support platform.
所述顶升机构包括顶杆、顶升油缸和多个真空吸盘,所述顶升油缸的数量为两套,两套顶升油缸对称固定在门架上,所述顶杆为方形结构,其两端分别与两套顶升油缸的活塞杆固定连接,所述的多个真空吸盘均匀固定在顶杆上用于吸附防水材料。 The jacking mechanism includes a jacking rod, a jacking cylinder and a plurality of vacuum suction cups. The number of the jacking cylinders is two sets, and the two sets of jacking cylinders are symmetrically fixed on the mast. The jacking rod is a square structure. The two ends are respectively fixedly connected with the piston rods of two sets of jacking cylinders, and the plurality of vacuum suction cups are evenly fixed on the jack rods for absorbing waterproof materials.
所述顶杆上还均匀开设有多个限位凹槽,所述的限位凹槽位于与真空吸盘相对应的另一面。 A plurality of limiting grooves are evenly formed on the ejector rod, and the limiting grooves are located on the other side corresponding to the vacuum suction cup.
所述顶升油缸的活塞杆上固定连接有转换接头,所述顶杆的两端分别通过轴承与两个转换接头连接,且顶杆与转换接头之间通过插销固定。 A conversion joint is fixedly connected to the piston rod of the jacking cylinder, and the two ends of the ejector rod are respectively connected to the two conversion joints through bearings, and the ejector rod and the conversion joint are fixed by a bolt.
所述顶杆上还设置有多个弹簧座,所述的弹簧座与真空吸盘位于同一面上,且弹簧座的高度高于真空吸盘的高度。 A plurality of spring seats are also arranged on the push rod, and the spring seats are located on the same surface as the vacuum chuck, and the height of the spring seats is higher than that of the vacuum chuck.
所述顶升机构的数量为五组,五组顶升机构按45度呈递增的角度布置在门架上。 The number of the jacking mechanisms is five groups, and the five groups of jacking mechanisms are arranged on the mast at increasing angles of 45 degrees.
所述移动锁紧机构包括底座、导柱、升降油缸和锁紧油缸,所述底座下方连接有行走轮,所述导柱的一端固定在底座上,另一端活动套设在门架的导套内,且导柱和导套上均开设有定位孔;所述升降油缸和锁紧油缸均固定在门架下部,其中,升降油缸的活塞杆固定在底座上,锁紧油缸的活塞杆上固定连接有锁紧销,锁紧时,锁紧油缸控制锁紧销插入导套上的定位孔和导柱上的定位孔。 The mobile locking mechanism includes a base, a guide column, a lifting cylinder and a locking cylinder, a traveling wheel is connected under the base, one end of the guide column is fixed on the base, and the other end is movably set on the guide sleeve of the door frame Inside, and positioning holes are provided on the guide post and the guide sleeve; the lifting cylinder and the locking cylinder are fixed on the lower part of the mast, wherein the piston rod of the lifting cylinder is fixed on the base, and the piston rod of the locking cylinder is fixed on the A locking pin is connected, and when locking, the locking oil cylinder controls the locking pin to be inserted into the positioning hole on the guide sleeve and the positioning hole on the guide post.
所述导柱的数量为四根,四根导柱对称设置在门架的底部,对应的,所述锁紧油缸的数量为四套,四套锁紧油缸均固定在门架的下部。 The number of the guide pillars is four, and the four guide pillars are arranged symmetrically at the bottom of the door frame. Correspondingly, the number of the locking cylinders is four sets, and the four sets of locking cylinders are all fixed on the bottom of the door frame.
采用本实用新型的优点在于: The advantage of adopting the utility model is:
一、本实用新型中,通过托架和卷筒的配合,能够快速地将防水材料卷绕到行走小车上,不仅减少了人力物力的使用及人工劳动强度,还有利于提高施工效率。通过卷筒与行走小车的配合,能使防水材料自动展开、自动顶升就位、自动形成垂度,一次性完成一卷防水材料的自动展开;通过多组顶升机构能够快速准确地将防水材料顶升至隧道内壁上,一次性完成一卷防水材料的自动顶升,大幅提高了施工效率。而通过移动锁紧机构则能够准确地控制整个台车的水平移动、上下升降移动及施工时的安全锁紧定位,不仅能够最大化地减少人力及物力的使用,还提高了使用安全性。与现有技术相比,本实用新型采用上述结构的配合后,不仅适用于3~4m幅宽防水材料的铺设,还能够实现6~7m幅宽防水材料的一次性铺设,铺设范围更广,铺设效率更高。 1. In the utility model, through the cooperation of the bracket and the reel, the waterproof material can be quickly wound onto the trolley, which not only reduces the use of manpower and material resources and labor intensity, but also helps to improve construction efficiency. Through the cooperation of the reel and the walking trolley, the waterproof material can be automatically unfolded, automatically lifted into place, and automatically formed to sag, and the automatic unfolding of a roll of waterproof material can be completed at one time; through multiple sets of jacking mechanisms, the waterproof can be quickly and accurately The material is lifted to the inner wall of the tunnel, and the automatic lifting of a roll of waterproof material is completed at one time, which greatly improves the construction efficiency. The mobile locking mechanism can accurately control the horizontal movement of the entire trolley, the up and down movement and the safe locking and positioning during construction, which can not only minimize the use of manpower and material resources, but also improve the safety of use. Compared with the prior art, the utility model is not only suitable for laying waterproof materials with a width of 3-4m after adopting the above-mentioned structure, but also can realize the one-time laying of waterproof materials with a width of 6-7m, and the laying range is wider. Laying efficiency is higher.
二、本实用新型中,卷筒与电机连接的结构,实现了防水材料的自动卷绕,有利于提高施工效率和降低人工劳动强度。而通过两台电机同步驱动卷筒卷绕的结构,则有利于提高卷筒卷绕的稳定性。 2. In the utility model, the structure in which the reel is connected to the motor realizes the automatic winding of the waterproof material, which is conducive to improving construction efficiency and reducing labor intensity. The structure of synchronously driving the reel winding by two motors is beneficial to improve the stability of the reel winding.
三、本实用新型中,通过至少两组夹持件固定防水材料,保证了防水材料固定的稳定性。而夹持件主要由夹持块、夹板和固定螺栓组成的结构,则使得卷筒具有结构简单、固定夹持速度快和固定夹持效果好的优点。 3. In the utility model, the waterproof material is fixed by at least two sets of clamping parts, which ensures the stability of the waterproof material fixing. The clamping part is mainly composed of a clamping block, a splint and a fixing bolt, so that the reel has the advantages of simple structure, fast fixing and clamping speed and good fixing and clamping effect.
四、本实用新型中,夹板的夹持面设置为平面,有利于提高夹持的稳固性,而夹板的非夹持面设置为与卷筒半径相同的弧形面,则使得安装有夹持件的卷筒在整体结构上还是属于圆柱体结构,这样不仅有利于快速卷绕,还不会对防水材料造成损伤。 4. In the utility model, the clamping surface of the splint is set as a plane, which is beneficial to improve the stability of the clamping, and the non-clamping surface of the splint is set as an arc surface with the same radius as the reel, so that the clamping surface is installed The reel of the parts is still a cylindrical structure in the overall structure, which is not only conducive to fast winding, but also will not cause damage to the waterproof material.
五、本实用新型中,通过滑动架体与固定架体的配合,不仅能够快速将防水材料放置到滑动架体的支撑台上,还能够对放置好的防水材料进行定位,有利于下一卷绕工序的快速进行。而通过设置在滑动架体上的多个支撑台,则能够在卷筒卷绕时防止防水材料跑偏。 5. In the utility model, through the cooperation of the sliding frame body and the fixed frame body, not only the waterproof material can be quickly placed on the support platform of the sliding frame body, but also the placed waterproof material can be positioned, which is beneficial to the next roll Fast progress around the process. And through the multiple supporting platforms arranged on the sliding frame body, the waterproof material can be prevented from running off when the reel is wound.
六、本实用新型中,通过真空吸盘能够自动将展开的防水材料吸附在顶杆上,进而避免展开的防水材料在顶升过程中滑落或偏移,有利于提升施工效率。 6. In the utility model, the vacuum suction cup can automatically absorb the unfolded waterproof material on the ejector rod, thereby preventing the unfolded waterproof material from slipping or shifting during the jacking process, which is beneficial to improving construction efficiency.
七、本实用新型中,在与真空吸盘相对应的另一面上还均匀开设有多个限位凹槽,该结构使得顶升机构除了用于顶升防水材料外,还能够用于顶升钢筋,即只需要将顶杆翻转固定即可实现防水材料和钢筋的顶升,有利于施工的连续性,大幅提高了施工效率。 7. In the utility model, a plurality of limit grooves are evenly opened on the other surface corresponding to the vacuum suction cup. This structure enables the jacking mechanism to be used for jacking up the steel bar in addition to the waterproof material. , that is, it is only necessary to turn and fix the ejector rod to realize the jacking of waterproof materials and steel bars, which is conducive to the continuity of construction and greatly improves the construction efficiency.
八、本实用新型中,顶杆通过轴承与转换接头连接,且顶杆与转换接头之间通过插销固定,该结构中,实现顶杆的翻转只需要取下插销即可,插上插销后即可实现顶杆的固定,使得顶杆在顶升防水材料和钢筋之间的转换更加简单方便快速。 8. In the utility model, the ejector rod is connected to the adapter through the bearing, and the ejector rod and the adapter are fixed by a bolt. In this structure, the flipping of the ejector rod only needs to take off the bolt. After inserting the bolt, the The fixing of the ejector rod can be realized, so that the conversion of the ejector rod between the jacking waterproof material and the steel bar is simpler, more convenient and faster.
九、本实用新型中,通过高度高于真空吸盘的弹簧座,能够在真空吸盘失去吸附力的时候继续将防水材料自动顶升到隧道内壁上,防止防水材料移位,有利于增加施工的顺利性和快速性。 9. In the utility model, the spring seat whose height is higher than that of the vacuum suction cup can continue to automatically lift the waterproof material to the inner wall of the tunnel when the vacuum suction cup loses its adsorption force, preventing the waterproof material from shifting, which is beneficial to increase the smoothness of construction sex and speed.
十、本实用新型中,五组顶升机构按45度呈递增的角度布置,该结构既能够避免顶升机构的浪费,又保证能够准确稳定地将防水材料和钢筋顶升到指定位置。 10. In the utility model, five sets of jacking mechanisms are arranged at increasing angles of 45 degrees. This structure can not only avoid the waste of jacking mechanisms, but also ensure that waterproof materials and steel bars can be accurately and stably lifted to designated positions.
十一、本实用新型中,通过锁紧油缸与锁紧销的配合,能够在门架升高到指定施工位置时自动锁定门架,防止发生安全事故,大幅提高了施工安全性。 11. In the utility model, through the cooperation of the locking cylinder and the locking pin, the mast can be automatically locked when the mast is raised to the designated construction position, preventing safety accidents and greatly improving construction safety.
十二、本实用新型中,导柱的数量设置为四根,锁紧油缸的数量设置为四套,该结构进一步提升了门架锁紧时的稳固性。 12. In the utility model, the number of guide pillars is set to four, and the number of locking cylinders is set to four sets. This structure further improves the stability of the door frame when it is locked.
十三、本实用新型通过门架、输送机构、顶升机构、移动锁紧机构和两台行走小车的配合,实现了防水材料的自动卷绕、自动展开、自动顶升、自动调节铺设位置、自动支撑等功能,具有铺设效率更高和智能化程度更高等优点。 Thirteen. The utility model realizes the automatic winding, automatic unfolding, automatic jacking, automatic adjustment of the laying position, With functions such as automatic support, it has the advantages of higher laying efficiency and higher intelligence.
附图说明 Description of drawings
图1为本实用新型的主视结构示意图; Fig. 1 is the main view structure schematic diagram of the utility model;
图2为本实用新型的一种立体结构示意图; Fig. 2 is a kind of three-dimensional structure schematic diagram of the utility model;
图3为本实用新型的另一种结构示意图; Fig. 3 is another kind of structural representation of the utility model;
图4为图3中I处的放大结构示意图; Fig. 4 is the enlarged structure schematic diagram of I place in Fig. 3;
图5为本实用新型中卷筒的结构示意图; Fig. 5 is the structural representation of reel in the utility model;
图6为图5的A—A剖面示意图; Fig. 6 is the A-A sectional schematic diagram of Fig. 5;
图7为本实用新型中顶杆的主视结构示意图; Fig. 7 is the schematic diagram of the front view structure of the push rod in the utility model;
图8为本实用新型中顶杆的后视结构示意图; Fig. 8 is a rear view structural schematic diagram of the ejector rod in the utility model;
图中标记为:1、门架,2、行走小车,3、弧形轨道,4、卷筒,5、夹持块,6、夹板,7、固定螺栓,8、夹持面,9、非夹持面,10、固定架体,11、滑动架体,12、支撑台,13、顶杆,14、顶升油缸,15、真空吸盘,16、限位凹槽,17、转换接头,18、底座,19、导柱,20、升降油缸,21、锁紧油缸,22、锁紧销,23、防水材料,24、弹簧座。 The marks in the figure are: 1. Mast frame, 2. Walking trolley, 3. Arc track, 4. Reel, 5. Clamping block, 6. Plywood, 7. Fixing bolt, 8. Clamping surface, 9. Non- Clamping surface, 10, fixed frame body, 11, sliding frame body, 12, support platform, 13, ejector rod, 14, jacking cylinder, 15, vacuum suction cup, 16, limit groove, 17, conversion joint, 18 , base, 19, guide post, 20, lifting oil cylinder, 21, locking oil cylinder, 22, locking pin, 23, waterproof material, 24, spring seat.
具体实施方式 detailed description
实施例1 Example 1
一种隧道施工智能台车,包括门架1、输送机构、顶升机构、移动锁紧机构和两台行走小车2,所述门架1上固定设置有两条对称的弧形轨道3,所述的两台行走小车2对称设置在两条弧形轨道3上;所述输送机构包括托架和卷筒4,所述托架设置在门架1底部用于支撑防水材料23,所述卷筒4转动设置在两台行走小车2上用于卷绕托架上的防水材料23;所述顶升机构为多组,多组顶升机构均匀固定在门架1上用于顶升防水材料23;所述移动锁紧机构设置在门架1下部用于门架1的水平移动、上下升降移动和施工时的锁紧定位。 An intelligent trolley for tunnel construction, comprising a door frame 1, a conveying mechanism, a jacking mechanism, a moving locking mechanism and two walking trolleys 2, two symmetrical arc-shaped rails 3 are fixedly arranged on the door frame 1, and the The two walking trolleys 2 described above are arranged symmetrically on two arc-shaped rails 3; the conveying mechanism includes a bracket and a reel 4, and the bracket is arranged at the bottom of the door frame 1 to support the waterproof material 23, and the reel The cylinder 4 is rotated and installed on two walking trolleys 2 for winding the waterproof material 23 on the bracket; the jacking mechanism is multi-group, and the multi-group jacking mechanism is evenly fixed on the door frame 1 for jacking up the waterproof material 23. The moving locking mechanism is arranged at the lower part of the mast 1 for horizontal movement, up and down movement of the mast 1 and locking and positioning during construction.
本实施例中,所述输送机构还包括两台电机,两台电机分别对称固定在两台行走小车2上,两台电机的动力输出轴分别与卷筒4的两端连接。卷绕防水材料23时,两台电机同步带动卷筒4自动卷绕托架上的防水材料23。 In this embodiment, the conveying mechanism further includes two motors, and the two motors are symmetrically fixed on the two trolleys 2 respectively, and the power output shafts of the two motors are respectively connected to both ends of the reel 4 . When winding the waterproof material 23, the two motors synchronously drive the reel 4 to automatically wind the waterproof material 23 on the bracket.
本实施例中,所述卷筒4上设置有至少两组用于固定夹持防水材料23的夹持件,所述夹持件包括夹持块5、夹板6和固定螺栓7,所述夹持块5为方形块,所述夹板6包括为平面的夹持面8和为弧形面的非夹持面9;所述卷筒4的外表面上开设有安装槽,所述夹持块5通过焊接固定的方式镶嵌在安装槽内,所述夹板6的上端通过铰链活动连接在夹持块5上,所述固定螺栓7穿过夹板6后固定连接在夹持块5上。在卷绕防水材料23前,需要先将防水材料23的端部固定夹持在卷筒4上,具体的固定夹持步骤为:先将防水材料23的端部放置在夹板6与卷筒4之间,然后调节固定螺栓7使夹板6以其上端与夹持块5的连接处为基点向卷筒4移动,直至将防水材料23紧密夹持在卷筒4与夹板6的夹持面8之间。其中,由于夹板6的夹持面8为平面,为了保证夹持的稳固性,相应地,卷筒4上对应的夹持部位也为平面。另外,由于卷筒4上开设有安装槽,为了使卷筒4在安装了夹持件后还能保持完整的筒体结构,优选将夹板6的非夹持面9设置为其半径与卷筒4的半径相同的弧形面,以该非夹持面9刚好填补卷筒4上的开槽区域面为佳。这样,当夹板6处于夹紧位置时,卷筒4在整体结构上保持完整的圆柱体结构,不仅有利于快速卷绕,还不会对防水材料23造成损伤。 In this embodiment, the reel 4 is provided with at least two sets of clamping parts for fixing and clamping the waterproof material 23, and the clamping parts include a clamping block 5, a splint 6 and a fixing bolt 7. The holding block 5 is a square block, and the clamping plate 6 includes a flat clamping surface 8 and a non-clamping surface 9 of an arcuate surface; the outer surface of the reel 4 is provided with a mounting groove, and the clamping block 5 is embedded in the installation groove by welding and fixing, the upper end of the splint 6 is movably connected to the clamping block 5 through a hinge, and the fixing bolt 7 is fixedly connected to the clamping block 5 after passing through the splint 6 . Before winding the waterproof material 23, the end of the waterproof material 23 needs to be fixedly clamped on the reel 4. The specific fixing and clamping steps are: first place the end of the waterproof material 23 on the splint 6 and the reel 4. Between, then adjust the fixing bolt 7 to make the splint 6 move to the reel 4 based on the connection between its upper end and the clamping block 5 until the waterproof material 23 is tightly clamped on the clamping surface 8 of the reel 4 and the splint 6 between. Wherein, since the clamping surface 8 of the splint 6 is a plane, in order to ensure the stability of the clamping, correspondingly, the corresponding clamping part on the reel 4 is also a plane. In addition, since the reel 4 is provided with a mounting groove, in order to enable the reel 4 to maintain a complete cylinder structure after the clamping member is installed, it is preferable to set the non-clamping surface 9 of the splint 6 to its radius equal to that of the reel. 4 with the same radius, it is better that the non-clamping surface 9 just fills up the grooved area surface on the reel 4 . In this way, when the splint 6 is in the clamping position, the reel 4 maintains a complete cylindrical structure on the overall structure, which is not only conducive to fast winding, but also will not cause damage to the waterproof material 23 .
进一步的,所述夹持块5上开设有固定螺孔,所述夹板6的中部开设有通孔,所述固定螺栓7穿过夹板6上的通孔后固定在夹持块5的固定螺孔内,即通过调节固定螺栓7在固定螺孔内的位置即可实现防水材料23的夹紧与松开。其中,夹板6的通孔与固定螺栓7之间还设置有碟形垫圈。 Further, the clamping block 5 is provided with a fixing screw hole, and the middle part of the clamping plate 6 is provided with a through hole, and the fixing bolt 7 is fixed on the fixing screw of the clamping block 5 after passing through the through hole on the clamping plate 6. In the hole, that is, by adjusting the position of the fixing bolt 7 in the fixing screw hole, the clamping and loosening of the waterproof material 23 can be realized. Wherein, a disk washer is also arranged between the through hole of the splint 6 and the fixing bolt 7 .
更进一步的,所述夹持件的数量为五组,五组夹持件均匀设置在卷筒4上。 Furthermore, the number of the clamping parts is five sets, and the five sets of clamping parts are evenly arranged on the reel 4 .
本实施例中,所述托架包括固定架体10、滑动架体11和多个支撑台12,所述固定架体10包括两根凹形导轨和多根连接件,多根连接件并排固定连接在门架1的底部,两根凹形导轨对称固定在多根连接件上。所述滑动架体11包括两根平行并固定成一体的滑轨,该滑轨滑动设置在固定架体10的两根凹形导轨之间。所述的多个支撑台12均匀固定在滑动架体11的两根滑轨上,所述支撑台12上设置有弧形凹槽。工作时,防水材料23放置在弧形凹槽内。 In this embodiment, the bracket includes a fixed frame body 10, a sliding frame body 11 and a plurality of support platforms 12, the fixed frame body 10 includes two concave guide rails and a plurality of connectors, and the plurality of connectors are fixed side by side Connected to the bottom of the door frame 1, two concave guide rails are symmetrically fixed on multiple connecting pieces. The sliding frame body 11 includes two parallel and integrated sliding rails, and the sliding rails are slidably arranged between the two concave guide rails of the fixing frame body 10 . The plurality of supporting platforms 12 are evenly fixed on the two slide rails of the sliding frame body 11, and the supporting platforms 12 are provided with arc-shaped grooves. When working, the waterproof material 23 is placed in the arc groove.
本实施例中,所述行走小车2通过电气控制电机转动带动行走小车2以链轮链条的方式沿弧形轨道3移动。 In this embodiment, the traveling trolley 2 drives the traveling trolley 2 to move along the arc track 3 in the form of a sprocket chain through the rotation of the electrical control motor.
实施例2 Example 2
一种隧道施工智能台车,包括门架1、输送机构、顶升机构、移动锁紧机构和两台行走小车2,所述门架1上固定设置有两条对称的弧形轨道3,所述的两台行走小车2对称设置在两条弧形轨道3上;所述输送机构包括托架和卷筒4,所述托架设置在门架1底部用于支撑防水材料23,所述卷筒4转动设置在两台行走小车2上用于卷绕托架上的防水材料23;所述顶升机构为多组,多组顶升机构均匀固定在门架1上用于顶升防水材料23;所述移动锁紧机构设置在门架1下部用于门架1的水平移动、上下升降移动和施工时的锁紧定位。 An intelligent trolley for tunnel construction, comprising a door frame 1, a conveying mechanism, a jacking mechanism, a moving locking mechanism and two walking trolleys 2, two symmetrical arc-shaped rails 3 are fixedly arranged on the door frame 1, and the The two walking trolleys 2 described above are arranged symmetrically on two arc-shaped rails 3; the conveying mechanism includes a bracket and a reel 4, and the bracket is arranged at the bottom of the door frame 1 to support the waterproof material 23, and the reel The cylinder 4 is rotated and installed on two walking trolleys 2 for winding the waterproof material 23 on the bracket; the jacking mechanism is multi-group, and the multi-group jacking mechanism is evenly fixed on the door frame 1 for jacking up the waterproof material 23. The moving locking mechanism is arranged at the lower part of the mast 1 for horizontal movement, up and down movement of the mast 1 and locking and positioning during construction.
本实施例中,所述顶升机构包括顶杆13、顶升油缸14和多个真空吸盘15,所述顶升油缸14的数量为两套,两套顶升油缸14对称固定在门架1上,所述顶杆13为方形结构,其两端分别与两套顶升油缸14的活塞杆固定连接,所述的多个真空吸盘15均匀固定在顶杆13上用于吸附防水材料23。进一步的,所述门架1上还设置有真空吸附机,所述真空吸附机与顶杆13上的多个真空吸盘15连接。工作时,行走小车2通过卷筒4展开防水材料23,每经过一组顶升机构时,真空吸附机控制该组顶升机构上的真空吸盘15将防水材料23吸附到顶杆13上,防止防水材料23滑落。 In this embodiment, the jacking mechanism includes a jack rod 13, a jacking cylinder 14 and a plurality of vacuum suction cups 15, the number of the jacking cylinders 14 is two sets, and the two sets of jacking cylinders 14 are symmetrically fixed on the mast 1 Above, the ejector rod 13 has a square structure, and its two ends are respectively fixedly connected with the piston rods of two sets of jacking cylinders 14 , and the plurality of vacuum suction cups 15 are evenly fixed on the ejector rod 13 for absorbing the waterproof material 23 . Further, the door frame 1 is also provided with a vacuum suction machine, and the vacuum suction machine is connected with a plurality of vacuum suction cups 15 on the ejector rod 13 . During work, the walking trolley 2 unfolds the waterproof material 23 through the reel 4, and when passing through a group of jacking mechanisms, the vacuum adsorption machine controls the vacuum suction cup 15 on the group of jacking mechanisms to adsorb the waterproof material 23 to the push rod 13 to prevent waterproofing. Material 23 slips off.
进一步的,为了防止被顶升到隧道内壁的防水材料23在真空吸盘15失去吸附力时滑落,所述顶杆13上还均匀设置有多个弹簧座24,所述的弹簧座24与真空吸盘15位于顶杆的同一面上,且弹簧座24的高度高于真空吸盘15的高度。这样,当真空吸盘15失去吸附力时,弹簧座24接替真空吸盘15自动将防水材料23顶升并支撑到隧道内壁上。 Further, in order to prevent the waterproof material 23 that is lifted to the inner wall of the tunnel from slipping when the vacuum chuck 15 loses its adsorption force, a plurality of spring seats 24 are evenly arranged on the push rod 13, and the spring seats 24 and the vacuum chuck 15 is positioned on the same face of push rod, and the height of spring seat 24 is higher than the height of vacuum chuck 15. In this way, when the vacuum suction cup 15 loses its adsorption force, the spring seat 24 takes over from the vacuum suction cup 15 to automatically lift the waterproof material 23 and support it on the inner wall of the tunnel.
本实施例中,所述顶杆13上还均匀开设有多个用于限位钢筋的限位凹槽16,所述的限位凹槽16位于与真空吸盘15相对应的另一面。该结构使得顶杆13既能够用于顶升防水材料23,又能够用于顶升钢筋,具体顶升过程为:当铺设完防水材料23后,控制顶杆13翻转,再将钢筋放置在多个顶杆13上的限位凹槽16内,防止钢筋滑动,然后通过顶升油缸14即可顶升钢筋。 In this embodiment, the ejector rod 13 is evenly provided with a plurality of limiting grooves 16 for limiting steel bars, and the limiting grooves 16 are located on the other side corresponding to the vacuum suction cup 15 . This structure enables the ejector rod 13 to be used not only for jacking up the waterproof material 23, but also for jacking up the reinforcing steel bar. In the limit groove 16 on the top rod 13, the steel bar is prevented from sliding, and then the steel bar can be lifted by the jacking cylinder 14.
进一步的,所述顶升油缸14的活塞杆上固定连接有转换接头17,所述顶杆13的两端分别通过轴承与两个转换接头17连接,且顶杆13与转换接头17上均设置有插孔,顶杆13与转换接头17通过插销和插孔固定。在实际使用时,只需通过插取插销即可实现顶杆13的快速翻转。进而达到顶升防水材料23与钢筋的快速转换。 Further, the piston rod of the jacking cylinder 14 is fixedly connected with an adapter 17, and the two ends of the ejector rod 13 are respectively connected to the two adapters 17 through bearings, and both the ejector rod 13 and the adapter 17 are provided with There is a jack, and the push rod 13 and the conversion joint 17 are fixed by the latch and the jack. In actual use, the rapid flipping of the ejector rod 13 can be realized only by inserting and removing the bolt. And then reach the rapid conversion of jacking waterproof material 23 and reinforcing bar.
本实施例中,所述顶升机构的数量为五组,五组顶升机构按45度呈递增的角度布置在门架上,具体布置方式为:第一组顶升机构和第五组顶升机构分别横向对称布置,且两者的顶升方向相反;第三组顶升机构纵向布置,其顶升方向与第一组顶升机构的顶升方向相垂直;第二组顶升机构布置在第一组顶升机构和第三组顶升机构中间,其顶升方向与第一组顶升机构的顶升方向和第三组顶升机构的顶升方向成45度夹角;第四组顶升机构布置在第五组顶升机构和第三组顶升机构中间,其顶升方向与第五组顶升机构的顶升方向和第三组顶升机构的顶升方向成45度夹角。在顶升时,五磁顶升机构同步顶升,这样就能够准确稳定地将防水材料23和钢筋一次性顶升到指定位置。 In this embodiment, there are five sets of jacking mechanisms, and the five sets of jacking mechanisms are arranged on the mast at an increasing angle of 45 degrees. The specific arrangement is: the first set of jacking mechanisms and the fifth set of jacking mechanisms. The lifting mechanisms are arranged horizontally and symmetrically, and the lifting directions of the two are opposite; the third group of lifting mechanisms is arranged vertically, and its jacking direction is perpendicular to that of the first group of lifting mechanisms; the second group of lifting mechanisms is arranged Between the first group of jacking mechanisms and the third group of jacking mechanisms, the jacking direction is at an angle of 45 degrees to the jacking direction of the first group of jacking mechanisms and the jacking direction of the third group of jacking mechanisms; the fourth The jacking mechanism group is arranged between the fifth jacking mechanism and the third jacking mechanism, and its jacking direction is 45 degrees to the jacking direction of the fifth jacking mechanism and the jacking direction of the third jacking mechanism angle. When jacking up, the five magnetic jacking mechanisms are jacked up synchronously, so that the waterproof material 23 and the steel bar can be jacked up to the designated position accurately and stably at one time.
实施例3 Example 3
一种隧道施工智能台车,包括门架1、输送机构、顶升机构、移动锁紧机构和两台行走小车2,所述门架1上固定设置有两条对称的弧形轨道3,所述的两台行走小车2对称设置在两条弧形轨道3上;所述输送机构包括托架和卷筒4,所述托架设置在门架1底部用于支撑防水材料23,所述卷筒4转动设置在两台行走小车2上用于卷绕托架上的防水材料23;所述顶升机构为多组,多组顶升机构均匀固定在门架1上用于顶升防水材料23;所述移动锁紧机构设置在门架1下部用于门架1的水平移动、上下升降移动和施工时的锁紧定位。 An intelligent trolley for tunnel construction, comprising a door frame 1, a conveying mechanism, a jacking mechanism, a moving locking mechanism and two walking trolleys 2, two symmetrical arc-shaped rails 3 are fixedly arranged on the door frame 1, and the The two walking trolleys 2 described above are arranged symmetrically on two arc-shaped rails 3; the conveying mechanism includes a bracket and a reel 4, and the bracket is arranged at the bottom of the door frame 1 to support the waterproof material 23, and the reel The cylinder 4 is rotated and installed on two walking trolleys 2 for winding the waterproof material 23 on the bracket; the jacking mechanism is multi-group, and the multi-group jacking mechanism is evenly fixed on the door frame 1 for jacking up the waterproof material 23. The moving locking mechanism is arranged at the lower part of the mast 1 for horizontal movement, up and down movement of the mast 1 and locking and positioning during construction.
本实施例中,所述移动锁紧机构包括底座18、导柱19、升降油缸20和锁紧油缸21,所述底座18的数量为两套,两套底座18对称设置在门架1下部,所述底座18下方连接有行走轮,通过控制行走轮即可控制整个台车的水平移动。所述导柱19的数量为四根,四根导柱19分别对称设置在两套底座18上,所述导柱19的一端固定在底座18上,另一端活动套设在门架1的导套内,且导柱19和导套上均开设有定位孔。所述升降油缸20和锁紧油缸21的数量均为四套,两者均固定在门架1下部,其中,四套升降油缸20的活塞杆分别固定在两套底座18上,用于控制整个台车的上下升降;而四套锁紧油缸21则固定在门架1的下部,四套锁紧油缸21的活塞杆上均固定连接有锁紧销22,四个锁紧销22对称设置在四根导柱19的定位孔处,当需要锁紧门架1时,四套锁紧油缸21同步控制四个锁紧销22同时插入导套上的定位孔和导柱19上的定位孔。 In this embodiment, the mobile locking mechanism includes a base 18, a guide column 19, a lifting cylinder 20 and a locking cylinder 21. The number of the bases 18 is two sets, and the two sets of bases 18 are symmetrically arranged at the lower part of the door frame 1. The bottom of the base 18 is connected with traveling wheels, and the horizontal movement of the whole trolley can be controlled by controlling the traveling wheels. The quantity of described guide post 19 is four, and four guide posts 19 are symmetrically arranged on two sets of bases 18 respectively, and one end of described guide post 19 is fixed on the base 18, and the other end is movably sleeved on the guide of door frame 1. In the sleeve, and the guide post 19 and the guide sleeve are all provided with positioning holes. There are four sets of lifting cylinders 20 and locking cylinders 21, both of which are fixed on the lower part of the mast 1, wherein the piston rods of the four sets of lifting cylinders 20 are respectively fixed on two sets of bases 18 for controlling the entire The lifting and lowering of the trolley; and the four sets of locking cylinders 21 are fixed on the bottom of the door frame 1, and the piston rods of the four sets of locking cylinders 21 are fixedly connected with locking pins 22, and the four locking pins 22 are symmetrically arranged on the At the positioning holes of the four guide posts 19, when the door frame 1 needs to be locked, four sets of locking oil cylinders 21 synchronously control the four locking pins 22 to insert into the positioning holes on the guide sleeve and the positioning holes on the guide post 19 simultaneously.
本实用新型中,所述门架1上还设置有平台及竖梯,方便施工人员的上下施工。 In the utility model, the door frame 1 is also provided with a platform and a vertical ladder, which is convenient for construction personnel to work up and down.
本实用新型的施工方法包括防水材料23的施工方法和钢筋的施工方法,分别为: Construction method of the present utility model comprises the construction method of waterproof material 23 and the construction method of reinforcing bar, is respectively:
防水材料23的施工方法:准备工作,人工拉出滑动架体11将成卷的防水材料23放置在支撑台上并将滑动架体11复位,人力操作通过夹持件把防水材料23的端部固定夹持到卷筒4上,通过电机正转控制卷筒4卷绕防水材料23,卷绕完成后控制行走小车2移动,并同时控制电机反转,此时卷筒4随着行走小车2的移动沿弧形轨道3展开防水材料23,当展开的防水材料23经过第一组顶升机构后,启动真空吸附机使真空吸盘15将经过的防水材料23吸附在该第一组顶升机构上的顶杆13上,以此类推,直至防水材料23完全展开并吸附在五组顶升机构的顶杆13上,然后通过固定螺栓7和夹板6松开被固定夹持的防水材料23,再通过底座18、升降油缸20调整门架1的水平位置和高度,调整完成后,通过锁紧油缸21将锁紧销22插入导柱19和导套上的定位孔内对整个门架1进行锁定,锁定完成后,启动五组顶升机构中的顶升油缸14同步顶升防水材料23至隧道轮廓处,然后控制真空吸附机停止工作,此时真空吸盘15对防水材料23失去吸附力,防水材料23在弹簧座24的作用下继续被支撑在隧道内壁,施工人员在门架1上的平台上使用便携式超声波焊接机的焊枪,对准备防水材料23与超声波焊接垫片重合的部位焊接,焊接完成后,顶升油缸14和锁紧油缸21均复位至起始位置,等待下一次施工。 The construction method of waterproof material 23: preparation work, manually pull out the sliding frame body 11, place the rolled waterproof material 23 on the support platform and reset the sliding frame body 11, and fix the end of the waterproof material 23 through the clamping parts by manual operation Clamped to the reel 4, the reel 4 is controlled to wind the waterproof material 23 through the forward rotation of the motor. After the winding is completed, the walking trolley 2 is controlled to move, and the motor is controlled to reverse at the same time. At this time, the reel 4 follows the movement of the traveling trolley 2 Move along the arc track 3 to expand the waterproof material 23. When the expanded waterproof material 23 passes through the first group of jacking mechanisms, start the vacuum adsorption machine so that the vacuum suction cup 15 will absorb the passed waterproof material 23 on the first group of jacking mechanisms. On the top rod 13 of the jack, and so on, until the waterproof material 23 is fully expanded and adsorbed on the top rod 13 of the five groups of jacking mechanisms, then the fixedly clamped waterproof material 23 is loosened by the fixing bolt 7 and the splint 6, and then Adjust the horizontal position and height of the mast 1 through the base 18 and the lifting cylinder 20. After the adjustment is completed, insert the locking pin 22 into the positioning hole on the guide post 19 and the guide sleeve through the locking cylinder 21 to lock the entire mast 1 After the locking is completed, start the jacking cylinders 14 in the five groups of jacking mechanisms to simultaneously lift the waterproof material 23 to the contour of the tunnel, and then control the vacuum adsorption machine to stop working. The material 23 continues to be supported on the inner wall of the tunnel under the action of the spring seat 24. The construction personnel use the welding torch of the portable ultrasonic welding machine on the platform on the portal frame 1 to weld the overlapping parts of the prepared waterproof material 23 and the ultrasonic welding gasket. After completion, the jacking oil cylinder 14 and the locking oil cylinder 21 are all reset to the starting position, waiting for the next construction.
钢筋的施工方法:准备工作,通过插销控制顶杆13翻转,使顶杆13上设置有限位凹槽16的一面成为工作面,然后将钢筋按设计规定的间距放置到五组顶升机构中的顶杆13中限位凹槽16内,钢筋放置完成后,人工绑扎钢筋,绑扎完成后,再通过底座18、升降油缸20调整门架1的水平位置和高度,调整完成后,通过锁紧油缸21将锁紧销22插入导柱19和导套上的定位孔内对整个门架1进行锁定,锁定完成后,启动五组顶升机构中的顶升油缸14同步顶升钢筋至隧道轮廓处进行施工,施工完成后,顶升油缸14和锁紧油缸21均复位至起始位置,等待下一次施工。 The construction method of the steel bar: preparation work, control the ejector rod 13 to turn over through the bolt, so that the side of the ejector rod 13 with the limit groove 16 becomes the working surface, and then place the steel bars in the five sets of jacking mechanisms according to the spacing specified in the design. In the limit groove 16 in the ejector rod 13, after the steel bars are placed, manually bind the steel bars. After the binding is completed, adjust the horizontal position and height of the mast 1 through the base 18 and the lifting cylinder 20. 21 Insert the locking pin 22 into the positioning hole on the guide post 19 and the guide sleeve to lock the entire mast 1. After the locking is completed, start the jacking cylinders 14 of the five sets of jacking mechanisms to simultaneously lift the steel bars to the tunnel contour Carry out the construction, after the construction is completed, the jacking oil cylinder 14 and the locking oil cylinder 21 are all reset to the starting position, waiting for the next construction.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521092998.9U CN205243538U (en) | 2015-12-25 | 2015-12-25 | Tunnel construction intelligence platform truck |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521092998.9U CN205243538U (en) | 2015-12-25 | 2015-12-25 | Tunnel construction intelligence platform truck |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205243538U true CN205243538U (en) | 2016-05-18 |
Family
ID=55942618
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521092998.9U Expired - Lifetime CN205243538U (en) | 2015-12-25 | 2015-12-25 | Tunnel construction intelligence platform truck |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205243538U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105422143A (en) * | 2015-12-25 | 2016-03-23 | 德阳思远重工有限公司 | Intelligent trolley for tunnel construction |
| CN106988770A (en) * | 2017-05-19 | 2017-07-28 | 龚岗 | Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth |
| CN108468557A (en) * | 2018-05-09 | 2018-08-31 | 云南省建设投资控股集团有限公司 | Constructing tunnel waterproof cloth cloth hanging device |
-
2015
- 2015-12-25 CN CN201521092998.9U patent/CN205243538U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105422143A (en) * | 2015-12-25 | 2016-03-23 | 德阳思远重工有限公司 | Intelligent trolley for tunnel construction |
| CN106988770A (en) * | 2017-05-19 | 2017-07-28 | 龚岗 | Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth |
| CN108468557A (en) * | 2018-05-09 | 2018-08-31 | 云南省建设投资控股集团有限公司 | Constructing tunnel waterproof cloth cloth hanging device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105422143B (en) | Constructing tunnel intelligence chassis | |
| CN108331603B (en) | A multifunctional trolley and its construction method | |
| CN109611112B (en) | Multi-head rock drilling machine for tunnel excavation and tunneling | |
| CN211314243U (en) | Integrated construction trolley for hanging cloth in tunnel | |
| CN102061927A (en) | Tunnel waterproof material laying equipment and method | |
| CN111894621B (en) | Tunnel disease restores platform truck fast | |
| CN111594221A (en) | Tunnel secondary lining full-section integrated construction trolley and secondary lining method using same | |
| CN209817930U (en) | Rail-walking type foldable tunnel pipe erecting machine for coal mine | |
| CN107725078A (en) | One kind adopts face crossheading circulatory self-moving advance support system and track from shifting system | |
| CN205243538U (en) | Tunnel construction intelligence platform truck | |
| CN112610242A (en) | Integrative platform truck of cloth is hung to big section reinforcing bar of railway tunnel | |
| CN107620575B (en) | Pulling type pipe grabbing and transporting device | |
| CN203515385U (en) | Racking platform drill-pipe stand supporting device | |
| CN103982200B (en) | Slide rail Mobile steel mould trolley in tunneling boring | |
| CN205243535U (en) | A remove locking mechanism for platform truck | |
| CN116556414B (en) | A positioning construction system and construction method for prefabricated integrated pipe corridors under large longitudinal slopes | |
| CN104763447B (en) | Beret piece combined steel mold trolley | |
| CN110777681B (en) | Whole hole Liang Huan sets of equipment | |
| CN205578009U (en) | Two lined steel bones RACK in tunnel equipment of being under construction | |
| CN205243539U (en) | A waterproof material conveying mechanism for platform truck | |
| CN207031936U (en) | A kind of bracket | |
| CN105443148A (en) | Jacking mechanism and trolley using same | |
| CN116006247A (en) | Coal mine fully-mechanized mining face hydraulic support positioning device | |
| CN105422144B (en) | Waterproof material conveying mechanism for chassis | |
| CN202039867U (en) | Auxiliary device for pavement of tunnel waterproof boards |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Tunnel construction intelligence platform truck Effective date of registration: 20171124 Granted publication date: 20160518 Pledgee: Sichuan Tianfu bank Limited by Share Ltd. Deyang branch Pledgor: DEYANG SIYUAN HEAVY INDUSTRY Co.,Ltd. Registration number: 2017510000083 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20181221 Granted publication date: 20160518 Pledgee: Sichuan Tianfu bank Limited by Share Ltd. Deyang branch Pledgor: DEYANG SIYUAN HEAVY INDUSTRY Co.,Ltd. Registration number: 2017510000083 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Tunnel construction intelligence platform truck Effective date of registration: 20190104 Granted publication date: 20160518 Pledgee: Sichuan Tianfu bank Limited by Share Ltd. Deyang branch Pledgor: DEYANG SIYUAN HEAVY INDUSTRY Co.,Ltd. Registration number: 2018510000140 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200116 Granted publication date: 20160518 Pledgee: Sichuan Tianfu bank Limited by Share Ltd. Deyang branch Pledgor: DEYANG SIYUAN HEAVY INDUSTRY Co.,Ltd. Registration number: 2018510000140 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Tunnel construction intelligence platform truck Effective date of registration: 20200120 Granted publication date: 20160518 Pledgee: Sichuan Tianfu bank Limited by Share Ltd. Deyang branch Pledgor: DEYANG SIYUAN HEAVY INDUSTRY Co.,Ltd. Registration number: Y2020510000010 |
|
| CX01 | Expiry of patent term |
Granted publication date: 20160518 |