CN104453966B - 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 - Google Patents

大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 Download PDF

Info

Publication number
CN104453966B
CN104453966B CN201410574422.XA CN201410574422A CN104453966B CN 104453966 B CN104453966 B CN 104453966B CN 201410574422 A CN201410574422 A CN 201410574422A CN 104453966 B CN104453966 B CN 104453966B
Authority
CN
China
Prior art keywords
steel
acnemia
canopy
digging machine
mechanized digging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410574422.XA
Other languages
English (en)
Other versions
CN104453966A (zh
Inventor
张文彬
徐玉胜
胡红伟
曹雪芹
夏海涛
郑常清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201410574422.XA priority Critical patent/CN104453966B/zh
Publication of CN104453966A publication Critical patent/CN104453966A/zh
Application granted granted Critical
Publication of CN104453966B publication Critical patent/CN104453966B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/02Provisional protective covers for working space for use in longwall working

Abstract

本发明涉及一种煤矿井下巷道支护技术,具体是大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法。具体为:在陷落柱区域进行常规支护,然后通过增加工字钢和单体柱,架设无腿棚,棚间通过拉杆固定成一个整体,无腿棚一端由液压支架支撑,另一端由单体柱支撑,与顶板固定紧密,综掘机在下方掘进时可以安全的进行作业。工作面顶板的稳固是影响煤矿安全的关键因素,本发明充分利用了液压支架和单体柱的支撑力,通过架设无腿棚,不仅缩短了施工工期,减轻了工人的劳动强度,而且提高了安全系数。

Description

大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法
技术领域
本发明涉及一种煤矿井下巷道支护技术,具体是一种大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法,适用于大采高工作面撤架通道过陷落柱架棚巷道。
背景技术
目前,大采高工作面末采综掘机做撤架通道是一项新型生产工艺,但是还从来没有遇到过在末采通道中过陷落柱的情况,而在陷落柱区域进行常规支护已无法满足巷道的顶板支护。本发明通过在陷落区域中顶板增加工字钢,架设无腿棚支护,很好的解决了撤架通道中陷落区域的顶板支护问题。
发明内容
本发明的目的是为了解决撤架通道内过陷落柱时顶板破碎、不易支护的问题,而提供一种大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法。
本发明是通过如下技术方案实现的:
一种大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,在陷落柱区域进行常规支护,然后在常规支护上采用工字钢梁和单体柱架设无腿棚;工字钢梁的一端深入支架顶端不小于500mm且被液压支架顶端接实至巷道顶板(即:工字钢梁被夹固在液压支架顶端与巷道顶板之间),工字钢梁的另一端紧靠煤帮且被单体柱接实至巷道顶板;一个液压支架上顶固两根工字钢梁,相邻的两根工字钢梁之间的间距不大于1000mm,并且相邻的两根工字钢梁之间固定有拉杆,从而使得所有工字钢梁固定成一个整体。
进一步的,煤帮的底部留设有600mm高的底板,单体柱的底部支撑在该底板上,这样就更易于安全的控制住顶板。
每根工字钢梁的两端再通过打锚索槽钢使其与顶板形成一个整体。
在陷落柱区域进行常规支护无法满足巷道的顶板支护,本发明通过增加工字钢,架设无腿棚,棚间通过拉杆固定成一个整体,无腿棚一端由液压支架支撑,另一端由单体柱支撑,与顶板固定紧密,综掘机在下方掘进时可以安全的进行作业。本发明充分利用了液压支架和单体柱的支撑力,通过架设无腿棚,不仅缩短了施工工期,减轻了工人的劳动强度,而且提高了安全系数。
本发明具有的有益效果如下:
与传统的过陷落柱打“U”型棚技术相比,本发明很好的解决了大采高末采综掘机做撤架通道过陷落柱的顶板维护问题,提高了安全系数;本发明通过架设无腿棚,解决了扫底时“U”型棚支护棚腿支护巷道的问题。无腿棚两端通过液压支架和单体柱支撑,缩短了施工工期,减轻了工人的劳动强度,提高了掘进效率,保证了安全生产。
附图说明
图1为大采高工作面末采撤架通道过陷落柱时架设无腿棚支护立体图。
图2为大采高工作面末采撤架通道过陷落柱时架设无腿棚支护平面图。
图中:1-工字钢梁、2-单体柱、3-液压支架、4-拉杆、5-底板、6-锚索槽钢。
具体实施方式
以下结合附图对本发明作进一步的描述:
如图1、2所示,一种大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法,在陷落柱区域进行常规支护,然后在常规支护上采用工字钢梁1和单体柱2架设无腿棚;工字钢梁1的一端深入液压支架3顶端不小于500mm且被液压支架3顶端接实至巷道顶板,工字钢梁1的另一端紧靠煤帮且被单体柱2接实至巷道顶板;一个液压支架3上顶固两根工字钢梁1,相邻的两根工字钢梁1之间的间距不大于1000mm,并且相邻的两根工字钢梁1之间固定有拉杆4。煤帮的底部留设有600mm高的底板5,单体柱2的底部支撑在该底板5上。每根工字钢梁1的两端分别通过打锚索槽钢6使其与顶板形成一个整体,锚索槽钢6即指用槽钢和锚索组成的固定装置,槽钢用于固定工字钢梁1,锚索用于固定槽钢。
具体实施时,为了能够进一步加固本发明所述的无腿棚,还可以继续进行如下操作:1)利用陷落柱区域的常规支护用大链和钢丝绳对工字钢梁1进行再次固定;2)在工字钢梁1上用板梁或木楔打“井”字木垛进行支撑顶和顶板接实;3)架设工字钢梁1完成后,再在巷道中间用槽钢进行吊挂固定工字钢梁1组成的无腿棚,槽钢吊挂在永久支护的锚索上;4)为防止顶板漏矸,根据现场需要在工字钢梁1组成的无腿棚上铺设双层金属网,金属网之间按每米不少于10道用16#铁丝进行连接。

Claims (1)

1.一种大采高末采综掘机做撤架通道过陷落柱架设无腿棚施工方法,其特征在于:在陷落柱区域进行常规支护,然后在常规支护上采用工字钢梁(1)和单体柱(2)架设无腿棚;工字钢梁(1)的一端深入液压支架(3)顶端不小于500mm且被液压支架(3)顶端接实至巷道顶板,工字钢梁(1)的另一端紧靠煤帮且被单体柱(2)接实至巷道顶板;一个液压支架(3)上顶固两根工字钢梁(1),相邻的两根工字钢梁(1)之间的间距不大于1000mm,并且相邻的两根工字钢梁(1)之间固定有拉杆(4);煤帮的底部留设有600mm高的底板(5),单体柱(2)的底部支撑在该底板(5)上;每根工字钢梁(1)的两端分别通过打锚索槽钢(6)使其与顶板形成一个整体。
CN201410574422.XA 2014-10-24 2014-10-24 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法 Active CN104453966B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410574422.XA CN104453966B (zh) 2014-10-24 2014-10-24 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410574422.XA CN104453966B (zh) 2014-10-24 2014-10-24 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法

Publications (2)

Publication Number Publication Date
CN104453966A CN104453966A (zh) 2015-03-25
CN104453966B true CN104453966B (zh) 2016-05-18

Family

ID=52900636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410574422.XA Active CN104453966B (zh) 2014-10-24 2014-10-24 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法

Country Status (1)

Country Link
CN (1) CN104453966B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640148B (zh) * 2016-12-27 2018-11-30 山西晋城无烟煤矿业集团有限责任公司 煤矿井下超高巷道永久加固工艺
CN114776355B (zh) * 2022-04-18 2023-08-22 内蒙古满世煤炭集团罐子沟煤炭有限责任公司 一种煤层破碎带回撤通道加强支护确定方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1083360A (en) * 1964-12-03 1967-09-13 Gullick Ltd Improvements in or relating to cable and like handling devices
CN102312676A (zh) * 2011-09-26 2012-01-11 山西晋城无烟煤矿业集团有限责任公司 复杂地质条件大采高工作面撤架通道施工方法
CN102418525B (zh) * 2011-10-28 2014-07-09 山西晋城无烟煤矿业集团有限责任公司 软煤层长壁大采高综合机械化采煤末采方法
CN102777182B (zh) * 2012-08-11 2014-04-16 山西晋城无烟煤矿业集团有限责任公司 大采高工作面快速末采方法
CN102828759B (zh) * 2012-08-31 2014-11-26 山东新煤机械装备股份有限公司 煤矿破碎顶板工作面搬家撤架方法
CN102900444B (zh) * 2012-09-10 2015-03-18 山西晋城无烟煤矿业集团有限责任公司 改进型综采工作面液压支架回撤工艺

Also Published As

Publication number Publication date
CN104453966A (zh) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103161480B (zh) 主动支撑巷旁充填沿空留巷的方法
CN103485801B (zh) 用于动压巷道和沿空留巷的巷道支护装置
CN106150503A (zh) 一种水力压裂治理坚硬顶板的方法
CN103758529A (zh) 一种煤矿沿空留巷巷旁支护方法
CN102777182B (zh) 大采高工作面快速末采方法
CN103711518A (zh) 一种便携式矿山充填挡墙
CN108868833A (zh) 一种在u型钢支护巷道内进行切顶卸压巷内沿空留巷的方法
CN104863590B (zh) 一种大采高综采工作面末采回撤巷道留设方法
CN105201524B (zh) 一种极软煤层巷道预空锚网直角可缩棚联合支护方法
CN104234749A (zh) 一种综采工作面大断面回撤通道围岩控制方法
CN101936172A (zh) 采动期间巷道底鼓治理方法
CN104453966B (zh) 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法
CN106640148B (zh) 煤矿井下超高巷道永久加固工艺
CN106089234A (zh) 一种长距离辅巷多通道快速回撤综采工作面的方法
CN206129303U (zh) 一种大采高煤壁片帮加固装置
CN203145980U (zh) 矿用抬棚支架
CN205400744U (zh) 利用沿空护巷实现近距离煤层开采的支护结构
CN110939464A (zh) 一种相邻工作面沿空留巷联合支护方法
CN203769849U (zh) 一种便携式矿山充填挡墙
CN105201529A (zh) 一种沿空留巷横斜双拉纤维柔性模板及其充填方法
CN205422777U (zh) 一种用于顶板不稳定的沿空留巷支护系统
CN205445623U (zh) 沿空护巷开采近距离煤层的支护设施
CN205477640U (zh) 对采空区切顶卸压的安全支护装置
CN203891905U (zh) 无腿棚支架
CN106121684B (zh) 一种托顶煤岩体支护装置的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant