CN105421585A - Column base joint with double defense shear-resistant keys and construction method thereof - Google Patents

Column base joint with double defense shear-resistant keys and construction method thereof Download PDF

Info

Publication number
CN105421585A
CN105421585A CN201510988283.XA CN201510988283A CN105421585A CN 105421585 A CN105421585 A CN 105421585A CN 201510988283 A CN201510988283 A CN 201510988283A CN 105421585 A CN105421585 A CN 105421585A
Authority
CN
China
Prior art keywords
defences
shear key
roads
shear
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510988283.XA
Other languages
Chinese (zh)
Other versions
CN105421585B (en
Inventor
郦宏伟
杜兆宇
陈杰
俞奇效
吴国松
刘云飞
丁毅
孙立群
张笑乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201510988283.XA priority Critical patent/CN105421585B/en
Publication of CN105421585A publication Critical patent/CN105421585A/en
Application granted granted Critical
Publication of CN105421585B publication Critical patent/CN105421585B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2463Connections to foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention belongs to the field of building structures and particularly relates to a column base joint with double defense shear-resistant keys and a construction method thereof. A steel structure column base joint consists of two shear-resistant split systems; a second defense shear-resistant key is free of load in the normal using stage; when the column base joint suffers from extreme disasters and a first defense shear-resistant system is damaged, the second defense shear-resistant key takes effect instantly, so that the continuous damage to the column base joint is avoided. Through the technical scheme, the safety redundancy degree of the steel structure column joint is improved; a certain energy-dissipation effect is also achieved; meanwhile, the second defense shear-resistant key is simple to process and manufacture and convenient to mount.

Description

Set up defences the foot joint of shear key and construction method thereof in a kind of band two roads
Technical field
The invention belongs to building structure field, be specifically related to a kind of band two roads and set up defences the foot joint of shear key and construction method thereof.
Background technology
Steel building compares traditional architecture, has that the strength of materials is high, anti-seismic performance good, environmental protection, is convenient to the aspect advantages such as suitability for industrialized production, be widely used in industry, civilian construction.In steel building, foot joint, as the coupling part of superstructure and infrastructure, plays the effect of forming a connecting link, particularly important to the safety of structure.If foot joint destroys, imponderable loss will be caused.Therefore not only to ensure that steel work foot joint has enough degrees of safety in the design stage, and do special protection in construction and operational phase reply suspension column.
In recent years, terrorist activity spreads in the world, due to steel work suspension column closely face, and is subject to Vehicular impact and the blast impulse of the attack of terrorism.And steel building also may meet with the rarely occurred earthquake higher than this area fortification intensity in-service, geological process is the repeatedly reciprocating impact to structure, accumulating will be caused to destroy to foot joint;
What adopt in conventional steel structure foot joint is welded to connect, and because weld stress is concentrated with wood property uneven, under the reciprocating impact effect of above-mentioned extreme disaster, may bring out brittle fracture.If foot joint only has shearing resistance system of setting up defences together, once after destroying, following one by one lasting earthquake or blast impulse cannot be resisted.Therefore the applicant provides a kind of band two roads to set up defences the foot joint of shear key and construction method thereof, and this case produces thus.
Summary of the invention
The object of the present invention is to provide a kind of band two roads to set up defences the foot joint of shear key and construction method thereof, steel work foot joint is made up of a twice shearing resistance point system.
For achieving the above object, the concrete disclosed technical scheme of the present invention is: setting up defences the foot joint of shear key in a kind of band two roads, comprises basis, be provided with built-in fitting in basis, built-in fitting is provided with finished product bearing, the upper bracket plate on finished product bearing is provided with steel column; Be distributed with crashproof bracket and two roads in described steel column to set up defences shear key, wherein, two roads shear key of setting up defences is positioned at crashproof bracket and leaves certain interval.
Further, set up defences shear key and crashproof bracket of described two roads cooperatively interacts and is connected in cross distribution; Or, described two roads set up defences shear key be well word distribution, described crashproof bracket circumferentially disperses distribution.
Further, described finished product bearing comprises upper bracket, the undersetting of mutual clamping, and is flexibly connected the middle spacer of upper bracket and undersetting; Wherein the arc surface of middle spacer is flexibly connected with the concave surface of undersetting, and the horizontal plane of middle spacer abuts with upper bracket.
Setting up defences the construction method of foot joint of shear key in band two roads, specifically comprises the steps: step one, complete burying underground of built-in fitting, and carry out pouring & maintenance to base concrete and complete; Step 2, finished product bearing and built-in fitting firm welding, and temporary fixed, set up defences the upper bracket plate firm welding of shear key and finished product bearing in two roads; Step 3, steel column hoisted in position, and temporary fixed, setting up defences gap between shear key in the crashproof bracket of adjustment steel column and two roads, ensures that gap meets design requirement, adjust complete after steel column and finished product bearing upper bracket plate are welded and fixed; Step 4, after structural entity installation, remove the temporary fixed plate of finished product bearing, structural entity unloads.In the design stage, two roads shear key of setting up defences should be thrown off completely with foot joint, and reserved appropriate clearance, both guarantees do not collide at serviceability limit stage; Two roads shear key of setting up defences can adopt single shear key, also can adopt multiple shear keies of dispersion; Set up defences shear key cross section and attachment weld size of two roads should be determined according to designing and calculating; The gap set up defences between shear key in steel work foot joint and two roads should be 5mm; Shear key correspondence position of setting up defences in two roads should arrange crashproof bracket or crashproof stiffener.
Shear key is set up defences before dispatching from the factory in two roads, should carry out assembled in advance with foot joint, ensure field erected required precision; The anticorrosion way of shear key is set up defences in two roads should be consistent with main body steel work; The assembled entity that adopts is assembled or virtual assembled in advance in advance in advance.
Two roads shear key of setting up defences has welded with bottom built-in fitting or finished product bearing, and weld size should meet design requirement; Two roads are set up defences after shear key welded, and should carry out subsurface work acceptance in time; Next process can be carried out after acceptance(check).
Steel work foot joint hoisted in position, and temporary fixed, setting up defences gap between shear key in adjustment foot joint and two roads, ensures that gap meets design requirement; After adjustment, foot joint is welded and fixed.
Beneficial effect of the present invention:
Second shear key of setting up defences does not bear any load at serviceability limit stage; When foot joint meets with extreme disaster, first is set up defences after shearing resistance system goes to pot, and second shear key of setting up defences plays a role immediately, prevents foot joint from occurring to destroy continuously;
This technical scheme improves the unnecessary degree of safety of steel work foot joint, another fixed power consumption effect; Simultaneously two roads set up defences shear key processing and manufacturing simple, install convenient.
Accompanying drawing explanation
Fig. 1 is the foot joint schematic diagram of present pre-ferred embodiments one; Fig. 2 is the sectional view of Fig. 1 along A-A direction; Fig. 3 is that Fig. 1 analyses and observe line drawing along A-A direction; Fig. 4 is the foot joint schematic diagram of present pre-ferred embodiments two; Fig. 5 is the sectional view of Fig. 4 along B-B direction; Fig. 6 is that Fig. 4 analyses and observe line drawing along B-B direction; Fig. 7 is the foot joint schematic diagram of present pre-ferred embodiments three; Fig. 8 is the sectional view of Fig. 7 along C-C direction.
Detailed description of the invention
As Figure 1-3, what the present invention disclosed is a kind of band two roads the set up defences foot joint of shear key, comprises basic A7, is provided with built-in fitting A6 in basis, built-in fitting A6 is provided with finished product bearing A5, finished product bearing A5 is provided with steel column A1; Be distributed with crashproof bracket A3 and two roads in described steel column to set up defences shear key A2, wherein, the two roads shear key A2 that sets up defences is positioned at crashproof bracket A3 and leaves certain interval; The described two roads shear key A2 and crashproof bracket phase A3 that sets up defences is connected mutually in cross distribution; Or, described two roads set up defences shear key A2 be well word distribution, described crashproof bracket A3 circumferentially disperses distribution.
Described finished product bearing A5 comprises upper bracket A51, the undersetting A52 of mutual clamping, and is flexibly connected the middle spacer A53 of upper bracket A51 and undersetting A52; Wherein the arc surface of middle spacer A53 is flexibly connected with the concave surface of undersetting A52, and the horizontal plane of middle spacer A53 abuts with upper bracket A51.
Shown in composition graphs 1-3, be present pre-ferred embodiments: setting up defences the construction method of foot joint of shear key in a kind of band two road, specifically comprises the steps:
(1), complete burying underground of built-in fitting A6, and pouring & maintenance is carried out to basic A7 concrete complete;
(2), finished product bearing A5 and built-in fitting A6 firm welding, and temporary fixed, set up defences the column base plate A4 firm welding of shear key A2 and finished product bearing A5 in two roads;
(3), steel column A1 hoisted in position, and temporary fixed, setting up defences gap between shear key A2 in the crashproof bracket A3 of adjustment steel column A1 and two roads, ensures that gap meets design requirement, adjust complete after steel column A1 and finished product bearing A5 column base plate A4 is welded and fixed;
(4), after structural entity installation, remove the temporary fixed plate of finished product bearing A5, structural entity unloads.
Be the another kind of embodiment of the present invention as Figure 4-Figure 6: mainly comprise: bearing steel pipe B11, steel pipe B12, set up defences shear key B13 in two roads, crashproof stiffener B14, built-in fitting B15, basic B16.
Specific construction step is as follows:
(1) burying underground of built-in fitting B15 is completed; Basis B16 concreting and maintenance complete;
Set up defences shearing resistance B13 and built-in fitting B15 firm welding in (2) two roads;
(3) bearing steel pipe B11 hoisted in position, and temporary fixed, setting up defences gap between shear key B13 in adjustment bearing steel pipe B11 and two roads, ensures that gap meets design requirement; After adjustment, bearing steel pipe B11 and built-in fitting B15 is welded and fixed.
Be the third embodiment of the present invention as Figure 7-8.Mainly comprise: steel column C21, set up defences shear key C22 in two roads, crashproof bracket C23, column base plate C24, secondary grout layer C25, crab-bolt C26, built-in fitting C27, basic C28.
Specific construction step is as follows:
(1) burying underground of crab-bolt C25 and built-in fitting C27 is completed; Basis C28 concreting and maintenance complete;
Set up defences shearing resistance C22 and built-in fitting C27 firm welding in (2) two roads;
(3) steel column C21 hoisted in position, and temporary fixed, setting up defences gap between shear key C22 in adjustment steel column C21 and two roads, ensures that gap meets design requirement; After adjustment, steel column C21 fixed and carried out secondary grout layer C25.
The set up defences design of column foot of shear key and construction technology of a kind of band two roads provided the embodiment of the present invention is above described in detail, for one of ordinary skill in the art, according to the thought of the embodiment of the present invention, all will change in specific embodiments and applications.In sum, this description should not be construed as limitation of the present invention, and any change that all foundation inventive concepts are made is all within protection scope of the present invention.

Claims (4)

1. set up defences the foot joint of shear key in Zhong Dai bis-road, it is characterized in that: comprise basis, be provided with built-in fitting in basis, built-in fitting is provided with finished product bearing, the column base plate on finished product bearing is provided with steel column; Be distributed with crashproof bracket and two roads in described steel column to set up defences shear key, wherein, two roads shear key of setting up defences is positioned at crashproof bracket and leaves gap.
2. set up defences the foot joint of shear key in a kind of band according to claim 1 two roads, it is characterized in that: set up defences shear key and crashproof bracket of described two roads cooperatively interacts that to be connected be cross distribution; Or, described two roads set up defences shear key be well word distribution, described crashproof bracket circumferentially disperses distribution.
3. set up defences the foot joint of shear key in a kind of band according to claim 1 two roads, it is characterized in that: described finished product bearing comprises upper bracket, the undersetting of mutual clamping, and be flexibly connected the middle spacer of upper bracket and undersetting; Wherein the arc surface of middle spacer is flexibly connected with the concave surface of undersetting, and the horizontal plane of middle spacer abuts with upper bracket.
4. set up defences the construction method of foot joint of shear key in Zhong Dai bis-road, it is characterized in that, specifically comprise the steps: step one, complete burying underground of built-in fitting, and carry out pouring & maintenance to base concrete and complete; Step 2, finished product bearing and built-in fitting firm welding, and temporary fixed, set up defences the upper bracket plate firm welding of shear key and finished product bearing in two roads; Step 3, steel column hoisted in position, and temporary fixed, setting up defences gap between shear key in the crashproof bracket of adjustment steel column and two roads, ensures that gap meets design requirement, adjust complete after steel column and finished product seat post base plate are welded and fixed; Step 4, after structural entity installation, remove the temporary fixed plate of finished product bearing, structural entity unloads.
CN201510988283.XA 2015-12-24 2015-12-24 A kind of band two is set up defences the foot joint and its construction method of shear key Active CN105421585B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510988283.XA CN105421585B (en) 2015-12-24 2015-12-24 A kind of band two is set up defences the foot joint and its construction method of shear key

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510988283.XA CN105421585B (en) 2015-12-24 2015-12-24 A kind of band two is set up defences the foot joint and its construction method of shear key

Publications (2)

Publication Number Publication Date
CN105421585A true CN105421585A (en) 2016-03-23
CN105421585B CN105421585B (en) 2017-12-01

Family

ID=55500092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510988283.XA Active CN105421585B (en) 2015-12-24 2015-12-24 A kind of band two is set up defences the foot joint and its construction method of shear key

Country Status (1)

Country Link
CN (1) CN105421585B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021011796A (en) * 2019-07-09 2021-02-04 センクシア株式会社 Column base structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09165754A (en) * 1995-12-15 1997-06-24 Kawasaki Heavy Ind Ltd Fixing structure of steel structural column base or the like
JP2012158942A (en) * 2011-02-02 2012-08-23 Daiwa House Industry Co Ltd Pin connection structure of column base
CN203462583U (en) * 2013-08-20 2014-03-05 浙江精工钢结构集团有限公司 Super high-rise exposed column foot
CN103696505A (en) * 2013-12-25 2014-04-02 哈尔滨工业大学 Low-yield-point steel buckling-restrained shearing plate damper
CN204174752U (en) * 2014-08-06 2015-02-25 绿地控股集团有限公司 The syndeton of circular steel column and concrete beam
CN204570931U (en) * 2015-03-02 2015-08-19 成都华川公路建设集团有限公司 A kind of Self-resetting shock-absorption spherical bearing
CN204608989U (en) * 2015-04-03 2015-09-02 中钢集团马鞍山矿山研究院有限公司 A kind of movable syndeton supported for steel frame mill building
CN205369526U (en) * 2015-12-24 2016-07-06 浙江精工钢结构集团有限公司 Take column base node of two shear keies of seting up defences

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09165754A (en) * 1995-12-15 1997-06-24 Kawasaki Heavy Ind Ltd Fixing structure of steel structural column base or the like
JP2012158942A (en) * 2011-02-02 2012-08-23 Daiwa House Industry Co Ltd Pin connection structure of column base
CN203462583U (en) * 2013-08-20 2014-03-05 浙江精工钢结构集团有限公司 Super high-rise exposed column foot
CN103696505A (en) * 2013-12-25 2014-04-02 哈尔滨工业大学 Low-yield-point steel buckling-restrained shearing plate damper
CN204174752U (en) * 2014-08-06 2015-02-25 绿地控股集团有限公司 The syndeton of circular steel column and concrete beam
CN204570931U (en) * 2015-03-02 2015-08-19 成都华川公路建设集团有限公司 A kind of Self-resetting shock-absorption spherical bearing
CN204608989U (en) * 2015-04-03 2015-09-02 中钢集团马鞍山矿山研究院有限公司 A kind of movable syndeton supported for steel frame mill building
CN205369526U (en) * 2015-12-24 2016-07-06 浙江精工钢结构集团有限公司 Take column base node of two shear keies of seting up defences

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021011796A (en) * 2019-07-09 2021-02-04 センクシア株式会社 Column base structure
JP7360573B2 (en) 2019-07-09 2023-10-13 センクシア株式会社 Column base structure

Also Published As

Publication number Publication date
CN105421585B (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN104032839B (en) Syndeton and the construction method thereof of friction damper assembling frame node
CN204753817U (en) Steel structure beam column joint
US20200087915A1 (en) N-shape prefabricated connective split column for underground structures
CN103883027A (en) Composite shear wall formed by embedding energy-dissipation bars between frame and wall with inbuilt steel plate and construction method
CN103696607B (en) A kind of prestressing force assembling slab column system with bracing members and construction method thereof
Jagadish et al. A study on bracing systems on high rise steel structures
WO2020057129A1 (en) Anti-buckling steel plate shear wall
CN105421585A (en) Column base joint with double defense shear-resistant keys and construction method thereof
CN205369526U (en) Take column base node of two shear keies of seting up defences
CN205976087U (en) Can dismantle shear force wall assembly structure system
CN204703077U (en) Based on the bridge pier reinforcement and repair structure of ultra-high performance concrete
CN206159728U (en) Whipping frame is prevented to nuclear power station pipeline
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN202324198U (en) Anti-pulling embedded fixed column base for portal-rigid frame
CN109594789B (en) Node reinforcing device and reinforcing method capable of restoring function
CN205242694U (en) Vertical connected node of uniform thickness superimposed shear wall
CN204920409U (en) Steel pylons angle steel connected node
CN204212261U (en) Post and curved beam horizontal flexibility connection space structural system
CN209339331U (en) A kind of steel core concrete column and girder steel connection structure
CN209099556U (en) A kind of Novel supporting-type metal energy consumption coupling beam
CN203320420U (en) Temporary locking structure for corrugated steel webs of steel and concrete combined box girder
CN205444477U (en) Buckling restrained brace and had concrete frame structure's joint construction
CN106049956B (en) Precast construction node energy-dissipating and shock-absorbing T-type damper
CN104264780A (en) Column and curved beam horizontal and flexible connection space structure system
CN209538378U (en) A kind of energy consumption enhancement mode node bracing means

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant