CN101936172A - 采动期间巷道底鼓治理方法 - Google Patents

采动期间巷道底鼓治理方法 Download PDF

Info

Publication number
CN101936172A
CN101936172A CN 201010250660 CN201010250660A CN101936172A CN 101936172 A CN101936172 A CN 101936172A CN 201010250660 CN201010250660 CN 201010250660 CN 201010250660 A CN201010250660 A CN 201010250660A CN 101936172 A CN101936172 A CN 101936172A
Authority
CN
China
Prior art keywords
channel
hydraulic prop
tunnel
breach
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010250660
Other languages
English (en)
Other versions
CN101936172B (zh
Inventor
张农
王成
韩昌良
李桂臣
阚甲广
郑西贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2010102506607A priority Critical patent/CN101936172B/zh
Publication of CN101936172A publication Critical patent/CN101936172A/zh
Application granted granted Critical
Publication of CN101936172B publication Critical patent/CN101936172B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及矿井下一种采动期间巷道底鼓治理方法,在采煤工作面的前方受采动影响的长度范围内,在回采巷道底板安置由纵向槽钢梁、横向槽钢梁构成的支柱底梁结构,在底梁结构与顶板之间安装有单体液压支柱,将顶板的压力通过单体液压支柱传递到底板,同时利用单体液压支柱本身所具有的高支护阻力,以达到控制底鼓的目的。该方法支护强度高、操作简便、对生产影响很小,是一种有效的采动期间巷道底鼓治理方法。

Description

采动期间巷道底鼓治理方法
技术领域
本发明涉及矿井下用于煤矿回采巷道的支护工程,尤其是一种采动期间巷道底鼓治理方法。
背景技术
在煤层回采的过程中,随着工作面的不断推进,其前方约60m~100m的范围内受采动的影响,围岩应力重新分布并表现出强烈变形,导致巷道断面缩小,影响工作面的安全高效生产。大量的现场实测数据表明,这一期间巷道变形以顶底板移近为主,其中底鼓量又占顶底板移近量的60%~70%以上。如果实施沿空留巷技术,巷道还要经受采空区上方顶板活动的强烈影响,底鼓量会进一步增加。因此,在工作面回采期间,巷道底鼓的治理不容忽视。现场工程实践和大量文献检索的结果显示:目前回采巷道大多采用采动期间放任底鼓、后期再被动起底的方式,不仅浪费工时,而且影响巷道的正常使用,延误生产。已有的主动控制底鼓的底板注浆和底板锚杆(索)支护技术也因为底板施工机具的不成熟、成本过高而难以实施,仅停留在构思阶段。
发明内容
为了解决巷道底鼓治理中存在的问题,本发明提供了采动期间巷道底鼓治理方法。该方法支护强度高、操作简便、对生产影响很小,是一种有效的采动期间巷道底鼓治理的方法。
本发明解决其技术问题所采用的技术方案是:在采煤工作面的前方受采动影响的长度范围内,在回采巷道底板安置由纵向槽钢梁、横向槽钢梁梁构成的支柱底梁结构,在底梁结构与顶板之间安装有单体液压支柱,将顶板的压力通过单体液压支柱传递到底板,同时利用单体液压支柱本身所具有的高支护阻力,以达到控制底鼓的目的。
本采动期间巷道底鼓控制方法的有益效果:
(1)能对底板提供较高的支护强度,有效控制底板变形。已有的单体液压支柱初撑阻力已达到100kN以上,工作阻力可达200kN最大者甚至超过350kN,可对顶底板提供足够的支撑强度,通过单体液压支柱以及相关装置对巷道顶板与底板的压力进行传递与调节,可同时有效控制顶板下沉和底板鼓起;
(2)利用已有的辅助支护形式添加相应的控底装置,用料少、成本低。由于回采工作面煤壁至前方30m~40m范围巷道变形较大,目前此范围之内普遍采用单体液压支柱辅助加强的形式对顶板进行支撑,本方法仅在单体液压支柱下方添加相应的控底装置,且该装置可循环利用,用料较少,成本较低;
(3)操作简便,劳动强度低。现场安装时直接将在地面加工好的槽钢放置在巷道底板相应的位置上然后安装单体液压支柱即可,非常容易操作,劳动强度小;
(4)安装时间短,对工作面的生产影响较小。
附图说明
下面结合附图对本发明的实施方式作进一步的说明:
附图1是本发明的结构布置方法俯视图。
附图2是控底结构在巷道内的布置截面图。
附图3是槽钢的加工示意图。
图中:1.回采巷道,2.横向槽钢梁,2-1.槽钢,2-2.缺口,3.纵向槽钢梁,4.单体液压支柱,5.铰接顶梁,B.巷道宽度,L1.横向槽钢梁的长度,L2.纵向槽钢梁的长度,l.单体液压支柱的排距,s.单体液压支柱的间距,b.槽钢的宽度,b’.缺口的宽度。
具体实施方式
在图中,在采煤工作面前方受采动影响的长度范围内,在回采巷道1的底板安置由纵向槽钢梁3、横向槽钢梁2构成的支柱底梁结构,在底梁结构与顶板之间安装有单体液压支柱4,将顶板的压力通过单体液压支柱4传递到底板,同时利用单体液压支柱4本身所具有的高支护阻力,以达到控制底鼓的目的。
本发明采动期间巷道底鼓控制方法,首先在地面加工多个槽钢侧面带有缺口2-2的槽钢2-1,槽钢分为横向槽钢梁2和纵向槽钢梁3,并运至施工地点;然后将槽钢纵横叠放在巷道底板上组成控底装置;最后把单体液压支柱4放置在槽钢的叠加处,挂铰接顶梁5,升起单体液压支柱4,并给予初撑力。具体步骤如下:
1、确定回采巷道的超前支护范围以及单体液压支柱的间距s、排距l。回采巷道的采动影响范围为工作面至前方60~100m,超前支护范围为工作面至前方30~60m;单体液压支柱间排距越小,支护强度越大,对底板的控制效果也就越好;间排距的大小可以通过具体的地质条件和巷道的矿压显现确定,间距s不小于巷道宽度B的1/3,排距l取值0.6m~1.5m。
2、在地面加工的多个槽钢侧面带有缺口2-2的槽钢2-1,每个槽钢的缺口的个数为2~4个;将槽钢的两翼去掉开出缺口,缺口的宽度b’要大于槽钢的宽度b,以保证两个槽钢可以通过缺口垂直叠加;横向槽钢梁的长度L1大于巷道宽度B的2.5倍,横向槽钢梁2的缺口的中心距等于单体液压支柱的间距s,纵向槽钢梁的长度L2不大于巷道的宽度B,纵向槽钢梁3的缺口中心距等于单体液压支柱的排距l。
3、将横向槽钢梁2和纵向槽钢梁3交错放置在回采巷道1的底板上;横向槽钢梁2和纵向槽钢梁3通过缺口2-2纵横叠加,均匀布置在巷道底板,组成控底装置。
4、在槽钢的叠加处放置单体液压支柱4,单体液压支柱4的上端按照常规方法挂铰接顶梁5,升起单体液压支柱,单体液压支柱的初撑力应达到100kN以上。
5、随着采煤工作面的不断向前推进,将巷道后方的槽钢、单体液压支柱以及铰接顶梁不断地撤掉,并重新安装在巷道前方,以此类推。

Claims (7)

1.采动期间巷道底鼓治理方法,其特征是:在采煤工作面的前方受采动影响的长度范围内,在回采巷道(1)的底板安置由纵向槽钢梁(3)、横向槽钢梁(2)构成的支柱底梁结构,在底梁结构与顶板之间安装有单体液压支柱(4),将顶板的压力通过单体液压支柱(4)传递到底板,同时利用单体液压支柱(4)本身所具有的高支护阻力,以达到控制底鼓的目的。
2.根据权利要求1所述的采动期间巷道底鼓治理方法,其特征是:首先在地面加工多个槽钢侧面带有缺口(2-2)的槽钢(2-1),槽钢分为横向槽钢梁(2)和纵向槽钢梁(3),并运至施工地点;然后将槽钢纵横叠放在巷道底板上组成控底装置;最后把单体液压支柱(4)放置在槽钢的叠加处,挂铰接顶梁(5),升起单体液压支柱(4),并给予初撑力。
3.根据权利要求1所述的采动期间巷道底鼓治理方法,其特征是:回采巷道的采动影响范围为工作面至前方60m~100m,超前支护范围为工作面至前方30m~60m。单体液压支柱间排距越小,支护强度越大,对底板的控制效果也就越好;间排距的大小可以通过具体的地质条件和巷道的矿压显现确定,间距s不小于巷道宽度B的1/3,排距l取值0.6m~1.5m。
4.根据权利要求1所述的采动期间巷道底鼓治理方法,其特征是:在地面加工的多个槽钢侧面带有缺口(2-2)的槽钢(2-1),每个槽钢的缺口的个数为2个~4个;将槽钢的两翼去掉开出缺口,缺口的宽度b’要大于槽钢的宽度b,以保证两个槽钢可以通过缺口垂直叠加;横向槽钢梁的长度L1大于巷道宽度B的2.5倍,横向槽钢梁(2)的缺口的中心距等于单体液压支柱的间距s,纵向槽钢梁的长度L2不大于巷道的宽度B,纵向槽钢梁(3)的缺口中心距等于单体液压支柱的排距l。
5.根据权利要求1所述的采动期间巷道底鼓治理方法,其特征是:将横向槽钢梁(2)和纵向槽钢梁(3)交错放置在回采巷道(1)的底板上;横向槽钢梁(2)和纵向槽钢梁(3)通过缺口2-2纵横叠加,均匀布置在巷道底板,组成控底装置。
6.根据权利要求1所述的采动期间巷道底鼓治理方法,其特征是:在槽钢的叠加处放置单体液压支柱(4),单体液压支柱(4)的上端按照常规方法挂铰接顶梁(5),升起单体液压支柱,单体液压支柱的初撑力应达到100kN以上。
7.根据权利要求1所述的采动期间巷道底鼓治理方法,其特征是:随着采煤工作面的不断向前推进,将巷道后方的槽钢、单体液压支柱以及铰接顶梁不断地撤掉,并重新安装在巷道前方,以此类推。
CN2010102506607A 2010-08-06 2010-08-06 采动期间巷道底鼓治理方法 Expired - Fee Related CN101936172B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102506607A CN101936172B (zh) 2010-08-06 2010-08-06 采动期间巷道底鼓治理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102506607A CN101936172B (zh) 2010-08-06 2010-08-06 采动期间巷道底鼓治理方法

Publications (2)

Publication Number Publication Date
CN101936172A true CN101936172A (zh) 2011-01-05
CN101936172B CN101936172B (zh) 2012-06-27

Family

ID=43389720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102506607A Expired - Fee Related CN101936172B (zh) 2010-08-06 2010-08-06 采动期间巷道底鼓治理方法

Country Status (1)

Country Link
CN (1) CN101936172B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244150A (zh) * 2013-05-24 2013-08-14 湖南科技大学 底拱连锁梁及其施工方法
CN106401603A (zh) * 2016-12-12 2017-02-15 煤炭科学技术研究院有限公司 一种软岩巷道倒拱梁控制底鼓方法
CN108930545A (zh) * 2018-08-29 2018-12-04 陕西陕煤黄陵矿业有限公司 一种综采工作面超前支架的安装方法
CN109973144A (zh) * 2019-04-04 2019-07-05 中国矿业大学(北京) 充填与旋转交替协同作业的两翼开采方法
CN110454216A (zh) * 2019-09-19 2019-11-15 西安科技大学 一种井下灾变区域临时快速密闭支撑装置及方法
CN112459812A (zh) * 2020-12-31 2021-03-09 山东里能鲁西矿业有限公司 组合式单体液压支柱
CN112832830A (zh) * 2020-12-31 2021-05-25 山东省煤田地质规划勘察研究院 一种矿用防冲双柱组合式墩柱结构、支护系统及施工方法
CN113847055A (zh) * 2021-09-14 2021-12-28 太原理工大学 一种极近距离煤层群下行开采的巷道布置和支护方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089011A (zh) * 1992-12-29 1994-07-06 中国矿业大学 一种控制巷道底臌技术
CN1865660A (zh) * 2006-06-16 2006-11-22 中国矿业大学 一种底板围岩弱化区域的构筑方法
CN101349155A (zh) * 2007-07-20 2009-01-21 河南理工大学 一种控制巷道底臌的装置
CN101493011A (zh) * 2008-12-30 2009-07-29 中国科学院武汉岩土力学研究所 一种软弱膨胀型围岩巷道支护方法
CN101509383A (zh) * 2009-03-24 2009-08-19 徐州工程学院 巷道底脚锚注加固抗底臌的方法及施工工艺
CN101737070A (zh) * 2008-11-07 2010-06-16 中国矿业大学 一种量测巷道底臌大变形的锚杆及其方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089011A (zh) * 1992-12-29 1994-07-06 中国矿业大学 一种控制巷道底臌技术
CN1865660A (zh) * 2006-06-16 2006-11-22 中国矿业大学 一种底板围岩弱化区域的构筑方法
CN101349155A (zh) * 2007-07-20 2009-01-21 河南理工大学 一种控制巷道底臌的装置
CN101737070A (zh) * 2008-11-07 2010-06-16 中国矿业大学 一种量测巷道底臌大变形的锚杆及其方法
CN101493011A (zh) * 2008-12-30 2009-07-29 中国科学院武汉岩土力学研究所 一种软弱膨胀型围岩巷道支护方法
CN101509383A (zh) * 2009-03-24 2009-08-19 徐州工程学院 巷道底脚锚注加固抗底臌的方法及施工工艺

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244150A (zh) * 2013-05-24 2013-08-14 湖南科技大学 底拱连锁梁及其施工方法
CN106401603A (zh) * 2016-12-12 2017-02-15 煤炭科学技术研究院有限公司 一种软岩巷道倒拱梁控制底鼓方法
CN108930545A (zh) * 2018-08-29 2018-12-04 陕西陕煤黄陵矿业有限公司 一种综采工作面超前支架的安装方法
CN109973144A (zh) * 2019-04-04 2019-07-05 中国矿业大学(北京) 充填与旋转交替协同作业的两翼开采方法
CN110454216A (zh) * 2019-09-19 2019-11-15 西安科技大学 一种井下灾变区域临时快速密闭支撑装置及方法
CN110454216B (zh) * 2019-09-19 2024-03-15 西安科技大学 一种井下灾变区域临时快速密闭支撑装置及方法
CN112459812A (zh) * 2020-12-31 2021-03-09 山东里能鲁西矿业有限公司 组合式单体液压支柱
CN112832830A (zh) * 2020-12-31 2021-05-25 山东省煤田地质规划勘察研究院 一种矿用防冲双柱组合式墩柱结构、支护系统及施工方法
CN113847055A (zh) * 2021-09-14 2021-12-28 太原理工大学 一种极近距离煤层群下行开采的巷道布置和支护方法
CN113847055B (zh) * 2021-09-14 2023-07-18 太原理工大学 一种极近距离煤层群下行开采的巷道布置和支护方法

Also Published As

Publication number Publication date
CN101936172B (zh) 2012-06-27

Similar Documents

Publication Publication Date Title
CN101936172B (zh) 采动期间巷道底鼓治理方法
CN101349159B (zh) 一种单通道无轨胶轮车回撤综采工作面的方法
CN202064981U (zh) 软煤层巷道支护结构
CN101761338B (zh) 一种固体充填采煤半断面单腿棚沿空留巷方法
CN101514633B (zh) 无巷旁支护的沿空留巷工艺
CN102128040B (zh) 液压迈步式超前支护装备
CN102493838A (zh) 一种急倾斜煤层综采连续充填采煤方法
CN102733836B (zh) 软弱特厚煤层综放回采巷道支护方法
CN105370299B (zh) 千米深埋厚煤层窄煤柱沿空护巷工艺
CN109209490B (zh) 一种矸石充填辅助末采阶段工作面回撤方法
CN103758529A (zh) 一种煤矿沿空留巷巷旁支护方法
CN103696788A (zh) 空巷支护设备及综采工作面过空巷的施工方法
CN108005654B (zh) 仰采大采高工作面过老巷施工工艺
CN105736044A (zh) 一种急倾斜煤层综采工作面设备快速回撤方法
CN102900449A (zh) 一种煤矿井下采空区顶板的支护方法
CN103867223A (zh) 架棚巷道用悬移顶梁液压支护装置
CN110985083B (zh) 一种回采巷道垛式支架支护系统及方法
CN105134215A (zh) 大倾角煤层走向长壁工作面局部充填开采方法
CN104863590A (zh) 一种大采高综采工作面末采回撤巷道留设方法
CN104405392B (zh) 三软厚煤层巷道托顶留底锚网索主动支护综放开采方法
CN102200020A (zh) 让压型异型梁锚索桁架巷道支护系统
CN205400744U (zh) 利用沿空护巷实现近距离煤层开采的支护结构
CN204552773U (zh) 软破岩体冒落巷道掘进组合钢支架支护装置
CN106285682A (zh) 房柱采矿法
CN104863584B (zh) 采煤工作面无缺口进刀采煤成套设备及进刀方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627

Termination date: 20160806

CF01 Termination of patent right due to non-payment of annual fee