CN105334486B - Electric energy meter test system - Google Patents

Electric energy meter test system Download PDF

Info

Publication number
CN105334486B
CN105334486B CN201510705303.8A CN201510705303A CN105334486B CN 105334486 B CN105334486 B CN 105334486B CN 201510705303 A CN201510705303 A CN 201510705303A CN 105334486 B CN105334486 B CN 105334486B
Authority
CN
China
Prior art keywords
sliding rail
electric energy
energy meter
measured
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510705303.8A
Other languages
Chinese (zh)
Other versions
CN105334486A (en
Inventor
车磊
朱奎
文先峰
黄远辉
张建成
范俊
谢伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen jinzhengfang Technology Co.,Ltd.
Original Assignee
SHENZHEN GOLDEN SQUARE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN GOLDEN SQUARE TECHNOLOGY Co Ltd filed Critical SHENZHEN GOLDEN SQUARE TECHNOLOGY Co Ltd
Priority to CN201510705303.8A priority Critical patent/CN105334486B/en
Publication of CN105334486A publication Critical patent/CN105334486A/en
Application granted granted Critical
Publication of CN105334486B publication Critical patent/CN105334486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Abstract

The present invention relates to a kind of electric energy meter test systems, the electric energy meter test system includes: sliding rail line, plug into plate and mechanism for testing, wherein, sliding rail line includes sliding rail line main body and at least sliding rail substrate that is arranged in the sliding rail line main body, and multiple electric energy meters to be measured can slide on the sliding rail substrate;Plate of plugging into is connected with the sliding rail line, for having enough to meet the need electric energy meter to be measured between assembly line and the sliding rail line;And mechanism for testing is used to test the electric energy meter to be measured being located in preset test station, the electric energy meter to be measured slides into the test station by the sliding rail substrate.The present invention is able to solve the low problem of testing efficiency of electric energy meter test system in the prior art.

Description

Electric energy meter test system
Technical field
The present invention relates to electric energy meter testing field more particularly to a kind of electric energy meter test systems.
Background technique
With manufacturing fast development, the aggravation competed between industry, each enterprise is to the control of production cost and efficiency Urgent requirement is proposed, product promotion of efficiency in batch production process becomes the emphasis of each enterprises pay attention.
But in actual production, especially electric energy meter manufacturing field, layout and operation mode based on conventional production lines, When leading to electric energy meter batch production test, there are following defects:
1, invalid operation caused by turnover is excessive: trying the stage in function, generallys use the side of single machine turnover, single machine test Formula, under which causes test station operating efficiency very low.
2, process step design is unreasonable: when carrying out overall throughput promotion, for the balance for guaranteeing production line, test station needs are set Multiple duplicate test stations are set, increasing considerably for human cost and equipment cost is thus caused.
3, testing scheme is unreasonable: duplicate test station is brought to the quality control and the retrospect of defective products of product Difficulty causes certain quality hidden danger.
4, product turnover sequence is uncontrollable: different product results in the need for making for different product in the difference of design scheme Different testing tools.
Therefore, problem low there is also testing efficiency in existing electric energy meter test system.
Summary of the invention
The purpose of the present invention is to provide a kind of electric energy meter test systems, for solving electric energy meter test system in the prior art The low problem of the testing efficiency of system.
In order to solve the above-mentioned technical problem, the technical scheme adopted by the invention is as follows:
A kind of electric energy meter test system includes: sliding rail line, plug into plate and mechanism for testing, wherein sliding rail line includes sliding rail line Main body and at least sliding rail substrate being arranged in the sliding rail line main body, multiple electric energy meters to be measured can be in the cunning It is slided on base of the rail plate;Plate of plugging into is connected with the sliding rail line, for making electric energy meter to be measured between assembly line and the sliding rail line Turnover;And mechanism for testing is used to test the electric energy meter to be measured being located in preset test station, the electric energy meter to be measured is logical It crosses the sliding rail substrate and slides into the test station.
Further, the plate of plugging into includes that entrance plugs into plate and outlet is plugged into plate, and the entrance plugs into plate for by institute It states electric energy meter to be measured to go on the sliding rail line from the assembly line week, the plate of plugging into that exports is used for the electric energy meter to be measured It is gone on the assembly line from the sliding rail line week.
Further, the sliding rail line further includes the sliding rail support plate being arranged in below the sliding rail substrate, is used to support The sliding rail substrate.
Further, the sliding rail line further includes two railway limit plates and an at least station isolation board, the two tracks limit Position plate erects the both ends in the sliding rail substrate in the width direction, width of the station isolation board along the sliding rail substrate respectively Direction erects on the sliding rail substrate.
Further, the quantity of the sliding rail substrate is multiple, the multiple detachably connected formation institute of sliding rail substrate State sliding rail line.
Further, the mechanism for testing includes pneumatic unit and the test board that is connected with the pneumatic unit, passes through institute Stating pneumatic unit drives the test board to rise or decline, to test the electric energy meter to be measured.
Further, the test board includes multiple replaceable epitopes, with the electric energy meter to be measured to different model It is tested.
Further, the mechanism for testing further includes a control switch being arranged in the sliding rail line main body, for controlling Make the start and stop of the pneumatic unit.
Further, the mechanism for testing further includes auxiliary unit, the test for electric energy meter to be measured described in assistant analysis As a result.
Further, the auxiliary unit includes display module, communication module, signal detection module, signal output module One or several kinds.
Compared with prior art, the invention has the following advantages:
By the way that sliding rail line, plug into plate and mechanism for testing are arranged in electric energy meter test system, plate of plugging into can make electricity to be measured Energy table has enough to meet the need between assembly line and sliding rail line, and sliding rail line includes sliding rail substrate, and multiple electric energy meters to be measured can pass through sliding rail base Plate slides into preset test station, so that mechanism for testing tests electric energy meter to be measured in place.That is, by The operation mode of line sliding rail test carries out all transfer to test to multiple electric energy meters to be measured using sliding rail, and traditional single to be measured The operation mode that electric energy meter picks and places test is compared, and is significantly reduced the activity duration, is improved the test of electric energy meter test system Efficiency, to solve the problems, such as that the testing efficiency of electric energy meter test system in the prior art is low.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the electric energy meter test system of an embodiment.
Specific embodiment
Below with reference to attached drawing, various embodiments of the present invention are further described in detail.
Referring to Fig. 1, in one embodiment, a kind of electric energy meter test system includes sliding rail line, plug into plate and mechanism for testing 6.Wherein, sliding rail line includes sliding rail line main body and at least sliding rail substrate 9 that is arranged in sliding rail line main body, multiple electricity to be measured Energy table can slide on sliding rail substrate 9.In the present embodiment, the quantity of sliding rail substrate 9 be it is multiple, multiple sliding rail substrates 9 are removable It connects with unloading to form sliding rail line, in favor of the maintenance and preservation of sliding rail line.
Further, sliding rail line further includes the sliding rail support plate being arranged in below sliding rail substrate 9, is used to support sliding rail substrate 9.Meanwhile the sliding rail support plate also can be adjusting and the signal wire cabling reserved space of track of sliding track width.
Sliding rail line further includes two railway limit plates 3, two railway limit plates 3 erect respectively sliding rail substrate 9 in the width direction Both ends.By the railway limit plate 3 of setting, so that the width of track of sliding track is controlled, it is various sizes of to be measured to adapt to Electric energy meter.
Sliding rail line further includes that an at least station isolation board 8, station isolation board 8 is erected along the width direction of sliding rail substrate 9 On sliding rail substrate 9.Meanwhile station isolation board is also to position to electric energy meter to be measured, so that electric energy meter to be measured is in sliding rail substrate 9 Sliding process in, can accurately slide into preset test station.In the present embodiment, the quantity of station isolation board 8 is more It is a, it is mutually isolated for being carried out to multiple test stations, to guarantee the monomer absolute construction of the mechanism for testing 6 in test station.
In the present embodiment, the sliding in order to guarantee electric energy meter to be measured is smooth, and the making material of sliding rail line can select bakelite Material, and it is laid with one layer of wear-resistant metal material on the surface of sliding rail substrate, for example, alloy sheets.
Plate of plugging into is connected with sliding rail line, for having enough to meet the need electric energy meter to be measured between assembly line and sliding rail line.
Further, plate of plugging into includes that entrance plugs into plate 5 and outlet is plugged into plate 11, and entrance plugs into plate 5 for by electricity to be measured It can be gone on sliding rail line from assembly line week in table week, plate 11 is plugged into for electric energy meter to be measured to be gone to assembly line from sliding rail line week in outlet On.
By enabling electric energy meter to be measured unidirectionally have enough to meet the need mode in sliding rail, multistation in traditional work mode is efficiently avoided It tests simultaneously and leads to missing inspection situation.
Mechanism for testing 6 is used to test the electric energy meter to be measured being located in preset test station, and electric energy meter to be measured passes through sliding rail Substrate 9 slides into test station.
Further, mechanism for testing 6 includes pneumatic unit 1 and the test board 2 being connected with pneumatic unit 1, passes through pneumatic single Member 1 drives test board 2 to rise or decline, to test electric energy meter to be measured.In the present embodiment, test board 2 and pneumatic list Member 1 is is detachably connected, in favor of the maintenance and preservation of electric energy meter test system.
Further, pneumatic unit 1 is pneumatic fixture cylinder, and material is bakelite material.The material of test board 2 is sub- gram Dead-wood matter.
By the mechanism for testing of setting pneumatic type, the labor intensity of tester is significantly reduced, meanwhile, Pneumatic elevation Formula contact is reliably solved the problems, such as because of retest caused by poor contact in traditional work mode, to further mention The high testing efficiency of electric energy meter test system.
Mechanism for testing 6 further includes a control switch 7 being arranged in sliding rail line main body, for controlling opening for pneumatic unit 1 Stop.
Test board 2 includes multiple replaceable epitopes, is tested with the electric energy meter to be measured to different model.
By the way that mutually independent pneumatic unit 1 and test board 2 is arranged, and cooperate the track of sliding track of adjustable width, makes to slide Path is suitable for the electric energy meter to be measured of different model, has very strong versatility, efficiently solves needle in traditional work mode The problem of needing to make different testing tools to the electric energy meter to be measured of different model.
Mechanism for testing 6 further includes auxiliary unit 10, the test result for assistant analysis electric energy meter to be measured.Further, Auxiliary unit 10 include display module 4, communication module, signal detection module, signal output module one or several kinds.Not Same test scene, those modules can be configured according to actual testing requirement, comprehensively to meet the test of different user Demand.
In conclusion by using electric energy meter test system of the invention, when considerably reducing the operation of tester Between and labor intensity, operating efficiency is effectively promoted, enables the time of invalid operation to reduce 50% -60%, production capacity is promoted 20% -30%, manpower reduction 25% or so, meanwhile, the input cost of test equipment, tool etc. is considerably reduced, ensure that survey The consistency of examination, and ensure that the quality of product in production process.
Above content, only presently preferred embodiments of the present invention, are not intended to limit embodiment of the present invention, and this field is general Logical technical staff's central scope according to the present invention and spirit can very easily carry out corresponding flexible or modification, therefore originally The protection scope of invention should be subject to protection scope required by claims.

Claims (8)

1. a kind of electric energy meter test system characterized by comprising
Sliding rail line, it is multiple to be measured including sliding rail line main body and at least sliding rail substrate being arranged in the sliding rail line main body Electric energy meter can slide on the sliding rail substrate;
It plugs into plate, is connected with the sliding rail line, for having enough to meet the need electric energy meter to be measured between assembly line and the sliding rail line;And
Mechanism for testing, for testing the electric energy meter to be measured being located in preset test station, the electric energy meter to be measured passes through The sliding rail substrate slides into the test station, and the plate of plugging into includes that entrance plugs into plate and outlet is plugged into plate, the entrance Plate of plugging into is used for the electric energy meter to be measured from going to the sliding rail line assembly line week, the outlet plug into plate for will The electric energy meter to be measured is gone on the assembly line from the sliding rail line week, and the sliding rail line further includes two railway limit plates and extremely A few station isolation board, the two railway limits plate erect the both ends in the sliding rail substrate in the width direction, the work respectively Position isolation board erects on the sliding rail substrate along the width direction of the sliding rail substrate.
2. electric energy meter test system as described in claim 1, which is characterized in that the sliding rail line further includes being arranged in the cunning Sliding rail support plate below base of the rail plate is used to support the sliding rail substrate.
3. electric energy meter test system as described in claim 1, which is characterized in that the quantity of the sliding rail substrate is multiple, institute State the detachably connected formation sliding rail line of multiple sliding rail substrates.
4. electric energy meter test system as described in claim 1, which is characterized in that the mechanism for testing include pneumatic unit and with The connected test board of the pneumatic unit drives the test board to rise or decline, to described by the pneumatic unit Electric energy meter to be measured is tested.
5. electric energy meter test system as claimed in claim 4, which is characterized in that the test board includes multiple replaceable tables Position, is tested with the electric energy meter to be measured to different model.
6. electric energy meter test system as claimed in claim 4, which is characterized in that the mechanism for testing further includes a setting in institute The control switch in sliding rail line main body is stated, for controlling the start and stop of the pneumatic unit.
7. electric energy meter test system as claimed in claim 4, which is characterized in that the mechanism for testing further includes auxiliary unit, Test result for electric energy meter to be measured described in assistant analysis.
8. electric energy meter test system as claimed in claim 7, which is characterized in that the auxiliary unit includes display module, leads to Believe the one or several kinds of module, signal detection module, signal output module.
CN201510705303.8A 2015-10-27 2015-10-27 Electric energy meter test system Active CN105334486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510705303.8A CN105334486B (en) 2015-10-27 2015-10-27 Electric energy meter test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510705303.8A CN105334486B (en) 2015-10-27 2015-10-27 Electric energy meter test system

Publications (2)

Publication Number Publication Date
CN105334486A CN105334486A (en) 2016-02-17
CN105334486B true CN105334486B (en) 2019-01-25

Family

ID=55285128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510705303.8A Active CN105334486B (en) 2015-10-27 2015-10-27 Electric energy meter test system

Country Status (1)

Country Link
CN (1) CN105334486B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106383331A (en) * 2016-10-27 2017-02-08 宁波三星医疗电气股份有限公司 Single-phase watt-hour meter debugging and inspecting integrated device and method thereof
CN110068788B (en) * 2018-01-24 2024-01-30 郑州三晖电气股份有限公司 Flexible intelligent calibrating device and method compatible with calibration of various electric energy meters
CN108254714A (en) * 2018-04-10 2018-07-06 南京电力自动化设备三厂有限公司 Integral three-phase dial framework and three-phase electric energy meter metering calibration equipment and verification mode of connection

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102175986A (en) * 2011-02-17 2011-09-07 广东电网公司广州供电局 Meter loading and unloading device for automatic calibration of three-phase electric energy meter
CN202948100U (en) * 2012-08-27 2013-05-22 深圳市科陆电子科技股份有限公司 Voltage-withstanding testing apparatus for three-phase electric energy meter
CN102967782B (en) * 2012-11-23 2015-08-26 大连运明自动化技术有限公司 PCB flexible fully-automated synthesis production line pcb board automatic detecting machine module
CN202939302U (en) * 2012-11-29 2013-05-15 郑州三晖电气股份有限公司 Automated electric energy meter verification system
JP2015011022A (en) * 2013-07-02 2015-01-19 デンソクテクノ株式会社 Automatic wiring apparatus
CN104049198B (en) * 2014-05-17 2016-09-14 佛山市进步科技有限公司 A kind of PCBA on-line Full unmanned testing system

Also Published As

Publication number Publication date
CN105334486A (en) 2016-02-17

Similar Documents

Publication Publication Date Title
CN105334486B (en) Electric energy meter test system
CN104267330B (en) Multifunctional power panel testing production line
CN201555909U (en) Automatic detection equipment used for detecting transformer
CN103424623A (en) Resistivity measurement device
CN207051433U (en) Automatic burning detection machine
CN104457605A (en) Automatic warping testing device for PCB
CN201681131U (en) Circuit board test machine station
CN208188308U (en) A kind of high voltage electroscope batch detecting device
CN110420863A (en) A kind of external screw thread and thickness contact automatic detection device
CN102778620A (en) Portable test device for alternating-current turnout switch machines
CN206470338U (en) A kind of detection means of transformer assembling
CN105116266B (en) A kind of band center pillar core inductance automatic sorting instrument
CN208224762U (en) A kind of ND5 locomotive card universal test device
CN202693707U (en) Portable test device for alternating current switch machine
CN107765209A (en) A kind of calibrating detection device of the compatible electric energy meter of bilayer and concentrator
CN204758729U (en) Base plate automatic test equipment
CN203811633U (en) Novel clamp of real electrical measuring device
CN106841864A (en) A kind of detection means of transformer assembling
CN208766252U (en) A kind of full-automatic conduction detection equipment of plug conversion head
CN207440211U (en) A kind of transformer performance test device
CN205587310U (en) Automatic test control apparatus of semiconductor chip
CN208374667U (en) A kind of anchor nut lock dispensing apparatus
CN204777784U (en) Be applied to PCB test carrying platform's belt group
CN102879647B (en) Test bench for JYJXC-160/260 polarized reinforcing relay contact resistance
CN205496096U (en) High -frequency transformer comprehensive test machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518000 Guangdong city of Shenzhen province Nanshan District South Road seven No. 007 Shenzhen Digital Technology Park A3 Building 5 floor C District

Patentee after: Shenzhen jinzhengfang Technology Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District South Road seven Digital Technology Park A3 Building 5 floor C District

Patentee before: SHENZHEN GOLDEN SQUARE TECHNOLOGY Co.,Ltd.