CN105275000A - 一种基坑边坡支护土钉安装方法 - Google Patents

一种基坑边坡支护土钉安装方法 Download PDF

Info

Publication number
CN105275000A
CN105275000A CN201510672807.4A CN201510672807A CN105275000A CN 105275000 A CN105275000 A CN 105275000A CN 201510672807 A CN201510672807 A CN 201510672807A CN 105275000 A CN105275000 A CN 105275000A
Authority
CN
China
Prior art keywords
soil nailing
soil
foundation pit
slope
soil nails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510672807.4A
Other languages
English (en)
Inventor
赵家贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510672807.4A priority Critical patent/CN105275000A/zh
Publication of CN105275000A publication Critical patent/CN105275000A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明公开了一种基坑边坡支护土钉安装方法。它包括以下步骤:1)用若干根尼龙线纵横交错布置以在基坑边坡上确定需要钉入土钉的若干行钉入点的位置;2)用电锤向基坑边坡土层中压送土钉,直至土钉外露长度为400-600mm;3)沿垂直于基坑边坡的坡面方向铺设若干临时木跳板,操作人员站在临时木跳板上压送土钉,直至土钉外露长度为50-150mm;4)先在基坑边坡坡面上安装钢丝网,再向钢丝网内喷射混凝土,最后拆除临时木跳板,进行混凝土养护。本发明提出的安装方法,由于采用电锤进行土钉锚杆安装,压入土层中锚杆移动快捷,安装时间缩短,避免了人工逐个压入或锤击安装土钉时不经济、移动不方便,劳动强度高的技术问题。

Description

一种基坑边坡支护土钉安装方法
技术领域
本发明属于基坑边坡施工领域,尤其涉及一种基坑边坡支护土钉安装方法。
背景技术
目前,基坑所用使用土行孙机械或人工逐个压入或锤击安装锚杆土钉墙锚杆,这样的方法不经济、移动不方面,劳动强度高。
发明内容
本发明的目的在于提供一种基坑边坡支护土钉安装方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明采用了以下技术方案:
一种基坑边坡支护土钉安装方法,包括以下步骤:
1)按照方案确定的土钉间距,用若干根尼龙线纵横交错布置以在基坑边坡上确定需要钉入土钉的若干行钉入点的位置;
2)用接通电源的电锤前端抵住土钉,启动电锤向基坑边坡土层中压送土钉,直至土钉外露长度为400-600mm;
3)沿垂直于基坑边坡的坡面方向铺设若干临时木跳板,操作人员站在临时木跳板上通过电锤继续向基坑边坡土层中压送土钉,直至土钉外露长度为50-150mm;
4)先在基坑边坡坡面上安装钢丝网,再向钢丝网内喷射混凝土,最后拆除临时木跳板,进行混凝土养护。
优选的,土钉的长度为1000mm,直径为20mm。
优选的,步骤2)中土钉外露长度为500mm。
优选的,步骤3)中土钉外露长度为100mm。
与现有技术相比,本发明的有益效果如下:
本发明提出的安装方法,由于采用电锤进行土钉锚杆安装,压入土层中锚杆移动快捷,安装时间缩短,避免了土行孙机械或人工逐个压入或锤击安装锚杆土钉墙锚杆不经济、移动不方便,劳动强度高的技术问题。
附图说明
图1为土钉安装的平面图。
图2为土钉安装的剖面图。
具体实施方式
下面结合实施例对本发明的优选方式作进一步详细的描述。
如图1-2所示,一种基坑边坡支护土钉安装方法,包括以下步骤:
1)按照方案确定的土钉1间距,用若干根尼龙线2纵横交错布置以在基坑边坡3上确定需要钉入土钉1的若干行钉入点的位置;
2)用接通电源的电锤前端抵住土钉1,土钉1的长度为1000mm,直径为20mm,启动电锤向基坑边坡3土层中压送土钉1,直至土钉1外露长度为500mm;
3)沿垂直于基坑边坡3的坡面方向铺设若干临时木跳板4,操作人员站在临时木跳板4上通过电锤继续向基坑边坡3土层中压送土钉1,直至土钉1外露长度为100mm;
4)先在基坑边坡3坡面上安装钢丝网5,再向钢丝网5内喷射混凝土6,最后拆除临时木跳板4,进行混凝土6养护。
本发明提出了一种基坑边坡支护土钉安装方法,该方法首先用尼龙线2确定若干行钉入点的位置,再用电锤向基坑边坡3土层中压送土钉1直至土钉外露长度为500mm,再设置临时木跳板4,继续用电锤向基坑边坡3土层中压送土钉1直至土钉外露长度为100mm,最后在基坑边坡3坡面上安装钢丝网5,再向钢丝网5内喷射混凝土6,最后拆除临时木跳板4,进行混凝土6养护。
以上的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。

Claims (4)

1.一种基坑边坡支护土钉安装方法,其特征在于,包括以下步骤:
1)按照方案确定的土钉(1)间距,用若干根尼龙线(2)纵横交错布置以在基坑边坡(3)上确定需要钉入土钉(1)的若干行钉入点的位置;
2)用接通电源的电锤前端抵住土钉(1),启动电锤向基坑边坡(3)土层中压送土钉(1),直至土钉(1)外露长度为400-600mm;
3)沿垂直于基坑边坡(3)的坡面方向铺设若干临时木跳板(4),操作人员站在临时木跳板(4)上通过电锤继续向基坑边坡(3)土层中压送土钉(1),直至土钉(1)外露长度为50-150mm;
4)先在基坑边坡(3)坡面上安装钢丝网(5),再向钢丝网(5)内喷射混凝土(6),最后拆除临时木跳板(4),进行混凝土(6)养护。
2.根据权利要求1所述的基坑边坡支护土钉安装方法,其特征在于,所述土钉(1)的长度为1000mm,直径为20mm。
3.根据权利要求1所述的基坑边坡支护土钉安装方法,其特征在于,步骤2)中土钉(1)外露长度为500mm。
4.根据权利要求1所述的基坑边坡支护土钉安装方法,其特征在于,步骤3)中土钉(1)外露长度为100mm。
CN201510672807.4A 2015-10-13 2015-10-13 一种基坑边坡支护土钉安装方法 Pending CN105275000A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510672807.4A CN105275000A (zh) 2015-10-13 2015-10-13 一种基坑边坡支护土钉安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510672807.4A CN105275000A (zh) 2015-10-13 2015-10-13 一种基坑边坡支护土钉安装方法

Publications (1)

Publication Number Publication Date
CN105275000A true CN105275000A (zh) 2016-01-27

Family

ID=55144760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510672807.4A Pending CN105275000A (zh) 2015-10-13 2015-10-13 一种基坑边坡支护土钉安装方法

Country Status (1)

Country Link
CN (1) CN105275000A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797604A (zh) * 2018-06-13 2018-11-13 王海霖 一种防护网与液氮冻土墙复合支护实施方法及其支护结构
CN108978671A (zh) * 2018-07-12 2018-12-11 钱建良 一种土钉墙的施工工艺

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540107A (zh) * 2003-04-26 2004-10-27 曾宪明 软土边坡土钉支护工法
CN101122132A (zh) * 2007-09-03 2008-02-13 中铁建设集团有限公司 可拆卸复合材料面板土钉支护体系
CN102352630A (zh) * 2011-08-31 2012-02-15 中国新兴建设开发总公司 全螺纹纤维树脂杆体土钉墙及其施工方法
KR20130099411A (ko) * 2012-02-29 2013-09-06 코오롱글로벌 주식회사 소일네일 및 그 공법

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540107A (zh) * 2003-04-26 2004-10-27 曾宪明 软土边坡土钉支护工法
CN101122132A (zh) * 2007-09-03 2008-02-13 中铁建设集团有限公司 可拆卸复合材料面板土钉支护体系
CN102352630A (zh) * 2011-08-31 2012-02-15 中国新兴建设开发总公司 全螺纹纤维树脂杆体土钉墙及其施工方法
KR20130099411A (ko) * 2012-02-29 2013-09-06 코오롱글로벌 주식회사 소일네일 및 그 공법

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵信: "《建筑科技与经济》", 1 April 2015 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797604A (zh) * 2018-06-13 2018-11-13 王海霖 一种防护网与液氮冻土墙复合支护实施方法及其支护结构
CN108978671A (zh) * 2018-07-12 2018-12-11 钱建良 一种土钉墙的施工工艺

Similar Documents

Publication Publication Date Title
KR100777688B1 (ko) 오거크레인용 확장형 굴착유니트를 이용한 가공선로용아치형 전주근가 시공법
CN104653229A (zh) 盾构滑靴曲线上推过洞施工方法
CN105275000A (zh) 一种基坑边坡支护土钉安装方法
CN103603369A (zh) 一种锚拉桩扶壁式挡土墙施工方法
CN205804904U (zh) 一种找平装置
CN102644286A (zh) 一种深基坑支护结构
CN104328790B (zh) 现浇喷射混凝土暗承台及暗地梁胎模
CN111705817A (zh) 一种绿色装配式支护施工工法
CN204401999U (zh) 带卸料平台的爬升式脚手架
CN104389605B (zh) 一种采煤工作面密集钢丝绳掩护回撤方法
CN106193279B (zh) 主体结构墙预应力结构及主体结构墙的回筑方法
CN102352690A (zh) 现浇混凝土空心楼板钢管的抗浮定位系统的施工方法
CN105908959B (zh) 结构坡道处脚手架基础结构、脚手架及其施工方法
CN102477745A (zh) 一种梁板结构分体施工方法
CN108487660B (zh) 一种传统民居青砖墙扶正方法
CN103883340A (zh) 矿用锚固钢带和巷道顶板锚杆支护方法
CN109882206B (zh) 一种用于控制煤矿破碎围岩的多支护协同方法
CN210152652U (zh) 一种适用于钻爆法施工的多功能台车
CN203701143U (zh) 富水地层pba工法车站中板施工用模板装置
CN204163762U (zh) 一种矿山充填挡墙
CN206014323U (zh) 管道提升设备
CN201507142U (zh) 高压电线杆稳定装置
RU2471992C1 (ru) Ограждение горной выработки
CN104453966A (zh) 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法
CN205134382U (zh) 用于基坑底板换撑的后浇带传力装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160127

RJ01 Rejection of invention patent application after publication