CN105332343B - A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car - Google Patents

A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car Download PDF

Info

Publication number
CN105332343B
CN105332343B CN201510737304.0A CN201510737304A CN105332343B CN 105332343 B CN105332343 B CN 105332343B CN 201510737304 A CN201510737304 A CN 201510737304A CN 105332343 B CN105332343 B CN 105332343B
Authority
CN
China
Prior art keywords
wheel
car
big belt
bearing
small
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510737304.0A
Other languages
Chinese (zh)
Other versions
CN105332343A (en
Inventor
宋殿义
徐伟
黄益民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National University of Defense Technology
Original Assignee
National University of Defense Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National University of Defense Technology filed Critical National University of Defense Technology
Priority to CN201510737304.0A priority Critical patent/CN105332343B/en
Publication of CN105332343A publication Critical patent/CN105332343A/en
Application granted granted Critical
Publication of CN105332343B publication Critical patent/CN105332343B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Motorcycle And Bicycle Frame (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car, including shelf, handle, front wheels and rear wheels;The front-wheel uses crawler type fore wheel structure, including big belt wheel, small pulley, former, crawler belt and support;Big belt wheel is coupled by bearing fit with small axle, and small axle two ends are fixedly connected with former termination;Small pulley is coupled by bearing fit with the band small axle of shoulder, and the small axle of band shoulder is coupled simultaneously by shaft hole matching with former and support;Crawler belt is sleeved in two big belt wheels, and big belt wheel, small pulley are engaged with crawler belt;The frame upper is coupled by bearing pin one with connecting rod, is coupled with the otic placode of shelf by bearing pin two.The present invention adapts to the assembly type steel bridge on highway of the existing all models of China, it is to avoid wheel is absorbed in silt, simple to operate, light laborsaving, efficient quick.

Description

A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car
Technical field
The invention belongs to engineer operation equipment technical field, and in particular to a kind of assembly type steel bridge on highway is also known as Bailey bridge Carry and set up car.Can be widely used for the rush construction repairing to assembly type steel bridge on highway and military upper ancillary works soldier in earthquake relief work Carry out science of bridge building operation.
Background technology
Engineer operation equipment carries out assembly type steel bridge on highway rush construction repairing in China, the road is clear and logistics support in rise Very important effect, and assembly type steel bridge on highway has in the natural calamities such as Wenchuan, Yushu earthquake and Zhouqu County's mud-rock flow Using in military field, it can also be used to the science of bridge building operation of ancillary works soldier, efficiency is improved, strengthen the mobility of army.But It is that existing assembly type steel bridge on highway its erection method predominantly cantilever releases method and lift-on/lift-off system, cantilever releases method operating personnel Many, labour intensity is big, and the more muscle power of consumption operation hand, the time expended in transport and connecting elements is more long;Lift-on/lift-off system palpus Operation is carried out using bulky heavy large-scale erection hanging device, its mobility is poor, and engineering cost is high, particularly by frame If place limitation influence is big, so that many gully river valleys cannot be installed and used.Simultaneously because the truss and crossbeam of steel bridge component are Steel material, volume and weight is all very big, and, it is necessary to accurately position is transferred and docked during steel bridge sets up assembly, But the need for these the large-scale erection hanging devices for using at present cannot fully meet engineer operation.
In earthquake relief work and military training, general geography features as poor geologic condition, carrying erection car often will be in silt ground Operation, causes wheel to be absorbed in deeper, it is impossible to normal work, directly affects being smoothed out and entirely filling for steel-frame member butt-joint operation Construction speed with formula highway steel bridge.
The content of the invention
The technical problems to be solved by the invention are:Above-mentioned prior art is solved the problems, such as, and providing one kind has The assembly type steel bridge on highway of Athey wheel is carried and sets up car, adapts to various geographical conditions, it is to avoid wheel is absorbed in silt, operation letter It is single, light laborsaving, efficient quick, and small volume, low cost, reliable operation.
The technical solution adopted by the present invention is:
A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car, including shelf, handle, front wheels and rear wheels;Institute Front-wheel is stated using crawler type fore wheel structure.
In above-mentioned technical proposal, the crawler type front-wheel includes big belt wheel, small pulley, former, crawler belt and support;Big belt wheel There are two, before and after being distributed in, big belt wheel is coupled by bearing fit with small axle, and small axle two ends are by fastening screw and former end Head is fixedly connected;Small pulley is coupled by bearing fit with the band small axle of shoulder, and the small axle of band shoulder is by shaft hole matching and former middle part Couple simultaneously with pedestal lower end;Crawler belt is sleeved in two big belt wheels, and big belt wheel, small pulley are engaged with crawler belt;Big belt wheel, Small pulley outside is provided with backplate, it is to avoid crawler belt is interfered with support;Big belt wheel, small pulley can both make work of the circular shaft in frictional force Engaged with crawler belt with lower, may be alternatively configured toothed shank makes belt wheel preferably be engaged with crawler belt;The frame upper by bearing pin one with The connecting rod connection for setting up car is carried, frame upper is also coupled by bearing pin two with the otic placode of shelf.
In above-mentioned technical proposal, the described assembly type steel bridge on highway with Athey wheel is carried and sets up car, it is adaptable to China The assembly type steel bridge on highway of currently all model, and assembly type steel bridge on highway heavier to component, that erection required precision is higher Applicability is stronger.
In above-mentioned technical proposal, riser is fixed with the shelf, top board is fixed with riser, riser passes through left and right two A connection sheets are connected with cylinder pedestal, and oil cylinder includes big plunger and small plunger, and big plunger is connected with top board, small plunger top and hand Handle bottom is connected, and cylinder pedestal lower end is provided with trailing wheel, and pedal is connected by spring with riser or top board.
In above-mentioned technical proposal, described cylinder pedestal is hinged with A connection sheets, and A connection sheets pass through rotating shaft, B connection sheets again Transmission is connected with the connecting rod, rotating shaft is arranged on riser.
In above-mentioned technical proposal, described pedal is steel-frame structure, and it includes two lever arms and preceding bearing bar with after Bearing bar, fulcrum and the shelf rear end of lever arm are hinged.
In above-mentioned technical proposal, the flat rolling of guiding is placed with the shelf.
Operation principle and advantageous effect:
Assembly type steel bridge on highway is also known as Bailey bridge, in the repairing of wartime highway bridge, rush construction, overcomes rivers obstacle, Yi Ji Irreplaceable effect is all played in usually antidetonation flood fighting, rescue and relief work, traffic support.In earthquake relief work and military training In, field geology orographic condition is poor, carry set up car can not possibly all in flat cement flooring operation, but often will be in silt Work on the ground, and steel structure truss and crossbeam volume and weight are all very big, collapsible wheel obtains very deep, and causing carrying to set up car cannot be just Often work, assembly type steel bridge on highway is built and is obstructed, and has a strong impact on earthquake relief work and military training.The present invention will be carried and set up Chinese herbaceous peony Wheel is designed to crawler type fore wheel structure, and this problem is solved well.Crawler type front-wheel of the invention include preceding big belt wheel, Big belt wheel, middle part small pulley and crawler belt afterwards, big with contact area of ground, wheel will not be absorbed in silt ground on the inside of crawler belt. Additionally, its frame upper of crawler type front-wheel of the invention is connected by bearing pin with connecting rod and shelf otic placode respectively, this structure sets Meter, not only enables crawler type front-wheel bear the load on shelf well, and crawler type front-wheel is set up the original lift of car by carrying The link transmission control of mechanism is risen, crawler type front-wheel is lifted and is deflected, more the different landform of flexible adaptation and motion Direction, it is ensured that shelf are at the top of poised state, shelf to ground level at an arbitrary position all the time in whole mechanism lifting process It is identical;The control for setting up car direction due to carrying again is main by trailing wheel(Universal wheel)Carrying after control, therefore improvement sets up car Landform adaptability is greatly increased, but the flexibility of its divertical motion is not reduced.
Present invention application SolidWorks Three-dimensional Design Softwares, are that the assembly type steel bridge on highway with Athey wheel carries erection The three-dimensional structure modeling of car provides condition, and its Assembly design technology can make designer in design elements, blank, catch The design relation between part is caught, makes model more practical.Its engineering drawing drawing techniques, can obtain carrying erection car threedimensional model Detailed dimensions, are that manufacture in kind is provided convenience.ANSYS softwares with power can be to the knot of equipment threedimensional model Structure, carries out comprehensive analysis of various external load condition lower stress, deformation, stability and various dynamic characteristics, and it is limited to complete its Meta analysis, verifies its bearing capacity.
Brief description of the drawings
Fig. 1 is structural front view of the present invention;
Fig. 2 is structure top view of the present invention;
Fig. 3 is crawler type fore wheel structure front view;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is crawler type front-wheel generalized section;
Fig. 6 is the frame upper mounting structure upward view of crawler type front-wheel;
Fig. 7 is the flat rolling structural representation being oriented to;
Fig. 8 is the flat rolling cross-sectional view being oriented to;
Fig. 9 is the side view of Fig. 7.
Description of reference numerals:
1- handles, 2- shelf, 3- crawler type front-wheels, 4- trailing wheels, 5- risers, 6- top boards, 7- oil cylinders, 8- pedals, 9- levers Arm, bearing bar before 10-, 11- rear load-bearing bars, 12- bearing pins one, 13- bearing pins two, 14 1 small axles, 15- big belt wheels, 16- small pulleys, 17- formers, 18- crawler belts, the 19- band small axles of shoulder, 20- supports, 21- front-wheel bearings, 22- connecting rods, 23- shelf otic placodes, the flat rolling branch of 24- Frame, 25- guide bearings, 26- guiding trestles, 27- rollers, 28- drum shafts, 29- bearings, 30- guide bearing bearing pins, 31- blocks.
Referring to Fig. 1 ~ Fig. 6, multifunctional fabricated highway steel bridge of the invention is carried and sets up car, including shelf, handle, front-wheel And trailing wheel;The front-wheel uses crawler type fore wheel structure.
Above-mentioned crawler type front-wheel includes big belt wheel, small pulley, former, crawler belt and support;Big belt wheel has two, before being distributed in Afterwards, big belt wheel is coupled by bearing fit with small axle, and small axle two ends are fixedly connected by fastening screw with former termination;Small band Wheel is coupled by bearing fit with the band small axle of shoulder, and the small axle of band shoulder is joined simultaneously by shaft hole matching with former middle part and pedestal lower end Connect;Crawler belt is sleeved in two big belt wheels, and big belt wheel, small pulley are engaged with crawler belt;The frame upper passes through bearing pin one Couple with the connecting rod for carrying erection car, frame upper is also coupled by bearing pin two with the otic placode of shelf.
Above-mentioned big belt wheel, small pulley engage concrete structure with crawler belt:Big belt wheel, small pulley can make circular shaft, Big belt wheel, small pulley are engaged with crawler belt in the presence of frictional force;Or big belt wheel, small pulley make gear shaft, big belt wheel, small band Wheel is engaged with crawler belt.
Above-mentioned big belt wheel, small pulley outside are provided with backplate.
The flat rolling of guiding is placed with above-mentioned shelf.
Riser is fixed with above-mentioned shelf, top board is fixed with riser, riser is by the A connection sheets of left and right two and oil cylinder bottom Seat connection, oil cylinder includes big plunger and small plunger, and big plunger is connected with top board, and small plunger top is connected with handle bottom, oil cylinder Base lower end is provided with trailing wheel, and pedal is connected by spring with riser or top board.
Above-mentioned cylinder pedestal is hinged with A connection sheets, and A connection sheets are connected biography by rotating shaft, B connection sheets with the connecting rod again Dynamic, rotating shaft is arranged on riser.
Above-mentioned pedal is steel-frame structure, and it includes two lever arms and preceding bearing bar and rear load-bearing bar, the branch of lever arm Point is hinged with shelf rear end.
Referring to Fig. 7 ~ Fig. 9, the present invention increases the flat rolling explanation being oriented in shelf:Guider is installed additional in flat rolling on, Truss is set to position faster, it is more accurate.In Fig. 7 ~ Fig. 9, the flat rolling supports of 24-, 25- guide bearings, 26- guiding trestles, 27- rollers, 28- Drum shaft, 29- bearings, 30- guide bearing bearing pins, 31- blocks.Block is fixed by screws on guiding trestle, and block Fixed with flat rolling support.Guide bearing uses shaft hole matching with guide bearing bearing pin, and guide bearing bearing pin is fixed by nut Can be needed that different hole positions are installed according to different width on guiding trestle, on guiding trestle, roller passes through 4 bearings with axle Connection, axle is fixed on support further through snap ring and shaft hole matching.
Operation principle:
Carry and set up car and can be used for all components of assembly type steel bridge on highway from storage storehouse outbound, and transport after unloading Prepare region to operation, preparing region from operation is transported to erection ground, and realizes the quick and precisely splicing of truss, crossbeam.
Prepare region in operation, carry the valve piston cylinder for setting up car using hand lever starting hydraulic system, by hydraulic drive, Big piston, jack-up shelf is driven to adjust to proper height(Rim brake is located at the next working condition in lifting process, hydraulic system Relief valve closes locking, in place rear hydraulic locking cylinder, and hydraulic system realizes mechanical energy to hydraulic pressure in packing state, overall process The conversion of mechanical energy can again be arrived), during transport, operator is pushed by handle, traction transport sets up car, and using handle The direction of the control main directive wheel in bottom is rotated, so as to control body movement direction.Truss both can be by standing purlin(Truss is erected, left Right both sides manually buttress)Transport, also can be by falling purlin(Truss fell, and was buttressed without personnel)Transport, carrying erection car can also transport Send all components of bridge such as crossbeam, flat rolling, bridge plate.
Ground is being set up, during the transport of falling purlin, is needing truss class to erect truss, and splicing is rolled on flat(When vertical purlin is transported, can be straight Connect splicing), carrying erection car can realize that truss is significantly adjusted up and down by brake apparatus and handle(Rim brake position during decline In upper working condition, the relief valve of hydraulic system is opened, hydraulic oil backflow, hydraulic cylinder pressure relief, until shelf are high up to making a reservation for Degree), also the fine setting up and down of truss can be realized using lever principle by the cooperation of pedal and equalizer bar, meanwhile, by it is leading to Roller realizes the WidFin of truss(Cylindrical contact face is relatively smooth, reduces the coefficient of friction with truss, is conducive to truss Move left and right).When needing braking, carrying erection car can start brake gear, fixed car body.Truss class squeezes into pin rapidly.So After withdraw from barrow and set car, continue to carry.When removing receipts truss, carry and set up car insertion truss bottom, goods is lifted by hydraulic cylinder Frame, makes front guide roller and pedal front end be contacted with truss, then light pedal, finely tunes truss, now gets pin, time saving province Power, to get and finely tune pedal again after a pin and get second pin.First pin of supporting role of car is set up due to carrying Get and be relatively easy to, truss is lifted without people when second pin is played, it is only necessary to which personnel buttress truss on erection car is carried Pin is got, the truss that can be fallen after front and rear truss disengaging is placed on carrying erection car and withdraws.
The erection of crossbeam and remove receipts both can separate unit carry set up car operation, also can two carry set up cars simultaneously operations, make Returning face plate to working condition is first overturn before industry, suitable operating type can be selected according to landform, operating personnel during operation.Set up horizontal Liang Shi, first by flat rolling(As shown in Figure 1)Carrying is placed in set up on car, make flat rolling long while parallel to carry set up car it is long while, Operation carrying sets up car and reaches stitching position on the outside of truss, and rear cross beam class erects crossbeam on erection car is carried, and is placed in It is flat to roll on, crossbeam is located at two guide bearings(Guiding trestle)Centre, makes crossbeam lower end slightly above truss peg top, pushes horizontal Beam, for when the peg hole of crossbeam both sides is close to peg, operation handle reduction shelf, crossbeam make under gravity peg and Peg hole combines automatically, such as it is not in place can optionally before and after promote carry set up car or left and right promote crossbeam, make peg and peg Hole combines in place, can be withdrawn with reference to erection car is carried afterwards in place.When two carryings set up car operation, first by flat rolling(Such as Fig. 1 It is shown)Carrying is placed in set up on car, make flat rolling long while parallel to carry set up car it is long while, flat rolling can put 1 and also put 2, Such as put 2, answer 2 it is placed side by side.Carry set up car can one be placed in truss inner side, another be placed in truss outside, make crossbeam Carried at two and set up car operation, the peg position of the peg hole alignment truss of crossbeam is made as far as possible, crossbeam can be reduced first after in place Or the shelf of promotion truss inner side carrying erection car make peg hole close to peg, such as need adjustment, outside carrying sets up car can be coordinated Adjustment, it is ensured that two carryings set up car rack and are reduced to minimum point and withdraw after in place.
Remove the time receiving, such as separate unit is carried and sets up car operation, first by flat rolling(As shown in Figure 1)It is placed in carrying to set up on car, makes Flat rolling it is long while parallel to carry set up car it is long while, operation is carried and sets up car to crossbeam middle part, crossbeam is located at two guide bearings (Guiding trestle)Centre, lifting shelf depart from peg and peg hole, and crossbeam is then pushed laterally, crossbeam is taken off with truss From;When operation is difficult in the middle of the crossbeam can also the operation on the outside of truss, make crossbeam be placed in it is flat roll on, lifting shelf make close to removing Fortune sets up the peg of side and peg hole departs from, and then lifting opposite side crossbeam departs from the peg of opposite side and peg hole, and Backward outside pushes crossbeam, crossbeam is departed from truss;When two carryings set up car operation, Ke Yitai is placed in crossbeam middle part, one Platform is placed in outside, and middle part is carried and sets up car for boist truss and be allowed to depart from crossbeam, and outside is carried and sets up car and middle part frame If car is engaged removes receipts crossbeam, and carries it to appointed place.
Compared with prior art, beneficial effects of the present invention are:
(1) the crawler type front-wheel of present invention design improves assembly type steel bridge on highway and carries the applicable ability and peace for setting up car Quan Xing, especially for the weak soil such as seashore, miriness area, and improves the adaptability to adverse weather, can all weather operations, such as The miriness that rainy day causes, the Athey wheel improves bearing capacity;The ice and snow weather of low temperature severe cold, avoids skidding using Athey wheel, Improve the applicability and security of operation.
(2)Crawler type front-wheel landform is adaptable, but gait of march is slow, and wheeled front-wheel landform adaptability is poor, but row Enter speed soon, the present invention can adapt to the operation under various landform by more wheel change, practicality is stronger.During transport only Need 1-2 people to drag handle, reduce troops needed for carrying.The car normal travel speed is 1.0m/s, and running gait of march is reachable 2.0m/s。
(3)The present invention has larger lifting and improvement to the operation form of original assembly type steel bridge on highway, and work is greatly decreased Industry personnel, hence it is evident that improve operating speed, significantly reduce personnel's operation intensity.5 people, 1 people operation barrow are only needed during erection truss If car, 4 people buttress truss, and 5 people are only needed when setting up crossbeam, and 1 people operation is carried and sets up car, and 4 people push crossbeam.Contrast is original Operating type, operating personnel reduces 34%, and maximum is born a heavy burden and mitigates 50%, and heavy burden operating personnel reduces 75%, and the activity duration of bearing a heavy burden is reduced 83%, heavy burden traveling ultimate range reduces more than 85%.
With the increase of the equipment, operating speed will constantly be accelerated, can many carrying erection car operations, operating type simultaneously Method is various, flexible, but operating personnel significantly reduces, operation maximum intensity drop by half in operation process, and operation of bearing a heavy burden Distance and duration greatly shorten, and mobility also strengthens therewith, and when building a bridge more long, its superiority is more obvious, with Operational security also significantly improve.In operation process, set up using itself and remove receipts function, make operation more quick, smart It is accurate, laborsaving and safe, the insertion of pin, to smash out and can settle at one go, efficiency is significantly improved, and the splicing of crossbeam is received without substantially touching with removing Hit.And the operation under various landform can adapt to by more wheel change, practicality is stronger.To set up across footpath as the double individual layers of 21m " 321 " shaped steel bridge as a example by, troops needed for normal cantilever release method are 41 people, its people of squadron officer 1, each 8 people of two truss class, two Each 8 people of individual crossbeam class, a connection people of class 8, the single maximum a quarter born a heavy burden for truss or crossbeam weight, bear a heavy burden advance away from From about whole bridge length, total time-consuming about 2 hours, all truss classes and crossbeam class(That is 32 people, account for and participate in operation number 78%)In the intensive work time(Or the activity duration of heavy burden crossbeam or truss weight 1/8 and the above)Account for total operation time Half(About 1 hour).And coordinate two to carry and set up the uses of cars and the troops will be reduced to 27 people, its people of squadron officer 1, one Carry the people of class 8(Only it is responsible for being carried to truss, crossbeam on carrying erection car, no longer than 3 meters of operation distance is no more than One length of truss), 5 people of truss class and 1 carrying set up car, crossbeam 5 people of class and 1 carrying erection car, one The individual connection people of class 8, single maximum heavy burden is 1/8th of truss or crossbeam weight(I.e. maximum heavy burden mitigates 50%), fortune of bearing a heavy burden Distance is sent to be usually no more than 3 meters, total time-consuming will be less than 1.5 hours, and without obvious high-strength working, heavy burden personnel are only to carry to personnel The people of plate 8, bears a heavy burden the activity duration(The activity duration of heavy burden crossbeam or truss weight 1/8 and the above)No more than 10 minutes.Contrast is former There is operating type, operating personnel reduces 34%, and maximum is born a heavy burden and mitigates 50%, and heavy burden operating personnel reduces 75%, and the activity duration of bearing a heavy burden subtracts Few 83%, heavy burden traveling ultimate range reduces more than 85%.If being further added by 5 people and 1 being carried erection car and is used for truss operation, increase Plus 1 carrying sets up car and is used for crossbeam and floorings(Longeron)Operation, then whole operating speed will lift more than 30%, i.e. people Member increases by 18.5%, and operating speed can improve more than 30%.
(4)The present invention in the case where not changing complete vehicle structure and not reducing car body strength, using setting up the flat mode rolled Realize beam erection and remove the function of receipts, the operational method can both transport crossbeam, can set up and remove receipts crossbeam again, operating personnel by 8-10 people originally is reduced to 2-3 people;Flat rolling with making original a dead lift sliding friction be changed into rolling friction;Due to liquid The castering action of cylinder pressure, crossbeam and truss quick separating are lifted without artificial, make the erection of crossbeam and remove to receive not only quick but also laborsaving.
(5)Operation prepare faster, it is more convenient, safer.Due to the present invention assembling is carried and sets up using erection car is carried Formula highway steel bridge, makes operation process more steady, quick and safety.Meanwhile, the erection car has very strong transporting capacity, can Carry multi-disc truss and crossbeam simultaneously, transporting velocity is more than 10 times of original a dead lift, operating personnel can by 8 people simplify for 5 people.
(6)It is pure mechanic structure that assembly type steel bridge on highway is carried and sets up car, and the structure technology is ripe, Stability Analysis of Structures, weight Gently, low cost, simple to operate, intensity is high, and fault rate is low, and reliability is high, strong applicability.
In a word, by carry set up with cause assembly type steel bridge on highway operation it is more easy, efficient, safe, soon It is speed, accurate, steady, operating efficiency is obviously improved, the operating cost such as use manpower and material resources sparingly.It is public that the equipment can effectively lift assembled The Mechanization Level and landform adaptability of road steel bridge operation, solve labour intensity during simple manpower operation and greatly, expend in connection The problem long with time in transport member, and lifting operation method by place limited seriously, the slow problem of operating speed, It is that my army's emergent battle and rescue and relief work are raced against time.The equipment can not only be used for wartime or rescue and relief work assembly type steel bridge on highway The necessary accessories of fast erecting, also can be used as assembly type steel bridge on highway routine use, the auxiliary appliance of peacetime training.

Claims (2)

1. a kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car, including shelf, handle, front wheels and rear wheels;It is described Front-wheel uses crawler type fore wheel structure;Characterized in that, the crawler type front-wheel include big belt wheel, small pulley, former, crawler belt and Support;Big belt wheel has two, and before and after being distributed in, big belt wheel is coupled by bearing fit with small axle, and small axle two ends pass through fastening Screw is fixedly connected with former termination;Small pulley is coupled by bearing fit with the band small axle of shoulder, and the band small axle of shoulder is matched somebody with somebody by axis hole Close and couple simultaneously with former middle part and pedestal lower end;Crawler belt is sleeved in two big belt wheels, and big belt wheel, small pulley and crawler belt Engagement;The frame upper is coupled by bearing pin one with the connecting rod for setting up car is carried, and frame upper also passes through bearing pin two and shelf Otic placode connection;Big belt wheel, small pulley engage concrete structure with crawler belt:Big belt wheel, small pulley make circular shaft, in frictional force In the presence of engaged with crawler belt;Or big belt wheel, small pulley make toothed shank, big belt wheel, small pulley are engaged with crawler belt;It is described big Belt wheel, small pulley outside are provided with backplate;The flat rolling of guiding is placed with the shelf.
2. the assembly type steel bridge on highway with Athey wheel according to claim 1 is carried and sets up car, it is characterised in that described Be oriented to flat rolling be:Guider is installed additional in flat rolling on, the flat agglomeration of guiding includes flat rolling support, guide bearing, guiding trestle, rolling Cylinder, axle, bearing, guide bearing bearing pin, block;Block is fixed by screws on guiding trestle, and block and flat rolling support Fixed, guide bearing uses shaft hole matching with guide bearing bearing pin, and guide bearing bearing pin is fixed on guiding trestle by nut On, needed according to different width that different hole positions are installed on guiding trestle, roller is connected with axle by 4 bearings, axle further through Snap ring and shaft hole matching are fixed on support.
CN201510737304.0A 2015-11-04 2015-11-04 A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car Active CN105332343B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510737304.0A CN105332343B (en) 2015-11-04 2015-11-04 A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510737304.0A CN105332343B (en) 2015-11-04 2015-11-04 A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car

Publications (2)

Publication Number Publication Date
CN105332343A CN105332343A (en) 2016-02-17
CN105332343B true CN105332343B (en) 2017-06-09

Family

ID=55283086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510737304.0A Active CN105332343B (en) 2015-11-04 2015-11-04 A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car

Country Status (1)

Country Link
CN (1) CN105332343B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109625047B (en) * 2018-12-25 2021-07-27 亚杰科技(江苏)有限公司 Multifunctional logistics transport vehicle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001294182A (en) * 2000-04-11 2001-10-23 Yanmar Diesel Engine Co Ltd Crawler belt type work vehicle
CN201317415Y (en) * 2008-12-19 2009-09-30 陈一 Low gravity center pedrail delivery truck
CN102285386A (en) * 2011-08-29 2011-12-21 石家庄中煤装备制造股份有限公司 Mining explosion-proof crawler-type carrier vehicle
CN203238554U (en) * 2013-05-17 2013-10-16 中国人民解放军国防科学技术大学 Assembling-type highway steel bridge universally-rotating type carrying erection car
CN103953082A (en) * 2014-05-21 2014-07-30 林维金 Multifunctional special mechanical engineering working vehicle
CN205188824U (en) * 2015-11-04 2016-04-27 中国人民解放军国防科学技术大学 Car is erect in transport of assembled highway steel bridge with athey wheel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001294182A (en) * 2000-04-11 2001-10-23 Yanmar Diesel Engine Co Ltd Crawler belt type work vehicle
CN201317415Y (en) * 2008-12-19 2009-09-30 陈一 Low gravity center pedrail delivery truck
CN102285386A (en) * 2011-08-29 2011-12-21 石家庄中煤装备制造股份有限公司 Mining explosion-proof crawler-type carrier vehicle
CN203238554U (en) * 2013-05-17 2013-10-16 中国人民解放军国防科学技术大学 Assembling-type highway steel bridge universally-rotating type carrying erection car
CN103953082A (en) * 2014-05-21 2014-07-30 林维金 Multifunctional special mechanical engineering working vehicle
CN205188824U (en) * 2015-11-04 2016-04-27 中国人民解放军国防科学技术大学 Car is erect in transport of assembled highway steel bridge with athey wheel

Also Published As

Publication number Publication date
CN105332343A (en) 2016-02-17

Similar Documents

Publication Publication Date Title
CN203716573U (en) Rear cantilever type lifting and transversely-moving parking equipment
CN201209083Y (en) Folding gantry crane
CN105332343B (en) A kind of assembly type steel bridge on highway with Athey wheel is carried and sets up car
CN203381649U (en) Pushing type transport vehicle for rod piece materials
CN108557672A (en) A kind of hoisting fixture
CN205188825U (en) Car is erect in transport of multi -functional assembled highway steel bridge
CN205188824U (en) Car is erect in transport of assembled highway steel bridge with athey wheel
CN205440477U (en) Level land, dual -purpose electronic carriage of stair
CN202643236U (en) Movable hydraulic lifting device
CN104264956B (en) Movable construction platform method for supporting and platform
CN105332344B (en) Multifunctional prefabricated highway steel bridge carrying and erecting vehicle
CN103243655B (en) Assembling highway steel bridge transporting and erecting vehicle
CN109367638B (en) Upstairs and downstairs carrying device
CN203238554U (en) Assembling-type highway steel bridge universally-rotating type carrying erection car
CN205100112U (en) Assembled highway steel bridge transport of crossbeam can be erect and car is erect
CN203612885U (en) Lifting platform type radar klystron maintaining moving trolley
CN202530375U (en) Basket trolley for bridge body construction
CN205223859U (en) Car is erect in transport of assembled highway steel bridge with running roller goods shelves
CN203238552U (en) Assembling-type highway steel bridge carrying erection car
CN205589254U (en) Flue transport vechicle
CN101660356A (en) Portable machine for installing light partition boards
CN205256477U (en) Bridge expansion joint installation conveyer
CN203021269U (en) Full-automatic boosting device
CN203239009U (en) Self-moving type two-layer intelligent three-dimensional parking space
CN202557571U (en) Luggage cart with walking support mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant