CN105329774A - Gantry type frame of gantry crane and mounting method of gantry type frame - Google Patents

Gantry type frame of gantry crane and mounting method of gantry type frame Download PDF

Info

Publication number
CN105329774A
CN105329774A CN201510682145.9A CN201510682145A CN105329774A CN 105329774 A CN105329774 A CN 105329774A CN 201510682145 A CN201510682145 A CN 201510682145A CN 105329774 A CN105329774 A CN 105329774A
Authority
CN
China
Prior art keywords
shell
columns
column
supporting leg
type frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510682145.9A
Other languages
Chinese (zh)
Inventor
李国建
李站春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Donpcranes Co Ltd
Original Assignee
Shanghai Donpcranes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Donpcranes Co Ltd filed Critical Shanghai Donpcranes Co Ltd
Priority to CN201510682145.9A priority Critical patent/CN105329774A/en
Publication of CN105329774A publication Critical patent/CN105329774A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of hoisting machines, in particular to a gantry type frame of a gantry crane and a mounting method of the gantry type frame. The technical problem that mounting is not convenient in the prior art is solved. The gantry type frame comprises a main beam, a left supporting leg and a right supporting leg. The two ends of the main beam are detachably fixed to the top ends of the two supporting legs. Each supporting leg is composed of two supporting columns arranged in a splay shape. Each supporting column is divided into a plurality of column sections from top to bottom. The vertically adjacent column sections are fixed detachably. The gantry type frame of the gantry crane and the mounting method of the gantry type frame are especially suitable for occasions with small space.

Description

The door type frame of transfer crane and installation method thereof
Technical field
The present invention relates to elevator machinery technology, particularly relate to a kind of door type frame of transfer crane and the technology of installation method thereof.
Background technology
The door type frame of transfer crane is primarily of girder, and two supporting leg compositions, need when door type frame is installed to lift girder, supporting leg by swing crane, for the occasion that space is less, length, the width on lifting altitude ratio installation ground are also large, due to the deficiency of site area, this brings difficulty to on-the-spot installation.
Summary of the invention
For the defect existed in above-mentioned prior art, technical matters to be solved by this invention is to provide a kind of door type frame and installation method thereof of transfer crane easy for installation.
In order to solve the problems of the technologies described above, the door type frame of a kind of transfer crane provided by the present invention, comprises girder, and each supporting leg in left and right, it is characterized in that: the top of two supporting legs is removably fixed at the two ends of described girder; Every root supporting leg is all set as splay pillar by two cloth and forms, and every root pillar is divided into more piece shell of column all from top to bottom, and neighbouring shell of column removably interfixes.
The installation method of the door type frame of transfer crane provided by the present invention, is characterized in that, concrete steps are as follows:
1) use hinge at the two ends, left and right of girder respectively on the top of the first segment shell of column of four pillars;
Wherein, two shell of columns in left side are defined as L1 shell of column, and two shell of columns on right side are defined as R1 shell of column, and two L1 shell of columns are that splayed is laid, and two R1 shell of columns are that splayed is laid;
2) adopt assembly pulley to tighten up method, fix with girder after utilizing assembly pulley two L1 shell of column subtends gatherings to be put in place, with girder fix after utilizing assembly pulley two R1 shell of column subtends gatherings to be put in place simultaneously;
3) between two L1 shell of columns and between two R1 shell of columns, installation floater fills supporting leg respectively, utilizes interim frock supporting leg by two L1 shell of columns and the synchronous upwards jacking of two R1 shell of columns, makes it liftoff;
4) get next segmented column section of four pillars, and two shell of columns belonging to left support leg are wherein defined as L2 shell of column, two shell of columns belonging to right support leg are wherein defined as R2 shell of column;
5) the top hinge of two L2 shell of columns is hinged on respectively the bottom of two L1 shell of columns, and the top hinge of two R2 shell of columns is hinged on respectively the bottom of two R1 shell of columns, and two L2 shell of columns are that splayed is laid, two R2 shell of columns are that splayed is laid;
6) adopt assembly pulley to tighten up method, fix respectively with two L1 shell of columns after utilizing assembly pulley two L2 shell of column subtends gatherings to be put in place, with two piece R1 shell of columns respectively fix after utilizing assembly pulley two R2 shell of column subtends gatherings to be put in place simultaneously;
7) if girder jacking to setting height, then end is installed, otherwise then goes to step 8;
8) between two L2 shell of columns and between two R2 shell of columns, installation floater fills supporting leg respectively, utilizes interim frock supporting leg by two L2 shell of columns and the synchronous upwards jacking of two R2 shell of columns, makes it liftoff;
9) two L2 shell of columns are defined as new L1 shell of column, and two R2 shell of columns are defined as new R1 shell of column, then next segmented column section of four pillars is got, and two shell of columns belonging to left support leg are wherein defined as new L2 shell of column, two shell of columns belonging to right support leg are wherein defined as new R2 shell of column, and then go to step 5.
The door type frame of transfer crane provided by the invention and installation method thereof, the mode that alternating horizontal traction is carried out in the many segmentations of employing supporting leg, temporarily frock supporting leg, hauling block group installs supporting leg, and by girder jacking to predetermined height, install very convenient, be particularly suitable for the occasion that space is less.
Accompanying drawing explanation
Fig. 1 is the structural representation of the door type frame of the transfer crane of the embodiment of the present invention;
Fig. 2, Fig. 3 are the installation method schematic diagrams of the door type frame of the transfer crane of the embodiment of the present invention.
Detailed description of the invention
Illustrate below in conjunction with accompanying drawing and embodiments of the invention are described in further detail; but the present embodiment is not limited to the present invention; every employing analog structure of the present invention and similar change thereof, all should list protection scope of the present invention in, the pause mark in the present invention all represent and relation.
As shown in Figure 1, the door type frame of a kind of transfer crane that the embodiment of the present invention provides, comprises girder 1, and each supporting leg in left and right, it is characterized in that: the top of two supporting legs is removably fixed at the two ends of described girder 1; Every root supporting leg is all set as splay pillar 2 by two cloth and forms, and every root pillar 2 is divided into more piece shell of column all from top to bottom, and neighbouring shell of column removably interfixes.
The installation method of the embodiment of the present invention is as follows:
1) as shown in Figure 2, use hinge at the two ends, left and right of girder 1 respectively on the top of the first segment shell of column of four pillars;
Wherein, two shell of columns in left side are defined as L1 shell of column, and two shell of columns on right side are defined as R1 shell of column, and two L1 shell of columns are that splayed is laid, and two R1 shell of columns are that splayed is laid;
2) adopt assembly pulley to tighten up method, fix with girder 1 after utilizing assembly pulley 3 two L1 shell of column subtends gatherings to be put in place, with girder 1 fix after utilizing assembly pulley 3 two R1 shell of column subtends gatherings to be put in place simultaneously;
3) as shown in Figure 3, between two L1 shell of columns and between two R1 shell of columns, installation floater fills supporting leg 4 respectively, utilizes interim frock supporting leg 4 by two L1 shell of columns and the synchronous upwards jacking of two R1 shell of columns, makes it liftoff;
4) get next segmented column section of four pillars, and two shell of columns belonging to left support leg are wherein defined as L2 shell of column, two shell of columns belonging to right support leg are wherein defined as R2 shell of column;
5) the top hinge of two L2 shell of columns is hinged on respectively the bottom of two L1 shell of columns, and the top hinge of two R2 shell of columns is hinged on respectively the bottom of two R1 shell of columns, and two L2 shell of columns are that splayed is laid, two R2 shell of columns are that splayed is laid;
6) adopt assembly pulley to tighten up method, fix respectively with two L1 shell of columns after utilizing assembly pulley 5 two L2 shell of column subtends gatherings to be put in place, with two piece R1 shell of columns respectively fix after utilizing assembly pulley two R2 shell of column subtends gatherings to be put in place simultaneously;
7) if girder 1 jacking to setting height, then end is installed, otherwise then goes to step 8;
8) between two L2 shell of columns and between two R2 shell of columns, installation floater fills supporting leg respectively, utilizes interim frock supporting leg by two L2 shell of columns and the synchronous upwards jacking of two R2 shell of columns, makes it liftoff;
9) two L2 shell of columns are defined as new L1 shell of column, and two R2 shell of columns are defined as new R1 shell of column, then next segmented column section of four pillars is got, and two shell of columns belonging to left support leg are wherein defined as new L2 shell of column, two shell of columns belonging to right support leg are wherein defined as new R2 shell of column, and then go to step 5.

Claims (2)

1. a door type frame for transfer crane, comprises girder, and each supporting leg in left and right, it is characterized in that: the top of two supporting legs is removably fixed at the two ends of described girder; Every root supporting leg is all set as splay pillar by two cloth and forms, and every root pillar is divided into more piece shell of column all from top to bottom, and neighbouring shell of column removably interfixes.
2. the installation method of the door type frame of transfer crane according to claim 1, is characterized in that, concrete steps are as follows:
1) use hinge at the two ends, left and right of girder respectively on the top of the first segment shell of column of four pillars;
Wherein, two shell of columns in left side are defined as L1 shell of column, and two shell of columns on right side are defined as R1 shell of column, and two L1 shell of columns are that splayed is laid, and two R1 shell of columns are that splayed is laid;
2) adopt assembly pulley to tighten up method, fix with girder after utilizing assembly pulley two L1 shell of column subtends gatherings to be put in place, with girder fix after utilizing assembly pulley two R1 shell of column subtends gatherings to be put in place simultaneously;
3) between two L1 shell of columns and between two R1 shell of columns, installation floater fills supporting leg respectively, utilizes interim frock supporting leg by two L1 shell of columns and the synchronous upwards jacking of two R1 shell of columns, makes it liftoff;
4) get next segmented column section of four pillars, and two shell of columns belonging to left support leg are wherein defined as L2 shell of column, two shell of columns belonging to right support leg are wherein defined as R2 shell of column;
5) the top hinge of two L2 shell of columns is hinged on respectively the bottom of two L1 shell of columns, and the top hinge of two R2 shell of columns is hinged on respectively the bottom of two R1 shell of columns, and two L2 shell of columns are that splayed is laid, two R2 shell of columns are that splayed is laid;
6) adopt assembly pulley to tighten up method, fix respectively with two L1 shell of columns after utilizing assembly pulley two L2 shell of column subtends gatherings to be put in place, with two piece R1 shell of columns respectively fix after utilizing assembly pulley two R2 shell of column subtends gatherings to be put in place simultaneously;
7) if girder jacking to setting height, then end is installed, otherwise then goes to step 8;
8) between two L2 shell of columns and between two R2 shell of columns, installation floater fills supporting leg respectively, utilizes interim frock supporting leg by two L2 shell of columns and the synchronous upwards jacking of two R2 shell of columns, makes it liftoff;
9) two L2 shell of columns are defined as new L1 shell of column, and two R2 shell of columns are defined as new R1 shell of column, then next segmented column section of four pillars is got, and two shell of columns belonging to left support leg are wherein defined as new L2 shell of column, two shell of columns belonging to right support leg are wherein defined as new R2 shell of column, and then go to step 5.
CN201510682145.9A 2015-10-21 2015-10-21 Gantry type frame of gantry crane and mounting method of gantry type frame Pending CN105329774A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510682145.9A CN105329774A (en) 2015-10-21 2015-10-21 Gantry type frame of gantry crane and mounting method of gantry type frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510682145.9A CN105329774A (en) 2015-10-21 2015-10-21 Gantry type frame of gantry crane and mounting method of gantry type frame

Publications (1)

Publication Number Publication Date
CN105329774A true CN105329774A (en) 2016-02-17

Family

ID=55280591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510682145.9A Pending CN105329774A (en) 2015-10-21 2015-10-21 Gantry type frame of gantry crane and mounting method of gantry type frame

Country Status (1)

Country Link
CN (1) CN105329774A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011081061A1 (en) * 2011-08-17 2013-02-21 Sgl Carbon Se Crane bridge for overhead crane, has continuous plate-shaped fiber composite webs that are extended in bridge longitudinal direction
CN202880701U (en) * 2012-11-08 2013-04-17 张静 Trackless gantry crane
CN203306950U (en) * 2013-05-15 2013-11-27 中建一局集团安装工程有限公司 Detachable heavy portal frame
CN204057755U (en) * 2014-06-04 2014-12-31 国家电网公司 A kind of frame-type hanging device
CN204211355U (en) * 2014-10-08 2015-03-18 江苏华澄重工有限公司 A kind of gusset plate interconnection system flexible leg
CN205114854U (en) * 2015-10-21 2016-03-30 上海东普起重机械有限公司 Gantry crane's door type frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011081061A1 (en) * 2011-08-17 2013-02-21 Sgl Carbon Se Crane bridge for overhead crane, has continuous plate-shaped fiber composite webs that are extended in bridge longitudinal direction
CN202880701U (en) * 2012-11-08 2013-04-17 张静 Trackless gantry crane
CN203306950U (en) * 2013-05-15 2013-11-27 中建一局集团安装工程有限公司 Detachable heavy portal frame
CN204057755U (en) * 2014-06-04 2014-12-31 国家电网公司 A kind of frame-type hanging device
CN204211355U (en) * 2014-10-08 2015-03-18 江苏华澄重工有限公司 A kind of gusset plate interconnection system flexible leg
CN205114854U (en) * 2015-10-21 2016-03-30 上海东普起重机械有限公司 Gantry crane's door type frame

Similar Documents

Publication Publication Date Title
CN107044090B (en) A kind of construction method of dual deck bridge
CN104060540B (en) A kind of cable of space cable suspension bridge false stull and construction method for hanging thereof
CN106545172A (en) A kind of installation method of high-altitude long-span steel truss
JP2008274637A (en) Construction method for continuous viaduct
CN204151823U (en) Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN102277980B (en) Device for integrally jacking roof of single-layer industrial factory building and construction method thereof
CN104264685A (en) Construction method for mid-partition wall area structure closure
JP4796411B2 (en) Bridge removal method
CN104895336A (en) Method for installing steel beam of stiff hybrid structure in place
CN106592843A (en) Roof steel structure and area-by-area construction method thereof
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN103276909B (en) The assembled moulding bed of rack of arch-shaped space truss assembling method and use thereof
CN205114854U (en) Gantry crane's door type frame
CN211229458U (en) A operation platform for cylinder mound concrete placement construction
CN104652842A (en) Building integral deviation correcting and raising lifting method and equipment thereof
JP2011162298A (en) Installing construction method and device for overhead crane
CN208236001U (en) Hoistable platform for the disassembly of foundation pit supporting beam
CN104060841A (en) Large-span steel girder installation construction method
CN105329774A (en) Gantry type frame of gantry crane and mounting method of gantry type frame
CN106835984B (en) The reverse construction method of installation of slug matching bridge Bridge Erector
CN202899639U (en) Concrete column structure
JP2012237176A (en) Method and structure for rebuilding bridge pier
CN202023149U (en) Hanging basket used in construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160217