A kind of application method of beam steel installation tool Download PDFInfo
- Publication number
- CN105370046B CN105370046B CN201510865302.XA CN201510865302A CN105370046B CN 105370046 B CN105370046 B CN 105370046B CN 201510865302 A CN201510865302 A CN 201510865302A CN 105370046 B CN105370046 B CN 105370046B
- Authority
- CN
- China
- Prior art keywords
- muscle
- support
- stirrup
- row
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention discloses a kind of beam steel installation tool, including symmetrically arranged two support bases, and it is arranged on several connecting rods in the middle of two oppositely-arranged symmetric support seats;Described support seat includes upper support(4)And lower support(5), described upper support(4)And lower support(5)Pass through two blocks of steel plates(8)Clamping and the interior bolt and nut device for wearing steel plate(6)It is fixed;Described upper support(4)For a steel plate, upper support(4)Inside it is provided with arch dashpot(7)And antiskid bar(2);Described upper support(4)It is provided at both ends with connecting hole(3), both sides are provided with positioning hole(1).The present invention solves quality problems present in live construction of frame beam, and the invention can be using live waste-material-preparing, and cost is low and makes simple, quick.The invention is easy to operate, sturdy and durable, the applicable beam with various deck-moldings, is worth of widely use.
Description
Technical field
The present invention relates to build construction tool field, specially a kind of beam steel installation tool and its application method.
Background technology
In existing building construction process, the use of Vierendeel girder, very generally;But, architectural engineering middle frame joist steel
Muscle, which is installed, generally has following quality problems:
(1)When workman constructs, the row of beam top two, three placing of reinforcement not colligations, leakage are tied up or tied up less, cause each layer reinforcing bar clear spacing
It is excessive, the tension of Practical Project(It is pressurized)Reinforcing bar Resultant force is to tension(It is pressurized)The distance at edge()Set much larger than theory
Evaluation, reduces beam section compression(Tension)The outward flange in area is to tension(It is pressurized)The distance of reinforcing bar Resultant force(), reduction
The bearing capacity of structure.
(2)Beam bottom indulges muscle and has carried out colligation with stirrup position only in girder span, and vertical muscle does not form one with stirrup
Easy unstability after overall space framework of steel reinforcement, oblique section stress, is unfavorable for resistance beam diagonal tension failure, diagonal compression failure and shear compression failure shape
The oblique section destruction of state.
The reason for producing above-mentioned quality problems is, currently without construction tool of the invention for reinforcement installation, live work
People can only use U-shaped jacking when constructing.
Therefore, it is a urgent problem to design a kind of construction tool for not only facilitating but also solving above-mentioned quality.
The content of the invention
In order to overcome above-mentioned job site of the prior art there is no the construction tool of reinforcement installation, cause reinforcement installation mistake
Occur in that bottom indulges the colligation of muscle and stirrup, multilayer placing of reinforcement and do not have the colligation quality problems such as in place in journey.This patent is intended to hair
Bright one kind can solve above-mentioned quality problems, be easy to the construction tool of operative again.
The object of the present invention is achieved like this:
A kind of beam steel installation tool, including symmetrically arranged two support bases, and be arranged on two it is oppositely-arranged
Several connecting rods in the middle of symmetric support seat;Described support base includes upper support 4 and lower support 5, described top branch
Support 4 and lower support 5 are clamped by two blocks of steel plates 8, and two blocks of steel plates 8 are fixed by bolt and nut device 6;
Described upper support 4 is to be provided with arch dashpot 7 and antiskid bar 2 in a steel plate, upper support 4;Described
Upper support 4 is provided at both ends with connecting hole 3, and both sides are provided with positioning hole 1;
Described antiskid bar 2 is spiral, and it is vertically fixed in arch dashpot 7;
Described arch dashpot 7 is level trough and vertical slot, and antiskid bar 2 is arranged on level trough and vertical slot junction;
Described lower support 5 is to be provided at both ends with connecting hole 3 in a steel plate, lower support 5, and both sides are provided with positioning
Hole 1;Described lower support 5 is flexure plane;
The application method of described beam steel installation tool is:
(1)Beam section height<During 1200mm, the construction method of instrument
The assembling and placement of instrument:
The upper support of selection proper height specification is assembled with lower support with diameter 16mm screw rod;After assembling
Support base be adjacent to beam-slab template placement, and ensure its stability, in aforementioned manners, another symmetrically placed support base;
Muscle, waist muscle, upper longitudinal bar are indulged in the bottom of mounting rail successively:
Muscle row is indulged according to the bottom of beam, connecting rod is most descended to two positioning holes of row through lower support, is discharged to from down
Upper row is sequentially placed connecting rod, vertical muscle, a diameter of max(d,25)The isometric reinforcing rod with deck-siding;With the positioning hole of location-appropriate
It is interior to place connecting rod to prop up muscle of backing up.According to the depth of section of beam, the row of upper longitudinal bar, the highly suitable positioning hole of selection,
Muscle same construction method is indulged with bottom, and upper longitudinal bar is installed;The bottom connecting hole of upper support and lower support is assembled,
When beam is deeper, can repeatedly it assemble;
The colligation of beam
Progress cuff at stirrup spacing, positioning is marked with marker pen on vertical muscle.Colligation stirrup and upper longitudinal bar, each row are vertical
Muscle, waist muscle position, and colligation waist muscle and stirrup are positioned in stirrup;A diameter of max is placed between indulging muscle in each row bottom(d,25)With
The isometric reinforcing rod of deck-siding, colligation stirrup and vertical muscle, stirrup and waist muscle, finally place drag hook;
The whereabouts of beam:
Cushion block is placed at beam bottom, and antiskid bar is placed in the arch dashpot of correct position, connecting rod is extracted out, stirs
Antiskid bar, vertically groove is snapped down to level trough, aforesaid operations until the nearly beam bottom in beam whereabouts, extracts antiskid bar out to beam, and beam is fallen completely within
In beam forms;
(2)Beam section heightDuring >=1200mm, the construction method of instrument is:
The assembling and placement of instrument:
The upper support of selection proper height specification is assembled with lower support with diameter 16mm screw rod;After assembling
Support base be adjacent to beam-slab template placement, and ensure its stability, in aforementioned manners, another symmetrically placed support base;
Muscle, waist muscle, upper longitudinal bar are indulged in the bottom of mounting rail successively:
Muscle row is indulged according to the bottom of beam, connecting rod is most descended to two positioning holes of row through lower support, is discharged to from down
Upper row is sequentially placed connecting rod, vertical muscle, a diameter of max(d,25)The isometric reinforcing rod with deck-siding;With the positioning hole of location-appropriate
It is interior to place connecting rod to prop up muscle of backing up.According to the depth of section of beam, the row of upper longitudinal bar, the highly suitable positioning hole of selection,
Muscle same construction method is indulged with bottom, and upper longitudinal bar is installed;When muscle is indulged in mounting rail bottom, bottom is indulged muscle placement location and should not leaned on
Nearly bed die, is otherwise difficult cuff, is fallen after can placing the position for facilitating cuff, cuff;
The colligation of beam
Progress cuff at stirrup spacing, positioning is marked with marker pen on vertical muscle.Colligation stirrup and upper longitudinal bar, each row are vertical
Muscle, waist muscle position, and colligation waist muscle and stirrup are positioned in stirrup;A diameter of max is placed between indulging muscle in each row bottom(d,25)With
The isometric reinforcing rod of deck-siding, colligation stirrup and vertical muscle, stirrup and waist muscle, finally place drag hook;
The whereabouts of beam:
Cushion block is placed at beam bottom, and antiskid bar is placed in the arch dashpot of correct position, connecting rod is extracted out, stirs
Antiskid bar, vertically groove is snapped down to level trough to beam, and aforesaid operations are until the nearly beam bottom in beam whereabouts, extracts antiskid bar out repeatedly, and beam is complete
Fall into beam forms.
Positive beneficial effect:The present invention solves quality problems present in live construction of frame beam, and the invention can profit
With the waste-material-preparing at scene, cost is low and makes simple, quick.The invention is easy to operate, sturdy and durable, is applicable to various beams
High beam, is worth of widely use.
Brief description of the drawings
Fig. 1 is the front elevation of upper support;
Fig. 2 is the side view of upper support;
Fig. 3 is the front elevation of lower support;
Fig. 4 is the side view of lower support;
Fig. 5 is the side view that upper support is connected with lower support;
Fig. 6 is deck-molding<Side view before 1.2 meters of reinforcing bars whereabouts;
Fig. 7 is deck-moldingSide view before >=1.2 meters of reinforcing bars whereabouts;
It is in figure:Positioning hole 1, antiskid bar 2, connecting hole 3, upper support 4, lower support 5, bolt and nut device 6, arch
Dashpot 7, steel plate 8.
Embodiment
Below in conjunction with the accompanying drawings, the present invention is described further:
Support base is formed by upper support, lower support and steel plate, bolt connection, and can be assembled into according to deck-molding different
Structure type.Upper support, lower support can be made by steel sheet scrap thick live 8mm, and connecting rod can be live by diameter 12mm
Stirrup makes.Upper support, lower support are provided with diameter 12mm, spacing 55mm positioning hole, according to deck-molding, reinforcing bar during construction
Row, by connecting rod placement positioning hole, for supporting steel flaccidity of tendon and muscle muscle.
The two ends of upper support are provided with connecting hole, and vertical height has tri- kinds of specifications of 500mm, 600mm, 700mm, according to
The sliceable suitable form of assembling of depth of section of beam.Consider that specification provides that stirrup end need to set 135 ° of crotch, this is 135 curved
Hook is simultaneously not easy to workman's cuff, and crotch generally is made into 160 ° to meet construction speed when backstage makes reinforcing bar.To ensure engineering
Quality and progress, it is special that the spacing of positioning hole is set to 55mm, when colligation respectively arranges vertical muscle, bottom must be lifted and indulge muscle, will be adjacent vertical
A diameter of max is placed between muscle(d,25)Reinforcing rod carry out colligation firmly, gap must not be stayed.
Upper support is provided with " bow " shape dashpot and antiskid bar, anti-to stop loss to increase smoothness when steel reinforcement cage falls
Bad beam bottom board and side form.Antiskid bar can use live diameter 16mm spiral." bow " shape dashpot is divided into level trough and perpendicular
To groove, horizontal length 80mm, the vertical height 18mm of level trough, horizontal width 16mm, the vertical height 100mm of vertical slot.Should
The horizontal width of vertical slot is designed as under equivalence, the Action of Gravity Field of steel reinforcement cage by invention with sedimentation shank diameter, and surface is threaded
Antiskid bar produces translation friction with vertical slot, so as to realize the stationarity for improving whereabouts.Consider design more than bean column node stirrup
It is now 100mm by the vertical height same design of vertical slot for spacing 100mm, then to stirrup spacing when can avoid the beam from falling
Influence.The vertical dimension of level trough is more than the design of sedimentation shank diameter, reduces the frictional force of reinforcing bar translation, is easy to workman manual
Operation.
As shown in Figure 1, Figure 2 with shown in Fig. 5, a kind of beam steel installation tool, including symmetrically arranged two support bases, Yi Jishe
Put several connecting rods in the middle of two oppositely-arranged symmetric support seats;Described support seat includes upper support 4 and bottom
Support 5, described upper support 4 and lower support 5 is clamped by two blocks of steel plates 8, and two blocks of steel plates 8 pass through bolt and nut device 6
It is fixed;
Described upper support 4 is to be provided with arch dashpot 7 and antiskid bar 2 in a steel plate, upper support 4;Described
Upper support 4 is provided at both ends with connecting hole 3, and both sides are provided with positioning hole 1;
Described antiskid bar 2 is spiral, and it is vertically fixed in arch dashpot 7;
Described arch dashpot 7 is level trough and vertical slot, and antiskid bar 2 is arranged on level trough and vertical slot junction;
As shown in Figure 3, Figure 4, described lower support 5 is to be provided at both ends with connecting hole 3 in a steel plate, lower support 5,
Both sides are provided with positioning hole 1;Described lower support 5 is flexure plane;
The application method of described beam steel installation tool is:
(3)Beam section height<During 1200mm, the construction method of instrument, as shown in fig. 6,
The assembling and placement of instrument:
The upper support of selection proper height specification is assembled with lower support with diameter 16mm screw rod;After assembling
Support base be adjacent to beam-slab template and place, and ensure its stability, in aforementioned manners, another symmetrically placed support base;
Muscle, waist muscle, upper longitudinal bar are indulged in the bottom of mounting rail successively:
Muscle row is indulged according to the bottom of beam, connecting rod is most descended to two positioning holes of row through lower support, is discharged to from down
Upper row is sequentially placed connecting rod, vertical muscle, a diameter of max(d,25)The isometric reinforcing rod with deck-siding;With the positioning hole of location-appropriate
It is interior to place connecting rod to prop up muscle of backing up.According to the depth of section of beam, the row of upper longitudinal bar, the highly suitable positioning hole of selection,
Muscle same construction method is indulged with bottom, and upper longitudinal bar is installed;The bottom connecting hole of upper support and lower support is assembled,
When beam is deeper, can repeatedly it assemble;
The colligation of beam
Progress cuff at stirrup spacing, positioning is marked with marker pen on vertical muscle.Colligation stirrup and upper longitudinal bar, each row are vertical
Muscle, waist muscle position, and colligation waist muscle and stirrup are positioned in stirrup;A diameter of max is placed between indulging muscle in each row bottom(d,25)With
The isometric reinforcing rod of deck-siding, colligation stirrup and vertical muscle, stirrup and waist muscle, finally place drag hook;
The whereabouts of beam:
Cushion block is placed at beam bottom, and antiskid bar is placed in the arch dashpot of correct position, connecting rod is extracted out, stirs
Antiskid bar, vertically groove is snapped down to level trough, aforesaid operations until the nearly beam bottom in beam whereabouts, extracts antiskid bar out to beam, and beam is fallen completely within
In beam forms;
(4)Beam section heightDuring >=1200mm, the construction method of instrument is:As shown in fig. 7,
The assembling and placement of instrument:
The upper support of selection proper height specification is assembled with lower support with diameter 16mm screw rod;After assembling
Support base be adjacent to beam-slab template placement, and ensure its stability, in aforementioned manners, another symmetrically placed support base;
Muscle, waist muscle, upper longitudinal bar are indulged in the bottom of mounting rail successively:
Muscle row is indulged according to the bottom of beam, connecting rod is most descended to two positioning holes of row through lower support, is discharged to from down
Upper row is sequentially placed connecting rod, vertical muscle, a diameter of max(d,25)The isometric reinforcing rod with deck-siding;With the positioning hole of location-appropriate
It is interior to place connecting rod to prop up muscle of backing up.According to the depth of section of beam, the row of upper longitudinal bar, the highly suitable positioning hole of selection,
Muscle same construction method is indulged with bottom, and upper longitudinal bar is installed;When muscle is indulged in mounting rail bottom, bottom is indulged muscle placement location and should not leaned on
Nearly bed die, is otherwise difficult cuff, is fallen after can placing the position for facilitating cuff, cuff;
The colligation of beam
Progress cuff at stirrup spacing, positioning is marked with marker pen on vertical muscle.Colligation stirrup and upper longitudinal bar, each row are vertical
Muscle, waist muscle position, and colligation waist muscle and stirrup are positioned in stirrup;A diameter of max is placed between indulging muscle in each row bottom(d,25)With
The isometric reinforcing rod of deck-siding, colligation stirrup and vertical muscle, stirrup and waist muscle, finally place drag hook;
The whereabouts of beam:
Cushion block is placed at beam bottom, and antiskid bar is placed in the arch dashpot of correct position, connecting rod is extracted out, stirs
Antiskid bar, vertically groove is snapped down to level trough to beam, and aforesaid operations are until the nearly beam bottom in beam whereabouts, extracts antiskid bar out repeatedly, and beam is complete
Fall into beam forms.
The present invention solves quality problems present in live construction of frame beam, and the invention can utilize live waste material system
Make, cost is low and makes simple, quick.The invention is easy to operate, sturdy and durable, the applicable beam with various deck-moldings, is worth pushing away
Extensively use.
Above case study on implementation is merely to illustrate the preferred embodiment of the present invention, but the present invention is not limited to above-mentioned embodiment party
Formula, in the knowledge that the field those of ordinary skill possesses, that is made within the spirit and principles in the present invention is any
Modification, equivalent substitute and improvement etc., are regarded as the protection domain of the application.
Claims (4)
1. a kind of application method of beam steel installation tool, it is characterised in that:Including symmetrically arranged two support bases, Yi Jishe
Put several connecting rods in the middle of two oppositely-arranged symmetric support seats;Described support base includes upper support(4)With under
Portion is supported(5), described upper support(4)And lower support(5)Pass through two blocks of steel plates(8)Clamping, two blocks of steel plates(8)Pass through spiral shell
Bolt nut apparatus(6)It is fixed;Described upper support(4)For a steel plate, upper support(4)Inside it is provided with arch dashpot(7)
And antiskid bar(2);Described upper support(4)It is provided at both ends with connecting hole(3), both sides are provided with positioning hole(1);
The application method of described beam steel installation tool is:
Beam section height<During 1200mm, the construction method of instrument
The assembling and placement of instrument:
The upper support of selection proper height specification is assembled with lower support with diameter 16mm screw rod;By the branch after assembling
Support seat is adjacent to beam-slab template placement, and ensures its stability, in aforementioned manners, another symmetrically placed support base;
Muscle, waist muscle, upper longitudinal bar are indulged in the bottom of mounting rail successively:
Muscle row is indulged according to the bottom of beam, connecting rod is most descended to two positioning holes of row, the row of being discharged to from down through lower support
It is sequentially placed connecting rod, vertical muscle, a diameter of max(d,25)The isometric reinforcing rod with deck-siding;With being put in the positioning hole of location-appropriate
Connecting rod is put to prop up muscle of backing up;
According to the depth of section of beam, the row of upper longitudinal bar, the suitable positioning hole of selection height, the construction same with the vertical muscle in bottom
Method installs upper longitudinal bar;The bottom connecting hole of upper support and lower support is assembled, can be multiple when beam is deeper
Assemble;
The colligation of beam
Progress cuff at stirrup spacing, positioning is marked with marker pen on vertical muscle;
Colligation stirrup and upper longitudinal bar, the vertical muscle of each row, waist muscle position, and colligation waist muscle and stirrup are positioned in stirrup;At each row bottom
A diameter of max is placed between indulging muscle in portion(d,25)The isometric reinforcing rod with deck-siding, colligation stirrup and vertical muscle, stirrup and waist muscle, finally
Place drag hook;
The whereabouts of beam:
Cushion block is placed at beam bottom, and antiskid bar is placed in the arch dashpot of correct position, connecting rod is extracted out, stirs anti-skidding
Bar, vertically groove is snapped down to level trough, aforesaid operations until the nearly beam bottom in beam whereabouts, extracts antiskid bar out to beam, and beam falls completely within beam form
In plate;
Beam section heightDuring >=1200mm, the construction method of instrument is:
The assembling and placement of instrument:
The upper support of selection proper height specification is assembled with lower support with diameter 16mm screw rod;By the branch after assembling
Support seat is adjacent to beam-slab template placement, and ensures its stability, in aforementioned manners, another symmetrically placed support base;
Muscle, waist muscle, upper longitudinal bar are indulged in the bottom of mounting rail successively:
Muscle row is indulged according to the bottom of beam, connecting rod is most descended to two positioning holes of row, the row of being discharged to from down through lower support
It is sequentially placed connecting rod, vertical muscle, a diameter of max(d,25)The isometric reinforcing rod with deck-siding;With being put in the positioning hole of location-appropriate
Connecting rod is put to prop up muscle of backing up;
According to the depth of section of beam, the row of upper longitudinal bar, the suitable positioning hole of selection height, the construction same with the vertical muscle in bottom
Method installs upper longitudinal bar;When muscle is indulged in mounting rail bottom, muscle placement location is indulged in bottom to be otherwise difficult cuff close to bed die,
Fallen after the position for facilitating cuff, cuff can be placed;
The colligation of beam
Progress cuff at stirrup spacing, positioning is marked with marker pen on vertical muscle;
Colligation stirrup and upper longitudinal bar, the vertical muscle of each row, waist muscle position, and colligation waist muscle and stirrup are positioned in stirrup;At each row bottom
A diameter of max is placed between indulging muscle in portion(d,25)The isometric reinforcing rod with deck-siding, colligation stirrup and vertical muscle, stirrup and waist muscle, finally
Place drag hook;
The whereabouts of beam:
Cushion block is placed at beam bottom, and antiskid bar is placed in the arch dashpot of correct position, connecting rod is extracted out, stirs anti-skidding
Bar, vertically groove is snapped down to level trough to beam, and aforesaid operations are until the nearly beam bottom in beam whereabouts, extracts antiskid bar out repeatedly, and beam is fallen completely within
In beam forms.
2. a kind of application method of beam steel installation tool according to claim 1, it is characterised in that:Described antiskid bar
(2)For spiral, and it is vertically fixed on arch dashpot(7)It is interior.
3. a kind of application method of beam steel installation tool according to claim 2, it is characterised in that:Described arch is delayed
Jet-bedding(7)For level trough and vertical slot, antiskid bar(2)It is arranged on level trough and vertical slot junction.
4. a kind of application method of beam steel installation tool according to claim 1, it is characterised in that:Described bottom branch
Support(5)For a steel plate, lower support(5)Interior is provided at both ends with connecting hole(3), both sides are provided with positioning hole(1);Under described
Portion is supported(5)For flexure plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510865302.XA CN105370046B (en) | 2015-12-01 | 2015-12-01 | A kind of application method of beam steel installation tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510865302.XA CN105370046B (en) | 2015-12-01 | 2015-12-01 | A kind of application method of beam steel installation tool |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105370046A CN105370046A (en) | 2016-03-02 |
CN105370046B true CN105370046B (en) | 2017-11-03 |
Family
ID=55372619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510865302.XA Active CN105370046B (en) | 2015-12-01 | 2015-12-01 | A kind of application method of beam steel installation tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105370046B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113775184A (en) * | 2021-10-27 | 2021-12-10 | 中国航天建设集团有限公司 | Method for mounting beam steel bars |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH041363A (en) * | 1990-04-19 | 1992-01-06 | Shimizu Corp | Construction method of prestressed concrete structure |
CN202187567U (en) * | 2011-07-25 | 2012-04-11 | 中建七局第三建筑有限公司 | Installing and positioning frame for T-shaped beam rib reinforcement |
CN202831654U (en) * | 2011-11-25 | 2013-03-27 | 李华 | Convenient and quick reinforcement binding device |
CN104453243B (en) * | 2014-12-03 | 2016-06-22 | 武汉建工集团股份有限公司 | Cast-in-situ concrete beam steadily enters the erection device and method of mould |
CN204552119U (en) * | 2015-03-31 | 2015-08-12 | 武汉建工集团股份有限公司 | A kind of beam ledges founds binding device |
CN205134963U (en) * | 2015-12-01 | 2016-04-06 | 中国建筑第七工程局有限公司 | Roof beam rebar installation instrument |
-
2015
- 2015-12-01 CN CN201510865302.XA patent/CN105370046B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105370046A (en) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (en) | Built-in positioning prefabricated component reinforced concrete shear wall and construction method | |
CN103669655B (en) | Deformation joint both walls body concrete pouring construction process | |
CN103711201B (en) | A kind of large-span prestressed concrete beam slab frame structure system | |
CN109403456B (en) | Steel corbel embedded structure and construction method thereof | |
CN206942131U (en) | Cast-in-situ concrete beam plate form bracing system | |
CN204530494U (en) | High pier binder template is set up and is used support | |
CN102296735A (en) | Anti-floating structure and method for cast-in-situ concrete GBF (glass basalt fiber) hollow floor slab | |
CN210195269U (en) | A no pole setting braced system for assembled steel construction building superimposed sheet floor | |
CN105370046B (en) | A kind of application method of beam steel installation tool | |
CN107299764A (en) | A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar | |
CN108330984B (en) | Assembled cat ladder with adjustable pedal angle | |
CN104481151A (en) | Beam steel framework and beam column connecting part stirrup binding method | |
CN211173080U (en) | Early-dismantling formwork support frame connecting device for building construction | |
CN206383280U (en) | Precast T-Beam wing plate framework of steel reinforcement molding bed rack | |
CN205134963U (en) | Roof beam rebar installation instrument | |
CN207538461U (en) | A kind of quick construction formwork system of beam | |
CN204225480U (en) | Building frame construction post beam boundary section pulls and pushes plate device | |
CN209194352U (en) | A kind of fixed structure between the Bailey beam and spandrel girder of Bailey truss | |
CN210621685U (en) | System for supporting upper-layer steel bars of bottom plate by using anti-floating anchor rods | |
CN208168349U (en) | A kind of profile steel concrete column template reinforcing device | |
CN207143740U (en) | A kind of bridge construction drilling platform | |
CN206503377U (en) | A kind of movable railing of steel trestle | |
CN208668986U (en) | Upright rod of suspension scaffold positioning device | |
CN107653782B (en) | Continuous beam pier top section pouring internal mold supporting system | |
CN204001725U (en) | The adjustable gusseted of a kind of reinforcing bar self-bearing type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |