CN105297714B - Bored concrete pile pile cover and stake integrative construction device and method - Google Patents

Bored concrete pile pile cover and stake integrative construction device and method Download PDF

Info

Publication number
CN105297714B
CN105297714B CN201510795964.4A CN201510795964A CN105297714B CN 105297714 B CN105297714 B CN 105297714B CN 201510795964 A CN201510795964 A CN 201510795964A CN 105297714 B CN105297714 B CN 105297714B
Authority
CN
China
Prior art keywords
concrete
stake
pile
template
backing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510795964.4A
Other languages
Chinese (zh)
Other versions
CN105297714A (en
Inventor
陈亚军
石金学
杜毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN201510795964.4A priority Critical patent/CN105297714B/en
Publication of CN105297714A publication Critical patent/CN105297714A/en
Application granted granted Critical
Publication of CN105297714B publication Critical patent/CN105297714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of bored concrete pile pile cover and stake integrative construction device, including spirit level, total powerstation and cross section are annular backing plate, annular backing plate is laid on around stake holes upper port, and it is socketed on whole reinforcement cage, whole reinforcement cage is arranged in stake holes, stake holes is axially coincident with whole reinforcement cage, whole reinforcement cage is divided into ground pile cover reinforcing bar and pile foundation under ground portion reinforcing bar two parts, whole reinforcement cage includes the tie hoop of the cage bar and a rhizosphere beam of one group of longitudinal arrangement in this group of cage bar, one group of slotted eye is formed with annular backing plate, coordinate with slotted eye and be provided with bolt, bolt is connected with the bolt hole in template, template and backing plate, whole reinforcement cage center superposition.Difficulty of construction of the present invention is small, has higher economic benefit and social environment benefit.

Description

Bored concrete pile pile cover and stake integrative construction device and method
Technical field
The present invention relates to a kind of improvement of LNG tank pile cover construction technology, especially a kind of bored concrete pile pile cover with Stake integrative construction device and method, belong to technical field of building construction.
Background technology
Large-scale low-temperature storage tank outer tank is designed as post-stress reinforced concrete structure, is typically maked somebody a mere figurehead by pore-creating filling pile Support, Pile Diameter are 1~1.5m, and quantity is 169~556, and overhead height is 0.76~1.75m.In pile foundation construction process In, delay because the uncertainty of underground situation frequently can lead to pile foundation construction progress, reasonable arrangement pile cover and storage tank cushion cap Smooth construction just turns into the key for ensureing project duration.In conventional liquefied natural gas(LNG)In project, such as Zhuhai, Ningbo Etc. ground LNG projects, construction technology is separated using stake and pile cover, i.e., pile driving construction complete after carry out earth excavation, broken pile Head and colligation pile cover reinforcing bar, then pile cover concreting is carried out, backfilling of earthwork is finally carried out, completes pile cover construction, this skill Art tedious process, manpower, material and plant equipment input are larger, cause construction cost high, project progress is slow, also add and raises Dirt, noise etc. pollute.
The content of the invention
It is an object of the invention to:In view of the above-mentioned problems of the prior art, propose a kind of bored concrete pile pile cover and stake one Body constructing device, while its construction method is given, pile cover working procedure can be reduced, improves operating efficiency, control construction Cost.
In order to reach object above, bored concrete pile pile cover of the invention is with stake integrative construction device basic technical scheme: Backing plate including spirit level, total powerstation and cross section for annular, the annular backing plate is laid on around stake holes upper port, and is covered It is connected on whole reinforcement cage, the whole reinforcement cage is arranged in stake holes, and the stake holes and whole reinforcement cage are axially coincident, by institute State whole reinforcement cage and be divided into ground pile cover reinforcing bar and pile foundation under ground portion reinforcing bar two parts, the whole reinforcement cage is indulged including one group The tie hoop of cage bar and a rhizosphere beam in this group of cage bar to arrangement;One group of slotted eye is formed with the annular backing plate, with institute State slotted eye cooperation and be provided with bolt, the bolt is connected with the bolt hole in template again, the template and backing plate, overall reinforcing bar Cage center superposition.
Preferably, the template includes the cylinder surrounded by side template, and interior casing, the interior casing are cased with outside the cylinder Upper and lower ends mouth there is the chimb that stretches out, and outer casing, inside and outside shield are provided between the chimb up and down of the interior casing Several ribs are provided between cylinder, one group of bolt hole being engaged with bolt is formed with the lower chimb of the interior casing.
Preferably, there is the breach being engaged with backing plate on the lower end periphery of the cylinder below interior casing.
Preferably, the upper chimb of the interior casing is formed with one group of lacing hole for supplying steel wire penetrating, and the lacing hole is with burying The bar connecting being located on stake holes surrounding ground.
Preferably, casing is buried in the stake holes, casting platform is installed on the ground around the stake holes, it is described Casting platform is mainly made up of several layers of support, is easy to concreting in lifts.
Bored concrete pile pile cover and the stake integral construction method of the present invention, successively including pile foundation under ground portion concrete construction, Concrete is superfilled, and conduit and casing are extracted, model sheetinstallat, pile cover concreting, form removable and concrete curing.
Wherein, the first step, pile foundation under ground portion concrete construction comprise the following steps:
(11)According to conventional pouring pile hole construction technology, ground construction obtains stake holes at the scene, and shield is buried in stake holes Cylinder;
(12)Stirrup is spirally wound in the cage bar of one group of longitudinal arrangement, and company is tied up in stirrup and cage bar intersection Connect, whole reinforcement cage is made, whole reinforcement cage is lifted and is fixed in stake holes, the whole reinforcement cage is axially heavy with stake holes Close, and whole reinforcement cage is divided into ground pile cover reinforcing bar and pile foundation under ground portion reinforcing bar;
(13)By the conduit that is arranged in stake holes into stake holes continuous pouring concrete, control filling during filling concrete The coefficient that is full of is more than 1.05;
Second step, concrete are superfilled:Continue to be irrigated after continuous pouring concrete to the upper port of casing into stake holes, Until concrete reaches estimated superfilled height, the estimated superfilled height is influx height and the conversion amount in stake footpath;Concrete reaches To after estimated superfilled height, remove superfilled concrete and recycled, to ensure that the concrete quality of stake holes top surface is qualified Free from admixture;It is expected that superfilled height be generally 0.8~1.0m, i.e., as a diameter of 1.2m of stake, superfilled side amount be equal to π × 0.62 × (0.8~1.0)㎡;
3rd step, conduit and casing are extracted:Onsite acceptance is carried out, meets to require in superfilled amount and stake top concrete is whole After fresh concrete, i.e. acceptance(check), conduit and casing are extracted, and clear up stake top concrete and top pile cover reinforcing bar;Test In the time receiving, stake top concrete for making test block is taken, test block meets that layout design intensity requirement is as qualified;
4th step, model sheetinstallat is carried out before stake top portion concrete initial set, comprised the following steps:
(41)Inside and outside casing is made, the upper and lower ends mouth of interior casing, which stretches out, is made chimb, in the lower chimb of interior casing On open one group of bolt hole, by inside and outside casing connect rear enclosure on the cylinder that side template surrounds, form template;
(42)By stake holes surrounding ground it is smooth it is closely knit after, annular backing plate is socketed in whole reinforcement cage and is laid on ground On, spirit level leveling backing plate and ground are used during laying, annular backing plate is used for the horizontal and vertical degree of Control architecture;
(43)By on the formwork hoisting assembled to the annular backing plate laid, and make template center and backing plate center, whole Body steel reinforcement cage center alignment, the bolt hole of template and the bolt being arranged in annular backing plate slotted eye are connected, by template and ring Shape backing plate connects as one;
(44) the orthogonal erection of total powerstation, the perpendicularity of measurement module are used, and the vertical of template is adjusted by bolt, backing plate Degree;
5th step, pile cover concreting:After installation form, ensure that stake top concrete is not yet pre-hardening, carry out pile cover and mix Solidifying soil pours;When pouring, casting platform is lifted into job site, and the continuous stratification casting concrete into template, layering is poured The concrete that two layers of contact surface need to be pointed to when building concrete carries out vibration compacting operation, makes upper and lower two layer concretes fully mixed Close.
Second step, concrete are superfilled, and pile foundation under ground portion continues casting concrete after completing concreting, by traditional work Need the concrete laitance of dabbing to overflow in advance in skill to clean out, save process, avoid top concrete because of slag inclusion clod, water The problems such as intensity can not meet caused by mud etc., while superfilled concrete out is ejected stake holes top surface, it is interior containing miscellaneous Matter, clean spade can be used by the wagon box of superfilled spade to small handcart, and be transported to need place progress again nearby Utilize, such as need facing for hardening to build place etc., avoid waste of resource, while protect site environment.Concrete is superfilled to be kept away Exempt from stake top and laitance occur, ensure the concrete quality of pile crown, effectively improve the bearing capacity of bored concrete pile, and can prevent conduit from pulling out When going out, whole reinforcement cage floats.In addition, superfilled is the concrete compaction for pile cover and stake junction, without impurity such as mud, Avoid pile cover from pouring rear junction and " broken pile " phenomenon, the transmission of influence power occur.In addition, it is directed to bored concrete pile, traditional thinking Exactly complete to carry out earth excavation, broken pile head, colligation pile cover reinforcing bar, formwork supporting plate, pour the processes such as pile cover concrete pouring, and The present invention is by reinforcing bar global formation, originally the pile crown abolished will be needed not solidify it also after concreting to ground Before clean out, then quick template supporting plate complete pile cover pour, it is therefore necessary to avoid concrete setting, prevent between pile body and pile cover Produce construction joint.
Four, the 5th step, the presetting period of concrete is made full use of, cleaning correction whole reinforcement cage, lays annular backing plate, The fixed prefabricated template of installation, and pile cover concreting is carried out before stake top portion concrete initial set.Must be under ground portion pile foundation Before the concrete initial set at top, complete backing plate laying, model sheetinstallat, pile cover concreting, the reinforcing of pile cover model sheetinstallat etc. and apply Work, otherwise after pile foundation concrete initial set, it is then not possible to which continuous concrete, pile cover cannot realize integrated construction with stake. The main function of backing plate is support shuttering, because bed die concrete does not solidify also, it is necessary to which a support platform ensures template Perpendicularity.Determined when the concrete initial set time can be by doing concrete mix early stage, ensureing that concrete is each On the premise of item performance, the proper extension concrete initial set time;Simultaneously on the premise of quality is ensured, model sheetinstallat is rapidly completed Deng work, so as to the covert extension concrete initial set time.If however, not yet before concrete initial set complete template installation, Dabbing need to be carried out to stake top concrete, as treatment of construction joints, then carry out follow-up pile cover construction.
Preferably, step(13)The concrete being pointed in filling process in the range of stake holes upper port depth below Carry out vibration compacting operation;In second step, when filling concrete to design stake top absolute altitude after, and stake top top have it is fresh During concrete, it is pointed to the concrete in the range of stake holes upper port depth below and carries out the closely knit operation of secondary vibration.Necessarily Depth value is 5 ± 1m.
Preferably, step(44)In, steel wire penetrating is first arranged on to the lacing hole of template surrounding, then with being embedded in stake holes Bar connecting on surrounding ground, it is easy to reinforcing template, then using the perpendicularity of total station survey template, and by turning spiral shell The perpendicularity of bolt and mobile backing plate fine-tuning template, while coordinate perpendicularity to adjust by the steel wire rope of elastic layback, finally reach To the purpose of the perpendicularity of adjustment template.
The bored concrete pile pile cover of the present invention with stake integral construction method is continued after pile foundation concreting to casing mouth Pour up to exposing fresh qualified concrete surface, then focus on the concrete of superfilled part, with making full use of pile foundation In the presetting period of lower part concrete, installation form is adjusted by annular backing plate, and carry out pile cover concreting, be rapidly completed Pile cover construction operation.The present invention has advantages below:
1. pile cover reinforcing bar is linked as whole reinforcement cage with pile foundation under ground portion reinforcing bar, and is lifted, traditional handicraft is eliminated In separately installed pile cover reinforcing bar process, improve operating efficiency;
2. it is capable of the horizontal and vertical degree of Control architecture well by annular backing plate, because storage tank load is larger, to stake Base requirement for bearing capacity is higher, pile cover perpendicularity and levelness control it is good, storage tank cushion cap load can is efficiently transferred to stake End;
3. earth excavation, broken pile head and the earthwork in traditional pile cover construction are eliminated using the cast-in-place pile construction method of the present invention The processes such as backfill, control construction cost, reduce the pollution such as noise, airborne dust;
4. the concrete of pair superfilled spilling is collected and recycled, the wasting of resources is avoided.In a word, present invention construction is difficult Spend small, there is higher economic benefit and social environment benefit.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is grout pile cap schematic diagram in the present invention.
Fig. 2 is the superfilled schematic diagram of concrete.
Fig. 3 is the structural representation of annular backing plate in the present invention.
Fig. 4 is the structural representation of template in the present invention.
Fig. 5 is model sheetinstallat schematic diagram.
Fig. 6 is pile cover concreting schematic diagram.
Fig. 7 is the filling pile structure schematic diagram that construction is completed.
Fig. 8 is Fig. 5 A to enlarged drawing.
In figure:1. pile foundation under ground portion reinforcing bar, 2. ground pile cover reinforcing bars, 3. cage bars, 4. cushion caps, 5. tie hoops, 6. apply Work is stitched, 7. whole reinforcement cages, 8. fresh concrete faces, 9. slotted eyes, 10. billets, chimb on 11., 12. times chimbs, in 13. Casing, 14. outer casings, 15. cylinders, 16. ribs, 17. steel wire ropes, 18. bolts, 19. casting platforms.
Embodiment
Embodiment one
The bored concrete pile pile cover of the present embodiment and stake integrative construction device, including spirit level, total powerstation and cross section are ring The billet 10 of shape, annular billet 10 is laid on around stake holes upper port, and is socketed on whole reinforcement cage 7, overall steel Muscle cage 7 is arranged in stake holes, and stake holes and whole reinforcement cage 7 are axially coincident, and whole reinforcement cage 7 is divided for the He of ground pile cover reinforcing bar 2 The two parts of pile foundation under ground portion reinforcing bar 1, whole reinforcement cage 7 include the rhizosphere beam of cage bar 3 and one of one group of parallel longitudinal arrangement at this Tie hoop 5 in group cage bar 3;The annular internal diameter of billet 10 is 1.2m, external diameter 1.5m, thickness 2cm, annular billet 10 On be formed with four slotted eyes 9(See Fig. 3), coordinate with slotted eye 9 and be provided with bolt 18, bolt 18 coordinates with the bolt hole on steel form and connected Connect, steel form and billet 10, the center superposition of whole reinforcement cage 7.Wherein steel form includes the cylinder 15 surrounded by side plate, cylinder Interior casing 13 is cased with outside 15, the upper and lower ends mouth of interior casing 13 has the chimb to stretch out, upper chimb 11 in interior casing, under Outer casing 14 is provided between chimb 12, several ribs 16 are provided between interior casing 13, outer casing 14, and under interior casing 13 Be formed with four bolts hole being engaged with bolt on chimb 12, cylinder 15, interior casing 13, the cross section of outer casing 14 to be circular or It is square, there is the breach being engaged with billet 10 on the lower end periphery of cylinder 15 positioned at the interior lower section of casing 13(See Fig. 4), separately The upper chimb 11 of casing 13 is formed with one group of lacing hole passed through for steel wire rope 17 in outer, and lacing hole is with being embedded in stake holes surrounding ground On bar connecting, the long 1m of reinforcing bar, top is welded with annulus.Casing is buried in stake holes, is provided with the ground around stake holes Casting platform 19, casting platform 19 are mainly made up of several layers of support, are easy to concreting in lifts.
Bored concrete pile pile cover and the stake integral construction method of the present invention, successively including pile foundation under ground portion concrete construction, Concrete is superfilled, and conduit and casing are extracted, and steel form installation, pile cover concreting, steel form is removed and concrete curing.
Wherein, the first step, pile foundation under ground portion concrete construction comprise the following steps:
(11)According to conventional pouring pile hole construction technology, ground construction obtains stake holes at the scene, and shield is buried in stake holes Cylinder;
(12)Tie hoop 5 is spirally wound in the cage bar 3 of one group of parallel longitudinal arrangement, and in tie hoop 5 and master Connection is tied up in the intersection of muscle 3, and whole reinforcement cage 7 is made, and whole reinforcement cage 7 is lifted and is fixed in stake holes, whole reinforcement cage 7 It is axially coincident with stake holes, and whole reinforcement cage 7 is divided into ground pile cover reinforcing bar 2 and pile foundation under ground portion reinforcing bar 1;
(13)By the conduit that is arranged in stake holes into stake holes continuous pouring concrete, and when controlling filling concrete Fullness coefficient is more than 1.05, and the concrete in the range of 5m is pointed to below stake holes upper port in filling process and carries out vibration compacting Operation.
Second step, as shown in Fig. 2 concrete is superfilled:Into stake holes after continuous pouring concrete to the upper port of casing not Conduit is extracted, continues perfusion until concrete reaches estimated superfilled height or exposes fresh qualified concrete surface 8, it is contemplated that Superfilled height is influx height(Generally 0.8~1.0m)With the conversion amount in stake footpath;After concrete reaches estimated superfilled height, clearly Except superfilled concrete and recycled, to ensure the qualified free from admixture of the concrete quality of stake holes top surface;Work as filling concrete To the stake top absolute altitude of design, and when stake top top has fresh concrete eight, stake holes upper port depth below is pointed to (5±1m)In the range of concrete carry out the closely knit operation of secondary vibration.
3rd step, conduit and casing are extracted:After onsite acceptance is qualified, conduit and casing are extracted, and clear up stake top coagulation Soil and top pile cover reinforcing bar.
4th step, steel shutterings dress is carried out before stake top portion concrete initial set, comprised the following steps:
(41)Casing 13, outer casing 14 in making, the upper and lower ends mouth of interior casing 13, which stretches out, is made chimb, protects inside One group of bolt hole is opened on the lower chimb 12 of cylinder 13, interior casing 13 is connected to the cylinder 15 that rear enclosure surrounds in side plate with outer casing 14 On, steel form is formed, the steel form that preassembling is completed is polished using polishing machine, removes surface rusty stain, and use finished product releasing agent Uniformly brush its surface;
(42)By the surrounding ground of stake holes upper port it is smooth it is closely knit after, annular billet 10 is socketed in whole reinforcement cage 7 And lay on the ground, use spirit level leveling billet 10 and ground during laying, annular billet 10 is for controlling steel form Horizontal and vertical degree;
(43)The steel form assembled is lifted to the annular billet 10 laid using truck crane, and makes steel form Center and the center of billet 10, the center alignment of whole reinforcement cage 7, the bolt hole of steel form is with being arranged on the annular slotted eye of billet 10 Bolt 18 in 9 is connected, and steel form and annular billet 10 are connected as one, while steel wire rope 17 is passed through and is arranged on The lacing hole of steel form surrounding, then the bar connecting with being embedded on stake holes surrounding ground, it is easy to reinforce steel form(See Fig. 5, figure 8);
(44) use the orthogonal erection of total powerstation, and by regulating bolt 18, the double-direction control steel form of billet 10 it is vertical Degree, i.e., detected using total powerstation, and the perpendicularity of steel form is adjusted by bottom bolts 18.
5th step, as shown in figures 1 to 6, pile cover concreting:After steel form is installed, ensure stake top concrete still It is not pre-hardening, carry out pile cover concreting;When pouring, casting platform 19 is lifted into by job site using truck crane, and to steel Continuous stratification casting concrete in template, need to be pointed to during concreting in lifts two layers of contact surface concrete vibrate it is close Practical operation is made, and is sufficiently mixed upper and lower two layer concretes.Vibrated concrete uses poker vibrator, and its vibrating spear is to upper and lower two Divide the contact surface of concrete fully to be vibrated, ensure that two parts concrete is sufficiently mixed up and down, in order to avoid forming layering, was vibrated Fast insert is pulled out slowly in journey, and vibrator keeps 10~20cm distance, collision free steel form with side form.Special messenger should be sent when pouring in addition Lower-layer concrete surface state is monitored, and records the time.
6th step, steel form are removed:According to the temperature condition after pile, punching block is removed between 36~72 hours after pile Plate;When steel form is removed, first the bolt 18 of fixed steel form and steel wire rope 17 are unclamped, then uniformly applied in the both sides of steel form Power, steel form is set to depart from pile body naturally, billet 10 and steel form are removed in finally cleaning.
7th step, concrete curing:After removing steel form, exposed pile body is carried out to pour water process, to keep its humidity, Exposed pile body is wrapped up after watering using plastic sheeting.Need to inspect periodically the humidity in plastic sheeting during maintenance.
Finally the top of cage bar 3 of whole reinforcement cage is bent(See Fig. 7).
In addition to the implementation, the present invention can also have other embodiment.It is all to be formed using equivalent substitution or equivalent transformation Technical scheme, fall the protection domain in application claims.

Claims (8)

1. a kind of bored concrete pile pile cover and stake integral construction method, it is characterized in that, successively including pile foundation under ground portion coagulation soil application Work, concrete is superfilled, and conduit and casing are extracted, model sheetinstallat, pile cover concreting, form removable and concrete curing,
Wherein, the first step, pile foundation under ground portion concrete construction comprise the following steps:
(11) ground construction obtains stake holes at the scene, and casing is buried in stake holes;
(12) stirrup is spirally wound in the cage bar of one group of longitudinal arrangement, and ties up and be connected with cage bar intersection in stirrup, made Whole reinforcement cage to be made, whole reinforcement cage is lifted and is fixed in stake holes, the whole reinforcement cage and stake holes are axially coincident, and Whole reinforcement cage is divided into ground pile cover reinforcing bar and pile foundation under ground portion reinforcing bar;
(13) by the conduit that is arranged in stake holes into stake holes continuous pouring concrete, it is and full when controlling filling concrete Coefficient is more than 1.05;
Second step, concrete are superfilled:Continue to be irrigated after continuous pouring concrete to the upper port of casing into stake holes, until Concrete reaches estimated superfilled height, and the estimated superfilled height is influx height and the conversion amount in stake footpath;Concrete reaches pre- After counting superfilled height, superfilled concrete is removed;
3rd step, conduit and casing are extracted:Onsite acceptance is carried out, meets to require in superfilled amount and stake top concrete is all new After fresh concrete, conduit and casing are extracted, and clear up stake top concrete and top pile cover reinforcing bar;
4th step, model sheetinstallat is carried out before stake top portion concrete initial set, comprised the following steps:
(41) inside and outside casing is made, the upper and lower ends mouth of interior casing, which stretches out, is made chimb, is opened on the lower chimb of interior casing One group of bolt hole, inside and outside casing is connected into rear enclosure on the cylinder that side template surrounds, forms template;
(42) by stake holes surrounding ground it is smooth it is closely knit after, by annular backing plate be socketed in whole reinforcement cage and lay on the ground, paving If when use spirit level leveling backing plate and ground;
(43) by the formwork hoisting assembled to the annular backing plate laid, and template center and backing plate center, overall steel are made Muscle cage center alignment, the bolt hole of template and the bolt being arranged in annular backing plate slotted eye are connected, by template and air ring Plate connects as one;
(44) the orthogonal erection of total powerstation, the perpendicularity of measurement module are used, and passes through bolt, the perpendicularity of backing plate adjustment template;
5th step, pile cover concreting:After installation form, ensure that stake top concrete is not yet pre-hardening, carry out pile cover concrete Pour;When pouring, casting platform is lifted into job site, and the continuous stratification casting concrete into template, placement layer by layer mixes The concrete that two layers of contact surface need to be pointed to when solidifying native carries out vibration compacting operation, is sufficiently mixed upper and lower two layer concretes.
2. bored concrete pile pile cover and stake integral construction method according to claim 1, it is characterized in that, step (13), irrigating During be pointed to concrete in the range of stake holes upper port depth below and carry out vibration compacting operation;In second step, when After filling concrete to the stake top absolute altitude designed, and when stake top top has fresh concrete, it is pointed under stake holes upper port Concrete in the range of square certain depth carries out the closely knit operation of secondary vibration.
3. bored concrete pile pile cover and stake integral construction method according to claim 1, it is characterized in that, in step (44), first will Steel wire penetrating is arranged on the lacing hole of template surrounding, then the bar connecting with being embedded on stake holes surrounding ground, is easy to reinforce Template, then using the perpendicularity of total station survey template, and by turning the perpendicularity of bolt and mobile backing plate fine-tuning template, Perpendicularity is coordinated to adjust by the steel wire rope of elastic layback simultaneously.
4. according to the bored concrete pile pile cover that any one of claims 1 to 3 methods described uses and stake integrative construction device, its feature It is, including spirit level, total powerstation and cross section are the backing plate of annular, the annular backing plate is laid on around stake holes upper port, And be socketed on whole reinforcement cage, the whole reinforcement cage is arranged in stake holes, and the stake holes and whole reinforcement cage are axially coincident, The whole reinforcement cage is divided into ground pile cover reinforcing bar and pile foundation under ground portion reinforcing bar two parts, the whole reinforcement cage includes one Tie hoop of the cage bar and a rhizosphere beam of group longitudinal arrangement in this group of cage bar;One group of slotted eye is formed with the annular backing plate, Coordinate with the slotted eye and be provided with bolt, the bolt is connected with the bolt hole in template, the template and backing plate, overall steel Muscle cage center superposition.
5. bored concrete pile pile cover and stake integrative construction device according to claim 4, it is characterized in that, the template is included by side The cylinder that template surrounds, the cylinder are cased with interior casing outside, and the upper and lower ends mouth of the interior casing has the chimb to stretch out, And outer casing is provided between the chimb up and down of the interior casing, several ribs, the interior casing are provided between inside and outside casing Lower chimb on be formed with one group of bolt hole being engaged with bolt.
6. bored concrete pile pile cover and stake integrative construction device according to claim 5, it is characterized in that, in the lower end of the cylinder There is the breach being engaged with backing plate on periphery below interior casing.
7. bored concrete pile pile cover and stake integrative construction device according to claim 5, it is characterized in that, the interior casing it is convex While it is formed with one group of lacing hole for supplying steel wire penetrating, the lacing hole and the bar connecting being embedded on stake holes surrounding ground.
8. bored concrete pile pile cover and stake integrative construction device according to claim 4, it is characterized in that, shield is buried in the stake holes Cylinder, is provided with casting platform, the casting platform is mainly made up of several layers of support, is easy on the ground around the stake holes Concreting in lifts.
CN201510795964.4A 2015-11-18 2015-11-18 Bored concrete pile pile cover and stake integrative construction device and method Active CN105297714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510795964.4A CN105297714B (en) 2015-11-18 2015-11-18 Bored concrete pile pile cover and stake integrative construction device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510795964.4A CN105297714B (en) 2015-11-18 2015-11-18 Bored concrete pile pile cover and stake integrative construction device and method

Publications (2)

Publication Number Publication Date
CN105297714A CN105297714A (en) 2016-02-03
CN105297714B true CN105297714B (en) 2018-03-23

Family

ID=55195477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510795964.4A Active CN105297714B (en) 2015-11-18 2015-11-18 Bored concrete pile pile cover and stake integrative construction device and method

Country Status (1)

Country Link
CN (1) CN105297714B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476295A (en) * 2016-06-08 2017-12-15 宜兴市周铁镇生力钻探机械厂 A kind of Concrete Grouting Pale technique
CN106498938B (en) * 2016-10-26 2019-05-21 重庆大学 A kind of application method of cast-in-place concrete pile head shaping equipment
CN106677178A (en) * 2016-11-25 2017-05-17 上海市基础工程集团有限公司 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile
CN107938675A (en) * 2017-11-30 2018-04-20 中南勘察基础工程有限公司 A kind of Vertical spots concrete placings technique and device
CN109989395B (en) * 2019-04-16 2024-02-06 中海石油气电集团有限责任公司 Large storage tank filling pile assembled pile cap and construction method thereof
CN110552347A (en) * 2019-10-14 2019-12-10 中国电建集团贵州工程有限公司 Pile foundation construction template tool
CN110805040A (en) * 2019-10-24 2020-02-18 中铁十六局集团地铁工程有限公司 Device and method for pre-treatment of super-cast concrete of underwater cast-in-situ bored pile
CN111877330B (en) * 2020-09-04 2024-07-12 中铁建设集团有限公司 U-shaped round steel pipe template system of hole digging annular foundation pile and construction method
CN113684785B (en) * 2021-08-23 2023-06-16 中交(天津)疏浚工程有限公司 Construction process of pile foundation wharf
CN114808942A (en) * 2022-01-27 2022-07-29 海洋石油工程股份有限公司 Integrated pile-forming winter construction method for LNG storage tank
CN114922132B (en) * 2022-05-19 2023-07-14 中交第二航务工程局有限公司 Construction method for upper structure of high pile wharf based on combined inclined piles

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3564669B2 (en) * 1994-07-20 2004-09-15 東急建設株式会社 Reinforcement spacer and foundation pile method
CN100494581C (en) * 2006-09-26 2009-06-03 华北建设集团有限公司 Pipe pile hole maker with concrete bottom sealing, pipe cover and wings and construction process thereof
CN202430753U (en) * 2011-11-30 2012-09-12 中国核工业华兴建设有限公司 Prefabricated steel pipe column for static load detection of cast-in-place pile
CN202672172U (en) * 2012-06-29 2013-01-16 上海建工二建集团有限公司 Pile cap node of embedded ground-source heat pump tube of filling pile
CN203514315U (en) * 2013-08-06 2014-04-02 江苏翔森建设工程有限公司 Reinforced connecting structure between pile and pile cap
CN204676886U (en) * 2015-05-05 2015-09-30 杨华 House column apparatus for pouring
CN205188950U (en) * 2015-11-18 2016-04-27 中国核工业华兴建设有限公司 Bored concrete pile pile cover and stake integrated construction device

Also Published As

Publication number Publication date
CN105297714A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105297714B (en) Bored concrete pile pile cover and stake integrative construction device and method
CN104074199B (en) Underwater bearing platform construction method
CN106346595A (en) Vertical molding mold and system and application method for concrete utility tunnel
CN101691751B (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN106869172A (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN108505805B (en) Large cast-in-situ water pool with expansion reinforcing belt for crack control and construction method thereof
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN103410139B (en) Foundation ditch narrow zone backfill densification process
CN104775447B (en) Composite base framework used for power transmission tower in steep mountainous area and construction technology thereof
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN109736354A (en) Tunnel open excavation section main structure construction method
CN106182359A (en) The concrete list storehouse horizontal mould of pipe gallery, system and piping lane molding methods
WO2021097863A1 (en) Swirl pool construction method employing semi-reverse construction
CN106869548A (en) A kind of newel framework assembled underground parking structural system and construction method
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN109680671A (en) A kind of liquefaction foundation treatment method based on building waste
CN110485218A (en) It is a kind of to help wide construction method for railway bed
CN106436732A (en) Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
CN109706952A (en) Large-scale well-sinking construction method
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN105862897B (en) Sandy Silt ground shallow foundation original groove pouring construction engineering method
CN104947853B (en) A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method
CN109137990A (en) A kind of prefabricated cushion cap of land delay-pour joint sectional type and its production and installation method
CN205188950U (en) Bored concrete pile pile cover and stake integrated construction device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant