CN105297582A - Construction method of non-slip floor - Google Patents

Construction method of non-slip floor Download PDF

Info

Publication number
CN105297582A
CN105297582A CN201510670901.6A CN201510670901A CN105297582A CN 105297582 A CN105297582 A CN 105297582A CN 201510670901 A CN201510670901 A CN 201510670901A CN 105297582 A CN105297582 A CN 105297582A
Authority
CN
China
Prior art keywords
ground
brushing
floor
construction method
slip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510670901.6A
Other languages
Chinese (zh)
Inventor
汪柏川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Qunli Non Slip Material Co Ltd
Original Assignee
Suzhou Qunli Non Slip Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Qunli Non Slip Material Co Ltd filed Critical Suzhou Qunli Non Slip Material Co Ltd
Priority to CN201510670901.6A priority Critical patent/CN105297582A/en
Publication of CN105297582A publication Critical patent/CN105297582A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The invention discloses a construction method of a non-slip floor. The construction method comprises the steps of (1) cleaning the floor with detergent or an acid solvent to obtain a clean floor; (2) brushing the floor with a slip proofing agent for a plurality of times under the condition that the floor is guaranteed to be dry, wherein the time interval between every two times of brushing is 3-5 minutes; the slip proofing agent is maintained to be wet during each brushing process; and brushing is supplemented timely if partial slip proofing agent becomes dry; and (3) after brushing, washing the floor with water to obtain the non-slip floor. According to the construction method of the non-slip floor provided by the invention, through the manner, the construction is simple, the trouble of long-time on-site construction is solved, the construction period is shortened, and the working efficiency is improved, so that the overall construction cost is reduced; the popularization is facilitated; the construction method can be widely applied to floors of pedestrian overcrossings, stairs, escalators, and the like; and the requirements of people on safety, health and environmental protection are met.

Description

The construction method that a kind of ground is anti-skidding
Technical field
The present invention relates to anti-skidding construction field, particularly relate to the construction method that a kind of ground is anti-skidding.
Background technology
Anti-slip material is now concerning no longer strange people, and in pedestrian overcrossing, stadium, offshore platforms, naval vessel is dull and stereotyped, pontoon bridge is first-class all can see abrasive floor.Skid resistance is the essential characteristic of anti-slip material, is a kind of property that film has.Adopt the place of anti-slip material, can prevent personnel to slip tumble injury, ground also can be protected not to be damaged.The exploitation of anti-slip material have had history for many years, are generally to mix with hard and large particle in resin, as quartz sand or the similar item of cheapness.Present anti-slip material is varied, but well cannot be applied to and ground is carried out anti-skidding, and skidproof effect is bad.
Summary of the invention
The technical problem that the present invention mainly solves is to provide the anti-skidding construction method in a kind of ground, can obtain the extraordinary ground of skidproof effect.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide the construction method that a kind of ground is anti-skidding, comprising step is: (1) is cleaned ground with liquid detergent or acid flux material, obtains clean ground; (2) guarantee that described ground is dry, repeatedly brush with antilubricant to described ground, the time interval of each brushing is 3-5 minute, keeps antilubricant moistening in each painting process, if occurring locally to become dry mends brush in time; (3) brushing washes clean ground with water after terminating, and obtains non-slip floor.
In a preferred embodiment of the present invention, described in step (2), the instrument of brushing is brush, cylinder or mop.
In a preferred embodiment of the present invention, described in step (2), the number of times of brushing is 3-4 time.
In a preferred embodiment of the present invention, the ponding in step (3) behind water cleaning ground absorbs with dust catcher.
The invention has the beneficial effects as follows: the construction method that ground of the present invention is anti-skidding, construction is simple, solve the puzzlement of on-the-spot long-time construction operation, can the reduction of erection time, increase work efficiency, thus saved whole construction cost, be convenient to promote, can be widely applied on the ground such as pedestrian overcrossing, stair, escalator, meet the demand of people to safety, health and environmental protection.
Detailed description of the invention
Be clearly and completely described to the technical scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
The embodiment of the present invention comprises:
The construction method that ground is anti-skidding, comprising step is:
(1) with liquid detergent or acid flux material, ground is cleaned, obtain clean ground;
(2) guarantee that described ground is dry, with antilubricant, described ground is repeatedly brushed, the time interval of each brushing is 3-5 minute, keep antilubricant moistening in each painting process, if there is local exsiccation to mend brush in time, the instrument of described brushing can adopt brush, cylinder or mop, as required, generally the number of times of described brushing is controlled at 3-4 time;
(3) brushing washes clean ground with water after terminating, and the ponding dust catcher behind water cleaning ground is absorbed, and obtains non-slip floor.
The invention has the beneficial effects as follows:
One, construction is simple, solves the puzzlement of on-the-spot long-time construction operation;
Two, can the reduction of erection time, increase work efficiency, thus saved whole construction cost, be convenient to promote;
Three, can be widely applied on the ground such as pedestrian overcrossing, stair, escalator, meet the demand of people to safety, health and environmental protection.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.

Claims (4)

1. the construction method that ground is anti-skidding, is characterized in that, comprises step to be: (1) is cleaned ground with liquid detergent or acid flux material, obtains clean ground; (2) guarantee that described ground is dry, repeatedly brush with antilubricant to described ground, the time interval of each brushing is 3-5 minute, keeps antilubricant moistening in each painting process, if occurring locally to become dry mends brush in time; (3) brushing washes clean ground with water after terminating, and obtains non-slip floor.
2. the construction method that ground according to claim 1 is anti-skidding, is characterized in that, described in step (2), the instrument of brushing is brush, cylinder or mop.
3. the construction method that ground according to claim 1 is anti-skidding, is characterized in that, described in step (2), the number of times of brushing is 3-4 time.
4. the construction method that ground according to claim 1 is anti-skidding, is characterized in that, the ponding in step (3) behind water cleaning ground absorbs with dust catcher.
CN201510670901.6A 2015-10-19 2015-10-19 Construction method of non-slip floor Pending CN105297582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510670901.6A CN105297582A (en) 2015-10-19 2015-10-19 Construction method of non-slip floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510670901.6A CN105297582A (en) 2015-10-19 2015-10-19 Construction method of non-slip floor

Publications (1)

Publication Number Publication Date
CN105297582A true CN105297582A (en) 2016-02-03

Family

ID=55195351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510670901.6A Pending CN105297582A (en) 2015-10-19 2015-10-19 Construction method of non-slip floor

Country Status (1)

Country Link
CN (1) CN105297582A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108485601A (en) * 2018-03-07 2018-09-04 上海安众达地面防滑工程技术有限公司 A kind of ground antilubricant
CN108972852A (en) * 2018-08-10 2018-12-11 佛山东鹏洁具股份有限公司 A kind of the anti-slip material coating system and coating method of anti-skid brick

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018230A (en) * 1996-07-08 1998-01-20 Maruki:Kk Self-traveling type working carriage
JP2007182728A (en) * 2006-01-10 2007-07-19 Nippon Steel Engineering Co Ltd Construction method of bridge, and side floor slab mounting device for bridge
CN203654635U (en) * 2013-12-25 2014-06-18 中国建筑第四工程局有限公司 Stair step external corner and anti-slip strip construction tool

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018230A (en) * 1996-07-08 1998-01-20 Maruki:Kk Self-traveling type working carriage
JP2007182728A (en) * 2006-01-10 2007-07-19 Nippon Steel Engineering Co Ltd Construction method of bridge, and side floor slab mounting device for bridge
CN203654635U (en) * 2013-12-25 2014-06-18 中国建筑第四工程局有限公司 Stair step external corner and anti-slip strip construction tool

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
魏劲松等: "地下车库大面积地坪环氧无溶剂自流平漆面施工技术", 《建筑施工》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108485601A (en) * 2018-03-07 2018-09-04 上海安众达地面防滑工程技术有限公司 A kind of ground antilubricant
CN108972852A (en) * 2018-08-10 2018-12-11 佛山东鹏洁具股份有限公司 A kind of the anti-slip material coating system and coating method of anti-skid brick

Similar Documents

Publication Publication Date Title
CN104652838B (en) A kind of maintaining method of building stone surface
CN105297582A (en) Construction method of non-slip floor
CN108343213A (en) A kind of underground parking garage epoxy resin mortar abrasion-proof terrace and construction method
CN104405170A (en) Using method of composite penetration protection reinforcing material
CN103321447B (en) Method for repairing metal fluorocarbon paint outer wall coating defects
CN104789117A (en) Concrete surface protection nano paint and manufacturing technique thereof
CN102900004A (en) Vibration-free anti-slip lane and construction method thereof
CN102349739A (en) Tying-type water-spray soft hairbrush
CN202243381U (en) Folding portable spray-suction type car washer
KR100527819B1 (en) Method for repairing elastic floor material using waste urethane powder or waste rubber powder
CN206487171U (en) A kind of repairing structure of mattess frostbite
CN108485601A (en) A kind of ground antilubricant
CN113817376A (en) Water-soluble equipment protective film solution and preparation method thereof
CN106007798A (en) Use method of cement-based permeable hardener
CN202243382U (en) Water-spraying car washing device
KR101407360B1 (en) method for repairing section of concrete structures
CN109610608A (en) A kind of cable duct water-proof skid-proof construction method
CN202882348U (en) Restoring structure used for restoring terrazzo flooring
CN202875237U (en) Automatic cleaning machine for high-altitude walls
KR102382921B1 (en) Method Of Removing Paint From Bridge Structure And Paint Remover Applied Thereto
CN106701328A (en) Wipe-free cleaning solution and preparation method thereof
CN114165068A (en) Construction process of ground anti-slip agent
CN207929622U (en) A kind of brush rotary type saw blade cleaning equipment
CN115748519A (en) Road and bridge construction maintenance technology
CN106759113A (en) Construction method of anti-impact and wear-resistant protective coating for high-speed water flow building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication