CN202530375U - Basket trolley for bridge body construction - Google Patents

Basket trolley for bridge body construction Download PDF

Info

Publication number
CN202530375U
CN202530375U CN2012201991506U CN201220199150U CN202530375U CN 202530375 U CN202530375 U CN 202530375U CN 2012201991506 U CN2012201991506 U CN 2012201991506U CN 201220199150 U CN201220199150 U CN 201220199150U CN 202530375 U CN202530375 U CN 202530375U
Authority
CN
China
Prior art keywords
dolly
hanging basket
basket
trolley
body construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201991506U
Other languages
Chinese (zh)
Inventor
黄龙聚
文璐
于建利
李志国
张传令
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CR10BG CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
CR10BG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CR10BG CONSTRUCTION ENGINEERING Co Ltd filed Critical CR10BG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2012201991506U priority Critical patent/CN202530375U/en
Application granted granted Critical
Publication of CN202530375U publication Critical patent/CN202530375U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a basket trolley for bridge body construction. The basket trolley for the bridge body construction comprises a trolley and a basket; the tops of the trolley and the basket are integrally connected through span beams; the bottom of the basket is a working surface; rails are arranged at the periphery of the bottom working surface and are fixed on the span beams through double support beams; the height of the trolley is greater than the height of an inner beam surface and an anti-collision wall, and wheels are arranged underneath the trolley; the width of the trolley is 2 to 3 times greater than that of the basket; and a weight balancing mechanism is arranged at the outset end of the trolley. Wheel axles are used for supporting the lower part of the basket trolley and the basket trolley falls on a constructed bridge surface, so that a complete movable assembly bridge anti-collision wall construction basket is formed, and the problem that the basket cannot be rotated can be solved well; and the basket trolley for the bridge body construction has the advantages of safety and convenience, working efficiency can be improved, and cost can be saved.

Description

A kind of beam body construction hanging basket dolly
Technical field
The utility model relates to a kind of beam body construction and uses hanging basket.
Background technology
In recent years, along with development of city, viaduct construction and stride the river, to stride traffic main artery beam body construction more and more; Structure also becomes increasingly complex, and the operations such as installation of the application in bridge-collision-avoidance wall later stage and beam body side surface projector are one of later stage principal workss, usually receive the restriction of orographic condition and transportation condition; When construction adopted scraper plate, cage mostly or did one with scaffold tubes and fastener and simple and easyly hanged support in the past; The constructor stands on these hanging tools and operates, though traffick and pedestrian under constructor and the bridge are had the certain protection effect, overall structure is relatively heavier; Can not on bridge floor, move freely; And when construction station change manyly, inefficiency is to the particularly inconvenience of construction of at present comparatively common large bridge; And large-scale moving hanging basket, translational speed is slow, and mobility is poor, can not adapt to the requirement of modernization construction.
Summary of the invention
The utility model technical problem to be solved is to the deficiency of prior art, and a kind of conveniently moving, beam body construction hanging basket instrument safe in utilization are provided.
For solving this technical problem; The utility model provides a kind of beam body construction hanging basket dolly; Comprise dolly and hanging basket, the top of said dolly and hanging basket connects as one through striding beam, and said hanging basket bottom is a work plane; Along the bottom work plane around be provided with fence, be fixed on through the dual-gripper beam and stride on the beam; The height of said dolly is a little more than inner beam face to the height of crashproof wall, and its below is provided with wheel, and the width of said dolly is greater than 2 ~ 3 times of the width of hanging basket, is counterweigh mechanism in the outermost end of dolly.
Said hanging basket is 80 ~ 100 centimeters towards the fence height of work plane, and its excess-three face fence is an integrally closed.
Said dolly comprises bottom girder, cant beam and cross binding beam, is fixed on through the dual-gripper beam and strides on the beam.
Said dolly and hanging basket all adopt 10# or 8# channel-section steel field Welding to process.
Said wheel is the braking type wheel, and the specified supporting power of its single-wheel is greater than 500Kg.
Beneficial effect: the utility model below adopts wheel shaft to support, and lands in the beam face of construction completion, forms the crashproof wall construction of a complete mobile assembling bridge hanging basket; Preferably resolve the problem that hanging basket can't rotate; Conveniently solve region restricted problem, be applicable to the unsettled reinforcing bar binding in municipal bridge beam body side, welding, template shutoff, the side application of crashproof wall and the installation of beam body side surface projector, can satisfy bridge construction safety, efficient overall requirement; Strengthen and perfect safety protection structure traffick and pedestrian under constructor and the bridge; Have safety, advantage easily, can increase work efficiency, practice thrift cost.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the working state schematic representation of the utility model.
Among the figure: 1 dolly, 2 hanging baskets, 3 are striden beam, 4 fences, 5 wheels.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done specific descriptions.
Shown in Figure 1 is the utility model structural representation.
The utility model provides a kind of beam body construction hanging basket dolly; Comprise dolly 1 and hanging basket 2, the top of said dolly 1 and hanging basket 2 connects as one through striding beam 3, and said hanging basket 2 bottoms are work plane; Along the bottom work plane around be provided with fence 4, be fixed on through the dual-gripper beam and stride on the beam 3; The height of said dolly is a little more than inner beam face to the height of crashproof wall, and its below is provided with wheel 5, and the width of said dolly 1 is greater than 2 ~ 3 times of the width of hanging basket 2, is counterweigh mechanism in the outermost end of dolly 1.
Said hanging basket 2 highly is 80 ~ 100 centimeters towards the fence 4 of work plane, and its excess-three face fence 4 is an integrally closed, and this hanging basket 2 is after installation, and the whole construction operating platform has just formed the construction space of a sealing, can not produce any potential safety hazard.
Said dolly 1 comprises bottom girder, cant beam and cross binding beam, is fixed on through the dual-gripper beam and strides on the beam 3.
Said dolly 1 all adopts 10# or 8# channel-section steel field Welding to process with hanging basket 2.
Said wheel 5 is the braking type wheel, and convenient at the big beam face ramp to stop of the gradient, the specified supporting power of its single-wheel is greater than 500Kg.
Fig. 2 is the working state schematic representation of the utility model.
During use, dolly 1 strides across crashproof wall both sides respectively with hanging basket 2, and dolly 1 lands the beam face of accomplishing in construction, and counterweigh mechanism increases suitable weight according to actual needs, and 2 of hanging baskets are hung the outside at crashproof wall through striding beam 3.
During work, the constructor stands on hanging basket 2 enterprising line correlation constructions, realizes multistation walking and use.
The utility model below adopts wheel shaft to support, and lands in the beam face of construction completion, forms the crashproof wall construction of a complete mobile assembling bridge hanging basket; Preferably resolve hanging basket 2 irremovable problems; Conveniently solve region restricted problem, be applicable to the unsettled reinforcing bar binding in municipal bridge beam body side, welding, template shutoff, the side application of crashproof wall and the installation of beam body side surface projector, can satisfy bridge construction safety, efficient overall requirement; Strengthen and perfect safety protection structure traffick and pedestrian under constructor and the bridge; Have safety, advantage easily, can increase work efficiency, practice thrift cost.
The above-mentioned embodiment of the utility model just illustrates, and is not only, all in the utility model scope or the change that is equal in the scope of the utility model all surrounded by the utility model.

Claims (5)

1. beam body construction hanging basket dolly; Comprise dolly (1) and hanging basket (2); The top of said dolly (1) and hanging basket (2) connects as one through striding beam (3); It is characterized in that: said hanging basket (2) bottom is work plane, along the bottom work plane around be provided with fence (4), be fixed on through the dual-gripper beam and stride on the beam (3); The height of said dolly (1) is a little more than inner beam face to the height of crashproof wall, and its below is provided with wheel (5), and the width of said dolly (1) is greater than 2 ~ 3 times of the width of hanging basket (2), is counterweigh mechanism in the outermost end of dolly (1).
2. beam body construction hanging basket dolly according to claim 1 is characterized in that: said hanging basket 2 highly is 80 ~ 100 centimeters towards the fence (4) of work plane, and its excess-three face fence (4) is an integrally closed.
3. beam body construction hanging basket dolly according to claim 1, it is characterized in that: said dolly (1) comprises bottom girder, cant beam and cross binding beam, is fixed on through the dual-gripper beam and strides on the beam (3).
4. beam body construction hanging basket dolly according to claim 1 is characterized in that: said dolly (1) and hanging basket (2) all adopt 10# or 8# channel-section steel field Welding to process.
5. according to each described beam body construction hanging basket dolly of claim 1 ~ 4, it is characterized in that: said wheel (5) is the braking type wheel, and the specified supporting power of its single-wheel is greater than 500Kg.
CN2012201991506U 2012-05-07 2012-05-07 Basket trolley for bridge body construction Expired - Fee Related CN202530375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201991506U CN202530375U (en) 2012-05-07 2012-05-07 Basket trolley for bridge body construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201991506U CN202530375U (en) 2012-05-07 2012-05-07 Basket trolley for bridge body construction

Publications (1)

Publication Number Publication Date
CN202530375U true CN202530375U (en) 2012-11-14

Family

ID=47131569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201991506U Expired - Fee Related CN202530375U (en) 2012-05-07 2012-05-07 Basket trolley for bridge body construction

Country Status (1)

Country Link
CN (1) CN202530375U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088225A (en) * 2014-06-30 2014-10-08 葛洲坝集团电力有限责任公司 Large-span steel structure hanging basket for bridge and installation method thereof
CN109183630A (en) * 2018-11-06 2019-01-11 中国五冶集团有限公司 A kind of highway bridge construction hanging basket
WO2021103024A1 (en) * 2019-11-30 2021-06-03 中铁五局集团有限公司 Sidewalk construction scaffold for railway bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088225A (en) * 2014-06-30 2014-10-08 葛洲坝集团电力有限责任公司 Large-span steel structure hanging basket for bridge and installation method thereof
CN104088225B (en) * 2014-06-30 2016-06-15 葛洲坝集团电力有限责任公司 Bridge large-span steel hanging basket and installation method thereof
CN109183630A (en) * 2018-11-06 2019-01-11 中国五冶集团有限公司 A kind of highway bridge construction hanging basket
WO2021103024A1 (en) * 2019-11-30 2021-06-03 中铁五局集团有限公司 Sidewalk construction scaffold for railway bridge

Similar Documents

Publication Publication Date Title
CN202530375U (en) Basket trolley for bridge body construction
CN105819347A (en) Two-dimensional adjustment hydraulic type moving van
CN102198695A (en) Longitudinal moving method for outside die of box girder outer film
CN205733591U (en) A kind of device for positioning and supporting processing multi-storied garage back rest assembly
CN205025164U (en) Double -deck parking equipment is dodged to safe nothing
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN203247031U (en) Hoisting device for curtain board transporting
CN207714163U (en) A kind of combined type Hanging Basket
CN103449313A (en) Maintenance crane special for rail container door type portal crane trolley travel mechanism
CN204455818U (en) A kind of bridge inspection car
CN201826320U (en) Assembling and sinking device for double wall steel cofferdam
CN204608602U (en) Novel bridge maintenance protection installation work car
CN205653078U (en) Hydraulic pressure formula carrier is adjusted to two dimension
CN103216092B (en) Construction material handling method and equipment thereof
CN202543807U (en) Steel truss girder drag frame constructed by CRM crawler heavy carriers
CN203640250U (en) Trailer for construction of external surface of large-sized storage tank
CN202380754U (en) Floor-type steel transfer trolley
CN202926336U (en) Detachable lifting operation platform for tunnel
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN208883376U (en) A kind of dedicated translating trolleys for ship lift retarder
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN103287986A (en) Curtain board transport lifting device and method for mounting curtain board by using device
CN207700655U (en) A kind of precast beam stretching construction lift work platform
CN207377081U (en) A kind of outfield job execution platform
CN203021269U (en) Full-automatic boosting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20140507