CN105369744A - Suspended operation platform for bridge installation - Google Patents

Suspended operation platform for bridge installation Download PDF

Info

Publication number
CN105369744A
CN105369744A CN201510827642.3A CN201510827642A CN105369744A CN 105369744 A CN105369744 A CN 105369744A CN 201510827642 A CN201510827642 A CN 201510827642A CN 105369744 A CN105369744 A CN 105369744A
Authority
CN
China
Prior art keywords
hydraulic jack
job platform
walking
bracing frame
synchronous valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510827642.3A
Other languages
Chinese (zh)
Other versions
CN105369744B (en
Inventor
赵静一
杨璐
石玉
何东博
王昭
戎少峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanshan University
Original Assignee
Yanshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanshan University filed Critical Yanshan University
Priority to CN201510827642.3A priority Critical patent/CN105369744B/en
Publication of CN105369744A publication Critical patent/CN105369744A/en
Application granted granted Critical
Publication of CN105369744B publication Critical patent/CN105369744B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Provided is a suspended operation platform for bridge installation. The two sides of a work platform are each equipped with a rail A. Support rods A are connected between each rail A and the work platform. A synchronous valve A is arranged on the lower surface of the work platform. The work platform is connected with a vertical ladder mechanism. A connecting rod A is arranged between a support frame and a ladder. A hydraulic oil cylinder front lug plate A is arranged on the lower part of the support frame. A hydraulic oil cylinder rear lug plate A is arranged on one end of the work platform. A hydraulic oil cylinder A is arranged between the hydraulic oil cylinder front lug plate A and the hydraulic oil cylinder rear lug plate A. The two side faces of a walking plate are each connected with a connecting rod B through a support rod B. A walking beam is connected with the vertical ladder mechanism through a pin shaft B. A hydraulic oil cylinder B front lug plate is fixed to the bottom side face of the walking beam. A hydraulic oil cylinder B rear lug plate is fixed to the top of the support frame. A hydraulic oil cylinder B is arranged between the hydraulic oil cylinder front lug plate B and the hydraulic oil cylinder rear lug plate B. An electromagnet is arranged on one end of the walking beam. The suspended work platform is simple to install and disassemble. The shipping space is saved. A safe work platform is provided for bridge installation.

Description

A kind of unsettled operating platform installed for bridge
Technical field the present invention relates to a kind of unsettled operating equipment, is specifically related to the unsettled operating platform being applied to bridge installation.
Large quantities of prefabricated viaduct need be built and reconstruct to background technology, in order to meet the fast development of urban traffic.The structure adopting builder's jack girder steel to encorbelment for part before this provides the method for operation platform to solve engineering problem, or adopts the platform needing bottom to carry out supporting to construct.Their weak point is: dismantle inconvenience, take up room greatly.
Summary of the invention the object of this invention is to provide a kind ofly can unsettledly to operate, convenient disassembly, take up room the little unsettled operating platform installed for bridge.
The present invention mainly comprises: otic placode, bracing frame, hydraulic jack B, magnet, synchronous valve A and synchronous valve B after otic placode A, hydraulic jack A after job platform, railing A, support bar A, cat ladder, bracing frame, connecting rod A, hydraulic jack front ear plate A, hydraulic jack, walking flat board, support bar B, connecting rod B, hydraulic jack B front ear plate, hydraulic jack B.
Wherein, job platform is rectangular flat plate, is equipped with railing A in the both sides of job platform, and the cross section of railing A is door font.Preferably railing A be fixedly connected with some support bar A between job platform.Synchronous valve A is provided with at the soffit of job platform.One end of job platform is connected by bearing pin A with the lower end of vertical stair-climbing mechanism, and the width of job platform is less than the width of vertical stair-climbing mechanism.Vertical stair-climbing mechanism comprises cat ladder and bracing frame, is provided with bracing frame on the opposite of cat ladder, and the cross section of this bracing frame is door font, between the two sides and the two sides of cat ladder of bracing frame, be respectively equipped with connecting rod A.The hydraulic jack front ear plate A that one group of position is corresponding is provided with in bracing frame bottom, one end of job platform is provided with otic placode A after the corresponding hydraulic jack in one group of position, hydraulic jack A is provided with between otic placode A after corresponding hydraulic jack front ear plate A and hydraulic jack, flexible by the piston rod of hydraulic jack A, drives the rotation of job platform until reach 90 degree of stoppings.The oil-in of two hydraulic jack A is connected with two oil-outs of synchronous valve A respectively by hydraulic tube, and the oil-in of synchronous valve A is connected with the hydraulic tube of Bridge Erector pumping plant, is connected by hydraulic tube, disconnect after action when needs cylinder action.Walking flat board is rectangular flat plate, and the two sides dull and stereotyped in walking are connected with connecting rod B respectively by some support bar B, and walking is dull and stereotyped, support bar B and connecting rod B forms walking crossbeam.The width of walking crossbeam is larger than the width of vertical cat ladder, and one end of walking crossbeam is connected with the movable upper end of vertical stair-climbing mechanism by bearing pin B.The corresponding hydraulic jack B front ear plate in one group of position is fixed on walking crossbeam bottom surface, after the hydraulic jack B that one group of position is corresponding, otic placode is fixed on bracing frame top, hydraulic jack B is provided with between otic placode B after corresponding hydraulic jack front ear plate B and hydraulic jack, flexible by the piston rod of hydraulic jack B, drives the rotation of vertical stair-climbing mechanism until reach 90 degree of stoppings.The oil-in of two hydraulic jack B is connected with two oil-outs of synchronous valve B respectively by hydraulic tube, and the oil-in of synchronous valve B is connected with the hydraulic tube of Bridge Erector pumping plant, is connected by hydraulic tube, disconnect after action when needs cylinder action.Synchronous valve B is located at the soffit of walking crossbeam.One end of walking crossbeam is provided with electromagnet.
The electromagnet of this equipment in use, is directly docked with bridge equipment relevant position by crane by the present invention, and equipment then can be firmly fixed on this position by electromagnet energising.Two hydraulic jack A and two hydraulic jack B all adopt and are arranged symmetrically with, Synchronization Control is carried out by synchronous valve A and synchronous valve B, ensure the synchronism of oil cylinder, stretching by cylinder piston rod, drive vertical cat ladder to rotate until reach 90 degree of stoppings, driving the rotation of job platform until reach 90 degree of stoppings.At the end of installation or maintenance, by reverse operating, equipment is folded up, when electromagnet power-off, equipment can be disassembled and transport.
The present invention compared with prior art tool has the following advantages:
(1) novel device that the present invention proposes adopts electromagnet mounting means, and installing/dismounting is extremely simple.
(2) vertical cat ladder and job platform are folded by hydraulic jack and pinned connection by this equipment, simple to operate, save transport space.
(3) this equipment not only can be installed bridge, and also consider the unsettled working environment that bridge is installed, the installation for bridge provides the job platform of a safety simultaneously.
Accompanying drawing explanation
Fig. 1 is integral shaft mapping of the present invention;
Fig. 2 is integral shaft mapping of the present invention;
Fig. 3 is job platform folding picture of the present invention;
Fig. 4 is complete folding picture of the present invention.
Detailed description of the invention is in the simplified schematic diagram of the present invention shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, and job platform 1 is rectangular flat plate, is equipped with railing A2 in the both sides of job platform, and the cross section of railing A is door font.Railing A be fixedly connected with support bar A3 between job platform.Synchronous valve A4 is provided with at the soffit of job platform.One end of job platform is connected by bearing pin A5 with the lower end of vertical stair-climbing mechanism, and the width of job platform is less than the width of vertical stair-climbing mechanism.Vertical stair-climbing mechanism comprises cat ladder 6 and bracing frame 7, is provided with bracing frame on the opposite of cat ladder, and the cross section of this bracing frame is door font, between the two sides and the two sides of cat ladder of bracing frame, be respectively equipped with connecting rod A8.The hydraulic jack front ear plate A9 that one group of position is corresponding is provided with in bracing frame bottom, one end of job platform is provided with otic placode A10 after the corresponding hydraulic jack in one group of position, hydraulic jack A11 is provided with between otic placode A after corresponding hydraulic jack front ear plate A and hydraulic jack, flexible by the piston rod of hydraulic jack A, drives the rotation of job platform until reach 90 degree of stoppings.The oil-in of two hydraulic jack A is connected with two oil-outs of synchronous valve A respectively by hydraulic tube, and the oil-in of synchronous valve A is connected with the hydraulic tube of Bridge Erector.Walking dull and stereotyped 12 is rectangular flat plate, and the two sides dull and stereotyped in walking are connected with connecting rod B14 respectively by support bar B13, and walking is dull and stereotyped, support bar B and connecting rod B forms walking crossbeam.The width of walking crossbeam is larger than the width of vertical cat ladder, and one end of walking crossbeam is connected with the movable upper end of vertical stair-climbing mechanism by bearing pin B15.The corresponding hydraulic jack B front ear plate 16 in one group of position is fixed on walking crossbeam bottom surface, after the hydraulic jack B that one group of position is corresponding, otic placode 17 is fixed on bracing frame bottom, hydraulic jack B18 is provided with between otic placode B after corresponding hydraulic jack front ear plate B and hydraulic jack, flexible by the piston rod of hydraulic jack B, drives the rotation of vertical stair-climbing mechanism until reach 90 degree of stoppings.The oil-in of two hydraulic jack B is connected with two oil-outs of synchronous valve B19 respectively by hydraulic tube, and the oil-in of synchronous valve B is connected with the hydraulic tube of Bridge Erector.Synchronous valve B is located on the bottom surface of walking crossbeam.One end of walking crossbeam is provided with magnet 20.

Claims (2)

1. the unsettled operating platform installed for bridge, mainly include job platform, railing A, support bar A, cat ladder, bracing frame, connecting rod A, hydraulic jack front ear plate A, otic placode A after hydraulic jack, hydraulic jack A, walking is dull and stereotyped, support bar B, connecting rod B, hydraulic jack B front ear plate, otic placode after hydraulic jack B, bracing frame, hydraulic jack B, magnet, synchronous valve A and synchronous valve B, it is characterized in that: job platform is rectangular flat plate, railing A is equipped with in the both sides of job platform, the cross section of railing A is door font, synchronous valve A is provided with at the soffit of job platform, one end of job platform is connected by bearing pin A with the lower end of vertical stair-climbing mechanism, the width of job platform is less than the width of vertical stair-climbing mechanism, vertical stair-climbing mechanism comprises cat ladder and bracing frame, bracing frame is provided with on the opposite of cat ladder, the cross section of this bracing frame is door font, connecting rod A is respectively equipped with between the two sides and the two sides of cat ladder of bracing frame, the hydraulic jack front ear plate A that one group of position is corresponding is provided with in bracing frame bottom, one end of job platform is provided with otic placode A after the corresponding hydraulic jack in one group of position, hydraulic jack A is provided with between otic placode A after corresponding hydraulic jack front ear plate A and hydraulic jack, flexible by the piston rod of hydraulic jack A, drive the rotation of job platform until reach 90 degree of stoppings, the oil-in of two hydraulic jack A is connected with two oil-outs of synchronous valve A respectively by hydraulic tube, the oil-in of synchronous valve A is connected with the hydraulic tube of Bridge Erector pumping plant, walking flat board is rectangular flat plate, the two sides dull and stereotyped in walking are connected with connecting rod B respectively by support bar B, walking is dull and stereotyped, support bar B and connecting rod B forms walking crossbeam, the width of walking crossbeam is larger than the width of vertical cat ladder, one end of walking crossbeam is connected with the movable upper end of vertical stair-climbing mechanism by bearing pin B, the corresponding hydraulic jack B front ear plate in one group of position is fixed on walking crossbeam bottom surface, after the hydraulic jack B that one group of position is corresponding, otic placode is fixed on bracing frame top, hydraulic jack B is provided with between otic placode B after corresponding hydraulic jack front ear plate B and hydraulic jack, flexible by the piston rod of hydraulic jack B, drive the rotation of vertical stair-climbing mechanism until reach 90 degree of stoppings, the oil-in of two hydraulic jack B is connected with two oil-outs of synchronous valve B respectively by hydraulic tube, the oil-in of synchronous valve B is connected with the hydraulic tube of Bridge Erector pumping plant, synchronous valve B is located at the soffit of walking crossbeam, one end of walking crossbeam is provided with electromagnet.
2. according to claim 1 a kind of for bridge install unsettled operating platform, it is characterized in that: railing A be fixedly connected with support bar A between job platform.
CN201510827642.3A 2015-11-25 2015-11-25 Suspended operation platform for bridge installation Expired - Fee Related CN105369744B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510827642.3A CN105369744B (en) 2015-11-25 2015-11-25 Suspended operation platform for bridge installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510827642.3A CN105369744B (en) 2015-11-25 2015-11-25 Suspended operation platform for bridge installation

Publications (2)

Publication Number Publication Date
CN105369744A true CN105369744A (en) 2016-03-02
CN105369744B CN105369744B (en) 2017-04-26

Family

ID=55372333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510827642.3A Expired - Fee Related CN105369744B (en) 2015-11-25 2015-11-25 Suspended operation platform for bridge installation

Country Status (1)

Country Link
CN (1) CN105369744B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750604A (en) * 2019-02-14 2019-05-14 襄阳协利成机车车辆工程设备有限公司 A kind of Bridge Erector easy to use

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58180908U (en) * 1982-05-24 1983-12-02 柏木 茂 Foldable work scaffolding for bridges
JPH1018230A (en) * 1996-07-08 1998-01-20 Maruki:Kk Self-traveling type working carriage
CN2839367Y (en) * 2005-10-20 2006-11-22 王征 The bridge checkout equipment
CN201428110Y (en) * 2009-04-10 2010-03-24 江西蓝天学院 Maintenance and detection working vehicle for light bridges
CN202323771U (en) * 2011-12-01 2012-07-11 中国五冶集团有限公司 Installation and maintenance system for highway bridge
CN103243647A (en) * 2013-05-23 2013-08-14 山东大学 Novel hybrid bridge detection vehicle
CN203270453U (en) * 2013-05-21 2013-11-06 刘红枪 Unmanned bridge detecting vehicle
CN103492649A (en) * 2011-03-08 2014-01-01 艾迪思-创意设计有限公司 Suspended scaffolding system
CN205205693U (en) * 2015-11-25 2016-05-04 燕山大学 A unsettled operation platform for bridge installation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58180908U (en) * 1982-05-24 1983-12-02 柏木 茂 Foldable work scaffolding for bridges
JPH1018230A (en) * 1996-07-08 1998-01-20 Maruki:Kk Self-traveling type working carriage
CN2839367Y (en) * 2005-10-20 2006-11-22 王征 The bridge checkout equipment
CN201428110Y (en) * 2009-04-10 2010-03-24 江西蓝天学院 Maintenance and detection working vehicle for light bridges
CN103492649A (en) * 2011-03-08 2014-01-01 艾迪思-创意设计有限公司 Suspended scaffolding system
CN202323771U (en) * 2011-12-01 2012-07-11 中国五冶集团有限公司 Installation and maintenance system for highway bridge
CN203270453U (en) * 2013-05-21 2013-11-06 刘红枪 Unmanned bridge detecting vehicle
CN103243647A (en) * 2013-05-23 2013-08-14 山东大学 Novel hybrid bridge detection vehicle
CN205205693U (en) * 2015-11-25 2016-05-04 燕山大学 A unsettled operation platform for bridge installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750604A (en) * 2019-02-14 2019-05-14 襄阳协利成机车车辆工程设备有限公司 A kind of Bridge Erector easy to use

Also Published As

Publication number Publication date
CN105369744B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN202626845U (en) Bridge erection machine carrying bracket
CN203855895U (en) Mobile jib operation platform for constructing and overhauling bridges
CN102151698A (en) Roll replacement equipment for working roll of rolling mill
CN104480863B (en) The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction
CN102748039A (en) Multi-functional tunnel operation trolley
CN104234723A (en) Self-propelled mobile template support trolley for open trench tunnel with rectangular cross section
CN107401164A (en) A kind of mechanical piling machine in small building building site
CN109113320A (en) Construction operation method in a kind of elevator
CN104131515A (en) Method for constructing cast-in-place box beam by means of movable formwork
CN204738226U (en) Arched bridge main arch bottom plate rail formula tool car
CN205112085U (en) Hydraulic pressure centre form construction system
CN103639644B (en) The method of fast assembling-disassembling large hydraulic press hydraulic cylinder
CN205205693U (en) A unsettled operation platform for bridge installation
CN105369744A (en) Suspended operation platform for bridge installation
CN104533461B (en) A kind of tunnel construction trolley horizontal mobile device
CN208183529U (en) The high mobile job platform of hanging concrete guardrail
CN103130103A (en) Lifting device suitable for underground ally and chamber
CN205152760U (en) Preceding landing leg steering mechanism
CN202298471U (en) Construction platform for hanging U-shaped concrete beam
CN214424550U (en) Dismantled mine shaft and roadway construction ventilation equipment
CN205257791U (en) Quick assembly and disassembly formula gantry crane frame construction
CN203006882U (en) Steering mechanism of full-automatic propelling device
CN208363559U (en) A kind of hoistway operation platform level adjusting structure
CN108442249A (en) High hanging concrete guardrail moves job platform
CN205669174U (en) Jacking device for bridge maintenance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20211125