CN105421710A - 室内墙面石材干装 - Google Patents

室内墙面石材干装 Download PDF

Info

Publication number
CN105421710A
CN105421710A CN201510760463.2A CN201510760463A CN105421710A CN 105421710 A CN105421710 A CN 105421710A CN 201510760463 A CN201510760463 A CN 201510760463A CN 105421710 A CN105421710 A CN 105421710A
Authority
CN
China
Prior art keywords
work
stone plate
word steelframe
metope
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510760463.2A
Other languages
English (en)
Other versions
CN105421710B (zh
Inventor
刘卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Weiye Tiancheng Construction Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510760463.2A priority Critical patent/CN105421710B/zh
Publication of CN105421710A publication Critical patent/CN105421710A/zh
Application granted granted Critical
Publication of CN105421710B publication Critical patent/CN105421710B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2201/00Joining sheets or plates or panels
    • E04F2201/01Joining sheets, plates or panels with edges in abutting relationship

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

室内墙面石材干装,“工”字钢架横着排放,用膨胀螺丝固定在墙面上,把单根“工”字钢架从墙面一头上下排开横着固定在墙面上,石材板上、下两侧有“凹”槽,石材板上、下两侧“凹”槽内槽台留出空隙,安装时,把石材板上、下两侧“凹”槽抹上干挂胶套装入两根“工”字钢架头上其相对着的上沿,安完后再把一组单根“工”字钢架上、下排开接头横着固定在墙面上,套装入石材板,安装到墙面另一头时,把“工”字钢架头上上沿去掉一段,再从这一段套装入石材板,最后对于去掉上沿的这一段,把石材板用干挂胶直接沾固在“工”字钢架竖支撑和下沿上。

Description

室内墙面石材干装
技术领域
本发明属建筑领域室内墙面石材干装。
背景技术
现在室内墙面石材干装方法有多种,但大同小异,一般是膨胀螺丝固定角码,角码上再固定双钩吗,再用双钩吗和干挂胶固定石材板,工艺繁琐,结构复杂,用料多,施工费时费力,石材与墙面距离大。
发明内容
本发明的技术方案是:“工”字钢架横着排放,用膨胀螺丝固定在墙面上,把单根“工”字钢架从墙面一头上、下排开横着固定在墙面上,两个“工”字钢架中心线间距比石材板高度大0.5—3毫米,石材板上、下两侧有“凹”槽,“凹”槽比“工”字钢架上沿大0.5—3毫米,便于安装,石材板上、下两侧“凹”槽内槽台(石材板背面上、下两边)去掉1—3毫米以留出“工”字钢架竖支撑的空隙,安装时,把石材板上、下两侧“凹”槽抹上干挂胶套装入两根“工”字钢架头上其相对着的上沿,用手推到头,调整对正,安完后再把一组单根“工”字钢架上、下排开接头横着固定在墙面上,套装入石材板,安装到墙面另一头时,把“工”字钢架头上竖支撑之上的上沿去掉比石材板长度大0.5—5毫米的一段,再从去掉上沿的这一段套装入石材板,最后对于去掉上沿的这一段,把石材板背面上、下两边割出比“工”字钢架竖支撑大0.5—3毫米的空隙,用干挂胶直接沾固在“工”字钢架竖支撑和下沿上。
这种室内墙面石材干装方法结构简单,工艺简单,省事、省料,石材与墙面距离近,节省空间。
附图说明
图1是室内墙面干装石材结构视图及局部剖视图。
图2是室内墙面干装石材A-A竖切视图。
图3是室内墙面另一头干装石材B-B竖切视图。
具体实施方式
图中,1、石材板,2、“工”字钢架,3、干挂胶,4、膨胀螺丝,5、墙面,6、墙面另一头,“工”字钢架2横着排放,用膨胀螺丝4固定在墙面5上,把单根“工”字钢架2从墙面5一头上、下排开横着固定在墙面5上,两个“工”字钢架2中心线间距比石材板1高度大2毫米,石材板1上、下两侧有“凹”槽,“凹”槽比“工”字钢架2上沿大2毫米,石材板1上、下两侧“凹”槽内槽台(石材板1背面上、下两边)去掉2毫米以留出“工”字钢架2竖支撑的空隙,安装时,把石材板1上、下两侧“凹”槽抹上干挂胶3套装入两根“工”字钢架2头上其相对着的上沿,用手推到头,调整对正,安完后再把一组单根“工”字钢架2上、下排开接头横着固定在墙面5上,套装入石材板1,安装到墙面另一头6时,把“工”字钢架2头上竖支撑之上的上沿去掉比石材板1长度大1毫米的一段,再从去掉上沿的这一段套装入石材板1,最后对于去掉上沿的这一段,把石材板1背面上、下两边割出比“工”字钢架2竖支撑大2毫米的空隙,用干挂胶3直接沾固在“工”字钢架2竖支撑和下沿上。

Claims (1)

1.室内墙面石材干装,其特征是:“工”字钢架横着排放,用膨胀螺丝固定在墙面上,把单根“工”字钢架从墙面一头上、下排开横着固定在墙面上,两个“工”字钢架中心线间距比石材板高度大0.5—3毫米,石材板上、下两侧有“凹”槽,“凹”槽比“工”字钢架上沿大0.5—3毫米,便于安装,石材板上、下两侧“凹”槽内槽台(石材板背面上、下两边)去掉1—3毫米以留出“工”字钢架竖支撑的空隙,安装时,把石材板上、下两侧“凹”槽抹上干挂胶套装入两根“工”字钢架头上其相对着的上沿,用手推到头,调整对正,安完后再把一组单根“工”字钢架上、下排开接头横着固定在墙面上,套装入石材板,安装到墙面另一头时,把“工”字钢架头上竖支撑之上的上沿去掉比石材板长度大0.5—5毫米的一段,再从去掉上沿的这一段套装入石材板,最后对于去掉上沿的这一段,把石材板背面上、下两边割出比“工”字钢架竖支撑大0.5—3毫米的空隙,用干挂胶直接沾固在“工”字钢架竖支撑和下沿上。
CN201510760463.2A 2015-11-10 2015-11-10 室内墙面石材干装 Active CN105421710B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510760463.2A CN105421710B (zh) 2015-11-10 2015-11-10 室内墙面石材干装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510760463.2A CN105421710B (zh) 2015-11-10 2015-11-10 室内墙面石材干装

Publications (2)

Publication Number Publication Date
CN105421710A true CN105421710A (zh) 2016-03-23
CN105421710B CN105421710B (zh) 2019-03-01

Family

ID=55500215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510760463.2A Active CN105421710B (zh) 2015-11-10 2015-11-10 室内墙面石材干装

Country Status (1)

Country Link
CN (1) CN105421710B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167944A (ja) * 2000-12-01 2002-06-11 Takashi Taguchi 表装用石材板の取り付け構造及びその施工法
CN1384259A (zh) * 2001-05-09 2002-12-11 王广武 缝隙支撑石材幕墙
CN200985567Y (zh) * 2006-12-20 2007-12-05 山东鸿泰建设集团有限公司 新型外墙保温及砼饰面
CN201598791U (zh) * 2009-12-18 2010-10-06 广州市粤林木业有限公司 一种干挂装饰板龙骨
KR20130045711A (ko) * 2011-10-26 2013-05-06 김종성 실내장식용 커튼월 시공장치
CN103541534A (zh) * 2013-10-24 2014-01-29 广东蒙娜丽莎新型材料集团有限公司 轻质陶瓷薄板幕墙干挂结构及其施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167944A (ja) * 2000-12-01 2002-06-11 Takashi Taguchi 表装用石材板の取り付け構造及びその施工法
CN1384259A (zh) * 2001-05-09 2002-12-11 王广武 缝隙支撑石材幕墙
CN200985567Y (zh) * 2006-12-20 2007-12-05 山东鸿泰建设集团有限公司 新型外墙保温及砼饰面
CN201598791U (zh) * 2009-12-18 2010-10-06 广州市粤林木业有限公司 一种干挂装饰板龙骨
KR20130045711A (ko) * 2011-10-26 2013-05-06 김종성 실내장식용 커튼월 시공장치
CN103541534A (zh) * 2013-10-24 2014-01-29 广东蒙娜丽莎新型材料集团有限公司 轻质陶瓷薄板幕墙干挂结构及其施工方法

Also Published As

Publication number Publication date
CN105421710B (zh) 2019-03-01

Similar Documents

Publication Publication Date Title
CN105507537B (zh) 自由装拆、大小自由组合的建筑装饰面板干挂结构
CN204282729U (zh) 一种木饰面的干挂结构
CN105421715A (zh) 墙面石材干挂
CN210288789U (zh) 一种快速装配的装配式隔墙安装结构
CN205189333U (zh) 蜂窝墙板装置
CN207122081U (zh) 一种干挂结构及饰面系统
CN105421710A (zh) 室内墙面石材干装
CN105421711A (zh) 室内墙面石材干装法
CN205840201U (zh) 一种墙柱面的石材装饰阳角结构
CN205840056U (zh) 一种隔音装饰一体集成化隔墙系统
CN105421712A (zh) 室内墙面石材干装方法
CN204850171U (zh) 框架式幕墙结构
CN105442799A (zh) 室外墙面石材干挂
CN105421714A (zh) 墙面石材干挂方法
CN204199498U (zh) 铝塑板安装组件
CN105332490A (zh) 室内墙面石材干挂
CN207419791U (zh) 一种新型建筑幕墙结构
KR102094495B1 (ko) 커튼월 외장 시스템의 외부 장식물 설치 구조
CN105256928A (zh) 墙面石材干挂法
CN105421709A (zh) 室内墙面石材干挂法
CN204899109U (zh) 一种墙面装饰板的干挂构件
CN105421713A (zh) 室内墙面石材干挂方法
CN204876534U (zh) 一种建筑模板
CN105256929A (zh) 室外墙面石材干挂方法
CN213897719U (zh) 一种便于拆装组合的新型建筑幕墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190123

Address after: 266071 301 households in Unit 4, Building No. 3, 274 Ningxia Road, Southern District of Qingdao City, Shandong Province

Applicant after: Liu Weidong

Applicant after: Zhang Zhaogui

Address before: 271000 Room 101, unit 2, building 2, North Fifth Ring Road, Tai'an, Shandong.

Applicant before: Liu Weidong

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 233000 603, 6th floor, investment building, 1757 Tushan East Road, Bengbu Economic Development Zone, Anhui Province

Patentee after: Bengbu LU-03 Technology Consulting Co.,Ltd.

Address before: 266071 301 households in Unit 4, Building No. 3, 274 Ningxia Road, Southern District of Qingdao City, Shandong Province

Patentee before: Liu Weidong

Patentee before: Zhang Zhaogui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221130

Address after: 848300 Rooms 401 and 402, Unit 3, Building 1, Water Supply and Drainage Company of Cele County, Hotan Prefecture, Xinjiang Uygur Autonomous Region

Patentee after: Xinjiang Weiye Tiancheng Construction Engineering Co.,Ltd.

Address before: 233000 603, 6th floor, investment building, 1757 Tushan East Road, Bengbu Economic Development Zone, Anhui Province

Patentee before: Bengbu LU-03 Technology Consulting Co.,Ltd.