CN205369526U - Take column base node of two shear keies of seting up defences - Google Patents

Take column base node of two shear keies of seting up defences Download PDF

Info

Publication number
CN205369526U
CN205369526U CN201521098600.2U CN201521098600U CN205369526U CN 205369526 U CN205369526 U CN 205369526U CN 201521098600 U CN201521098600 U CN 201521098600U CN 205369526 U CN205369526 U CN 205369526U
Authority
CN
China
Prior art keywords
defences
shear key
roads
bracket
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521098600.2U
Other languages
Chinese (zh)
Inventor
郦宏伟
杜兆宇
陈杰
俞奇效
吴国松
刘云飞
丁毅
孙立群
张笑乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201521098600.2U priority Critical patent/CN205369526U/en
Application granted granted Critical
Publication of CN205369526U publication Critical patent/CN205369526U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model belongs to the building structure field, concretely relates to take column base node of two shear keies of seting up defences makes steel structure column foot node shear the components of a whole that can function independently series by twice and becomes, and wherein the second way is set up defences the shear key and is not undertaken any load in the normal use stage, meet with extreme calamity when the column base node, first way is set up defences the system of shearing and destroyed the back, and the second way is set up defences the shear key and is played a role immediately, prevents that the column base node from taking place to destroy in succession. This technical scheme has improved the unnecessary degree of safety of steel structure column foot node, again certain power consumption effect. Simultaneously set up defences that shear key manufacturing is simple, the installation is convenient for two.

Description

A kind of foot joint of shear key of setting up defences with two roads
Technical field
This utility model belongs to building structure field, is specifically related to the foot joint of a kind of shear key of setting up defences with two roads.
Background technology
Steel building compares traditional architecture, has that strength of materials height, anti-seismic performance be good, environmental protection, is easy to the aspect advantages such as industrialized production, has been widely used in industry, civil buildings.In steel building, foot joint, as the coupling part of superstructure Yu infrastructure, plays the effect formed a connecting link, and the safety of structure is particularly important.If foot joint destroys, will result in imponderable loss.Therefore not only to ensure that steel construction foot joint has enough degrees of safety in the design phase, and do special protection in construction and operational phase reply suspension column.
In recent years, terrorist activity spreads in the world, due to steel construction suspension column closely face, and is subject to Vehicular impact and the blast impulse of the attack of terrorism.And steel building is likely to in-service and meets with the rarely occurred earthquake higher than this area fortification intensity, geological process is the repeatedly reciprocating impact to structure, it will cause accumulating to destroy foot joint;
What adopt in conventional steel structure foot joint is welded to connect, and concentrates due to weld stress and material is uneven, under the reciprocating impact effect of above-mentioned extreme disaster, it is possible to bring out brittle fracture.If foot joint only has shearing resistance system of setting up defences together, once after destroying, will be unable to resist following one by one lasting earthquake or blast impulse.Therefore the applicant provides the foot joint of a kind of shear key of setting up defences with two roads, and this case thus produces.
Utility model content
The purpose of this utility model is in that to provide the foot joint of a kind of shear key of setting up defences with two roads, makes steel construction foot joint be made up of twice shearing resistances split system.
For achieving the above object, this utility model specifically disclosed technical scheme is: the foot joint of a kind of shear key of setting up defences with two roads, including basis, is provided with built-in fitting in basis, built-in fitting is provided with finished product bearing, the upper bracket plate on finished product bearing is provided with steel column;Distribution has crashproof bracket and two roads to set up defences shear key in described steel column, and wherein, two roads shear key of setting up defences is positioned at crashproof bracket and leaves certain interval.
Further, shear key is set up defences and crashproof bracket cooperates connection in cross distribution in described two roads;Or, described two roads set up defences shear key be well word distribution, described crashproof bracket circumferentially disperses distribution.
Further, described finished product bearing includes the upper bracket of mutual clamping, undersetting, and is flexibly connected the middle spacer of upper bracket and undersetting;Wherein the arc surface of middle spacer is flexibly connected with the concave surface of undersetting, and the horizontal plane of middle spacer abuts with upper bracket.
The construction method of foot joint of a kind of shear key of setting up defences with two roads, specifically includes following steps: step one, completes burying underground of built-in fitting, and base concrete is built and maintenance completes;Step 2, finished product bearing and built-in fitting firm welding, and fix, set up defences the shear key upper bracket plate firm welding with finished product bearing in two roads temporarily;Step 3, steel column hoisted in position, and temporarily fixing, adjusts the crashproof bracket of steel column and sets up defences gap between shear key in two roads, it is ensured that gap meets design requirement, adjust complete after steel column and finished product bearing upper bracket plate are welded and fixed;Step 4, after structure integral installation completes, removes finished product bearing and fixes plate temporarily, and structure entirety unloads.In the design phase, shear key is set up defences in two roads should be completely disengaged with foot joint, and reserved appropriate clearance, it is ensured that both do not collide at serviceability limit stage;Two roads shear key of setting up defences can adopt single shear key, also can adopt scattered multiple shear key;Are set up defences in shear key cross section in two roads and attachment weld size should be determined according to designing and calculating;The gap set up defences between shear key in steel construction foot joint and two roads should be 5mm;Shear key correspondence position of setting up defences in two roads should arrange crashproof bracket or crashproof stiffener.
Shear key is set up defences before dispatching from the factory in two roads, should carry out pre-assembly with foot joint, it is ensured that field erected required precision;Shear key anticorrosion way is set up defences in two roads should be consistent with main body steel construction;Pre-assembly can adopt entity assembled in advance or virtual pre-assembly.
Two roads shear key of setting up defences has welded with bottom built-in fitting or finished product bearing, and weld size should meet design requirement;Two roads are set up defences after shear key welded, and should carry out acceptance of concealed work in time;Next process can be carried out after acceptance(check).
Steel construction foot joint hoisted in position, and temporarily fixing, adjusts foot joint and sets up defences gap between shear key in two roads, it is ensured that gap meets design requirement;After adjustment, foot joint is welded and fixed.
This utility model beneficial effect:
Second shear key of setting up defences does not undertake any load at serviceability limit stage;When foot joint meets with extreme disaster, first is set up defences after shearing resistance system goes to pot, and second shear key of setting up defences plays a role immediately, it is prevented that foot joint occurs to destroy continuously;
This technical scheme improves the unnecessary degree of safety of steel construction foot joint, another fixed power consumption effect;Set up defences in two roads simultaneously, and shear key processing and manufacturing is simple, it is convenient to install.
Accompanying drawing explanation
Fig. 1 is the foot joint schematic diagram of this utility model preferred embodiment one;Fig. 2 is the Fig. 1 sectional view along A-A direction;Fig. 3 is the Fig. 1 section view line drawing along A-A direction;Fig. 4 is the foot joint schematic diagram of this utility model preferred embodiment two;Fig. 5 is the Fig. 4 sectional view along B-B direction;Fig. 6 is the Fig. 4 section view line drawing along B-B direction;Fig. 7 is the foot joint schematic diagram of this utility model preferred embodiment three;Fig. 8 is the Fig. 7 sectional view along C-C direction.
Detailed description of the invention
As Figure 1-3, what this utility model disclosed is the foot joint of a kind of shear key of setting up defences with two roads, including basis A7, is provided with built-in fitting A6, built-in fitting A6 is provided with finished product bearing A5, finished product bearing A5 is provided with steel column A1 in basis;Distribution has crashproof bracket A3 and two roads to set up defences shear key A2 in described steel column, and wherein, the two roads shear key A2 that sets up defences is positioned at crashproof bracket A3 and leaves certain interval;The described two roads shear key A2 and crashproof bracket phase A3 that sets up defences is connected mutually in cross distribution;Or, described two roads set up defences shear key A2 be well word distribution, described crashproof bracket A3 circumferentially disperses distribution.
Described finished product bearing A5 includes the upper bracket A51 of mutual clamping, undersetting A52, and is flexibly connected the middle spacer A53 of upper bracket A51 and undersetting A52;Wherein the arc surface of middle spacer A53 is flexibly connected with the concave surface of undersetting A52, and the horizontal plane of middle spacer A53 abuts with upper bracket A51.
Shown in Fig. 1-3, for this utility model preferred embodiment: the construction method of foot joint of a kind of shear key of setting up defences with two roads, specifically include following steps:
(1), complete burying underground of built-in fitting A6, and basis A7 concrete is built and maintenance completes;
(2), finished product bearing A5 and built-in fitting A6 firm welding, and fix temporarily, set up defences the column base plate A4 firm welding of shear key A2 and finished product bearing A5 in two roads;
(3), steel column A1 hoisted in position, and fix temporarily, adjust the crashproof bracket A3 of steel column A1 and set up defences gap between shear key A2 in two roads, it is ensured that gap meets design requirement, adjust complete after steel column A1 and finished product bearing A5 column base plate A4 is welded and fixed;
(4), after structure integral installation completes, removing finished product bearing A5 and fix plate temporarily, structure entirety unloads.
As Figure 4-Figure 6 for this utility model another kind embodiment: specifically include that to set up defences shear key B13, crashproof stiffener B14, built-in fitting B15 in bearing steel pipe B11, steel pipe B12, two road, basis B16.
Specific construction step is as follows:
(1) burying underground of built-in fitting B15 is completed;Basis B16 concreting and maintenance complete;
Set up defences shearing resistance B13 and built-in fitting B15 firm welding in (2) two roads;
(3) bearing steel pipe B11 hoisted in position, and temporarily fixing, adjusts bearing steel pipe B11 and sets up defences gap between shear key B13 in two roads, it is ensured that gap meets design requirement;After adjustment, bearing steel pipe B11 and built-in fitting B15 is welded and fixed.
It is the third embodiment of this utility model as Figure 7-8.Specifically including that steel column C21, set up defences shear key C22 in two roads, crashproof bracket C23, column base plate C24, secondary grout layer C25, crab-bolt C26, built-in fitting C27, basis C28.
Specific construction step is as follows:
(1) burying underground of crab-bolt C25 and built-in fitting C27 is completed;Basis C28 concreting and maintenance complete;
Set up defences shearing resistance C22 and built-in fitting C27 firm welding in (2) two roads;
(3) steel column C21 hoisted in position, and temporarily fixing, adjusts steel column C21 and sets up defences gap between shear key C22 in two roads, it is ensured that gap meets design requirement;After adjustment, steel column C21 fixed and carried out secondary grout layer C25.
What above this utility model embodiment is provided a kind of sets up defences the design of column foot of shear key with two roads and construction technology is described in detail, for one of ordinary skill in the art, according to the thought of this utility model embodiment, all will change in specific embodiments and applications.In sum, this specification content should not be construed as restriction of the present utility model, and any change that all foundation this utility model thought is made is all within protection domain of the present utility model.

Claims (3)

1. set up defences the foot joint of shear key in Zhong Dai bis-road, it is characterised in that: include basis, in basis, be provided with built-in fitting, built-in fitting is provided with finished product bearing, the column base plate on finished product bearing is provided with steel column;Distribution has crashproof bracket and two roads to set up defences shear key in described steel column, and wherein, two roads shear key of setting up defences is positioned at crashproof bracket and leaves gap.
2. the foot joint of a kind of shear key of setting up defences with two roads according to claim 1, it is characterised in that: connection that shear key is set up defences in described two roads and crashproof bracket cooperates is in cross distribution;Or, described two roads set up defences shear key be well word distribution, described crashproof bracket circumferentially disperses distribution.
3. the foot joint of a kind of shear key of setting up defences with two roads according to claim 1, it is characterised in that: described finished product bearing includes the upper bracket of mutual clamping, undersetting, and is flexibly connected the middle spacer of upper bracket and undersetting;Wherein the arc surface of middle spacer is flexibly connected with the concave surface of undersetting, and the horizontal plane of middle spacer abuts with upper bracket.
CN201521098600.2U 2015-12-24 2015-12-24 Take column base node of two shear keies of seting up defences Expired - Fee Related CN205369526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521098600.2U CN205369526U (en) 2015-12-24 2015-12-24 Take column base node of two shear keies of seting up defences

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521098600.2U CN205369526U (en) 2015-12-24 2015-12-24 Take column base node of two shear keies of seting up defences

Publications (1)

Publication Number Publication Date
CN205369526U true CN205369526U (en) 2016-07-06

Family

ID=56256349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521098600.2U Expired - Fee Related CN205369526U (en) 2015-12-24 2015-12-24 Take column base node of two shear keies of seting up defences

Country Status (1)

Country Link
CN (1) CN205369526U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421585A (en) * 2015-12-24 2016-03-23 浙江精工钢结构集团有限公司 Column base joint with double defense shear-resistant keys and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421585A (en) * 2015-12-24 2016-03-23 浙江精工钢结构集团有限公司 Column base joint with double defense shear-resistant keys and construction method thereof
CN105421585B (en) * 2015-12-24 2017-12-01 浙江精工钢结构集团有限公司 A kind of band two is set up defences the foot joint and its construction method of shear key

Similar Documents

Publication Publication Date Title
CN205776734U (en) A kind of assembly concrete connecting structure of beam column nodes
CN106930593B (en) Bamboo(Wood)Frame structure beam column assembled energy dissipation node
CN204326255U (en) A kind of Reinforced Concrete Composite Beams and steel pipe column connected node
CN105735503B (en) Power consumption steel column system with replaceable mild steel damper
CN105155684A (en) Steel frame integrated member for concrete core tube structures and assembly method thereof
CN107514062A (en) Steel construction main body assembling type node and its application
CN205369526U (en) Take column base node of two shear keies of seting up defences
Jagadish et al. A study on bracing systems on high rise steel structures
Scuderi Building exoskeletons for the integrated retrofit of social housing
CN105421585B (en) A kind of band two is set up defences the foot joint and its construction method of shear key
CN202954437U (en) Reinforced steel concrete beam column
CN105804416A (en) Connecting structure for prefabricated assembling type building tower crane
CN104452962A (en) Built-in inverted-corbel type concrete structure frame beam-column joint
CN205242694U (en) Vertical connected node of uniform thickness superimposed shear wall
CN209099556U (en) A kind of Novel supporting-type metal energy consumption coupling beam
CN209144999U (en) A kind of assembling type node of round steel tubing string connection
CN106049956B (en) Precast construction node energy-dissipating and shock-absorbing T-type damper
CN104213640B (en) Stoplog bonded type shear resistance connector
CN207551675U (en) Integrated construction elevator protective door
CN204112500U (en) Stoplog bonded type shear resistance connector
CN207161893U (en) Gas user indoor gas standpipe prefabricated component
CN213927631U (en) Construction connected node instrument and connection structure
CN206737114U (en) A kind of concrete complex building of steel meshwork framework
CN208792490U (en) The assembling type node structure of round steel tubing string and top steel frame
CN208078563U (en) A kind of crane span structure wears beam and crosses sedimentation crack structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20201224