CN104453966A - 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 - Google Patents
大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 Download PDFInfo
- Publication number
- CN104453966A CN104453966A CN201410574422.XA CN201410574422A CN104453966A CN 104453966 A CN104453966 A CN 104453966A CN 201410574422 A CN201410574422 A CN 201410574422A CN 104453966 A CN104453966 A CN 104453966A
- Authority
- CN
- China
- Prior art keywords
- steel
- leg
- fully
- construction method
- acnemia
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 title abstract description 4
- 238000005065 mining Methods 0.000 title abstract 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 41
- 239000010959 steel Substances 0.000 claims abstract description 41
- 239000003245 coal Substances 0.000 claims abstract description 9
- 241000540905 Acnemia Species 0.000 claims description 22
- 239000000178 monomer Substances 0.000 claims description 13
- 239000007787 solid Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract 1
- 231100000817 safety factor Toxicity 0.000 abstract 1
- 230000005641 tunneling Effects 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 6
- 229910052742 iron Inorganic materials 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 235000017375 Brosimum guianense Nutrition 0.000 description 1
- 241000985650 Brosimum guianense Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D19/00—Provisional protective covers for working space
- E21D19/02—Provisional protective covers for working space for use in longwall working
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种煤矿井下巷道支护技术,具体是大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法。具体为:在陷落柱区域进行常规支护,然后通过增加工字钢和单体柱,架设无腿棚,棚间通过拉杆固定成一个整体,无腿棚一端由液压支架支撑,另一端由单体柱支撑,与顶板固定紧密,综掘机在下方掘进时可以安全的进行作业。工作面顶板的稳固是影响煤矿安全的关键因素,本发明充分利用了液压支架和单体柱的支撑力,通过架设无腿棚,不仅缩短了施工工期,减轻了工人的劳动强度,而且提高了安全系数。
Description
技术领域
本发明涉及一种煤矿井下巷道支护技术,具体是一种大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法,适用于大采高工作面撤架通道过陷落柱架棚巷道。
背景技术
目前,大采高工作面末采综掘机做撤架通道是一项新型生产工艺,但是还从来没有遇到过在末采通道中过陷落柱的情况,而在陷落柱区域进行常规支护已无法满足巷道的顶板支护。本发明通过在陷落区域中顶板增加工字钢,架设无腿棚支护,很好的解决了撤架通道中陷落区域的顶板支护问题。
发明内容
本发明的目的是为了解决撤架通道内过陷落柱时顶板破碎、不易支护的问题,而提供一种大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法。
本发明是通过如下技术方案实现的:
一种大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,在陷落柱区域进行常规支护,然后在常规支护上采用工字钢梁和单体柱架设无腿棚;工字钢梁的一端深入支架顶端不小于500mm且被液压支架顶端接实至巷道顶板(即:工字钢梁被夹固在液压支架顶端与巷道顶板之间),工字钢梁的另一端紧靠煤帮且被单体柱接实至巷道顶板;一个液压支架上顶固两根工字钢梁,相邻的两根工字钢梁之间的间距不大于1000mm,并且相邻的两根工字钢梁之间固定有拉杆,从而使得所有工字钢梁固定成一个整体。
进一步的,煤帮的底部留设有600mm高的底板,单体柱的底部支撑在该底板上,这样就更易于安全的控制住顶板。
每根工字钢梁的两端再通过打锚索槽钢使其与顶板形成一个整体。
在陷落柱区域进行常规支护无法满足巷道的顶板支护,本发明通过增加工字钢,架设无腿棚,棚间通过拉杆固定成一个整体,无腿棚一端由液压支架支撑,另一端由单体柱支撑,与顶板固定紧密,综掘机在下方掘进时可以安全的进行作业。本发明充分利用了液压支架和单体柱的支撑力,通过架设无腿棚,不仅缩短了施工工期,减轻了工人的劳动强度,而且提高了安全系数。
本发明具有的有益效果如下:
与传统的过陷落柱打“U”型棚技术相比,本发明很好的解决了大采高末采综掘机做撤架通道过陷落柱的顶板维护问题,提高了安全系数;本发明通过架设无腿棚,解决了扫底时“U”型棚支护棚腿支护巷道的问题。无腿棚两端通过液压支架和单体柱支撑,缩短了施工工期,减轻了工人的劳动强度,提高了掘进效率,保证了安全生产。
附图说明
图1为大采高工作面末采撤架通道过陷落柱时架设无腿棚支护立体图。
图2为大采高工作面末采撤架通道过陷落柱时架设无腿棚支护平面图。
图中:1-工字钢梁、2-单体柱、3-液压支架、4-拉杆、5-底板、6-锚索槽钢。
具体实施方式
以下结合附图对本发明作进一步的描述:
如图1、2所示,一种大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,在陷落柱区域进行常规支护,然后在常规支护上采用工字钢梁1和单体柱2架设无腿棚;工字钢梁1的一端深入液压支架3顶端不小于500mm且被液压支架3顶端接实至巷道顶板,工字钢梁1的另一端紧靠煤帮且被单体柱2接实至巷道顶板;一个液压支架3上顶固两根工字钢梁1,相邻的两根工字钢梁1之间的间距不大于1000mm,并且相邻的两根工字钢梁1之间固定有拉杆4。煤帮的底部留设有600mm高的底板5,单体柱2的底部支撑在该底板5上。每根工字钢梁1的两端分别通过打锚索槽钢6使其与顶板形成一个整体,锚索槽钢6即指用槽钢和锚索组成的固定装置,槽钢用于固定工字钢梁1,锚索用于固定槽钢。
具体实施时,为了能够进一步加固本发明所述的无腿棚,还可以继续进行如下操作:1)利用陷落柱区域的常规支护用大链和钢丝绳对工字钢梁1进行再次固定;2)在工字钢梁1上用板梁或木楔打“井”字木垛进行支撑顶和顶板接实;3)架设工字钢梁1完成后,再在巷道中间用槽钢进行吊挂固定工字钢梁1组成的无腿棚,槽钢吊挂在永久支护的锚索上;4)为防止顶板漏矸,根据现场需要在工字钢梁1组成的无腿棚上铺设双层金属网,金属网之间按每米不少于10道用16#铁丝进行连接。
Claims (3)
1.一种大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,其特征在于:在陷落柱区域进行常规支护,然后在常规支护上采用工字钢梁(1)和单体柱(2)架设无腿棚;工字钢梁(1)的一端深入液压支架(3)顶端不小于500mm且被液压支架(3)顶端接实至巷道顶板,工字钢梁(1)的另一端紧靠煤帮且被单体柱(2)接实至巷道顶板;一个液压支架(3)上顶固两根工字钢梁(1),相邻的两根工字钢梁(1)之间的间距不大于1000mm,并且相邻的两根工字钢梁(1)之间固定有拉杆(4)。
2.根据权利要求1所述的大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,其特征在于:煤帮的底部留设有600mm高的底板(5),单体柱(2)的底部支撑在该底板(5)上。
3.根据权利要求1或2所述的大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,其特征在于:每根工字钢梁(1)的两端分别通过打锚索槽钢(6)使其与顶板形成一个整体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410574422.XA CN104453966B (zh) | 2014-10-24 | 2014-10-24 | 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410574422.XA CN104453966B (zh) | 2014-10-24 | 2014-10-24 | 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104453966A true CN104453966A (zh) | 2015-03-25 |
CN104453966B CN104453966B (zh) | 2016-05-18 |
Family
ID=52900636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410574422.XA Active CN104453966B (zh) | 2014-10-24 | 2014-10-24 | 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104453966B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106640148A (zh) * | 2016-12-27 | 2017-05-10 | 山西晋城无烟煤矿业集团有限责任公司 | 煤矿井下超高巷道永久加固工艺 |
CN114776355A (zh) * | 2022-04-18 | 2022-07-22 | 内蒙古满世煤炭集团罐子沟煤炭有限责任公司 | 一种煤层破碎带回撤通道施工工艺及加强支护确定方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3329097A (en) * | 1964-12-03 | 1967-07-04 | Gullick Ltd | Cable and like handling devices |
CN102312676A (zh) * | 2011-09-26 | 2012-01-11 | 山西晋城无烟煤矿业集团有限责任公司 | 复杂地质条件大采高工作面撤架通道施工方法 |
CN102418525A (zh) * | 2011-10-28 | 2012-04-18 | 山西晋城无烟煤矿业集团有限责任公司 | 软煤层长壁大采高综合机械化采煤末采方法 |
CN102777182A (zh) * | 2012-08-11 | 2012-11-14 | 山西晋城无烟煤矿业集团有限责任公司 | 大采高工作面快速末采方法 |
CN102828759A (zh) * | 2012-08-31 | 2012-12-19 | 山东新煤机械装备股份有限公司 | 煤矿破碎顶板工作面搬家撤架方法 |
CN102900444A (zh) * | 2012-09-10 | 2013-01-30 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型综采工作面液压支架回撤工艺 |
-
2014
- 2014-10-24 CN CN201410574422.XA patent/CN104453966B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3329097A (en) * | 1964-12-03 | 1967-07-04 | Gullick Ltd | Cable and like handling devices |
CN102312676A (zh) * | 2011-09-26 | 2012-01-11 | 山西晋城无烟煤矿业集团有限责任公司 | 复杂地质条件大采高工作面撤架通道施工方法 |
CN102418525A (zh) * | 2011-10-28 | 2012-04-18 | 山西晋城无烟煤矿业集团有限责任公司 | 软煤层长壁大采高综合机械化采煤末采方法 |
CN102777182A (zh) * | 2012-08-11 | 2012-11-14 | 山西晋城无烟煤矿业集团有限责任公司 | 大采高工作面快速末采方法 |
CN102828759A (zh) * | 2012-08-31 | 2012-12-19 | 山东新煤机械装备股份有限公司 | 煤矿破碎顶板工作面搬家撤架方法 |
CN102900444A (zh) * | 2012-09-10 | 2013-01-30 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型综采工作面液压支架回撤工艺 |
Non-Patent Citations (1)
Title |
---|
张育恒: "大采高工作面撤架通道快速施工工艺", 《煤矿安全》, vol. 44, no. 7, 31 July 2013 (2013-07-31) * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106640148A (zh) * | 2016-12-27 | 2017-05-10 | 山西晋城无烟煤矿业集团有限责任公司 | 煤矿井下超高巷道永久加固工艺 |
CN114776355A (zh) * | 2022-04-18 | 2022-07-22 | 内蒙古满世煤炭集团罐子沟煤炭有限责任公司 | 一种煤层破碎带回撤通道施工工艺及加强支护确定方法 |
CN114776355B (zh) * | 2022-04-18 | 2023-08-22 | 内蒙古满世煤炭集团罐子沟煤炭有限责任公司 | 一种煤层破碎带回撤通道加强支护确定方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104453966B (zh) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161480B (zh) | 主动支撑巷旁充填沿空留巷的方法 | |
CN100577986C (zh) | 三软地质条件下采空区留巷围岩支护方法 | |
CN104234749B (zh) | 一种综采工作面大断面回撤通道围岩控制方法 | |
CN104061001B (zh) | 沿空留巷开采支护工艺方法 | |
CN103061771B (zh) | 复采矿井综采面切眼掘进及其支护方法 | |
CN103775084B (zh) | 大倾角、大采高综采设备过地质构造破碎带施工工艺 | |
CN104763425A (zh) | 一种卸压预裂爆破沿空留巷无煤柱开采方法 | |
CN103758529A (zh) | 一种煤矿沿空留巷巷旁支护方法 | |
CN108868833A (zh) | 一种在u型钢支护巷道内进行切顶卸压巷内沿空留巷的方法 | |
CN103711518A (zh) | 一种便携式矿山充填挡墙 | |
CN105201524B (zh) | 一种极软煤层巷道预空锚网直角可缩棚联合支护方法 | |
CN110130978B (zh) | 一种充填复采小窑破坏区厚煤层破碎煤帮封堵方法 | |
CN106089234B (zh) | 一种长距离辅巷多通道快速回撤综采工作面的方法 | |
CN105888708B (zh) | 一种基于雷达探测技术的巷道冒顶区探测及处理方法 | |
CN104453966B (zh) | 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 | |
CN102493819B (zh) | 一种控制煤层巷道围岩稳定性的方法 | |
CN110159327B (zh) | 掘锚分离的巷道连续掘进临时支护装置及方法 | |
CN105370307B (zh) | 采煤工作面过超高段支护工艺 | |
CN204552773U (zh) | 软破岩体冒落巷道掘进组合钢支架支护装置 | |
CN106761873A (zh) | 一种用于金属地下矿山巷道冒落区及破碎带的支护方法 | |
CN102425417A (zh) | 易冒顶板锚索毛石墙联合沿空留巷方法 | |
CN102536277A (zh) | 一种悬臂式掘进机随车配套支锚系统 | |
CN205422777U (zh) | 一种用于顶板不稳定的沿空留巷支护系统 | |
CN106121678B (zh) | 一种基于雷达探测技术的顶板空顶区探测及巷道修复方法 | |
CN104632246A (zh) | 一种大跨度地下结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |