CN102255261A - 输电线路双回路带电作业转入装置 - Google Patents

输电线路双回路带电作业转入装置 Download PDF

Info

Publication number
CN102255261A
CN102255261A CN2011101879991A CN201110187999A CN102255261A CN 102255261 A CN102255261 A CN 102255261A CN 2011101879991 A CN2011101879991 A CN 2011101879991A CN 201110187999 A CN201110187999 A CN 201110187999A CN 102255261 A CN102255261 A CN 102255261A
Authority
CN
China
Prior art keywords
circuit
support rod
secured adjusted
insulating support
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101879991A
Other languages
English (en)
Other versions
CN102255261B (zh
Inventor
陆益民
刘国华
胡小红
周琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUZHOU POWER SUPPLY BUREAU
Original Assignee
QUZHOU POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUZHOU POWER SUPPLY BUREAU filed Critical QUZHOU POWER SUPPLY BUREAU
Priority to CN 201110187999 priority Critical patent/CN102255261B/zh
Publication of CN102255261A publication Critical patent/CN102255261A/zh
Application granted granted Critical
Publication of CN102255261B publication Critical patent/CN102255261B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Ladders (AREA)

Abstract

一种输电线路双回路带电作业转入装置,包括一绝缘支撑杆及其固定调节座,所述绝缘支撑杆与该固定调节座为活动铰接;在绝缘支撑杆的上端部设有一连接件,该连接件分别与一滑车组和一吊梯相联接。本发明在作业位置以外独立固定设置一根可作水平、垂直向位置调整的绝缘支撑杆,针对新开发的同杆塔紧凑型双回路、多回路塔型具有安全距离小、组合间隙不足或搭接难度大等特性,能够非常方便、准确地将等电位作业人员转入所需作业位置,为电力系统进行等电位作业提供了一种新型辅助装置,尤其适合在需要对同塔双(多)回路塔型上中相的防振锤更换、导线修补和耐张引流线接头发热处理等作业时使用。

Description

输电线路双回路带电作业转入装置
【技术领域】
本发明属于一种电力设施带电作业的辅助工具,尤其是属于110~220kV输电线路同杆塔双回路安全实施等电位带电作业的转入装置。
【背景技术】
随着电力系统输变电设备状态检修工作的推广,对输电线路进行日常维护和检修,普遍采用的是等电位作业方式,即:借助相关转入装置将作业人员送入等电位作业现场,完成相关的日常维护和检修工作。目前,作业人员进入等电位作业现场的方式主要有:沿绝缘硬梯水平进入、吊篮摆入、软硬梯摆入或沿滑轨水平进入几种。但是,由于近年来,随着电网建设的快速发展与土地资源合理利用和环境保护矛盾的日益突出,电力系统相继开发了同杆塔紧凑型双回路、多回路塔型,并且,它以线路走廊、投资成本等方面的明显优势而得到广泛的推广应用,业已取得良好的经济和社会效益。然而,新技术新设备的开发与应用,给日常维护和检修工作提出了新的课题,尤其是需要对同塔双(多)回路塔型上中相的防振锤更换、导线修补和耐张跳线引流线接头发热处理等作业时,等电位作业人员依靠上述转入装置进入作业位置出现了如下问题:安全距离小、组合间隙不足或搭接难度大等原因,难以满足规范化作业要求,存在危及等电位作业人员,以及带电线路运行的安全隐患。
【发明内容】
本发明所要解决的问题是提供一种110~220kV输电线路同杆塔双回路等电位转入装置,等电位作业人员利用该装置既能很方便地进入到同杆塔多回路等电位作业位置,且符合规范化作业要求,还能有效避免危及等电位作业人员和带电线路运行的安全隐患。
为实现上述目的,本发明采用了如下技术方案:这种输电线路双回路带电作业转入装置的结构要点是:包括一根绝缘支撑杆,以及设置在该绝缘支撑杆下端部的一固定调节座,所述绝缘支撑杆与该固定调节座为活动铰接;在所述绝缘支撑杆的上端部设有一连接件,该连接件的二侧分别设有与其相互连接的一滑车组和一吊梯。使用时,绝缘支撑杆下端部经固定调节座紧固在电力输电线路相应的铁塔横担上、上端部经滑车组定位在固定调节座上方的铁塔横担上,等电位作业人员则悬挂在吊梯上,并将安全带副保险绳系于固定调节座上方的铁塔横担上。然后,相对作业位置,分别由地电位人员通过滑车组调整等电位作业人员的垂直高度、通过固定调节座调节等电位作业人员的水平位置,实现准确进入作业位置实施日常维护和检修工作的目的。
具体实施时,所述固定调节座由固定组件和支撑杆调节组件两部分构成。
具体实施时,所述固定组件由若干个固定螺栓和换向夹头组成,通过这些固定螺栓和换向夹头的配合,使所述固定调节座紧固定位。
具体实施时,所述支撑杆调节组件由一涡杆、一涡轮、一支撑轴和一铰接轴组成,所述支撑轴与所述涡轮为整体件,该支撑轴的自由端截面呈凹字形,其凹部用于接纳所述绝缘支撑杆与之相匹配的下端部,并由所述铰接轴将两者铰接成一体。
具体实施时,所述吊梯的形状呈士字形,所述士字形吊梯上设有正保险绳安全带的捆绑处和等电位作业人员的承载面。
有益效果:与现有技术相比,本发明在作业对象的位置以外独立固定设置一根可作水平、垂直向位置调整的绝缘支撑杆,针对现有新开发的同杆塔紧凑型双回路、多回路塔型具有安全距离小、组合间隙不足或搭接难度大等特性,能够非常方便、准确地将等电位作业人员转入所需作业位置,从而解决了现在转入装置不适用同杆塔紧凑型双回路、多回路塔型的问题,为电力系统进行等电位作业提供了一种新型辅助装置,尤其适合在需要对同塔双(多)回路塔型上中相的防振锤更换、导线修补和耐张跳线引流线接头发热处理等作业时使用。
【附图说明】
下面结合附图,通过实施例对本发明作进一步描述。
图1为本发明一个实施例的结构示意图。
图2为图1中A部的放大结构图。
图中:固定调节座1,固定螺母11,涡杆12,固定螺栓13,支撑轴14,涡轮15,换向夹头16,铰接轴2,绝缘支撑杆3,连接套杆31,连接件32,支撑杆连接片33,吊梯4,滑车组5,滑轮51,绝缘绳索52,地电位作业人员控制端521,上部铁塔横担6。
【具体实施方式】
参见图1,并结合图2。这种输电线路双回路带电作业转入装置的结构,由一根绝缘支撑杆3、设置在该绝缘支撑杆3下端部的一固定调节座1、位于该绝缘支撑杆3上端部的滑车组5和吊梯4构成。绝缘支撑杆3具有足够强度和刚性,用于承载等电位作业人员,通过连接套杆31可视情加长。绝缘支撑杆3的下端部与固定调节座1活动铰接,上端部作为自由端经一个固定设置的连接件32,两侧分别与滑车组5的绝缘绳索52一端、吊梯4的一端固定联接。
在本实施例中,上述固定调节座1的结构由固定组件和支撑杆调节组件两部分整体构成。固定组件由若干个固定螺栓13和换向夹头16组成,换向夹头的使用是为了解决无论铁塔横担的角铁方向是朝上、朝下还是朝左、朝右,都能保证固定调节座1平面朝上,使调节装置能够正常使用。通过这些固定螺栓13和换向夹头16的配合,能把固定调节座1十分牢固地紧固在相应的铁塔横担上,所述相应的铁塔横担是指作业位置下方的铁塔横担。所述支撑杆调节组件由涡杆12、涡轮15、支撑轴14和铰接轴2组成。所述支撑轴14与涡轮15为整体件,经轴承安装在涡杆涡轮座上。该支撑轴14的自由端截面呈凹字形,其凹部用于接纳所述绝缘支撑杆3与之相匹配的下端部的支撑杆连接片33,并由所述铰接轴2将两者铰接成一体。
作业时,1名等电位作业人员及2名地电位作业人员从地面沿铁塔而上,到达指定位置后,先将固定调节座1固定设置在作业位置下方的铁塔横担上,然后,将绝缘支撑杆3的下端部支撑杆连接片33经铰接轴2铰接在支撑轴14自由端上,绝缘支撑杆3的上端部经滑车组5的绝缘绳索52挂在作业位置上部铁塔横担6上,该绝缘绳索52的游离端(即地电位作业人员控制端521)由地面工作人员牵引控制。安装完毕后,等电位作业人员进入吊梯4内,采用坐姿用安全带正保险绳把自身捆绑在吊梯4(例如小士字梯)上。然后,地电位作业人员通过固定在涡杆12上的摇臂,使涡杆12带动涡轮15、支撑轴14作水平旋转,从而使绝缘支撑杆3带着等电位作业人员逐渐转入作业位置,等电位作业人员的垂直高度由地面人员通过拉或放绝缘绳索52的游离端作相应调整,从而实现等电位作业人员准确转入作业位置,实施等电位检修和更换工作。

Claims (5)

1.一种输电线路双回路带电作业转入装置,其特征是:包括一根绝缘支撑杆(3),以及设置在该绝缘支撑杆(3)下端部的一固定调节座(1),所述绝缘支撑杆(3)与该固定调节座(1)为活动铰接;在所述绝缘支撑杆(3)的上端部设有一连接件(32),该连接件(32)的二侧分别设有与其相互连接的一滑车组(5)和一吊梯(4)。
2.如权利要求1所述的转入装置,其特征是:所述固定调节座(1)由固定组件和支撑杆调节组件两部分构成。
3.如权利要求2所述的转入装置,其特征是:所述固定组件由若干个固定螺栓(13)和换向夹头(16)组成,通过这些固定螺栓(13)和换向夹头(16)的配合,使所述固定调节座(1)紧固定位。
4.如权利要求2所述的转入装置,其特征是:所述支撑杆调节组件由一涡杆(12)、一涡轮(15)、一支撑轴(14)和一铰接轴(2)组成,所述支撑轴(14)与所述涡轮(15)为整体件,该支撑轴(14)的自由端截面呈凹字形,其凹部用于接纳所述绝缘支撑杆(3)与之相匹配的下端部,并由所述铰接轴(2)将两者铰接成一体。
5.如权利要求1所述的转入装置,其特征是:所述吊梯(4)的形状呈士字形,所述士字形吊梯(4)上设有安全带正保险绳的捆绑处和等电位作业人员的承载面。
CN 201110187999 2011-07-06 2011-07-06 输电线路双回路带电作业转入装置 Active CN102255261B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110187999 CN102255261B (zh) 2011-07-06 2011-07-06 输电线路双回路带电作业转入装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110187999 CN102255261B (zh) 2011-07-06 2011-07-06 输电线路双回路带电作业转入装置

Publications (2)

Publication Number Publication Date
CN102255261A true CN102255261A (zh) 2011-11-23
CN102255261B CN102255261B (zh) 2013-07-17

Family

ID=44982308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110187999 Active CN102255261B (zh) 2011-07-06 2011-07-06 输电线路双回路带电作业转入装置

Country Status (1)

Country Link
CN (1) CN102255261B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104638563A (zh) * 2015-01-20 2015-05-20 国家电网公司 高压输电线路输送装置
CN105239918A (zh) * 2015-10-20 2016-01-13 国网辽宁省电力有限公司鞍山供电公司 一种绝缘硬梯尾部固定夹具
CN103441446B (zh) * 2013-08-06 2016-11-23 国家电网公司 一种滑车悬挂器
CN106168111A (zh) * 2016-08-01 2016-11-30 国网浙江省电力公司金华供电公司 等电位作业专用绝缘吊梯
CN114614395A (zh) * 2022-03-09 2022-06-10 国网智能科技股份有限公司 一种线路防震锤复位工具、作业机器人及复位方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200997499Y (zh) * 2006-09-05 2007-12-26 上海电力带电作业技术开发有限公司 360°旋转式带电作业用绝缘平台装置
JP2008199732A (ja) * 2007-02-09 2008-08-28 Tokyo Electric Power Co Inc:The 鉄塔の仮支持装置及びこれを用いた鉄塔の工事方法
CN201113301Y (zh) * 2007-10-23 2008-09-10 福建省龙岩电业局 全方位旋转绝缘操作平台
CN101304163A (zh) * 2008-05-22 2008-11-12 衢州电力局 变电所等电位带电作业挂线装置
CN101771248A (zh) * 2008-12-30 2010-07-07 上海市南电力工程有限公司 用于配电线路带电作业的旋转式绝缘梯
CN202178530U (zh) * 2011-07-06 2012-03-28 衢州电力局 输电线路双回路带电作业转入装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200997499Y (zh) * 2006-09-05 2007-12-26 上海电力带电作业技术开发有限公司 360°旋转式带电作业用绝缘平台装置
JP2008199732A (ja) * 2007-02-09 2008-08-28 Tokyo Electric Power Co Inc:The 鉄塔の仮支持装置及びこれを用いた鉄塔の工事方法
CN201113301Y (zh) * 2007-10-23 2008-09-10 福建省龙岩电业局 全方位旋转绝缘操作平台
CN101304163A (zh) * 2008-05-22 2008-11-12 衢州电力局 变电所等电位带电作业挂线装置
CN101771248A (zh) * 2008-12-30 2010-07-07 上海市南电力工程有限公司 用于配电线路带电作业的旋转式绝缘梯
CN202178530U (zh) * 2011-07-06 2012-03-28 衢州电力局 输电线路双回路带电作业转入装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103441446B (zh) * 2013-08-06 2016-11-23 国家电网公司 一种滑车悬挂器
CN104638563A (zh) * 2015-01-20 2015-05-20 国家电网公司 高压输电线路输送装置
CN105239918A (zh) * 2015-10-20 2016-01-13 国网辽宁省电力有限公司鞍山供电公司 一种绝缘硬梯尾部固定夹具
CN106168111A (zh) * 2016-08-01 2016-11-30 国网浙江省电力公司金华供电公司 等电位作业专用绝缘吊梯
CN106168111B (zh) * 2016-08-01 2017-12-19 国网浙江省电力公司金华供电公司 等电位作业专用绝缘吊梯
CN114614395A (zh) * 2022-03-09 2022-06-10 国网智能科技股份有限公司 一种线路防震锤复位工具、作业机器人及复位方法

Also Published As

Publication number Publication date
CN102255261B (zh) 2013-07-17

Similar Documents

Publication Publication Date Title
CN102255261B (zh) 输电线路双回路带电作业转入装置
CN107069562A (zh) 带电更换绝缘子方法及载荷转移装置
CN105932601B (zh) 架空地线断股修补方法
CN101888075A (zh) 一种吊车配绝缘工具提升10kV导线作业方法
CN203071537U (zh) 地下敷设电缆正三角固定支架
CN207988628U (zh) 一种大跨越地形便于电缆上下塔用的10kV宽基塔设备
CN105514867A (zh) 一种输电线路杆塔的v型绝缘子串更换方法
CN205791238U (zh) 一种10kV配网线路直线段三相导线带电提升器
CN206148848U (zh) 一种大吨位带电导线的提升装置
CN105186370A (zh) 直线杆塔架空线路用收线装置
CN103825222B (zh) 一种带电更换220kV窄基塔耐张绝缘子串用工具
CN205070294U (zh) 直线杆塔架空线路用收线装置
CN202178530U (zh) 输电线路双回路带电作业转入装置
CN102931612A (zh) 10kV带电作业导线固定器
CN205882560U (zh) 配电带电作业地电位专用循环绳架装置
CN103334690A (zh) 一种电力杆塔用绝缘平梯悬挂装置
CN201963015U (zh) 高压终端平台钢管杆
CN203813320U (zh) 带电更换220kV窄基塔耐张绝缘子串用工具
CN204258228U (zh) 用于线路终端及引线的固定金具
CN104318859B (zh) 一种电力钢管铁塔标志牌固定装置及方法
CN203813334U (zh) 用于带电更换220kV耐张绝缘子串的直角联板卡具
CN103825223B (zh) 带电更换220kv窄基塔耐张绝缘子串工具及作业方法
CN105449612A (zh) 一种导线绝缘支撑板装置
CN205335800U (zh) 一种导线绝缘支撑板装置
CN105977860A (zh) 一种更换架空输电线路复合横担绝缘子装置及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant