CN105390993A - 风力发电机组大型电缆敷设方法 - Google Patents
风力发电机组大型电缆敷设方法 Download PDFInfo
- Publication number
- CN105390993A CN105390993A CN201510915797.2A CN201510915797A CN105390993A CN 105390993 A CN105390993 A CN 105390993A CN 201510915797 A CN201510915797 A CN 201510915797A CN 105390993 A CN105390993 A CN 105390993A
- Authority
- CN
- China
- Prior art keywords
- cable
- sized cable
- sized
- wind turbine
- tower cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
Abstract
本发明涉及一种风力发电机组大型电缆敷设方法,具有如下步骤:a)在风力发电机组吊装前,将需要敷设的全部大型电缆排布在上塔筒内并紧固;b)在风力发电机组吊装完成后,将预布置在上塔筒内的用于上塔筒上部电缆敷设的那部分大型电缆进行拆除,并利用吊运装置吊运至上层塔筒平台,然后利用牵引装置将大型电缆牵引至机舱内电缆接线位;c)将布置到位的大型电缆进行紧固,完成风机塔筒上部的大型电缆的敷设工作;d)将预布置的剩余部分进行拆除,并利于吊运装置逐层下放并紧固,依次逐层完成全部大型电缆的敷设安装工作。本发明的有益效果是:敷设作业过程更加合理、操作简单;减少现场施工过程的安全隐患,降低了人员的劳动强度。
Description
技术领域
本发明涉及一种风力发电机组大型电缆敷设方法。
背景技术
目前风力发电机组塔筒内的大型电缆的安装敷设,主要采用人工敷设方法,在风力发电机舱内,由工作人员运用人力将大型电缆往下放,并在塔筒内每隔一段距离设置一名人员,由上至下排开,对放下的电缆进行安装敷设,这种安装方式存在几大缺点:
第一,施工成本高,由于电缆敷设现场环境比较恶劣,劳动强度也很大,需配备大量的人员来保障作业过程,一次投入至少10人以上(每台机组),特别是对于采用通缆的机组,则需配备一台专用吊车配合作业,成本较高。
第二,作业效率低,如上所述,敷设一台风机大型电缆,需要花费2个工作日的时间,在投入大量人力物力的情况下,工作效率却比较低下。
第三,安全隐患大,风电的安装作业为高空作业,工作人员需要反复攀爬在塔筒爬梯上进行安装工作,对于劳动强度大且需要工作人员高度协调配合作业的过程,存在很大的安全隐患。
发明内容
本发明所要解决的技术问题是:提供一种风力发电机组大型电缆敷设方法,降低敷设作业的难度,降低敷设成本。
本发明解决其技术问题所采用的技术方案是:一种风力发电机组大型电缆敷设方法,具有如下步骤:a)风机塔筒大型电缆预布置:在风力发电机组吊装前,采用放线装置将需要敷设的全部大型电缆排布在上塔筒内并紧固;b)在风力发电机组吊装完成后,将预布置在上塔筒内的用于上塔筒上部电缆敷设的那部分大型电缆进行拆除,并将拆卸下的大型电缆利用固定在上塔筒的上层塔筒平台上的吊运装置吊运至上层塔筒平台,然后利用机舱内的牵引装置将吊运至上层塔筒平台上的大型电缆牵引至机舱内电缆接线位;c)将利用吊运装置和牵引装置布置到位的大型电缆进行紧固,完成风机塔筒上部的大型电缆的敷设工作;d)将预布置在上塔筒内大型电缆的剩余部分进行拆除,并将拆除下来的大型电缆利于固定在风机塔筒的各层塔筒平台上的吊运装置逐层下放并紧固,依次逐层完成全部大型电缆的敷设安装工作。
进一步限定,在步骤a中,预布置在上塔筒内的大型电缆排布在上塔筒内的电缆夹和塔筒爬梯上。
进一步限定,在步骤a中预布置在上塔筒内的用于上塔筒上部电缆敷设的那部分大型电缆排布在上塔筒内的马鞍上部,预布置在上塔筒内的大型电缆的剩余部分排布在上塔筒内的马鞍下部。
进一步限定,大型电缆在吊运至各层塔筒平台上后,采用人工将大型电缆盘好的方式消除电缆应力。
本发明的有益效果是:
(1)风力发电机大型电缆敷设作业过程更加合理、操作简单,使现场作业摆脱了完全依赖人力的状态,作业方法更加科学有效。
(2)减少了现场施工过程的安全隐患,由于采用了牵引机构和吊运装置,减少了作业人数的同时,大大降低了人员的劳动强度,使风力发电机组大型电缆安装困难、安装危险的问题得到了有效解决。
(3)降低成本,主要体现在人员的减少和施工作业周期缩短上,人员减少一半的同时,原本需要2个工作日的任务,1个工作日即可完成。
附图说明
下面结合附图和实施例对本发明进一步说明;
图1是本发明的风机塔筒大型电缆预布置的示意图;
图2是本发明的大型电缆在机舱和上塔筒内的敷设示意图;
图3是本发明的大型电缆的整体敷设示意图;
其中,1.放线装置,2.牵引装置,3.吊运装置,4.电缆夹,5.大型电缆,6.机舱,7.塔筒平,8.马鞍,9.塔筒爬梯,10.发电机,11.风机塔筒,11-1.上塔筒,11-2.中塔筒,11-3.下塔筒。
具体实施方式
如图1、2和3所示,一种风力发电机组大型电缆敷设方法,该大型电缆敷设的方法需要使用到放线装置1、牵引装置2、吊运装置3和电缆夹4。其中放线装置1用于将卷绕的大型电缆5进行放线。牵引装置2固定在机舱6内,可自下而上牵引大型电缆5至安装位置。吊运装置3根据吊运需求固定在风机塔筒的塔筒平台7的下部位置,用于吊运大型电缆5。电缆夹4安装在风机塔筒的塔筒壁上,可有效固定大型电缆5。风机塔筒11包括上塔筒11-1、中塔筒11-2和下塔筒11-3,这些塔筒内都具有塔筒平台7。
该敷设方法具有如下步骤:
a)风机塔筒大型电缆5预布置:在风力发电机组吊装前,采用放线装置1将需要敷设的全部大型电缆5排布在上塔筒11-1内并紧固,具体地,预布置在上塔筒11-1内的用于上塔筒11-1上部电缆敷设的那部分大型电缆5排布在上塔筒11-1内的马鞍8上部的电缆夹4和塔筒爬梯9上,并且,预布置在上塔筒11-1内的大型电缆5的剩余部分排布在上塔筒11-1内的马鞍8下部的电缆夹4和塔筒爬梯9上。
b)在风力发电机组吊装完成后,将预布置在上塔筒11-1内的马鞍8上方的用于上塔筒11-1上部电缆敷设的那部分大型电缆5进行拆除,并将拆卸下的大型电缆5挂在吊运装置3的挂钩上,以利用固定在上塔筒11-1的上层塔筒平台上的吊运装置3吊运至上层塔筒平台,人工将大型电缆5盘好,以有效消除电缆应力,然后利用机舱6内的牵引装置2将吊运至上层塔筒平台上的大型电缆5牵引至机舱6内的发电机10的电缆接线位。
c)将利用吊运装置3和牵引装置2布置到位的大型电缆5利用电缆夹4进行紧固,完成风机塔筒11上部的大型电缆5的敷设工作。
d)将预布置在上塔筒11-1内马鞍8下方的大型电缆5的剩余部分进行拆除,并将拆除下来的大型电缆5利于固定在风机塔筒11的各层塔筒平台上的吊运装置3逐层下放并紧固,依次逐层完成全部大型电缆5的敷设安装工作。风机塔筒11的法兰处的大型电缆5需做好弧度及防护,禁止大型电缆5在风机塔筒11的法兰处硬接触,大型电缆5在吊运至各层塔筒平台上后,采用人工将大型电缆5盘好的方式消除电缆应力。
Claims (4)
1.一种风力发电机组大型电缆敷设方法,其特征是:具有如下步骤:
a)风机塔筒大型电缆预布置:在风力发电机组吊装前,采用放线装置将需要敷设的全部大型电缆排布在上塔筒内并紧固;
b)在风力发电机组吊装完成后,将预布置在上塔筒内的用于上塔筒上部电缆敷设的那部分大型电缆进行拆除,并将拆卸下的大型电缆利用固定在上塔筒的上层塔筒平台上的吊运装置吊运至上层塔筒平台,然后利用机舱内的牵引装置将吊运至上层塔筒平台上的大型电缆牵引至机舱内电缆接线位;
c)将利用吊运装置和牵引装置布置到位的大型电缆进行紧固,完成风机塔筒上部的大型电缆的敷设工作;
d)将预布置在上塔筒内大型电缆的剩余部分进行拆除,并将拆除下来的大型电缆利于固定在风机塔筒的各层塔筒平台上的吊运装置逐层下放并紧固,依次逐层完成全部大型电缆的敷设安装工作。
2.根据权利要求1所述的风力发电机组大型电缆敷设方法,其特征是:在步骤a中,预布置在上塔筒内的大型电缆排布在上塔筒内的电缆夹和塔筒爬梯上。
3.根据权利要求1所述的风力发电机组大型电缆敷设方法,其特征是:在步骤a中预布置在上塔筒内的用于上塔筒上部电缆敷设的那部分大型电缆排布在上塔筒内的马鞍上部,预布置在上塔筒内的大型电缆的剩余部分排布在上塔筒内的马鞍下部。
4.根据权利要求1所述的风力发电机组大型电缆敷设方法,其特征是:大型电缆在吊运至各层塔筒平台上后,采用人工将大型电缆盘好的方式消除电缆应力。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510915797.2A CN105390993B (zh) | 2015-12-11 | 2015-12-11 | 风力发电机组大型电缆敷设方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510915797.2A CN105390993B (zh) | 2015-12-11 | 2015-12-11 | 风力发电机组大型电缆敷设方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105390993A true CN105390993A (zh) | 2016-03-09 |
CN105390993B CN105390993B (zh) | 2018-02-16 |
Family
ID=55422967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510915797.2A Active CN105390993B (zh) | 2015-12-11 | 2015-12-11 | 风力发电机组大型电缆敷设方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105390993B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105896411A (zh) * | 2016-05-25 | 2016-08-24 | 新疆金风科技股份有限公司 | 电缆护圈、风力发电机组及电缆安装方法 |
CN109361083A (zh) * | 2018-10-22 | 2019-02-19 | 新疆金风科技股份有限公司 | 电缆连接器、风力发电机组及其电缆连接方法 |
CN110932163A (zh) * | 2019-12-05 | 2020-03-27 | 远东电缆有限公司 | 风力涡轮机机舱内直流电缆的安装方法 |
CN111211527A (zh) * | 2020-01-16 | 2020-05-29 | 凯宸能源科技(天津)有限公司 | 一种风电塔筒内的电力输出系统 |
CN112003195A (zh) * | 2020-07-31 | 2020-11-27 | 远东电缆有限公司 | 一种风力发电用耐扭中压软电缆敷设安装方法 |
CN112003206A (zh) * | 2020-06-30 | 2020-11-27 | 上海江南长兴造船有限责任公司 | 一种电缆敷设结构、敷设方法 |
CN114068073A (zh) * | 2020-07-31 | 2022-02-18 | 北京金风科创风电设备有限公司 | 电缆、风力发电机组以及电缆的敷设方法 |
CN114696262A (zh) * | 2020-12-30 | 2022-07-01 | 新疆金风科技股份有限公司 | 电缆吊装敷设装置及方法、风力发电机组 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1745247A (zh) * | 2003-02-12 | 2006-03-08 | 艾劳埃斯·乌本 | 具有导电轨的风力设备 |
CN101634282A (zh) * | 2008-07-08 | 2010-01-27 | 通用电气公司 | 用于风力涡轮机塔架的线缆桥 |
CN102265030A (zh) * | 2010-03-15 | 2011-11-30 | 三菱重工业株式会社 | 风力发电装置及使用于该装置的电缆支承结构 |
EP2518844A1 (en) * | 2011-04-27 | 2012-10-31 | Siemens Aktiengesellschaft | Arrangement and method for installing cables |
CN203932842U (zh) * | 2014-06-10 | 2014-11-05 | 中国建筑第六工程局有限公司 | 竖井电缆敷设装置 |
-
2015
- 2015-12-11 CN CN201510915797.2A patent/CN105390993B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1745247A (zh) * | 2003-02-12 | 2006-03-08 | 艾劳埃斯·乌本 | 具有导电轨的风力设备 |
CN101634282A (zh) * | 2008-07-08 | 2010-01-27 | 通用电气公司 | 用于风力涡轮机塔架的线缆桥 |
CN102265030A (zh) * | 2010-03-15 | 2011-11-30 | 三菱重工业株式会社 | 风力发电装置及使用于该装置的电缆支承结构 |
EP2518844A1 (en) * | 2011-04-27 | 2012-10-31 | Siemens Aktiengesellschaft | Arrangement and method for installing cables |
CN203932842U (zh) * | 2014-06-10 | 2014-11-05 | 中国建筑第六工程局有限公司 | 竖井电缆敷设装置 |
Non-Patent Citations (2)
Title |
---|
丁效武: ""2000kW风力发电机组安装技术"", 《安徽建筑》 * |
吴佳梁等: "《风力机安装、维护与故障诊断》", 30 April 2011 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105896411A (zh) * | 2016-05-25 | 2016-08-24 | 新疆金风科技股份有限公司 | 电缆护圈、风力发电机组及电缆安装方法 |
CN105896411B (zh) * | 2016-05-25 | 2018-07-27 | 新疆金风科技股份有限公司 | 电缆护圈、风力发电机组及电缆安装方法 |
CN109361083A (zh) * | 2018-10-22 | 2019-02-19 | 新疆金风科技股份有限公司 | 电缆连接器、风力发电机组及其电缆连接方法 |
CN110932163A (zh) * | 2019-12-05 | 2020-03-27 | 远东电缆有限公司 | 风力涡轮机机舱内直流电缆的安装方法 |
CN111211527A (zh) * | 2020-01-16 | 2020-05-29 | 凯宸能源科技(天津)有限公司 | 一种风电塔筒内的电力输出系统 |
CN111211527B (zh) * | 2020-01-16 | 2021-11-02 | 凯宸能源科技(天津)有限公司 | 一种风电塔筒内的电力输出系统 |
CN112003206A (zh) * | 2020-06-30 | 2020-11-27 | 上海江南长兴造船有限责任公司 | 一种电缆敷设结构、敷设方法 |
CN112003195A (zh) * | 2020-07-31 | 2020-11-27 | 远东电缆有限公司 | 一种风力发电用耐扭中压软电缆敷设安装方法 |
CN112003195B (zh) * | 2020-07-31 | 2021-09-07 | 远东电缆有限公司 | 一种风力发电用耐扭中压软电缆敷设安装方法 |
CN114068073A (zh) * | 2020-07-31 | 2022-02-18 | 北京金风科创风电设备有限公司 | 电缆、风力发电机组以及电缆的敷设方法 |
CN114696262A (zh) * | 2020-12-30 | 2022-07-01 | 新疆金风科技股份有限公司 | 电缆吊装敷设装置及方法、风力发电机组 |
Also Published As
Publication number | Publication date |
---|---|
CN105390993B (zh) | 2018-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105390993A (zh) | 风力发电机组大型电缆敷设方法 | |
CN108736377B (zh) | 一种放线施工跨越电力线路的带电跨越系统及其应用方法 | |
CN106555503A (zh) | 一种多功能信号塔架 | |
CN105470867A (zh) | 一种基于无人机的自动登杆方法及其装置 | |
CN214204630U (zh) | 用于变电站10kV母线旁路带电作业成套装置与工具 | |
CN106865422A (zh) | 一种用于安装维护风力发电机组的折叠桁架臂吊装设备 | |
CN104836156A (zh) | 合成绝缘子简易爬梯 | |
CN204205436U (zh) | 水平桥架内电缆敷设装置 | |
CN107381397B (zh) | 一种风力发电机组塔筒内电缆快速安全吊装装置 | |
CN104925687A (zh) | 一种电力升降装置及其工作方法 | |
CN201737611U (zh) | 电力电容塔吊装装置 | |
CN204984238U (zh) | 一种电力抢修梯 | |
CN104113014A (zh) | 上扛提线滑车 | |
CN102255261A (zh) | 输电线路双回路带电作业转入装置 | |
CN202534979U (zh) | 一种无拉线绝缘抱杆装置 | |
CN104929413B (zh) | 信号交通灯通信塔 | |
CN202395384U (zh) | 用于110~220kV输电线路多回路的作业工具 | |
CN103640986B (zh) | 风力发电塔附着式鹤咀吊 | |
CN203656775U (zh) | 一种风机塔筒照明系统 | |
CN203359928U (zh) | 一种风电维修检测装置的提升机构 | |
CN104876165A (zh) | 光伏组件移动式安装检修平台 | |
CN203423428U (zh) | 子导线间隔棒安装设备 | |
CN205687456U (zh) | 一种便携式高压线路拉线盘投放装置 | |
CN203983863U (zh) | 上扛提线滑车 | |
CN210885078U (zh) | 高塔筒风力发电机组接力式电缆吊装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |