CN105354377A - 一种确定输电杆塔的脉动风振荷载的方法 - Google Patents

一种确定输电杆塔的脉动风振荷载的方法 Download PDF

Info

Publication number
CN105354377A
CN105354377A CN201510724749.5A CN201510724749A CN105354377A CN 105354377 A CN105354377 A CN 105354377A CN 201510724749 A CN201510724749 A CN 201510724749A CN 105354377 A CN105354377 A CN 105354377A
Authority
CN
China
Prior art keywords
wind
transmission tower
load
fluctuating
omega
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510724749.5A
Other languages
English (en)
Inventor
王飞
苏志钢
李清华
韩军科
王旭明
刘亚多
汪长智
胡晓光
朱彬荣
曹晔晖
杨风利
张宏杰
邢海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201510724749.5A priority Critical patent/CN105354377A/zh
Publication of CN105354377A publication Critical patent/CN105354377A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]

Abstract

本发明涉及一种确定输电杆塔的脉动风振荷载的方法,包括:确定脉动风速功率谱密度函数;通过对所述脉动风速功率谱密度函数的矩阵进行分解,生成随机脉动风速样本;根据所述脉动风速样本确定脉动风振荷载。本发明技术方案适用于一般的输电杆塔,生成的风振荷载数据可以直接进行有限元分析,大大方便了输电杆塔的风振时程分析的有限元计算研究。

Description

一种确定输电杆塔的脉动风振荷载的方法
技术领域:
本发明涉及输电线路杆塔领域,更具体涉及一种确定输电杆塔的脉动风振荷载的方法。
背景技术:
风荷载是作用在结构上的重要动力荷载之一,尤其对于输电杆塔这种高耸结构来说,设计中必须要考虑风荷载的作用。计算输电杆塔动力风振的一个有效的方法是MonteCarlo法,即根据某些既定的统计参数产生一系列的时程样本,在对每个样本函数进行线性或非线性的结构分析,通过对结构不同单元在样本函数下的时程响应的统计分析,计算结构是否安全,在结构特定的点上的风速通常认为是稳定的随机过程,其塔形可完全由谱密度函数确定。
由于风荷载可以分解为平均风和脉动风,对于脉动风部分,可以借助经验公式给出的功率谱函数,从频域和时域两个方面来分析。基于线性叠加的频域分析方法概念清晰、简便,因此在工程中应用广泛。但不能给出反应的相关函数、瞬间反应,不能进行非线性结构分析,并且对于输电杆塔结构,由于其频率密集,在计算中应取多少阶模态,怎样补偿模态截断的能量损失,仍是一个问题。
发明内容:
本发明的目的是提供一种确定输电杆塔的脉动风振荷载的方法,解决输电杆塔进行风振时程响应分析时风振时程的生成问题。
为实现上述目的,本发明采用以下技术方案:一种确定输电杆塔的脉动风振荷载的方法,包括:
确定脉动风速功率谱密度函数;
通过对所述脉动风速功率谱密度函数的矩阵进行分解,生成随机脉动风速样本;
根据所述脉动风速样本确定脉动风振荷载。
根据世界上不同地点、不同高度测得90次以上的强风记录,并假定水平阵风谱中的湍流积分尺度L沿高度不变,取常数值1200m,取脉动风速谱为不同离地高度实测值的平均值,从而确定脉动风速功率谱密度函数。
所述脉动风速功率谱密度函数通过下式确定:
S V ( n ) = 4 kv 10 2 f 2 n ( 1 + f 2 ) 4 / 3
式中,v10表示10m处的平均风速,,k为Karman常数;n为风的脉动频率。
所述脉动风速功率谱密度函数的矩阵根据谐波合成法,一维三变量零均值平稳随机过程中的自相关函数确定,所述自相关函数为:
R 0 ( τ ) = R 11 0 ( τ ) R 12 0 ( τ ) R 13 0 ( τ ) R 21 0 ( τ ) R 22 0 ( τ ) R 23 0 ( τ ) R 31 0 ( τ ) R 32 0 ( τ ) R 33 0 ( τ )
所述脉动风速功率谱密度矩阵为:
S 0 ( ω ) = S 11 0 ( ω ) S 12 0 ( ω ) S 13 0 ( ω ) S 21 0 ( ω ) S 22 0 ( ω ) S 23 0 ( ω ) S 31 0 ( ω ) S 32 0 ( ω ) S 33 0 ( ω )
其中,τ为时差,ω为频率。
5、如权利要求4所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:对所述脉动风速功率谱密度矩阵进行Cholesky分解:
SO(ω)=H(ω)HT*(ω)
其中,H(ω)为以下三角矩阵:
H ( ω ) = H 11 ( ω ) H 12 ( ω ) H 13 ( ω ) H 21 ( ω ) H 22 ( ω ) H 23 ( ω ) H 31 ( ω ) H 32 ( ω ) H 33 ( ω )
所述脉动风速功率谱密度矩阵分解后,随机过程fj 0(t),j=1,2,3用下式模拟:
f j ( t ) = 2 Σ m = 1 j Σ j = 1 N | H j m ( ω j m ) | Δ ω cos [ ω m l t - θ j m ( ω m l ) + φ m l ]
带有双下标的频率定义如下:
ω 1 l = l · Δ ω - 2 3 Δ ω , l = 1 , 2 , ... , N
ω 2 l = l · Δ ω - 1 3 Δ ω , l = 1 , 2 , ... , N
ω3l=l·Δω,l=1,2,…,N
Δ ω = ω u N , l = 1 , 2 , ... , N
ωu是截断频率,ωjm为带双下标频率,t为时间,θjm为系数,φml为相位角序列,N为大整数;
模拟的随机过程fj(t)是周期函数,其周期如下所示:
T 0 = 3 2 π Δ ω
由上式可知,在给定的截断频率ωu下,N越大,则模拟的随机过程的周期越长;根据随机相位序列i为随机相位分量号;得到随机风速样本如下式:
f j ( i ) ( t ) = 2 Σ m = 1 j Σ j = 1 N | H j m ( ω j m ) | Δ ω cos [ ω m l t - θ j m ( ω m l ) + Φ m l ( i ) ] j = 1 , 2 , 3 ;
为了避免产生频率混淆的问题,时间步长Δt必须满足以下公式:
Δ t ≤ 2 π 2 ω u
将所述风速样本进行快速傅里叶变换生成随机脉动风速样本。
通过空间点的体型系数得到风压动力荷载:
式中,μsx,μsy,μsz分别为空间点yz迎风面、xz迎风面和xy迎风面体形系数,Ax,Ay,Az分别为空间点yz迎风面、xz迎风面和xy迎风面的迎风面积;V(x,y,z,t)为空间点的模拟风速时程,利用上述公式和输电杆塔参数生成输电杆塔各分段上各节点处的脉动风振荷载。
通过谐波合成法得到的所述空间点的模拟风速时程:
V(x,y,z,t)=v(z)+v(x,y,z,t)
其中,v(z)是平均风速,v(x,y,z,t)是脉动时程风速。
所述方法还包括设定输电杆塔参数和设定风荷载计算参数。
所述输电杆塔参数包括输电杆塔各分段的高度、各分段上节点的编号、节点数目和分段的迎风面面积;所述风荷载计算参数包括地表粗糙度指数、基准风速高度、基准高度处风速、截止频率、频率间距和风速时程长度。
和最接近的现有技术比,本发明提供技术方案具有以下优异效果
1、本发明技术方案通过设定输电杆塔和风荷载计算参数,利用谐波合成法自动生成可以直接用于风振时程分析的脉动风振荷载数据;
2、本发明技术方案操作简便,计算速度快,稳定性好;
3、本发明技术方案风荷载计算参数可以手动进行调整,提高了对计算的控制性;
4、本发明技术方案风荷载计算参数的选用参考了规范,与规范结合紧密;
5、本发明技术方案适用于普通的输电杆塔,生成的风振荷载数据可以直接进行有限元分析,大大方便了输电杆塔的风振时程分析的有限元计算研究。
附图说明
图1为本发明实施例的空间点的体型系数、迎风面积与风压力的关系图;
图2为本发明实施例的方法流程图;
图3为本发明实施例的方法流程图。
具体实施方式
下面结合实施例对发明作进一步的详细说明。
实施例1:
本例的发明提供一种确定输电杆塔的脉动风振荷载的方法,包括:如图2和3所示:
步骤1)设定输电杆塔参数:
设定输电杆塔结构分段参数,包括各分段的高度,各分段上节点的编号,节点数目,分段的迎风面面积。设定这些参数是为了将风速时程数据转换为风压时程数据。
步骤2)设定风荷载计算参数:
本发明需要设定的风荷载计算参数有地表粗糙度指数,基准风速高度,基准高度处风速,截止频率,频率间距,风速时程长度。
步骤3)生成脉动风速功率谱密度函数:
Davenport根据世界上不同地点、不同高度测得90多次的强风记录,并假定水平阵风谱中的湍流积分尺度L沿高度不变,取常数值1200m,取脉动风速谱为不同离地高度实测值的平均值,建立了经验数学表达式
S V ( n ) = 4 kv 10 2 f 2 n ( 1 + f 2 ) 4 / 3
式中,v10表示z=10m处的平均风速,,k为Karman常数,通常取为0.4。风的脉动频率
我国规范在风工程应用中一般采用Davenport脉动风速谱,Davenport谱比其它谱偏大,而谱值偏大的范围正好是风频率域结构自振接近的地方,影响较大,故Davenport谱可能会高估结构的动力响应,其结果可能偏于保守,但是从结构设计的角度而言,却提高了结构的安全度。
本发明使用了Davenport谱生成脉动风速功率谱密度函数。
步骤4)谐波合成法生成脉动风速时程:
本发明使用谐波合成法生成脉动风速时程。
利用谐波合成法,一维三变量零均值平稳随机过程中的自相关函数为:
R 0 ( τ ) = R 11 0 ( τ ) R 12 0 ( τ ) R 13 0 ( τ ) R 21 0 ( τ ) R 22 0 ( τ ) R 23 0 ( τ ) R 31 0 ( τ ) R 32 0 ( τ ) R 33 0 ( τ )
其功率谱密度矩阵为:
S 0 ( ω ) = S 11 0 ( ω ) S 12 0 ( ω ) S 13 0 ( ω ) S 21 0 ( ω ) S 22 0 ( ω ) S 23 0 ( ω ) S 31 0 ( ω ) S 32 0 ( ω ) S 33 0 ( ω )
对平稳随机过程进行模拟,需要对功率谱密度矩阵进行Cholesky分解:
S0(ω)=H(ω)HT*(ω)
其中为下三角矩阵:
H ( ω ) = H 11 ( ω ) H 12 ( ω ) H 13 ( ω ) H 21 ( ω ) H 22 ( ω ) H 23 ( ω ) H 31 ( ω ) H 32 ( ω ) H 33 ( ω )
功率谱分解后,随机过程,j=1,2,3可以用下式模拟。
f j ( t ) = 2 Σ m = 1 j Σ j = 1 N | H j m ( ω j m ) | Δ ω cos [ ω m l t - θ j m ( ω m l ) + φ m l ] , ( j = 1 , 2 , 3 )
带有双下标的频率定义如下:
ω 1 l = l · Δ ω - 2 3 Δ ω , l = 1 , 2 , ... , N
ω 2 l = l · Δ ω - 1 3 Δ ω , l = 1 , 2 , ... , N
ω3l=l·Δω,l=1,2,…,N
Δ ω = ω u N , l = 1 , 2 , ... , N
是截断频率,其大小通常由功率谱密度矩阵中各项与的函数关系而定,所选取的必须充分大使得功率谱密度矩阵中各项趋于零,这样无论从数值角度还是从物理意义上,大于的频率成分都不会造成影响。
模拟的随机过程是周期函数,其周期如下所示:
T 0 = 3 2 π Δ ω
由上式可以看出,在给定的截断频率ωu下,N越大,则模拟的随机过程的周期越长。根据随机相位序列可得到随机风速样本:
f j ( i ) ( t ) = 2 Σ m = 1 j Σ j = 1 N | H j m ( ω j m ) | Δ ω cos [ ω m l t - θ j m ( ω m l ) + Φ m l ( i ) ] ( j = 1 , 2 , 3 )
用上式产生随机样本时,为了避免产生频率混淆的问题,时间步长Δt必须满足以下公式:
Δ t ≤ 2 π 2 ω u
利用FFT技术可以对公式进行重写,并生成随机脉动风速样本。
步骤6)利用风速时程数据生成风压时程数据:
通过谐波合成法计算得到的空间点的模拟风速时程
V(x,y,z,t)=v(z)+v(x,y,z,t)
其中v(z)是平均风速,v(x,y,z,t)是脉动时程风速。
按照荷载规范引入空间点的体型系数可以得到风压动力荷载的计算公式:如图1空间点的体型系数、迎风面积与风压力的关系:
式中μsx,μsy,μsz分别为空间点yz迎风面、xz迎风面和xy迎风面体形系数,Ax,Ay,Az分别为空间点yz迎风面、xz迎风面和xy迎风面的迎风面积。利用这个公式和输电杆塔各分段的高度,各分段上节点的编号,节点数目,分段的迎风面面积,可以生成各分段上各节点处的脉动风振荷载。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,所属领域的普通技术人员尽管参照上述实施例应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,这些未脱离本发明精神和范围的任何修改或者等同替换,均在申请待批的本发明的权利要求保护范围之内。

Claims (10)

1.一种确定输电杆塔的脉动风振荷载的方法,其特征在于:包括:
确定脉动风速功率谱密度函数;
分解所述脉动风速功率谱密度函数的矩阵,生成随机脉动风速样本;
确定脉动风振荷载。
2.如权利要求1所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:根据不同地点和高度测得90次以上的强风记录,并假定水平阵风谱中的湍流积分尺度L沿1200m高度不变并取脉动风速功率谱为不同离地高度实测值的平均值,从而确定脉动风速功率谱密度函数。
3.如权利要求2所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:用下式确定所述脉动风速功率谱密度函数:
式中,v10表示10m处的平均风速,,k为Karman常数;n为风的脉动频率。
4.如权利要求1所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:根据谐波合成法,用一维三变量零均值平稳随机过程中的自相关函数确定所述脉动风速功率谱密度函数的矩阵:
所述自相关函数为:
所述脉动风速功率谱密度矩阵为:
其中,τ为时差,ω为频率。
5.如权利要求4所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:用下式Cholesky分解所述脉动风速功率谱密度矩阵:
S0(ω)=H(ω)HT*(ω)
其中,H(ω)为以下三角矩阵:
6.如权利要求5所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:所述脉动风速功率谱密度矩阵分解后,模拟随机过程j=1,2,3如下式所示:
其中:
ω3l=l·Δω,l=1,2,…,N
ωu是截断频率,ωjm为带双下标频率,t为时间,θjm为系数,φml为相位角序列,N为大整数;
模拟的随机过程fj(t)是如下所示周期的周期函数:
在给定的截断频率ωu下,N越大,则模拟的随机过程的周期越长;根据随机相位序列l=1,…,N,i为随机相位分量号;得到如下式所示的随机风速样本:
j=1,2,3;
时间步长Δt必须满足以下公式:
将所述风速样本进行快速傅里叶变换生成随机脉动风速样本。
7.如权利要求1所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:利用风压动力荷载和输电杆塔参数生成输电杆塔各分段上各节点处的脉动风振荷载;所述风压动力荷载如下式所示:
式中,μsx,μsy,μsz分别为空间点yz迎风面、xz迎风面和xy迎风面体形系数,Ax,Ay,Az分别为空间点yz迎风面、xz迎风面和xy迎风面的迎风面积;V(x,y,z,t)为空间点的模拟风速时程。
8.如权利要求7所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:所述空间点的模拟风速时程于下式所示:
V(x,y,z,t)=v(z)+v(x,y,z,t)
其中,v(z)是平均风速,v(x,y,z,t)是脉动时程风速。
9.如权利要求1所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:所述方法还包括设定输电杆塔参数和设定风荷载计算参数。
10.如权利要求9所述的一种确定输电杆塔的脉动风振荷载的方法,其特征在于:所述输电杆塔参数包括输电杆塔各分段的高度、各分段上节点的编号、节点数目和分段的迎风面面积;所述风荷载计算参数包括地表粗糙度指数、基准风速高度、基准高度处风速、截止频率、频率间距和风速时程长度。
CN201510724749.5A 2015-10-29 2015-10-29 一种确定输电杆塔的脉动风振荷载的方法 Pending CN105354377A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510724749.5A CN105354377A (zh) 2015-10-29 2015-10-29 一种确定输电杆塔的脉动风振荷载的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510724749.5A CN105354377A (zh) 2015-10-29 2015-10-29 一种确定输电杆塔的脉动风振荷载的方法

Publications (1)

Publication Number Publication Date
CN105354377A true CN105354377A (zh) 2016-02-24

Family

ID=55330349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510724749.5A Pending CN105354377A (zh) 2015-10-29 2015-10-29 一种确定输电杆塔的脉动风振荷载的方法

Country Status (1)

Country Link
CN (1) CN105354377A (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105703357A (zh) * 2016-01-20 2016-06-22 陈杨珑 一种可实时监测的水力发电站
CN105975697A (zh) * 2016-05-09 2016-09-28 中国电力科学研究院 输电塔迎风面积确定方法及装置
CN106548009A (zh) * 2016-10-11 2017-03-29 中国电力科学研究院 采空区输电塔动力冲击效应的评估方法及装置
CN107169201A (zh) * 2017-05-15 2017-09-15 河海大学 一种基于开方分解谱表示法的平稳脉动风场模拟方法
CN107292032A (zh) * 2017-06-22 2017-10-24 国网新疆电力公司经济技术研究院 寒冷地区输电铁塔疲劳寿命预测方法
CN107506521A (zh) * 2017-07-11 2017-12-22 国网电力科学研究院武汉南瑞有限责任公司 一种输电铁塔三维风荷载模拟方法
CN108414187A (zh) * 2018-03-13 2018-08-17 重庆交通大学 低矮建筑屋盖风压时频特性测量方法
CN109029896A (zh) * 2018-04-27 2018-12-18 国网浙江省电力有限公司经济技术研究院 一种格构式塔架角度风荷载分配系数识别及塔架风荷载的确定方法
CN109101726A (zh) * 2018-08-10 2018-12-28 国网浙江省电力有限公司经济技术研究院 一种基于风载总计的输电塔整体脉动风荷载谱确定方法
CN109116753A (zh) * 2018-09-10 2019-01-01 国网江西省电力有限公司电力科学研究院 一种高压输电铁塔空间刚架有限元模型风载荷的施加方法
CN109359359A (zh) * 2018-09-29 2019-02-19 西安交通大学 一种考虑风载荷时空分布特性的输电线路风速场模拟方法
CN110657066A (zh) * 2018-06-29 2020-01-07 中车株洲电力机车研究所有限公司 一种风电机组控制方法、控制器及装置
CN110851905A (zh) * 2019-11-14 2020-02-28 福州大学 一种峡谷微地形条件下的输电铁塔风振系数计算方法
CN111506946A (zh) * 2020-03-31 2020-08-07 重庆科技学院 基于有效荷载法和塔线分离法考虑塔线耦合影响的常规输电塔、线设计风载荷的计算方法
CN112001099A (zh) * 2020-07-07 2020-11-27 中国科学院新疆天文台 大型射电望远镜天线面板脉动风压快速测算方法
CN112580231A (zh) * 2020-11-24 2021-03-30 广东电网有限责任公司阳江供电局 一种输电杆塔在强风下力学特性仿真方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120197605A1 (en) * 2011-01-30 2012-08-02 Sinovel Wind Group Co., Ltd. Comprehensive assessment system and assessment method for vibration and load of wind generating set
CN104268791A (zh) * 2014-08-21 2015-01-07 国家电网公司华中分部 山地赋存环境中500kV高压输电线路的健康评估方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120197605A1 (en) * 2011-01-30 2012-08-02 Sinovel Wind Group Co., Ltd. Comprehensive assessment system and assessment method for vibration and load of wind generating set
CN104268791A (zh) * 2014-08-21 2015-01-07 国家电网公司华中分部 山地赋存环境中500kV高压输电线路的健康评估方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何文飞: "高耸格构式塔架风振响应研究", 《中国优秀硕士学位论文全文数据库-工程科技Ⅱ辑》 *
李黎、尹鹏: "大跨越输电塔-线体系风振控制研究", 《工程力学》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105703357A (zh) * 2016-01-20 2016-06-22 陈杨珑 一种可实时监测的水力发电站
CN105975697A (zh) * 2016-05-09 2016-09-28 中国电力科学研究院 输电塔迎风面积确定方法及装置
CN105975697B (zh) * 2016-05-09 2021-03-02 中国电力科学研究院 输电塔迎风面积确定方法及装置
CN106548009A (zh) * 2016-10-11 2017-03-29 中国电力科学研究院 采空区输电塔动力冲击效应的评估方法及装置
CN106548009B (zh) * 2016-10-11 2020-06-02 中国电力科学研究院 采空区输电塔动力冲击效应的评估方法及装置
CN107169201A (zh) * 2017-05-15 2017-09-15 河海大学 一种基于开方分解谱表示法的平稳脉动风场模拟方法
CN107292032A (zh) * 2017-06-22 2017-10-24 国网新疆电力公司经济技术研究院 寒冷地区输电铁塔疲劳寿命预测方法
CN107506521A (zh) * 2017-07-11 2017-12-22 国网电力科学研究院武汉南瑞有限责任公司 一种输电铁塔三维风荷载模拟方法
CN108414187A (zh) * 2018-03-13 2018-08-17 重庆交通大学 低矮建筑屋盖风压时频特性测量方法
CN109029896B (zh) * 2018-04-27 2020-03-17 国网浙江省电力有限公司经济技术研究院 一种格构式塔架角度风荷载分配系数识别及塔架风荷载的确定方法
CN109029896A (zh) * 2018-04-27 2018-12-18 国网浙江省电力有限公司经济技术研究院 一种格构式塔架角度风荷载分配系数识别及塔架风荷载的确定方法
CN110657066A (zh) * 2018-06-29 2020-01-07 中车株洲电力机车研究所有限公司 一种风电机组控制方法、控制器及装置
CN109101726A (zh) * 2018-08-10 2018-12-28 国网浙江省电力有限公司经济技术研究院 一种基于风载总计的输电塔整体脉动风荷载谱确定方法
CN109101726B (zh) * 2018-08-10 2022-09-09 国网浙江省电力有限公司经济技术研究院 一种基于风载总计的输电塔整体脉动风荷载谱确定方法
CN109116753A (zh) * 2018-09-10 2019-01-01 国网江西省电力有限公司电力科学研究院 一种高压输电铁塔空间刚架有限元模型风载荷的施加方法
CN109359359A (zh) * 2018-09-29 2019-02-19 西安交通大学 一种考虑风载荷时空分布特性的输电线路风速场模拟方法
CN109359359B (zh) * 2018-09-29 2020-11-10 西安交通大学 一种考虑风载荷时空分布特性的输电线路风速场模拟方法
CN110851905B (zh) * 2019-11-14 2022-06-14 福州大学 一种峡谷微地形条件下的输电铁塔风振系数计算方法
CN110851905A (zh) * 2019-11-14 2020-02-28 福州大学 一种峡谷微地形条件下的输电铁塔风振系数计算方法
CN111506946A (zh) * 2020-03-31 2020-08-07 重庆科技学院 基于有效荷载法和塔线分离法考虑塔线耦合影响的常规输电塔、线设计风载荷的计算方法
CN111506946B (zh) * 2020-03-31 2022-05-13 重庆科技学院 基于有效荷载法和塔线分离法考虑塔线耦合影响的常规输电塔、线设计风载荷的计算方法
CN112001099A (zh) * 2020-07-07 2020-11-27 中国科学院新疆天文台 大型射电望远镜天线面板脉动风压快速测算方法
CN112580231A (zh) * 2020-11-24 2021-03-30 广东电网有限责任公司阳江供电局 一种输电杆塔在强风下力学特性仿真方法

Similar Documents

Publication Publication Date Title
CN105354377A (zh) 一种确定输电杆塔的脉动风振荷载的方法
Schaffarczyk Introduction to wind turbine aerodynamics
Sarmast et al. Mutual inductance instability of the tip vortices behind a wind turbine
Li et al. Coupled multi-body dynamics and CFD for wind turbine simulation including explicit wind turbulence
CN102938003B (zh) 一种叶轮机械计入错频的气动弹性稳定性数值预测方法
Kleist et al. Improving incremental balance in the GSI 3DVAR analysis system
Beran et al. Reduced-order modeling-New approaches for computational physics
CN106934185A (zh) 一种弹性介质的流固耦合多尺度流动模拟方法
Dai et al. Chaos and chaotic transients in an aeroelastic system
Ma et al. Investigations of aerodynamic effects on streamlined box girder using two-dimensional actively-controlled oncoming flow
Li et al. Modeling and simulation of fluctuating wind speeds using evolutionary phasespectrum
CN104516771A (zh) 一种非平稳随机过程高效模拟方法
Zhang et al. Wind Speed Prediction with Wavelet Time Series Based on Lorenz Disturbance.
CN104317985A (zh) 一种基于界带有限元和拉格朗日坐标的流体仿真方法
CN103617308A (zh) 一种风电场频域等效模型的构建方法
CN105117539A (zh) 风力机叶片模态频率及其双峰高斯分布拟合方法
CN110717216A (zh) 不规则波下带柔性气囊直升机横摇响应预报方法
CN115544830A (zh) 一种随机风载荷下风力机动力响应分析方法
Rieper et al. Range of validity of an extended WKB theory for atmospheric gravity waves: One-dimensional and two-dimensional case
CN111651920B (zh) 塔线体系下大跨越输电塔风致机械能的传递分析方法
CN104091003A (zh) 一种基础运动时柔性壳结构大变形响应的有限元建模方法
Digraskar Simulations of flow over wind turbines
Vitsas et al. Multiscale aeroelastic simulations of large wind farms in the atmospheric boundary layer
Kasahara et al. Normal modes of a global nonhydrostatic atmospheric model
Chabaud Synthetic turbulence modelling for offshore wind farm engineering models using coherence aggregation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wang Fei

Inventor after: Cao Yehui

Inventor after: Yang Fengli

Inventor after: Zhang Hongjie

Inventor after: Xing Haijun

Inventor after: Zhang Guangcheng

Inventor after: Su Zhigang

Inventor after: Li Qinghua

Inventor after: Han Junke

Inventor after: Wang Xuming

Inventor after: Liu Yaduo

Inventor after: Wang Changzhi

Inventor after: Hu Xiaoguang

Inventor after: Zhu Binrong

Inventor before: Wang Fei

Inventor before: Cao Yehui

Inventor before: Yang Fengli

Inventor before: Zhang Hongjie

Inventor before: Xing Haijun

Inventor before: Su Zhigang

Inventor before: Li Qinghua

Inventor before: Han Junke

Inventor before: Wang Xuming

Inventor before: Liu Yaduo

Inventor before: Wang Changzhi

Inventor before: Hu Xiaoguang

Inventor before: Zhu Binrong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160803

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Applicant after: State Grid Shandong Electric Power Company

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

Applicant before: State Grid Corporation of China

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160224