CN105370257A - 一种煤层气井高功率电爆震辅助水力压裂增产方法 - Google Patents
一种煤层气井高功率电爆震辅助水力压裂增产方法 Download PDFInfo
- Publication number
- CN105370257A CN105370257A CN201510753634.9A CN201510753634A CN105370257A CN 105370257 A CN105370257 A CN 105370257A CN 201510753634 A CN201510753634 A CN 201510753634A CN 105370257 A CN105370257 A CN 105370257A
- Authority
- CN
- China
- Prior art keywords
- coal
- well
- bed gas
- fracturing
- electric field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
- Jet Pumps And Other Pumps (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510753634.9A CN105370257B (zh) | 2015-11-06 | 2015-11-06 | 一种煤层气井高功率电爆震辅助水力压裂增产方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510753634.9A CN105370257B (zh) | 2015-11-06 | 2015-11-06 | 一种煤层气井高功率电爆震辅助水力压裂增产方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105370257A true CN105370257A (zh) | 2016-03-02 |
CN105370257B CN105370257B (zh) | 2018-09-14 |
Family
ID=55372815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510753634.9A Active CN105370257B (zh) | 2015-11-06 | 2015-11-06 | 一种煤层气井高功率电爆震辅助水力压裂增产方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105370257B (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106593528A (zh) * | 2017-01-22 | 2017-04-26 | 成都理工大学 | 隧洞大变形的气压致裂高应力阻断方法及其装置 |
CN106761646A (zh) * | 2016-12-30 | 2017-05-31 | 北京百恒达石油技术有限公司 | 冲击波造缝装置及系统 |
CN107989586A (zh) * | 2017-10-18 | 2018-05-04 | 西安交通大学 | 基于可控冲击波复合浪涌式增压注水的煤层气井改造方法 |
CN109083624A (zh) * | 2018-07-04 | 2018-12-25 | 华中科技大学 | 一种复合脉冲激波和水力压裂的储层物性改造方法及装置 |
CN109538209A (zh) * | 2018-09-11 | 2019-03-29 | 中国矿业大学 | 一种基于电脉冲技术的弱化煤层坚硬顶板方法 |
CN109838221A (zh) * | 2017-11-28 | 2019-06-04 | 中国石油化工股份有限公司 | 一种深层页岩气高能电弧复合体积压裂方法 |
CN109863282A (zh) * | 2016-08-22 | 2019-06-07 | 沙特阿拉伯石油公司 | 利用无线电波压裂油气储层中的岩石 |
CN109944576A (zh) * | 2019-04-12 | 2019-06-28 | 西安科技大学 | 一种电脉冲强化脉动水力压裂的装置及其应用方法 |
US10858913B2 (en) | 2016-10-28 | 2020-12-08 | China University Of Mining And Technology | Permeability enhancement method for coalbed methane wells by using electric pulse detonation fracturing technology |
CN112943172A (zh) * | 2021-03-31 | 2021-06-11 | 内蒙古科技大学 | 高压电脉冲水压致裂煤岩体方法及导向裂缝开设装置 |
CN114658392A (zh) * | 2021-12-21 | 2022-06-24 | 重庆大学 | 一种井上下联合瓦斯抽采系统及方法 |
CN114922599A (zh) * | 2022-04-19 | 2022-08-19 | 中国矿业大学 | 一种实现岩层高效水力压裂的脉冲频率控制方法 |
CN115030691A (zh) * | 2022-06-20 | 2022-09-09 | 太原理工大学 | 一种低透气性煤层电脉冲注热协同强化瓦斯抽采方法及装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102094604A (zh) * | 2010-11-19 | 2011-06-15 | 中国工程物理研究院流体物理研究所 | 一种油气井下液电压裂复合射孔装置及射孔方法 |
CN102155253A (zh) * | 2011-01-26 | 2011-08-17 | 吕晓琳 | 基于重复频率冲击波的地面抽采煤层气井改造方法 |
US20130255936A1 (en) * | 2012-03-29 | 2013-10-03 | Shell Oil Company | Electrofracturing formations |
CN104061014A (zh) * | 2014-07-07 | 2014-09-24 | 太原理工大学 | 一种基于高压电脉冲的煤层增透实验装置 |
CN104832149A (zh) * | 2015-05-16 | 2015-08-12 | 太原理工大学 | 一种电脉冲辅助水力压裂的非常规天然气储层增透方法 |
-
2015
- 2015-11-06 CN CN201510753634.9A patent/CN105370257B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102094604A (zh) * | 2010-11-19 | 2011-06-15 | 中国工程物理研究院流体物理研究所 | 一种油气井下液电压裂复合射孔装置及射孔方法 |
CN102155253A (zh) * | 2011-01-26 | 2011-08-17 | 吕晓琳 | 基于重复频率冲击波的地面抽采煤层气井改造方法 |
US20130255936A1 (en) * | 2012-03-29 | 2013-10-03 | Shell Oil Company | Electrofracturing formations |
CN104061014A (zh) * | 2014-07-07 | 2014-09-24 | 太原理工大学 | 一种基于高压电脉冲的煤层增透实验装置 |
CN104832149A (zh) * | 2015-05-16 | 2015-08-12 | 太原理工大学 | 一种电脉冲辅助水力压裂的非常规天然气储层增透方法 |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109863282A (zh) * | 2016-08-22 | 2019-06-07 | 沙特阿拉伯石油公司 | 利用无线电波压裂油气储层中的岩石 |
US10858913B2 (en) | 2016-10-28 | 2020-12-08 | China University Of Mining And Technology | Permeability enhancement method for coalbed methane wells by using electric pulse detonation fracturing technology |
CN106761646A (zh) * | 2016-12-30 | 2017-05-31 | 北京百恒达石油技术有限公司 | 冲击波造缝装置及系统 |
CN106593528A (zh) * | 2017-01-22 | 2017-04-26 | 成都理工大学 | 隧洞大变形的气压致裂高应力阻断方法及其装置 |
CN107989586A (zh) * | 2017-10-18 | 2018-05-04 | 西安交通大学 | 基于可控冲击波复合浪涌式增压注水的煤层气井改造方法 |
WO2019075885A1 (zh) * | 2017-10-18 | 2019-04-25 | 西安交通大学 | 基于可控冲击波复合浪涌式增压注水的煤层气井改造方法 |
CN109838221A (zh) * | 2017-11-28 | 2019-06-04 | 中国石油化工股份有限公司 | 一种深层页岩气高能电弧复合体积压裂方法 |
CN109083624A (zh) * | 2018-07-04 | 2018-12-25 | 华中科技大学 | 一种复合脉冲激波和水力压裂的储层物性改造方法及装置 |
WO2020006973A1 (zh) * | 2018-07-04 | 2020-01-09 | 华中科技大学 | 一种复合脉冲激波和水力压裂的储层物性改造方法及装置 |
CN109538209A (zh) * | 2018-09-11 | 2019-03-29 | 中国矿业大学 | 一种基于电脉冲技术的弱化煤层坚硬顶板方法 |
CN109944576A (zh) * | 2019-04-12 | 2019-06-28 | 西安科技大学 | 一种电脉冲强化脉动水力压裂的装置及其应用方法 |
CN109944576B (zh) * | 2019-04-12 | 2021-03-26 | 西安科技大学 | 一种电脉冲强化脉动水力压裂的装置及其应用方法 |
CN112943172A (zh) * | 2021-03-31 | 2021-06-11 | 内蒙古科技大学 | 高压电脉冲水压致裂煤岩体方法及导向裂缝开设装置 |
CN114658392A (zh) * | 2021-12-21 | 2022-06-24 | 重庆大学 | 一种井上下联合瓦斯抽采系统及方法 |
CN114658392B (zh) * | 2021-12-21 | 2023-12-05 | 重庆大学 | 一种井上下联合瓦斯抽采系统及方法 |
CN114922599A (zh) * | 2022-04-19 | 2022-08-19 | 中国矿业大学 | 一种实现岩层高效水力压裂的脉冲频率控制方法 |
CN115030691A (zh) * | 2022-06-20 | 2022-09-09 | 太原理工大学 | 一种低透气性煤层电脉冲注热协同强化瓦斯抽采方法及装置 |
CN115030691B (zh) * | 2022-06-20 | 2023-12-15 | 太原理工大学 | 一种低透气性煤层电脉冲注热协同强化瓦斯抽采方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105370257B (zh) | 2018-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105370257A (zh) | 一种煤层气井高功率电爆震辅助水力压裂增产方法 | |
CN105275443A (zh) | 一种煤矿井下高功率电爆震辅助水力压裂增透方法 | |
US10858913B2 (en) | Permeability enhancement method for coalbed methane wells by using electric pulse detonation fracturing technology | |
CN108361061B (zh) | 低渗煤层电爆震及微波辅助液氮冻融增透装置及方法 | |
CN105298462A (zh) | 一种底抽巷高功率电爆震辅助水力压裂煤层增透方法 | |
CN104863628B (zh) | 一种利用脉冲爆震波致裂增透掩护煤巷掘进方法 | |
CN108397182B (zh) | 电脉冲协同液氮冻融增透煤层的装置及方法 | |
CN201687513U (zh) | 井下钻孔水力压裂系统 | |
US9951597B1 (en) | Downhole coal seam pulse detonation wave directional fracturing permeability-increasing method | |
CN102678117B (zh) | 基于聚能爆破的定向水力致裂方法 | |
WO2018113227A1 (zh) | 一种煤层气井电脉冲解堵增渗方法 | |
WO2019075884A1 (zh) | 基于可控冲击波技术的煤矿井下钻孔增透方法 | |
CN101440704B (zh) | 可地浸矿层连续高能气体压裂增渗方法及专用高能气体发生器 | |
CN106285681A (zh) | 一种坚硬煤层顶板致裂装置及方法 | |
CN109162755B (zh) | 一种电脉冲与注浆加固相结合的石门揭煤方法 | |
CN103510979B (zh) | 干冰爆炸增透装置及其抽放瓦斯的方法 | |
CN103114871A (zh) | 一种利用微波加热煤层的抽采装置及方法 | |
CN105525901A (zh) | 一种基于微波辐照的煤层水力压裂强化增透方法 | |
CN204941505U (zh) | 液态二氧化碳炮加支撑剂爆破增透装置 | |
CN104314606A (zh) | 一种钻孔内水力割缝与瓦斯爆炸致裂煤体联合强化抽采方法 | |
CN104453827A (zh) | 一种高能电爆震提高煤层透气性的方法 | |
CN104389574A (zh) | 一种气相压裂装置 | |
CN112943210A (zh) | 一种电脉冲协同超声波的煤层气强化开采方法 | |
CN208168859U (zh) | 电脉冲协同液氮冻融增透煤层的装置 | |
CN103352682B (zh) | 脉冲电磁提高煤层瓦斯抽采率的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Lin Baiquan Inventor after: Yan Fazhi Inventor after: Zhang Xiangliang Inventor after: Wang Yihan Inventor after: Zhu Chuanjie Inventor after: Guo Chang Inventor after: Zou Quanle Inventor after: Liu Ting Inventor after: Kong Jia Inventor before: Lin Baiquan Inventor before: Yan Fazhi Inventor before: Zhu Chuanjie Inventor before: Guo Chang Inventor before: Zou Quanle Inventor before: Liu Ting Inventor before: Kong Jia |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |