CN105275309B - Door/window auxiliary frame and application method thereof - Google Patents
Door/window auxiliary frame and application method thereof Download PDFInfo
- Publication number
- CN105275309B CN105275309B CN201510777171.XA CN201510777171A CN105275309B CN 105275309 B CN105275309 B CN 105275309B CN 201510777171 A CN201510777171 A CN 201510777171A CN 105275309 B CN105275309 B CN 105275309B
- Authority
- CN
- China
- Prior art keywords
- auxiliary frame
- frame
- window
- screw
- deckle board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
Abstract
The invention provides a door/window auxiliary frame, which comprises an upper frame plate, a lower frame plate, a left frame plate and a right frame plate, wherein the four frame plates are connected together. A corner formed between the two ends of each frame plate is in the form of an oblique angle with the cutting angle thereof to be 45 degrees. Adjacent frame plates are connected through the welding process. Inside each frame plate, a longitudinal slot is arranged to extend along the length direction of the frame plate. A right angle-shaped connector is inserted into the longitudinal slots of adjacent frame plates and the connector is provided with inverted teeth. The frame plates are the same in cross-sectional area. The middle part of the cross section of each frame plate is provided with a reinforcing rib and a longitudinal slot and the reinforcing rib is connected with a fixed sheet via a screw. The fixed sheet is connected with a wall body via an expansion bolt. The two sides of the cross section of each frame plate are respectively provided with a fixing slot. The lower side of the cross section of each frame plate is provided with a buckle for being connected with the fixed sheet. The application method comprises the steps of assembling the auxiliary frame, connecting the auxiliary frame with the wall body, and connecting the auxiliary frame with a door/window.
Description
Technical field
The present invention relates to a kind of install the door and window auxiliary frame and using method used during building doors and windows.
Background technology
Building energy consumption accounts for 1/3rd of social total energy consumption, and the 30% of building energy consumption or so is relevant with door and window, with
The continuous improvement that the popularization of national Building Energy Conservation Policy and construction quality are required, people it is also proposed more and more higher to building doors and windows
Requirement.In order to improve erection of doors and windows quality, unit in charge of construction progressively installs to replace conventional mounting arrangements using dry method, i.e.,
Auxiliary frame is installed in wall hole first during civil engineering, again by erection of doors and windows in auxiliary frame after civil engineering terminates.Dry method is pacified
Dress can improve door and window stress, it is to avoid door and window occurs being stained because of civil engineering impact, scratches, but, due to original
The operation for installing auxiliary frame is increased in mounting means so that the erection of doors and windows time increases significantly.Additionally, auxiliary frame makes door and window and body of wall
Between gap be changed into two from one, reduce the sealing and heat insulating ability of door and window, infiltration, knot during use, easily occur
The phenomenons such as dew.
The content of the invention
Wasted time and energy to solve existing auxiliary frame when in use, sealing, the problem of heat insulating ability difference, the present invention provides a kind of
It is easy to use, and the door and window auxiliary frame and its using method of sealing property and heat-insulating property between door and window and body of wall can be improved.
A kind of door and window auxiliary frame of the present invention, its main body are connected and composed by upper deckle board, lower frame plate, left frame plate, right deckle board,
The two ends of each described deckle board are cut into the oblique angle that angle is 45 degree, and by being welded to connect between adjacent deckle board, its feature exists
In:There is the cannelure that the length direction along deckle board extends in described deckle board, the connector of square inserts adjacent deckle board
Cannelure, has pawl on described connector;Described deckle board has identical cross section, has and add in the middle part of described cross section
Strong muscle and described cannelure, reinforcement are connected by screw stator, and stator is by expansion bolt connecting wall, described
Respectively there is a fixing groove both sides of cross section, have the buckle for the piece that is connected on the downside of described cross section;Described deckle board
Filled and process material in interior cannelure.
Further, described deckle board is processed by the raw material Jing conical double screw extruders of following mass fraction:PVC trees
100 parts of fat, PVC stabilizer 3-5 part, wood powder 10-40 parts, activated Calcium carbonate 5-30 parts, CPE modifying agent 4-10 parts, propylene
Acids processing aid 0.2-2 parts.
Further, screw is connected between described connector and its deckle board for inserting, have enhancing steel disc inside connector.
Further, injecting glue groove and the first screw position line, described fixing groove are designed with the upside of described cross section
Inside there is the second screw position line, on the downside of cross section, have the 3rd screw position line of the screw for the piece that is connected.
Preferably, the outer surface of four pieces of deckle boards is through blasting treatment, with rough microstructure.
The using method of door and window auxiliary frame of the present invention, is characterized in that:The using method is comprised the following steps:
(1) auxiliary frame assembling;By right after filled and process material in upper deckle board, lower frame plate, left frame plate, the cannelure of right deckle board
Should be related to and be placed in level table, after the junction insertion connector of adjacent two boards, be welded to connect with Welding plate.Weldering
After the auxiliary frame for connecting cools down 10-20 minutes at room temperature, overlap is cleared up, and the second spiral shell in the fixing groove of auxiliary frame
Connector screw is vertically squeezed in nail position line, connector screw is fixed connector through the screw pilot hole on connector
In auxiliary frame;
(2) auxiliary frame and wall connecting;Stator screw is squeezed into vertically in the 3rd screw position line of auxiliary frame first, will plating
Zinc steel stator is fixed on the reinforcement of auxiliary frame;Subsequently auxiliary frame is temporarily fixed in body of wall reserved opening, to attached with timber wedge
After frame position is adjusted, stator is fixed on body of wall with expansion bolt;Finally with cement mortar by auxiliary frame and body of wall
Gap fills up, and removes timber wedge, then fill up the gap vacated with cement mortar after cement mortar solidification;
(3) auxiliary frame is connected with door and window;After civil engineering is finished, door and window is temporarily fixed in auxiliary frame with timber wedge, treats position
Put after being adjusted in place, fabrication hole is bored on window frame, window frame is fixed in auxiliary frame through fabrication hole with screw, and use technique port lid
Fabrication hole is sealed;The subsequently filling-foam agent in gap of the auxiliary frame with door and window, and any excess foam is cut with perching knife;Finally remove
The gap vacated is filled up by timber wedge with foaming agent, and injecting glue is sealed at the auxiliary frame injecting glue groove with fluid sealant.
The invention has the beneficial effects as follows:
(1) main body of auxiliary frame of the present invention is made up of the low wood plastic composite of heat conductivity, possesses good workability
Also there is while energy relatively low heat conductivity, the heat-insulating property of auxiliary frame can be strengthened;
(2) main body of auxiliary frame of the present invention is hollow-structure sheets, during assembling inside filled and process material, can strengthen attached
The heat-insulating property of frame;
(3) auxiliary frame of the present invention is designed with fixing groove and buckle, can mutually be halved together with wall body structure, strengthen auxiliary frame with
Sealing property between body of wall;
(4) auxiliary frame of the present invention is designed with injecting glue groove, physics interlocking is formed with fluid sealant, can strengthen door and window after injecting glue
Sealing property between auxiliary frame;
(5) auxiliary frame of the present invention is designed with screw position line at the position for needing drivescrew, can remove from during processing
Manual measurement is found accurately, time saving and energy saving, screw can also be play the guiding role, it is to avoid train off;
(6) auxiliary frame of the present invention is designed with reinforcement at the 3rd screw position line, while auxiliary frame intensity is increased,
The nail-holding ability of stator screw can also be increased;
(7) auxiliary frame of the present invention using be welded to connect ensure seam crossing sealing property while, also internally insert
Enter connector to be threadedly coupled, further enhancing bonding strength;
(8) stud connector design of the present invention has pawl, facilitates insertion into;Screw pilot hole is designed with, it is convenient to fix;It is internal
There is enhancing steel disc, bonding strength can be improved;
(9) outer surface of auxiliary frame of the present invention, can be strengthened with rough microstructure through blasting treatment
With foaming agent and the adhesion of cement mortar, the sealing property of auxiliary frame is further enhanced.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is auxiliary frame upper plate of the present invention, auxiliary frame lower plate, auxiliary frame left plate, the cross-sectional view of auxiliary frame right panel.
Fig. 3 is connecting-piece structure schematic diagram.
Fig. 4 is attachment structure schematic diagram between auxiliary frame difference plate.
Fig. 5 is auxiliary frame and window frame, connecting structure of wall schematic diagram.
Deckle board on 1. in figure, 2. lower frame plate, 3. left frame plate, 4. right deckle board, 5. the first screw position line, 6. injecting glue groove, 7.
Fixing groove, 8. the second screw position line, 9. buckle, 10. the 3rd screw position line, 11. reinforcements, 12. connectors, 13. screws
Location hole, 14. pawls, 15. stator screws, 16. stators, 17. expansion bolts, 18. screws, 19. technique port lids, 20.
Infusion, 21. fluid sealants, 22. window frames, 23. foamed materialss.
Specific embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, auxiliary frame of the present invention be rectangular box, main body by upper deckle board 1, lower frame plate 2, left frame plate 3,
Right deckle board 4 is constituted, and every piece of plate two ends are cut into the oblique angle that angle is 45 degree;Each deckle board has identical cross section, cross section
Upside is designed with the first screw position line 5 and injecting glue groove 6, and on the left of cross section, right side is designed with fixing groove 7 and the second screw is positioned
Line 8, is designed with buckle 9 and the 3rd screw position line 10, reinforcement 11 is designed with the inside of cross section on the downside of cross section.Institute of the present invention
The outer surface of auxiliary frame is stated through blasting treatment, with rough microstructure, can be strengthened and foaming agent 20 and cement bonded sand
The adhesion of slurry.
As shown in figure 3, connector of the present invention 12 is square plastic injection piece, during injection, internally pre-buried steel disc increases
By force, exterior design has screw pilot hole 13 and pawl 14, is easy to assembly and connection.
As shown in Figure 4, Figure 5, auxiliary frame of the present invention is in assembling, the filled and process material first in the cannelure of each deckle board
Material 23, and in the junction insertion connector 12 of adjacent two boards, be subsequently welded to connect with Welding plate.It is to be welded to connect
After auxiliary frame cools down 10-20 minutes at room temperature, the overlap to weld is cleared up, and in the second screw position line 8 of auxiliary frame
On vertically squeeze into connector screw, make connector screw through the screw pilot hole 13 on connector 12, connector be fixed on
In auxiliary frame.
As shown in figure 5, the auxiliary frame for assembling can be attached with body of wall after wall hole molding in advance, treat that civil engineering is applied
After work thoroughly terminates, then door and window is attached with auxiliary frame, civil engineering so just can be avoided to be stained door and window, while can also avoid
Civil engineering and erection of doors and windows crossed construction, mutually keep in check.When auxiliary frame is with wall connecting, the 3rd screw first in auxiliary frame is positioned
Stator screw 15 is vertically squeezed on line 10, galvanized steel stator 16 is fixed on the reinforcement 11 of auxiliary frame;Timber wedge is used subsequently
Auxiliary frame is temporarily fixed in body of wall reserved opening, it is after being adjusted to auxiliary frame position, stator 16 is solid with expansion bolt 17
It is scheduled on body of wall;Finally the gap between auxiliary frame and body of wall is filled up with cement mortar, timber wedge is removed after cement mortar solidification, then
The gap vacated is filled up with cement mortar.When auxiliary frame is connected with door and window, first door and window is temporarily fixed in auxiliary frame with timber wedge, is treated
After position adjustment in place, fabrication hole is bored on window frame, window frame 22 is fixed in auxiliary frame through fabrication hole with screw 18, and recruitment
Fabrication hole is sealed by skill port lid 19;The subsequently filling-foam agent 20 in gap of the auxiliary frame with window frame 22, and cut with perching knife it is unnecessary
Foam;Timber wedge is finally removed, the gap vacated is filled up with foaming agent, and injecting glue enters at the auxiliary frame injecting glue groove 6 with fluid sealant 21
Row sealing.
Above-described embodiment be only by describing the illustration lifted of the present invention, rather than the restriction to embodiment in detail, it is every according to
According to any simple modification, equivalent variations and modification that the technical spirit of the present invention is made to above example, the present invention is each fallen within
Protection domain in.
Claims (5)
1. a kind of door and window auxiliary frame, its main body are connected and composed by upper deckle board, lower frame plate, left frame plate, right deckle board, each described deckle board
Two ends be cut into the oblique angle that angle is 45 degree, by being welded to connect between adjacent deckle board, it is characterised in that:In described deckle board
There is the cannelure that the length direction along deckle board extends, the connector of square inserts the cannelure of adjacent deckle board, described company
There is pawl on fitting;Described deckle board has identical cross section, has reinforcement and described vertical in the middle part of described cross section
To groove, reinforcement is connected by screw stator, and, by expansion bolt connecting wall, the both sides of described cross section are each for stator
There is a fixing groove, on the downside of described cross section, have the buckle for the piece that is connected;Fill out in cannelure in described deckle board
Fill foamed materialss;
Described deckle board is processed by the raw material Jing conical double screw extruders of following mass fraction:100 parts of polyvinyl chloride resin, PVC
Stabilizer 3-5 parts, wood powder 10-40 parts, activated Calcium carbonate 5-30 parts, CPE modifying agent 4-10 parts, acrylic processing aid
0.2-2 parts.
2. a kind of door and window auxiliary frame as claimed in claim 1, it is characterised in that:Between described connector and its deckle board for inserting
Screw is connected with, inside connector, has enhancing steel disc.
3. door and window auxiliary frame according to claim 2, is characterized in that:Injecting glue groove and are designed with the upside of described cross section
One screw position line, has the second screw position line, has the spiral shell for the piece that is connected on the downside of cross section in described fixing groove
3rd screw position line of nail.
4. the door and window auxiliary frame according to one of claim 1-3, is characterized in that:The outer surface of four pieces of deckle boards is passed through
Blasting treatment, with rough microstructure.
5. a kind of using method of door and window auxiliary frame as claimed in claim 1, is characterized in that:The using method includes following step
Suddenly:
(1) auxiliary frame assembling;By correspondence pass after filled and process material in upper deckle board, lower frame plate, left frame plate, the cannelure of right deckle board
System is placed in level table, after the junction insertion connector of adjacent two boards, is welded to connect with Welding plate, is welded
Auxiliary frame cool down 10-20 minutes at room temperature after, overlap is cleared up, and vertical in the second screw position line of auxiliary frame
Connector screw is squeezed into, connector screw connector is fixed in auxiliary frame through the screw pilot hole on connector;
(2) auxiliary frame and wall connecting;Stator screw is squeezed into vertically in the 3rd screw position line of auxiliary frame first, by galvanized steel
Stator is fixed on the reinforcement of auxiliary frame;Subsequently auxiliary frame is temporarily fixed in body of wall reserved opening with timber wedge, to auxiliary frame position
Put after being adjusted, stator is fixed on body of wall with expansion bolt;Finally with cement mortar by the gap of auxiliary frame and body of wall
Fill up, timber wedge is removed after cement mortar solidification, then the gap vacated is filled up with cement mortar;
(3) auxiliary frame is connected with door and window;After civil engineering is finished, door and window is temporarily fixed in auxiliary frame with timber wedge, treats that position is adjusted
It is whole in place after, fabrication hole is bored on window frame, window frame is fixed in auxiliary frame through fabrication hole with screw, and with technique port lid by work
Skill hole seals;The subsequently filling-foam agent in gap of the auxiliary frame with door and window, and any excess foam is cut with perching knife;Wood is removed finally
The gap vacated is filled up by wedge with foaming agent, and injecting glue is sealed at the auxiliary frame injecting glue groove with fluid sealant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510777171.XA CN105275309B (en) | 2015-11-13 | 2015-11-13 | Door/window auxiliary frame and application method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510777171.XA CN105275309B (en) | 2015-11-13 | 2015-11-13 | Door/window auxiliary frame and application method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105275309A CN105275309A (en) | 2016-01-27 |
CN105275309B true CN105275309B (en) | 2017-04-19 |
Family
ID=55145046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510777171.XA Active CN105275309B (en) | 2015-11-13 | 2015-11-13 | Door/window auxiliary frame and application method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105275309B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105545130A (en) * | 2016-02-02 | 2016-05-04 | 赵立新 | Door and window installation self-locking device |
CN107152211B (en) * | 2016-03-02 | 2020-03-17 | 大连万达商业管理集团股份有限公司 | Window auxiliary frame capable of reducing cold bridge and cold bridge reducing method thereof |
CN106703603B (en) * | 2017-01-19 | 2018-05-29 | 浙江建业幕墙装饰有限公司 | A kind of easy-to-mount forms connection component |
CN107398721B (en) * | 2017-06-28 | 2020-04-21 | 赵亮 | Assembling method of frame assembly |
CN109989674A (en) * | 2017-12-29 | 2019-07-09 | 江苏源盛复合材料技术股份有限公司 | A kind of injecting glue connection section bar component and preparation method thereof and novel big bridge cutoff window |
CN108166890B (en) * | 2018-02-06 | 2024-01-02 | 无锡日兆节能科技有限公司 | Mounting structure of door and window auxiliary frame and door and window outer frame |
CN108716354A (en) * | 2018-05-17 | 2018-10-30 | 苏州金刚防火钢型材系统有限公司 | A kind of fire prevention window construction of the energy saving secondary frame of band |
CN110185357A (en) * | 2019-06-26 | 2019-08-30 | 唐山坤达科技有限公司 | A kind of novel multi-cavity seal aluminum plastic aluminium door and window |
CN112302474A (en) * | 2019-08-02 | 2021-02-02 | 金鹏节能科技有限公司 | Method for mounting aluminum alloy door and window |
CN110485854A (en) * | 2019-08-15 | 2019-11-22 | 佛山市拓实达幕墙门窗制造有限公司 | A kind of auxiliary frame bound edge door and window installation structure |
CN112610111B (en) * | 2020-12-09 | 2023-01-06 | 青岛国信建设投资有限公司 | Building outer wall door and window limb installation system with waterproof function |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101072082B1 (en) * | 2007-12-28 | 2011-10-10 | (주)엘지하우시스 | Angle Unit for Window Installation |
CN202530966U (en) * | 2011-12-14 | 2012-11-14 | 北京西飞世纪门窗幕墙工程有限责任公司 | Aluminum alloy window with bracket of guide plate |
CN203755925U (en) * | 2014-03-04 | 2014-08-06 | 中建幕墙有限公司 | Combined type energy-saving unit window |
CN104179417A (en) * | 2014-09-16 | 2014-12-03 | 江苏金百合门窗科技有限公司 | Installation method for energy-saving steel-plastic auxiliary frames and doors/windows |
CN204552454U (en) * | 2015-04-30 | 2015-08-12 | 江苏绿嘉建材科技有限公司 | Door and window auxiliary frame |
CN205314786U (en) * | 2015-11-13 | 2016-06-15 | 浙江中财型材有限责任公司 | Door -window attaching frame |
-
2015
- 2015-11-13 CN CN201510777171.XA patent/CN105275309B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105275309A (en) | 2016-01-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105275309B (en) | Door/window auxiliary frame and application method thereof | |
CN104746828B (en) | Dovetail key suspension member and use its decorative panel dry hanging construction technique | |
US7127865B2 (en) | Modular structure for building panels and methods of making and using same | |
CN105937278B (en) | A kind of assembly concrete frame wall filled with masonry system and its construction method | |
CN205314786U (en) | Door -window attaching frame | |
CN110241939B (en) | Green building wall system | |
CN107386561A (en) | A kind of lightweight fireproof insulating decoration composite plate and preparation method thereof | |
CN101592007B (en) | Process for filling clearances of general auxiliary frames or general frames of construction windows and doors through one-time pressure injection | |
CN203821651U (en) | Steel frame unit type glass curtain wall | |
CN106121102B (en) | Precast concrete peripheral protective sandwich type wall panel mounts connection construction method | |
CN104863273B (en) | The method and construction of a kind of use strength cement-based grouting material sealing wall splicing seams | |
CN111809779B (en) | Stably-installed building curtain wall structure | |
CN210396493U (en) | Fixing device for aluminum alloy window | |
CN105544745B (en) | Assembled sandwich keeps the temperature close rib compound external wall panel partitioning slot device and construction method | |
CN115075423A (en) | WdW heat insulation structure integrated plate for prefabricated building and construction method | |
CN109610866A (en) | A kind of joint filling method that auxiliary frame is connect with wall hole | |
CN110725434A (en) | PEC wall and major structure wet-type connected node | |
CN206376674U (en) | The windowsill water proof structure of air entrained concrete batten | |
CN215368743U (en) | Heat preservation exterior sheathing connecting piece and wall structure | |
CN105672811B (en) | Method is filled after a kind of fabricated shear wall system exterior window | |
CN210151996U (en) | Green constant temperature building wall | |
CN212534640U (en) | Prefabricated semi-rigid combined large plate | |
CN213838307U (en) | Embedded fixed glass sash structure of hidden sash door and window | |
CN217630977U (en) | Exempt from to tear open template type structure and heat preservation and decorate integration board | |
CN211850123U (en) | PEC wall and major structure wet-type connected node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |