CN105314145B - A kind of efficient long material set bag sealer - Google Patents
A kind of efficient long material set bag sealer Download PDFInfo
- Publication number
- CN105314145B CN105314145B CN201410284396.7A CN201410284396A CN105314145B CN 105314145 B CN105314145 B CN 105314145B CN 201410284396 A CN201410284396 A CN 201410284396A CN 105314145 B CN105314145 B CN 105314145B
- Authority
- CN
- China
- Prior art keywords
- bag
- bagging
- liftout
- sealing
- mandrel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims abstract description 155
- 230000007246 mechanism Effects 0.000 claims abstract description 130
- 238000007789 sealing Methods 0.000 claims abstract description 82
- 238000005266 casting Methods 0.000 claims description 59
- 230000006835 compression Effects 0.000 claims description 20
- 238000007906 compression Methods 0.000 claims description 20
- 230000009471 action Effects 0.000 claims description 9
- 238000005520 cutting process Methods 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 4
- 238000011144 upstream manufacturing Methods 0.000 claims description 4
- 238000010008 shearing Methods 0.000 claims description 2
- 238000012856 packing Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 24
- 238000003825 pressing Methods 0.000 description 20
- 230000032258 transport Effects 0.000 description 16
- 238000004806 packaging method and process Methods 0.000 description 7
- 238000003860 storage Methods 0.000 description 6
- 229920001169 thermoplastic Polymers 0.000 description 5
- 239000004416 thermosoftening plastic Substances 0.000 description 5
- 206010057071 Rectal tenesmus Diseases 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 208000012271 tenesmus Diseases 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
Landscapes
- Auxiliary Devices For And Details Of Packaging Control (AREA)
Abstract
Present invention aim to address current length to expect the problem of bagging work efficiency is low, there is provided a kind of can be more root long material bagging and packing machine sealed at the same time every time.This packing machine will treat that the long feed collet of bagging rises and carries out bagging using folder bag head using the first Lifting Device and the second Lifting Device, and by the first enclosed mechanism, the second enclosed mechanism and cut bag mechanism and sealed and blanking.The machine can complete multitube bagging, both-end sealing at the same time, cut a series of activities such as bag blanking, efficient bagging and sealing so as to fulfill long material.
Description
Technical field
The present invention relates to a kind of package packing machine, more particularly to it is a kind of to metal pipe material, the isometric bar material of plastic pipe into
Row bagging and the bagging seal packing machine of sealing protection.
Background technology
At present, it is domestic that independent packaging can be carried out to every tubing to stainless steel pipe, high quality plastic tubing etc..Due to lacking
The automation equipment of this respect, is all in most cases obviously non-using manually progress bagging and sealing, such way
Often lack efficiency.
Chinese invention patent " the long material bag-fastening packer of one kind ", the patent No.:201210186765.X, there is provided it is a kind of automatic
The bagging device of change, the equipment can mitigate the labor intensity of worker.But such machine is only 1 pipe sleeve bag every time, and
Without bag body both-end enclosing function, production efficiency is still than relatively low.Then a kind of highly efficient automatic bag sheathing sealing is needed to set
It is standby.
The content of the invention
Present invention aim to address current length to expect the problem of bagging work efficiency is low, there is provided a kind of can be more every time
Long material while bagging and the packing machine of sealing.
To reach above-mentioned purpose, the present invention takes following technical solution:
A kind of efficient long material set bag sealer, including support bagging apparatus and bagging mechanism;Support bagging apparatus include mandrel seat and
Mandrel;Especially, the first material jacking mechanism, the second material jacking mechanism, transport establishment, material lifting device, the first enclosed mechanism, are further included
Two enclosed mechanisms, cut bag mechanism and bag compression framework;
First material jacking mechanism includes:First liftout seat board, the n being installed and connected on the first liftout seat board supports
Bagging apparatus, n are positive integer, and for driving the first reciprocating liftout power set of the first liftout seat board;It is described
Support the mandrel of bagging apparatus one is the first liftout end that bagging length material one end is treated for holding out against;The other end of mandrel is for inciting somebody to action
The distracted support bag end of bag body;The n support bagging apparatus are arranged side by side;The central axes of the axis hole of each mandrel seat are parallel to each other, and
The liftout end of each mandrel is towards the same side;
Second material jacking mechanism includes:Second liftout seat board, n liftout being installed and connected on the second liftout seat board dress
Put and for driving the second reciprocating liftout power set of the second liftout seat board;The Lifting Device, which is equipped with, to be used
In hold out against treat bagging length material the other end the second liftout end;Second liftout end of the Lifting Device and the first top of the mandrel
Expect end face one by one;Space between the first liftout end and the second liftout end of institute's face is formed as single bagging station;Institute is just
To the first liftout end and the second liftout end between line direction be single bagging station longitudinal direction;
The transport establishment is will to treat that bagging length material is corresponding to be delivered to below bagging station, and the longitudinal direction of bagging length material is treated in order
The mechanism parallel to each other with the longitudinal direction of bagging station;
The material lifting device is will to treat that bagging length material moves away from transport establishment's support position, and will treat that the long material of bagging is raised to
The mechanism of bagging station corresponding to the long material;
The bagging mechanism includes:Trolley, the track being oriented to for trolley and for trolley provide the small of back and forth movement power
Car power set;The direction of motion of trolley is parallel longitudinal with the bagging station;N are equipped with trolley to be used to clamp bag body
Folder bag head;Folder bag head is corresponded with bagging station;
First enclosed mechanism is a mechanism sealed to covering the bag body on long material;In the first liftout
With the second liftout end phase away from the state of, the sealing enforcing location of the first enclosed mechanism is to be in the first liftout end and second at end
Between liftout end, and close to the first liftout end;
Second enclosed mechanism is the mechanism sealed to the other end for covering the bag body on long material;On the first top
End and the second liftout end are expected mutually away from the state of, and the sealing enforcing location of the second enclosed mechanism is to be in the first liftout end and the
Between two liftout ends, and close to the second liftout end;
The bag mechanism of cutting is the mechanism for cutting the bag body section covered on long material on the whole from bag body;Cut bag mechanism
Shearing enforcing location is between the first liftout end and the first enclosed mechanism sealing enforcing location;
The bag compression framework is the hold-down mechanism for preventing bag body to be voluntarily in and out of the mandrel;The compression of bag compression framework is implemented
Position is in the upstream at the support bag end;The position of bag compression framework is constant relative to the earth.
Compared with the prior art, one of feature is that bag compression framework does not pull back bag body action to the present invention.
Above-described support bagging apparatus is preferably with lower structure:Mandrel is equipped with stage portion, the both sides difference of stage portion
It is first step slope and second step slope;First step slope is close to the support bag end, and second step slope is close to described
Liftout end;The distance between first step slope and second step slope d are in more than 4cm;On mandrel seat with first step slope
Corresponding position is equipped with some rollers;On mandrel seat some rollers also are provided with position corresponding with second step slope.Due to
The mandrel moment of the present invention needs to undertake the weight for treating bagging length material half, and such structure can prevent mandrel from undertaking
The deflection of wide-angle occurred for the axis hole during weight with respect to mandrel seat.
Above-described support bagging apparatus can also be made to improve with lower structure:One is provided with mandrel seat with reeded
Reshaping directive wheel;A part is equipped with mandrel and falls into reshaping part or reshaping roller in the groove.Knot in this way
Structure, during gap of the bag body through mandrel and mandrel seat, due to being acted on be subject to reshaping directive wheel and reshaping part cooperation, or
It is subject to the effect of reshaping directive wheel and the cooperation of reshaping roller and is formed and swelled at this, can so significantly improves the action of folder bag head
Reliability.
Since the bag body being packed for is typically polybag, so the mode of sealing is typically thermoplastic sealing.Implementing thermoplastic
In the case of sealing, above-described first enclosed mechanism can be used with lower structure:Including that can press mutually and separated
Casting die and the first lower sealing casting die are sealed on one, one has the calorific capacity needed for sealing at least within;Pressure is sealed on first
Part and the first lower sealing are across all bagging stations.Under the structure, casting die and the first lower sealing casting die are sealed once on first
Pressing at the same time can seal all long material put on after bag.First enclosed mechanism can also be used with lower structure:Including n
Set sealing unit, often set sealing unit, which includes 2, can press mutually and separated sealing casting die;Often set sealing unit corresponds to 1
Or several bagging stations.Under the structure, each unit that seals is at the same time, independently to implement sealing to act.
Above-described second enclosed mechanism can use following mechanism:Including can press mutually with separated second on seal
Mouth casting die and the second lower sealing casting die, one, which has, at least within seals required calorific capacity;Casting die and the are sealed on second
Two lower sealings are across all bagging stations;Casting die is sealed on second and is installed and connected in the trolley.Such structure, is sealed on second
Mouthful casting die is with moving of car and stops, and when trolley is in the position for packaging bag, (i.e. trolley clamps bag body and moves to the
During two liftout ends), by being installed on sealing casting die power set on second on trolley sealing casting die on second can be made opposite
Moving of car, is pressed so as to make and casting die is sealed on second with the second lower sealing casting die.And the envelope of general laminated type up and down
Mouth mechanism covers machine due to being subject to the restriction of volume and stopping for trolley track, cannot generally solve the stitching problems, and this
Problem be exactly existing technical staff not on packing machine set enclosing function the main reason for.
To prevent that middle part tenesmus seriously influences the smooth of bagging to very thin and rigidity deficiency long material under gravity
Carry out, above-mentioned packing machine can be made improvements as follows:It is additionally provided with and send a bag roller mechanism, it is described to send a bag roller mechanism to include:Roller seat, roller
Body, roller seat power set and roll body driving device;The roll body is across all bagging stations;Roll body and the roll body driving device
It is installed on roller seat, roll body driving device drives roll body to rotate;Roller seat power set can drive the roller seat in vertical direction
It is reciprocating;The roll body is arranged near the longitudinal centre or centre of the bagging station.After structure as addition,
The middle part that roll body can treat bagging length material is supported, and prevents from treating the excessively tenesmus of bagging length material.And during bagging, work as bag
Body be pulled to reach roll body when, can OnNow roll body driving device and make roll body towards be conducive to bagging direction rotate,
Support not only was provided to treat that bagging grows material so as to play, but also reduces the effect of pulling bag power.It is described send bag roller mechanism quantity can be
List covers, two sets or more than two sets.
Technical solution more than, the machine can complete multitube bagging, both-end sealing at the same time, cut a system such as bag blanking
Row work, efficient bagging and sealing so as to fulfill long material.
Brief description of the drawings
Fig. 1 is the main structure diagram of embodiment 1;
Fig. 2 is the overlooking the structure diagram of Fig. 1;
Fig. 3 is the A-A schematic cross-sectional views of Fig. 2;
Fig. 4 is the dimensional structure diagram of embodiment 1;
Fig. 5 is the structural principle schematic diagram of embodiment 1;
Fig. 6 is the structure diagram of the first material jacking mechanism in embodiment 1;
Fig. 7 is the structure diagram (not including second on seal casting die) of the second enclosed mechanism in embodiment 1;
Fig. 8 is the main structure diagram of 1 support bagging apparatus of embodiment;
Fig. 9 is the overlooking the structure diagram of Fig. 8;
Figure 10 is the backsight structural representation of Fig. 8;
Figure 11 is the right side structural representation of Fig. 8;
Figure 12 is the dimensional structure diagram of 1 support bagging apparatus of embodiment;
Figure 13 is the B-B direction schematic cross-sectional view of Fig. 8;
Figure 14 is the C-C of Fig. 8 to schematic cross-sectional view;
Figure 15 is the D-D of Figure 11 to schematic cross-sectional view;
Figure 16 is the E-E of Figure 11 to schematic cross-sectional view;
Figure 17 is the structure diagram of the second material jacking mechanism in embodiment 1;
Figure 18 is the structure diagram of material lifting device in embodiment 1;
Figure 19 is the structure diagram of transport establishment in embodiment 1;
Figure 20 is the F point enlarged drawings of Figure 19;
Figure 21 is the structure diagram of the track of bagging mechanism in embodiment 1;
Figure 22 is the structure diagram of trolley in embodiment 1;
Figure 23 is the structure diagram of bag compression framework in embodiment 1;
Figure 24 is the first enclosed mechanism and the structure diagram for cutting bag mechanism in embodiment 1;
Figure 25 is the G-G of Figure 24 to schematic cross-sectional view;
Figure 26 is the course of work principle sketch of embodiment 1;
Figure 27 is the dimensional structure diagram of embodiment 2;
Figure 28 is the structural principle schematic diagram of embodiment 2;
Figure 29 is the structure diagram that bag roller mechanism is sent in embodiment 2;
Figure 30 is the course of work principle sketch of embodiment 2;
Figure 31 is the dimensional structure diagram of embodiment 3;
Figure 32 is the structural principle schematic diagram of embodiment 3;
Figure 33 is the course of work principle sketch of embodiment 3.
Embodiment
Present invention is described further with reference to the accompanying drawings and examples.
Embodiment 1
As shown in Fig. 1 to Figure 25, the efficient long material set bag sealer of the present embodiment includes:First material jacking mechanism 1, second
Material jacking mechanism 2, conveying chain mechanism 3, material lifting device 4, bagging mechanism 5, the first enclosed mechanism 6, the second enclosed mechanism 7, cut a bag machine
Structure 8, bag compression framework 9 and storage rack 10.
As shown in fig. 6, the first material jacking mechanism 1 includes:First liftout seat board 11, be installed and connected on the first liftout seat board 11
10 support bagging apparatus 12 and for drive the first liftout seat board 11 make horizontal direction reciprocating motion the first liftout power set 13.
As shown in Fig. 9 to Figure 12, support bagging apparatus 12 includes mandrel seat 121 and mandrel 122, and one of mandrel 122 is the first liftout end
1221, the other end of mandrel 122 is support bag end 1222.As shown in Figure 13 to Figure 16, in the present embodiment, mandrel 122 is equipped with platform
Rank portion 1223, the both sides of stage portion 1223 are first step slope 1224 and second step slope 1225 respectively.First step is oblique
Slope 1224 is close to support bag end 1222, and second step slope 1225 is close to the first liftout end 1221.First step slope 1224 and
The distance between two terraced slopes 1225 d is in more than 4cm.Set on mandrel seat 121 with 1224 corresponding position of first step slope
There are 4 rollers 14,4 rollers 15 also are provided with 1225 corresponding position of second step slope on mandrel seat 121.On mandrel seat 121
One is also equipped with fluted 161 reshaping directive wheel 16, a part is additionally provided with mandrel 122 and falls into the groove
Reshaping roller 17 in 161, for making bag body form protuberance when by the position.Such 10 support bagging apparatus 12 are arranged side by side
Row, the central axes of the axis hole of each mandrel seat are parallel to each other, and the liftout end of each mandrel is towards the same side.
As shown in figure 17, the second material jacking mechanism 2 includes:Second liftout seat board 21, be installed and connected in the second liftout seat board 21
On 10 Lifting Devices 22 and for drive the second liftout seat board 21 make horizontal direction reciprocating motion the second liftout power set
23.Lifting Device 22, which is equipped with, to be used to hold out against the second liftout end 221 for treating the bagging length material other end.Second top of Lifting Device 22
Expect the first liftout end 1221 of end 221 and mandrel 122 face one by one.Between the first liftout end and the second liftout end of institute's face
Space is formed as single bagging station.Line direction between the first liftout end and the second liftout end of institute's face is single bagging
The longitudinal direction of station.The Lifting Device 22 of the present embodiment is additionally provided with for the buffer spring to the second liftout end 221 into row buffering
222。
As shown in Fig. 1, Fig. 3, Figure 19, Figure 20, the transport establishment 3 of the present embodiment is to include conveying frame 31, conveying chain drum
32nd, the conveying chain mechanism including conveyor chain 33, carrier chain actuating cylinder 34, ratchet 35, pawl 36, friction check device 37.
Supporting block for location 331 is installed on each conveyor chain 33, formed with positioning recess 332 on supporting block for location 331, wall scroll is defeated
The spacing for sending positioning recess 332 adjacent on chain is equal, and equal to the distance between adjacent mandrel seat axis hole central axes.
In this way, designated position can be transported to after the long material of bagging falls into positioning recess 332, and adjacent two treat bagging length material defeated
Keep parallel to each other during sending, and more of synchronization treats that the long material of bagging can be with bagging station face one by one.
As shown in figure 18, the material lifting device 4 of the present embodiment includes material lift rest pad 41 and drives material lift rest pad 41 to hang down
The material lift power set 42 directly moved back and forth.Material lift rest pad 42 is in strip, and across all bagging stations, in material lift branch
Supporting block 41 is equipped with 10 material lift recess 411, and the spacing of adjacent material lift recess 411 is equal, and is equal to adjacent mandrel seat
The distance between axis hole central axes.When material lift rest pad 41 rises, it can will treat that bagging length material is lifted to from conveyor chain 33
Bagging station;When material lift rest pad 41 carry hold package the long material of bag and drop to lower position when, the long material for packaging bag will again
Fall in the positioning recess 332 of conveyor chain 33, hereafter conveyor chain 33 acts, and the long material for packaging bag is sent same to collecting region
When follow-up treated that the long material of bagging transports bagging station to again.The quantity of the material lifting device 4 of the present embodiment is 2 sets, a set of close the
One liftout end 1221, another set of close second liftout end 221.
As shown in Fig. 2, Fig. 4, Figure 21, Figure 22, the bagging mechanism 5 of the present embodiment includes:Trolley 51, track 52 and trolley
Power set 53.The track 52 of the present embodiment includes 3 sub-tracks 521 parallel to each other.It is total to by this 3 sub-tracks 521
It is same to share trolley 51 and the thereon weight of institute's installing mechanism.The lower section of centrally located sub-track 521 is fixed with rack 522, small
Car 51 realizes reciprocal fortune in orbit by drive connection as " motor --- retarder --- driving gear --- rack "
It is dynamic.10 folder bags first 54 for being used to clamp bag body are equipped with trolley 51, folder bag first 54 is corresponded with bagging station, works as folder bag
When head power set 55 act, folder bag first 54 carries out clamping action;After the reset of folder bag head power set 55, first 54 side of folder bag
Open and discharge clamped bag body.The clamping action enforcing location of each folder bag first 54 is bag body by reshaping directive wheel 16 and changes
The position that shape roller 17 is acted on and swelled.
As shown in Figure 24, Figure 25, first enclosed mechanism 6 of the present embodiment is thermoplastic closure types, including:Sealed on first
61 and first lower sealing casting die 62 of casting die.The bag mechanism 8 of cutting of the present embodiment includes:Upper slitter 81 and lower knife 82.To simplify machine
Structure, casting die 61 is sealed on first and is linked together with the installation of upper slitter 81, the first lower sealing casting die 62 and the installation connection of lower knife 82
Together, can so complete to cut bag work while being sealed.It is used by first enclosed mechanism 6 of the present embodiment
Conventional principles and structure, the present embodiment will not be described in great detail.The upper slitter 81 of the present embodiment is to put on knife assembly 811 by plural number to arrange side by side
What row were formed, knife assembly 821, which is arranged side by side, under lower knife 82 is covered by plural number is formed.Upper knife assembly 811 and lower knife assembly 821 1
One face.The cutting edge line of each upper knife assembly is parallel to each other, the sword of the cutting edge line of upper knife assembly 811 non-parallel to lower knife assembly 821
Mouth line.
As shown in Fig. 7, Figure 22, second enclosed mechanism 7 of the present embodiment is also thermoplastic closure types, including:Sealed on second
Mouth 71 and second lower sealing casting die 72 of casting die.Second lower sealing casting die 72 is cannot be along the lengthwise movement of bagging station, can only
In up-and-down motion.And casting die 71 is sealed on second and is mounted on trolley 51, it is also equipped with trolley 51
Sealing cylinder 73, on second sealing casting die 71 can avoid each folder bag first 54 under the promotion of upper sealing cylinder 73 and upwards after movement
Or preceding movement downwards, this place is using the first liftout end before, after the second liftout end is.It is in when sealing casting die 71 is flat on second
On position in place, it is necessary to when performing thermoplastic sealing, trolley 51 move in place to the second liftout extreme direction, goes up sealing cylinder at this time
73 seal the preceding movement downwards of casting die 71 in promotion second, make sealing casting die 71 on second be pressed together on the second lower sealing casting die 72
Implement sealing together.Band of the casting die 71 in upper sealing cylinder 73 is sealed after the long sealing work for expecting the end is completed, on second
Moved up to thereon in place under dynamic, and keep position on it in place.
As shown in figure 23, the bag compression framework 9 of the present embodiment includes 10 bag pressing stations.Bag pressing station and bagging station one
One face.When the piston rod of loose bag cylinder 91 is retracted, then briquetting 92 will overcome the elastic force of spring 93 away from bearing plate 94, make
Bag body through briquetting 92 and bearing plate 94 can free in and out, and otherwise cannot move.
As shown in Figures 1 to 4, the storage rack 10 of the present embodiment includes storing frame body 101, the first stop gauge 102, second
Stop gauge 103 and material toggling turntable 104.Storing frame body 101 is equipped with the inclined load of relative level and holds bar 105, treats that bagging is grown
Material, which is placed on load and holds, can roll or slide under gravity the first stop gauge 102 on bar 105.First stop gauge
The distance between 102 backgauge position and the backgauge position of the second stop gauge 103 only than treating that the diameter of the long material of bagging is bigger,
During the alternating movement of first stop gauge 102 and the second stop gauge 103, both then only allow 1 per alternating movement 1 time
Root treats that the long material of bagging passes through, and then passes through the control to 103 alternating movement of the first stop gauge 102 and the second stop gauge, i.e.,
It can control feeding opportunity and the feeding quantity of pipe range material to be covered.Material toggling turntable 104 is arranged on the upstream position of the first stop gauge 102
Put, for avoid treating bagging length material lower floor head caused by the multiple-level stack expect to be suspected in rolling or slip,
So that it is guaranteed that treat bagging length material all the time before the first stop gauge 102 arrangement treat into.
In the present embodiment, the first material jacking mechanism 1, the second material jacking mechanism 2, material lifting device 4, bagging mechanism 5, the first sealing machine
Structure 6, the second enclosed mechanism 7, cut bag mechanism 8 and bag compression framework 9 is mounted in the rack of transport establishment 3, by transporter
The rack supporting of structure 3.Storage rack 10 is abreast placed with transport establishment 3.
Specifically, as shown in figure 5, the first material jacking mechanism 1 and the second material jacking mechanism 2 are in conveying frame 31 and convey respectively
The both sides in direction.First enclosed mechanism 6 and cut bag mechanism 8 and be merged into an entirety, be in the first material jacking mechanism 1 and the second liftout
Between mechanism 2 and close to the first material jacking mechanism 1.Bag compression framework 9 is arranged on by the first material jacking mechanism 1, as the first material jacking mechanism 1
Upstream equipment.Material lifting device 4 is between the first material jacking mechanism 1 and the second material jacking mechanism 2, and material lifting device 4 is in transporter
Structure 3 transports the lower section of long material.The track 52 of bagging mechanism 5 is in the top of the first material jacking mechanism 1 and the second material jacking mechanism 2, bagging
On the trolley 51 and trolley 51 of mechanism 5 belonging to second enclosed mechanism 7 second on sealing casting die 71 be in transport establishment 3 and transported
The top of long material.The second lower sealing casting die 72 belonging to second enclosed mechanism 7 is in the first material jacking mechanism 1 and the second material jacking mechanism
Between 2 and close to the second material jacking mechanism 2.
The course of work of the present embodiment is as shown in figure 26, below 1) in description corresponding diagram 9) a) to i) legend:
1) gap by bag body through mandrel seat 121 and mandrel 122, and by the briquetting 92 of bag compression framework 9 and hold
Pressing plate 94 compresses bag body, prevents a bag body autonomous travel.At this time the first liftout end 1221 and the second liftout end 221 away from each other,
The upper casting die 61 and first of first sealing seals the upper casting die 71 and second of the sealing of pressing member 62, second and seals pressing member 72, upper slitter 81
Discrete state is in lower knife 82, material lift rest pad 41 is in down in place, and trolley 51 is from the second liftout end 221 to the first liftout
The movement of end 1221.Conveying chain mechanism will treat that bagging length material is equidistantly transported to bagging station from storage rack side by side at this time.
2) 10 when bagging length material with 10 bagging station faces one by one when, conveying chain mechanism stopping action.Material lift supports
Block 41 moves up in place, during which treats that bagging length material moves away from the supporting block for location 331 of conveying chain mechanism by 10, and allow every
Root treats that the long material of bagging reaches exactly to bagging station.
3) the first liftout power set 13 and the second liftout power set 23 act, the first liftout end 1221 and the second liftout
Hold 221 adjacent to each other, will treat that the long feed collet of bagging is lived.
4) trolley 51 moves to 1221 place side of the first liftout end, and the position for being swelled bag body by folder bag first 54 clamps.
5) material lift rest pad 41 moves downwardly to down in place.Briquetting 92 and bearing plate 94 separate and unclamp a bag body, folder bag head
54 hold the head of bag body at this time, and bag body is pulled to the second liftout end 221 from the first liftout end 1221.
6) trolley 51 stops after the head of bag body is pulled to 221 place side of the second liftout end, and folder bag first 54 keeps clamping shape
State.
7) material lift rest pad 41 moves up in place, and support packages the long material of bag.First liftout power set at this time
13 and second liftout power set 23 act, the first liftout end 1221 and the second liftout end 221 are away from each other.Briquetting 92 and pressure-bearing
Plate 94 also closes and compresses a bag body.
8) the upper casting die 61 of the first sealing is pressed with the first sealing pressing member 62, under the upper casting die 71 and second of the second sealing seals
Casting die 72 presses, and upper slitter 81 cuts conjunction, the head of the first 54 release bag body of folder bag with lower knife 82.
9) the upper casting die 61 and first of the first sealing seals the upper casting die 71 and second of the sealing of pressing member 62, second and seals pressing member
72nd, upper slitter 81 is separated with lower knife 82, and material lift rest pad 41 moves downwardly to down in place, is packaged the long material of bag and will be fallen on respective original
On the supporting block for location 331 come.Hereafter conveying chain mechanism acts, and the long material for packaging bag is delivered to the position of finished product collection.It is small
Car 51 starts to move from the second liftout end 221 to the first liftout end 1221.
More than repeating the 1) to the 9) step to carry out bagging next time.
Embodiment 2
As shown in Figure 27, Figure 28, Figure 29, the present embodiment and the difference of embodiment 1 are:Also have additional 1 set and send bag
Roller mechanism 106, including:Roller seat 1061, roll body 1062, roller seat power set 1063 and roll body driving device 1064.
Roller seat power set 1064 are mounted in the conveying frame 31 of transport establishment 3.Roll body is in institute of transport establishment 3
The lower section of the long material of fortune.
As shown in figure 28, send near the longitudinal centre or centre that bag roller mechanism 106 is arranged at bagging station, and roll body
1062 across all bagging stations.As shown in figure 29, roll body 1062 and roll body driving device 1064 are installed on roller seat 1061, roller
Body drive 1064 drives roll body 1062 to rotate.It is past that roller seat power set 1063 can drive roller seat 1061 to make in vertical direction
Multiple movement.
The course of work of the present embodiment is as shown in figure 30, below 1) in description corresponding diagram 10) a) to j) legend:
1) gap by bag body through mandrel seat 121 and mandrel 122, and by the briquetting 92 of bag compression framework 9 and hold
Pressing plate 94 compresses bag body, prevents a bag body autonomous travel.At this time the first liftout end 1221 and the second liftout end 221 away from each other,
The upper casting die 61 and first of first sealing seals the upper casting die 71 and second of the sealing of pressing member 62, second and seals pressing member 72, upper slitter 81
Discrete state is in lower knife 82, material lift rest pad 41 is in down in place, and roll body 1062 is in down in place, trolley 51 from second
Moved to the first liftout end 1221 at liftout end 221.Conveying chain mechanism will treat that bagging length material is equidistantly transported from storage rack side by side at this time
Transport to below bagging station.
2) 10 when bagging length material with 10 bagging station faces one by one when, conveying chain mechanism stopping action.Material lift supports
Block 41 moves up in place, during which treats that bagging length material moves away from the supporting block for location 331 of conveying chain mechanism by 10, and allow every
Root treats that the long material of bagging reaches exactly to bagging station.Roll body 1062 moves up to thereon in place, every is treated in bagging length material
Portion is supported.
3) the first liftout power set 13 and the second liftout power set 23 act, the first liftout end 1221 and the second liftout
Hold 221 adjacent to each other, will treat that the long feed collet of bagging is lived.
4) trolley 51 moves to 1221 place side of the first liftout end, and the position for being swelled bag body by folder bag first 54 clamps.
5) material lift rest pad 41 moves downwardly to down in place.Briquetting 92 and bearing plate 94 separate and unclamp a bag body, folder bag head
54 hold the head of bag body at this time, and bag body is pulled to the second liftout end 221 from the first liftout end 1221.
6) when the head of bag body reaches exactly to roll body 1062, roll body 1062 starts to rotate and aid in bagging.
7) trolley 51 stops after the head of bag body is pulled to 221 place side of the second liftout end, and folder bag first 54 keeps clamping shape
State.Roll body 1062 stops operating.
8) material lift rest pad 41 moves up in place, and support packages the long material of bag.First liftout power set at this time
13 and second liftout power set 23 act, the first liftout end 1221 and the second liftout end 221 are away from each other.Briquetting 92 and pressure-bearing
Plate 94 also closes and compresses a bag body.
9) the upper casting die 61 of the first sealing is pressed with the first sealing pressing member 62, under the upper casting die 71 and second of the second sealing seals
Casting die 72 presses, and upper slitter 81 cuts conjunction, the head of the first 54 release bag body of folder bag with lower knife 82.
10) the upper casting die 61 and first of the first sealing seals the upper sealing of casting die 71 and second of the sealing of pressing member 62, second and pushes
Part 72, upper slitter 81 are separated with lower knife 82, and material lift rest pad 41 moves downwardly to down in place, and roll body 1062, which moves downwardly to down, to be arrived
Position, packaging the long material of bag will fall on each original supporting block for location 331.Hereafter conveying chain mechanism acts, and will package bag
Long material is delivered to the position of finished product collection.Trolley 51 starts to move from the second liftout end 221 to the first liftout end 1221.
More than repeating the 1) to the 10) step to carry out bagging next time.
Embodiment 3
As shown in Figure 31, Figure 32, the present embodiment and the difference of embodiment 1 are:A bag roller mechanism is sent equipped with first
106 ' and second send a bag roller mechanism 106 ".First send a bag roller mechanism 106 ' to include:First roller seat, the first roll body 1062 ', the first roller
Seat power set and the first roll body driving device.Second send a bag roller mechanism 106 " to include:Second roller seat, the second roll body 1062 ",
Two roller seat power set and the second roll body driving device.
The first of the present embodiment send bag roller mechanism 106 ' and second send bag roller mechanism 106 " and embodiment 2 send a bag roller mechanism
Structure be identical, the present embodiment repeats no more.
As shown in Figure 31, Figure 32, in the present embodiment, the first roller seat power set and the second roller seat power set are installations
In in the conveying frame 31 of transport establishment 3.First roll body 1062 ' and the second roll body 1062 " are in transport establishment 3 and transport long material
Lower section.
In addition, the first roll body 1062 ' and the second roll body 1062 " are near longitudinal centre of bagging station, and it is horizontal
Across all bagging stations.
The course of work of the present embodiment is as shown in figure 33, below 1) in description corresponding diagram 11) a) to k) legend:
1) gap by bag body through mandrel seat 121 and mandrel 122, and by the briquetting 92 of bag compression framework 9 and hold
Pressing plate 94 compresses bag body, prevents a bag body autonomous travel.At this time the first liftout end 1221 and the second liftout end 221 away from each other,
The upper casting die 61 and first of first sealing seals the upper casting die 71 and second of the sealing of pressing member 62, second and seals pressing member 72, upper slitter 81
Discrete state is in lower knife 82, material lift rest pad 41 is in down in place, and the first roll body 1062 ' is in down in place, the second roller
Body 1062 " is in down in place, and trolley 51 is moved from the second liftout end 221 to the first liftout end 1221.Conveying chain mechanism at this time will
Treat that bagging length material is equidistantly transported to bagging station from storage rack side by side.
2) 10 when bagging length material with 10 bagging station faces one by one when, conveying chain mechanism stopping action.Material lift supports
Block 41 moves up in place, during which treats that bagging length material moves away from the supporting block for location 331 of conveying chain mechanism by 10, and allow every
Root treats that the long material of bagging reaches exactly to bagging station.First roll body 1062 ' moves up to thereon in place, the second roll body 1062 " to
On move to thereon in place, the first roll body 1062 ' and the second roll body 1062 " while treat that the middle part of bagging length material is propped up to every
Support.
3) the first liftout power set 13 and the second liftout power set 23 act, the first liftout end 1221 and the second liftout
Hold 221 adjacent to each other, will treat that the long feed collet of bagging is lived.
4) trolley 51 moves to 1221 place side of the first liftout end, and the position for being swelled bag body by folder bag head clamps.
5) material lift rest pad 41 moves downwardly to down in place.First roll body moves downwardly to down in place.Briquetting 92 and pressure-bearing
Plate 94 separates and unclamps a bag body, and folder bag first 54 holds the head of bag body at this time, and bag body is pulled to from the first liftout end 1221
Two liftout ends 221.
6) when the head of bag body is in the first roll body 1062 ' between the second roll body 1062 ", the first roll body 1062 ' is upwards
Move in place and support and treat bagging length material, and the first roll body 1062 ' rotates and aids in bagging.Second roll body 1062 " to
Under move to down in place.
7) after the second roll body 1062 ", the second roll body 1062 " moves up in place and supports and treat on the head of bag body
Bagging length material, and the second roll body 1062 " rotates and aids in bagging.
8) trolley 51 stops after the head of bag body is pulled to 221 place side of the second liftout end, and folder bag first 54 keeps clamping shape
State.First roll body 1062 ' and the second roll body 1062 " stop operating.
9) material lift rest pad 41 moves up in place, and support packages the long material of bag.First liftout power set at this time
13 and second liftout power set 23 act, the first liftout end 1221 and the second liftout end 221 are away from each other.Briquetting 92 and pressure-bearing
Plate 94 also closes and compresses a bag body.
10) the upper casting die 61 of the first sealing is pressed with the first sealing pressing member 62, and the upper casting die 71 and second of the second sealing seals
Pressing member 72 presses, and upper slitter 81 cuts conjunction, the head of the first 54 release bag body of folder bag with lower knife 82.
11) the upper casting die 61 and first of the first sealing seals the upper sealing of casting die 71 and second of the sealing of pressing member 62, second and pushes
Part 72, upper slitter 81 are separated with lower knife 82, and material lift rest pad 41 moves downwardly to down in place, and the first roll body 1062 ' moves downward
Under in place, the second roll body 1062 " moves downwardly to down in place, packages the long material of bag and will fall on each original supporting block for location
On 331.Hereafter conveying chain mechanism acts, and the long material for packaging bag is delivered to the position of finished product collection.Trolley 51 starts from second
Moved to the first liftout end 1221 at liftout end 221.
More than repeating the 1) to the 11) step to carry out bagging next time.
What this specification was enumerated is only better embodiment of the invention, all institutes under the operation principle and thinking of the present invention
The equivalent technologies conversion done, is accordingly to be regarded as protection scope of the present invention.
Claims (8)
1. a kind of efficient long material set bag sealer, including support bagging apparatus and bagging mechanism;Support bagging apparatus includes mandrel seat and core
Axis;It is characterized in that:Further include the first material jacking mechanism, the second material jacking mechanism, transport establishment, material lifting device, the first enclosed mechanism,
Two enclosed mechanisms, cut bag mechanism and bag compression framework;
First material jacking mechanism includes:First liftout seat board, the n being installed and connected on the first liftout seat board supports are packed
Putting, n is positive integer, and for driving the first reciprocating liftout power set of the first liftout seat board;The support bag
One of the mandrel of device is the first liftout end that bagging length material one end is treated for holding out against;The other end of mandrel is for by bag body
Distracted support bag end;The n support bagging apparatus are arranged side by side;The central axes of the axis hole of each mandrel seat are parallel to each other, and each core
The liftout end of axis is towards the same side;
Second material jacking mechanism includes:Second liftout seat board, n Lifting Device being installed and connected on the second liftout seat board and
For driving the second reciprocating liftout power set of the second liftout seat board;The Lifting Device, which is equipped with, to be used to push up
Tight the second liftout end for treating the bagging length material other end;Second liftout end of the Lifting Device and the first liftout end of the mandrel
Face one by one;Space between the first liftout end and the second liftout end of institute's face is formed as single bagging station;Institute's face
Line direction between first liftout end and the second liftout end is the longitudinal direction of single bagging station;
The transport establishment is will to treat that bagging length material is corresponding to be delivered to below bagging station, and longitudinal direction and the set of bagging length material are treated in order
The longitudinal direction mechanism parallel to each other of bag station;
The material lifting device is will to treat that bagging length material moves away from the support position of transport establishment, and will treat that the long material of bagging is raised to the length
The mechanism of bagging station corresponding to material;
The bagging mechanism includes:Trolley, the track being oriented to for trolley and the trolley of back and forth movement power is provided for trolley moves
Power apparatus;The direction of motion of trolley is parallel longitudinal with the bagging station;The n folders for being used to clamp bag body are equipped with trolley
Bag head;Folder bag head is corresponded with bagging station;
First enclosed mechanism is a mechanism sealed to covering the bag body on long material;The first liftout end with
Mutually away from the state of, the sealing enforcing location of the first enclosed mechanism is to be in the first liftout end and the second liftout at the second liftout end
Between end, and close to the first liftout end;
Second enclosed mechanism is the mechanism sealed to the other end for covering the bag body on long material;At the first liftout end
With the second liftout end phase away from the state of, the sealing enforcing location of the second enclosed mechanism is to be in the first liftout end and the second top
Between expecting end, and close to the second liftout end;
The bag mechanism of cutting is the mechanism for cutting the bag body section covered on long material on the whole from bag body;Cut the shearing of bag mechanism
Enforcing location is between the first liftout end and the first enclosed mechanism sealing enforcing location;
The bag compression framework is the hold-down mechanism for preventing bag body to be voluntarily in and out of the mandrel;The compression enforcing location of bag compression framework
It is in the upstream at the support bag end;The position of bag compression framework is constant relative to the earth, and bag compression framework does not pull back bag body
Action.
2. a kind of efficient long material set bag sealer as claimed in claim 1, it is characterized in that:The support bagging apparatus use with
Lower structure:Mandrel is equipped with stage portion, and the both sides of stage portion are first step slope and second step slope respectively;First step
Slope is close to the support bag end, and second step slope is close to the first liftout end;First step slope and second step slope
The distance between d in more than 4cm;Position corresponding with first step slope is equipped with some rollers on mandrel seat;On mandrel seat with
Second step slope also is provided with some rollers on corresponding position.
3. a kind of efficient long material set bag sealer as claimed in claim 1 or 2, it is characterized in that:The support bagging apparatus is made
Improved with lower structure:One is provided with mandrel seat with reeded reshaping directive wheel;Fall on mandrel equipped with a part
Enter the reshaping part in the groove.
4. a kind of efficient long material set bag sealer as claimed in claim 1, it is characterized in that:First enclosed mechanism is using following
Structure:
Including can press mutually with separated first on seal casting die and the first lower sealing casting die, one has sealing at least within
Required calorific capacity;Casting die and the first lower sealing are sealed on first across all bagging stations.
5. a kind of efficient long material set bag sealer as claimed in claim 1, it is characterized in that:First enclosed mechanism is using following
Structure:
Sealing unit is covered including n, often set sealing unit, which includes 2, can press mutually and separated sealing casting die;Often set sealing is single
The corresponding 1 bagging station of member.
6. a kind of efficient long material set bag sealer as claimed in claim 1, it is characterized in that:Second enclosed mechanism is using following
Mechanism:
Including can press mutually with separated second on seal casting die and the second lower sealing casting die, one has sealing at least within
Required calorific capacity;Casting die and the second lower sealing are sealed on second across all bagging stations;Casting die installation is sealed on second
In the trolley.
7. a kind of efficient long material set bag sealer as claimed in claim 1, it is characterized in that:It is additionally provided with and send a bag roller mechanism, institute
State and send a bag roller mechanism to include:Roller seat, roll body, roller seat power set and roll body driving device;The roll body is across all bagging works
Position;
Roll body and the roll body driving device is installed on roller seat, and roll body driving device drives roll body to rotate;Roller seat power set
The roller seat can be driven reciprocating in vertical direction;The roll body be arranged at the bagging station longitudinal centre or
Near centre.
8. a kind of efficient long material set bag sealer as claimed in claim 7, it is characterized in that:The quantity for sending bag roller mechanism
It is two sets.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410284396.7A CN105314145B (en) | 2014-06-23 | 2014-06-23 | A kind of efficient long material set bag sealer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410284396.7A CN105314145B (en) | 2014-06-23 | 2014-06-23 | A kind of efficient long material set bag sealer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105314145A CN105314145A (en) | 2016-02-10 |
CN105314145B true CN105314145B (en) | 2018-04-20 |
Family
ID=55242637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410284396.7A Expired - Fee Related CN105314145B (en) | 2014-06-23 | 2014-06-23 | A kind of efficient long material set bag sealer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105314145B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105905380A (en) * | 2016-07-02 | 2016-08-31 | 凌中良 | Horizontal drive mechanism of plastic round pipe bagging device |
CN105947257A (en) * | 2016-07-02 | 2016-09-21 | 凌中良 | Drive device for plastic circular tube bagging device |
CN107776969B (en) * | 2017-10-24 | 2020-11-10 | 东莞市观瑞设备科技有限公司 | Stick outer film bag covering equipment |
CN107914917A (en) * | 2017-12-06 | 2018-04-17 | 佛山市尊聚自动化设备有限公司 | A kind of bag film clasps mechanism |
CN109515796A (en) * | 2018-11-27 | 2019-03-26 | 广东顶固集创家居股份有限公司 | A kind of semi-automatic packing machine and its automatic loose clamp device |
CN109775047B (en) * | 2019-03-22 | 2023-11-21 | 佛山市科文自动化设备有限公司 | Section bar bagging mechanism |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102717928A (en) * | 2012-06-29 | 2012-10-10 | 武汉理工大学 | Bagging packaging method for poly vinyl chloride (PVC) pipe |
CN103101636A (en) * | 2013-01-24 | 2013-05-15 | 河南联塑实业有限公司 | Tubular product automatic packaging machine |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0451126Y2 (en) * | 1986-03-28 | 1992-12-02 | ||
KR100547913B1 (en) * | 2004-02-17 | 2006-02-01 | 이천희 | The Apparatus of Bar and Pipe Autowrapping and its' Method of Bar and Pipe Autowrapping |
CN202966710U (en) * | 2012-04-27 | 2013-06-05 | 深圳大学 | Pipe automatic packing machine |
CN202670154U (en) * | 2012-06-08 | 2013-01-16 | 兰信庭 | Plastic bag expansion mechanism |
CN103359309B (en) * | 2013-07-05 | 2015-08-26 | 佛山市南海区竟佳工控设备有限公司 | A kind of pipe automatic packaging machine |
CN203544409U (en) * | 2013-10-31 | 2014-04-16 | 凌中水 | Automatic tube packaging machine |
-
2014
- 2014-06-23 CN CN201410284396.7A patent/CN105314145B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102717928A (en) * | 2012-06-29 | 2012-10-10 | 武汉理工大学 | Bagging packaging method for poly vinyl chloride (PVC) pipe |
CN103101636A (en) * | 2013-01-24 | 2013-05-15 | 河南联塑实业有限公司 | Tubular product automatic packaging machine |
Also Published As
Publication number | Publication date |
---|---|
CN105314145A (en) | 2016-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105314145B (en) | A kind of efficient long material set bag sealer | |
CN202292243U (en) | Feeding and discharging device of light-emitting diode (LED) welding wire machine or die bonder | |
CN107031894B (en) | Double-station blanking press-in type fine dried noodle high-speed flat pocket bagging machine | |
CN105618835B (en) | Chip lug processing unit | |
CN105501553B (en) | A kind of device applied to double casing inner bag tying | |
CN106144378A (en) | Bottled medicament automatic medicine-dispensing device | |
CN110606231B (en) | Braided bag packing apparatus | |
CN105292582A (en) | Device for conveying bagged spring strings | |
CN106314880A (en) | Automatic transportation and temporary storage device and method for cigarette cases | |
CN108327983A (en) | Article vanning work station and article packing method | |
CN210526937U (en) | Sausage packaging machine | |
CN105336975B (en) | Battery end back side rubberizing paper equipment | |
CN206395515U (en) | A kind of automatic paper dividing dexter feeder for drawing-type facial tissue folding machine | |
CN103606709B (en) | Winding-type lithium battery polar group packaging device | |
CN105196337A (en) | Transverse dried bean curd dividing and cutting machine with automatic feeding and discharging functions | |
CN105329501A (en) | Automatic tubular product packing machine | |
CN105129122A (en) | Automatic toothpick bag packaging equipment | |
CN103287630B (en) | Row strip upright packing machine | |
CN211685876U (en) | Twine sticky tape and tie up packing apparatus | |
CN113232904A (en) | Filling and tail sealing machine and filling method for producing tramadol cream | |
CN104353895A (en) | Full-automatic pipe cutting machine with pipe feeding and discharging devices | |
CN109606808B (en) | Boxing device for cupped products | |
CN109941515A (en) | A kind of Thin film glove automatic packaging machine | |
CN206466236U (en) | A kind of packing apparatus of irregular strip cigarette | |
CN109436439A (en) | A kind of standard brick pallet-free packaging system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180420 |