CN103195443A - 深部开采优化支护参数预防巷道滞后突水的方法 - Google Patents
深部开采优化支护参数预防巷道滞后突水的方法 Download PDFInfo
- Publication number
- CN103195443A CN103195443A CN2013101118612A CN201310111861A CN103195443A CN 103195443 A CN103195443 A CN 103195443A CN 2013101118612 A CN2013101118612 A CN 2013101118612A CN 201310111861 A CN201310111861 A CN 201310111861A CN 103195443 A CN103195443 A CN 103195443A
- Authority
- CN
- China
- Prior art keywords
- supporting
- anchor
- tunnel
- anchor pole
- adopt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
一种深部开采优化支护参数预防巷道滞后突水的方法,包括:(1)确定初步支护方案;(2)锚杆支护参数优化;(3)支护方案及支护参数确定;(4)断层破碎带含水层探测与注浆加固;(5)巷道矸石充填。本方法在理论上提出了突水过程化概念,通过实验验证了岩体蠕变特性与承压水突出的时效性问题;解决了通过优化支护参数、预防巷道流动变形、增加保护岩体的防突潜能预防滞后突水问题。
Description
技术领域
本发明涉及一种预防突水的方法,尤其涉及一种深部开采优化支护参数预防巷道滞后突水的方法。
背景技术
巷道滞后出水是一种比较常见的井下地质现象,其发生前常出现矿压显现、底板拱起、顶底板渗水等征兆,通过加强出水机理研究,掌握其发生规律,巷道断层滞后出水是可以得到预防和治理的。在现场技术应用方面,已有的技术成果主要有:
(1)井巷工程施工前,作好施工区域水文地质条件探查工作。采取钻探、物探等手段探查研究区构造发育情况,查清断层位置、落差、导水性等基本特征,根据断层水害威胁程度,分别采取留设防水煤柱、设置防水闸门等安全措施。断层导水性不是一成不变的,对已控制断层要根据新揭露的情况进行重新评价,防止由于条件变化使不导水断层转化为导水断层。
(2)建立专门的断层台帐,加强对断层等构造的管理。对井巷工程揭露的有导水迹象和大中型断层要进行定期观测、评价,要结合矿井水动态观测、矿压观测及矿井排水系统、防隔离设施评价等,对断层可能引起的水害进行综合预测、评价。
(3)制定完善的注浆加固措施,保证施工质量、效果。对危险地区进行注浆加固时,必须编制专门设计和安全技术措施。钻孔开孔位置要避开集中压力区和构造破碎带,要选择合适的注浆材料,确定钻探、注浆施工顺序和注浆层位,一般应先对含水层进行注浆改造,然后对断层带加固。断层带注浆时要严格控制注浆压力、时间,防止压力过高对断层带造成破坏。
上述技术虽具有原理简单、成果直观等特点,但同时也有着预防效果不明显,监测预报困难等不足之处。特别是近几年来随着煤矿开采深度的不断加大,由此而暴露出来的一些新问题,使那些传统方法和理论的工程应用受到一定的限制。因此,探讨解决新问题的新方法,再次摆在了人们的面前。
发明内容
为解决上述问题,本发明提出一种深部开采优化支护参数预防巷道滞后突水的方法,其特征在于:包括
(1)确定初步支护方案;
(2)锚杆支护参数优化;
(3)支护方案及支护参数确定;
(4)断层破碎带含水层探测与注浆加固;
(5)巷道矸石充填。
优选所述确定初步支护方案包括:
①特殊地质条件下巷道初步支护
掘进过程中,采用井下地震探测、瑞利波探测或瞬变电磁仪探测方法超前探测断层岩性变化的地质异常情况,确定断层及断层破碎带具体位置;在断层位置超前注浆,使用加强锚网索或锚杆锚索桁架支护,所述锚杆锚索桁架中采用左旋预应力锚杆和预应力鸟巢锚索;采用螺旋注浆锚杆对断层破碎带进行后续注浆;
②底鼓、流变围岩巷道初步支护
若掘进过程中出现较严重的底鼓现象,首先采用数值模拟方法确定底鼓的影响范围;加强底鼓位置处两帮支护,增加锚杆支护密度和锚杆、锚索支护长度;然后采用螺旋注浆锚杆对底鼓位置处的底板进行注浆加固,若仍达不到强度要求则采用混凝土钢管反底拱梁进行支护;
③巷道锚杆锚索平衡初步支护
首先进行巷道围岩应力分布实测或数值模拟,确定巷道围岩应力的分布状况;根据巷道围岩应力的分布状况,布置让压管锚杆解决让压问题,同时采用预应力部件解决让压管锚杆协同受力问题。
优选所述锚杆支护参数优化包括:
利用有限元法建立巷道支护模型,确定松散破碎区的范围;根据围岩松散破碎区的分布分析,确定锚杆长度以保证至少600mm的锚杆锚固在稳定岩石中;通过改变模型中锚杆的安装载荷,进行模型运算最终获得合理的安装载荷的大小,以达到无离层、顶板中的拉应力最小的最佳组合梁效果。
优选所述支护方案及支护参数确定包括:
轨道下山锚杆间排距900×800mm,顶板选用Ф20mm、长度200mm的左旋螺纹钢锚杆,两帮选用Ф20mm、长度2200mm的左旋无纵筋滚丝锚杆;运输下山锚杆间排距1200×1200mm;二次支护五花布置锚杆,锚杆间排距1200×1200mm,喷浆总厚度不低于150mm;工作面下顺槽半圆拱形断面采用锚网索永久支护,巷道拱部选用Ф22mm、长度2400mm的全螺纹钢锚杆,两帮选用Ф20mm、长度2000mm的全螺纹钢锚杆,锚杆间排距1000×1000mm,锚杆预紧力不小于4t。
优选所述断层破碎带含水层探测与注浆加固包括:
采用瞬变电磁法对巷道围岩及断层破碎带进行富水性探测,确定注浆加固区域;注浆设备选用Z2W-7.5-65/45型注浆机及相匹配的高压注浆管;
所述巷道矸石充填包括:
岩巷掘进头产生的矸石以运输巷道-轨道大巷-水平的充填上部车场-矸石仓上口--破碎机-矸石仓-给料机-胶带运输-充填巷迎头-抛矸机的次序处理以用于迎头充填;充填后进行注浆加固。
与现有预防巷道突水技术相比,本技术在理论上提出了突水过程化概念,地下岩体受采矿活动的影响从底板岩层受采动影响破坏、失稳、突水通道形成乃至突水事故的发生是一个由量变到质变的连续发育过程。开挖的岩体只要发生突水,突水点及其附近岩体就会产生与突水有关的围岩变形和破坏。这一变形、破坏过程符合围岩的基本流动变形破坏规律-差异变形破坏;
通过实验验证了岩体蠕变特性与承压水突出的时效性问题;
解决了通过优化支护参数、预防巷道流动变形、增加保护岩体的防突潜能预防滞后突水问题。由于巷道大部分在煤层中掘进,容易受到采空区的影响,煤体强度变低,巷道成形较差,同时巷道还将经受采煤工作面回采时超前支撑压力的影响,因此巷道表面控制对于充分发挥锚杆支护系统的作用非常重要。有效的表面控制系统应保证无片帮和片顶现象,锚杆和表面控制系统一起形成最佳组合梁。通过现场实测和数值仿真技术对巷道锚杆支护长度、锚杆安装应力、以及锚杆受力等支护参数进行了优化,验证了巷道支护参数在预防巷道流动变形、增加防突水潜能或保护岩体的防突潜能等方面是有效的。
提出了通过巷帮充填减少巷道变形,预防滞后突水的安全开采方案,并结合工程实践进行了应用。济宁矿业集团阳城煤矿-650m三条水平大巷必须经过季庄断层,通过对巷道两帮的回采巷道实施的矸石充填,增加了巷道两帮及顶底板的约束力,缩小了巷道变形和应力影响范围及塑性区范围,增大了充填巷两帮煤柱的承载能力,提高了巷道两帮煤柱的整体稳定性,充填效果明显。从预防巷道围岩变形方面来讲,矸石充填起到了明显的作用,对于有发生滞后突水危险的巷道来说,将井下原生矸石进行废弃巷道充填或者巷道充填开采,是一种安全开采方案。
附图说明
附图1为本发明所述深部开采优化支护参数预防巷道滞后突水的方法的流程图。
具体实施方式
参见附图1,其描述了根据本发明所述深部开采优化支护参数预防巷道滞后突水的方法的一个优选实施例。该方法包括五个步骤,分别为:
(1)确定初步支护方案;
(2)锚杆支护参数优化;
(3)支护方案及支护参数确定;
(4)断层破碎带含水层探测与注浆加固;
(5)巷道矸石充填。
下面对各个步骤做进一步的详细介绍。
确定初步支护方案步骤包括以下工艺内容:
①特殊地质条件下巷道初步支护
掘进过程中,采用井下地震探测、瑞利波探测或瞬变电磁仪探测方法超前探测断层岩性变化的地质异常情况,确定断层及断层破碎带具体位置;在断层位置超前注浆,使用加强锚网索或锚杆锚索桁架支护,所述锚杆锚索桁架中采用左旋预应力锚杆和预应力鸟巢锚索;采用螺旋注浆锚杆对断层破碎带进行后续注浆;
②底鼓、流变围岩巷道初步支护
若掘进过程中出现较严重的底鼓现象,首先采用数值模拟方法确定底鼓的影响范围;加强底鼓位置处两帮支护,增加锚杆支护密度和锚杆、锚索支护长度;然后采用螺旋注浆锚杆对底鼓位置处的底板进行注浆加固,若仍达不到强度要求则采用混凝土钢管反底拱梁进行支护;
③巷道锚杆锚索平衡初步支护
首先进行巷道围岩应力分布实测或数值模拟,确定巷道围岩应力的分布状况;根据巷道围岩应力分布规律,煤及岩层倾角、性质、厚度,巷道断面形状、断面积等进行巷道平衡支护的方案设计;根据巷道围岩应力的分布状况,布置让压管锚杆解决让压问题,同时采用预应力部件解决让压管锚杆协同受力问题。
锚杆支护参数优化步骤包括以下工艺内容:
利用有限元法建立巷道支护模型,确定松散破碎区的范围;根据围岩松散破碎区的分布分析,确定锚杆长度以保证至少600mm的锚杆锚固在稳定岩石中;通过改变模型中锚杆的安装载荷,进行模型运算最终获得合理的安装载荷的大小,在保证无离层的情况下使顶板中的拉应力最小。
明确锚杆杆体的受力和受力过程,进行锚杆受力分析。锚杆的受力包括两部分:预应力和由于巷道开挖后围岩变形而引起的变形载荷。锚杆的受力将经过三个阶段:安装应力;掘进期间的变形载荷;长壁回采时的动压变形载荷。综合考虑上述锚杆的受力情况,选择满足安装应力、变形载荷和动压变形载荷要求的锚杆,同时针对本发明的需要,锚杆的公称使用载荷应在上述三种载荷的最大值的两倍以上。
支护方案及支护参数确定步骤包括以下工艺内容:
轨道下山锚杆间排距900×800mm,顶板选用Ф20mm、长度200mm的左旋螺纹钢锚杆,两帮选用Ф20mm、长度2200mm的左旋无纵筋滚丝锚杆;运输下山锚杆间排距1200×1200mm;二次支护五花布置锚杆,锚杆间排距1200×1200mm,喷浆总厚度不低于150mm;工作面下顺槽半圆拱形断面采用锚网索永久支护,巷道拱部选用Ф22mm、长度2400mm的全螺纹钢锚杆,两帮选用Ф20mm、长度2000mm的全螺纹钢锚杆,锚杆间排距1000×1000mm;上述所有锚杆预紧力都不小于4吨。
断层破碎带含水层探测与注浆加固步骤包括以下工艺内容:
采用瞬变电磁法对巷道围岩及断层破碎带进行富水性探测,确定注浆加固区域;注浆设备选用Z2W-7.5-65/45型注浆机及相匹配的高压注浆管;
巷道矸石充填步骤包括以下工艺内容:
岩巷掘进头产生的矸石以运输巷道-轨道大巷-水平的充填上部车场-矸石仓上口--破碎机-矸石仓-给料机-胶带运输-充填巷迎头-抛矸机的次序处理以用于迎头充填;充填后进行注浆加固。
以上所述,仅为本发明专利较佳的具体实施方式,但本发明专利的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明专利揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明专利的保护范围之内。
Claims (5)
1.一种深部开采优化支护参数预防巷道滞后突水的方法,其特征在于:包括
(1)确定初步支护方案;
(2)锚杆支护参数优化;
(3)支护方案及支护参数确定;
(4)断层破碎带含水层探测与注浆加固;
(5)巷道矸石充填。
2.如权利要求1所述的深部开采优化支护参数预防巷道滞后突水的方法,其特征在于:
所述确定初步支护方案包括:
①特殊地质条件下巷道初步支护
掘进过程中,采用井下地震探测、瑞利波探测或瞬变电磁仪探测方法超前探测断层岩性变化的地质异常情况,确定断层及断层破碎带具体位置;在断层位置超前注浆,使用加强锚网索或锚杆锚索桁架支护,所述锚杆锚索桁架中采用左旋预应力锚杆和预应力鸟巢锚索;采用螺旋注浆锚杆对断层破碎带进行后续注浆;
②底鼓、流变围岩巷道初步支护
若掘进过程中出现底鼓现象,首先采用数值模拟方法确定底鼓的影响范围;加强底鼓位置处两帮支护,增加锚杆支护密度和锚杆、锚索支护长度;然后采用螺旋注浆锚杆对底鼓位置处的底板进行注浆加固,若仍达不到强度要求则采用混凝土钢管反底拱梁进行支护;
③巷道锚杆锚索平衡初步支护
首先进行巷道围岩应力分布实测或数值模拟,确定巷道围岩应力的分布状况;根据巷道围岩应力的分布状况,布置让压管锚杆解决让压问题,同时采用预应力部件解决让压管锚杆协同受力问题。
3.如权利要求1所述的深部开采优化支护参数预防巷道滞后突水的方法,其特征在于:
所述锚杆支护参数优化包括:
利用有限元法建立巷道支护模型,确定松散破碎区的范围;根据围岩松散破碎区的分布分析,确定锚杆长度以保证至少600mm的锚杆锚固在稳定岩石中;通过改变模型中锚杆的安装载荷,进行模型运算最终获得合理的安装载荷的大小,以达到无离层、顶板中的拉应力最小的最佳组合梁效果。
4.如权利要求1所述的深部开采优化支护参数预防巷道滞后突水的方法,其特征在于:
所述支护方案及支护参数确定包括:
轨道下山锚杆间排距900×800mm,顶板选用Ф20mm、长度200mm的左旋螺纹钢锚杆,两帮选用Ф20mm、长度2200mm的左旋无纵筋滚丝锚杆;运输下山锚杆间排距1200×1200mm;二次支护五花布置锚杆,锚杆间排距1200×1200mm,喷浆总厚度不低于150mm;工作面下顺槽半圆拱形断面采用锚网索永久支护,巷道拱部选用Ф22mm、长度2400mm的全螺纹钢锚杆,两帮选用Ф20mm、长度2000mm的全螺纹钢锚杆,锚杆间排距1000×1000mm,锚杆预紧力不小于4t。
5.如权利要求1所述的深部开采优化支护参数预防巷道滞后突水的方法,其特征在于:
所述断层破碎带含水层探测与注浆加固包括:
采用瞬变电磁法对巷道围岩及断层破碎带进行富水性探测,确定注浆加固区域;注浆设备选用Z2W-7.5-65/45型注浆机及相匹配的高压注浆管;
所述巷道矸石充填包括:
岩巷掘进头产生的矸石以运输巷道-轨道大巷-水平的充填上部车场-矸石仓上口--破碎机-矸石仓-给料机-胶带运输-充填巷迎头-抛矸机的次序处理以用于迎头充填;充填后进行注浆加固。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310111861.2A CN103195443B (zh) | 2013-04-02 | 2013-04-02 | 深部开采优化支护参数预防巷道滞后突水的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310111861.2A CN103195443B (zh) | 2013-04-02 | 2013-04-02 | 深部开采优化支护参数预防巷道滞后突水的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195443A true CN103195443A (zh) | 2013-07-10 |
CN103195443B CN103195443B (zh) | 2015-05-06 |
Family
ID=48718242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310111861.2A Active CN103195443B (zh) | 2013-04-02 | 2013-04-02 | 深部开采优化支护参数预防巷道滞后突水的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195443B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109139057A (zh) * | 2018-10-29 | 2019-01-04 | 六盘水师范学院 | 一种采煤巷道底板吸水底鼓治理方法 |
CN109854285A (zh) * | 2019-02-28 | 2019-06-07 | 长沙有色冶金设计研究院有限公司 | 一种深立井支护结构和施工方法 |
CN109958461A (zh) * | 2019-03-20 | 2019-07-02 | 济宁学院 | 一种煤矿断层防透水结构 |
CN110952998A (zh) * | 2019-12-12 | 2020-04-03 | 湖北尧治河化工股份有限公司 | 一种断层破碎顶板支护方法 |
CN111305876A (zh) * | 2020-03-27 | 2020-06-19 | 天地科技股份有限公司 | 深部巷道锚固-劈裂注浆-水力压裂卸压协同控制方法 |
CN111456739A (zh) * | 2020-03-09 | 2020-07-28 | 中国十七冶集团有限公司 | 一种基于有限元的隧道台阶法施工方法 |
CN112483172A (zh) * | 2020-11-25 | 2021-03-12 | 中国煤炭地质总局水文地质局 | 一种人为再造阻水边界的方法 |
CN112780277A (zh) * | 2020-12-30 | 2021-05-11 | 六盘水师范学院 | 一种煤层底板断层水害加筋防治方法 |
CN111058865B (zh) * | 2019-12-18 | 2021-06-04 | 永城煤电控股集团有限公司 | 一种钻爆法岩巷锚网索喷施工工艺 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3820700A1 (de) * | 1988-06-18 | 1989-12-21 | Ruhrkohle Ag | Anker-verbundausbau |
CN101881182A (zh) * | 2010-07-14 | 2010-11-10 | 中国矿业大学(北京) | 矿井断裂构造延迟突水模拟预测评价方法 |
-
2013
- 2013-04-02 CN CN201310111861.2A patent/CN103195443B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3820700A1 (de) * | 1988-06-18 | 1989-12-21 | Ruhrkohle Ag | Anker-verbundausbau |
CN101881182A (zh) * | 2010-07-14 | 2010-11-10 | 中国矿业大学(北京) | 矿井断裂构造延迟突水模拟预测评价方法 |
Non-Patent Citations (4)
Title |
---|
刘白宙: "《焦作矿区防止突水淹井事故的对策》", 《煤田地质与勘探》 * |
吴纪修: "《白象山铁矿富水巷道围岩稳定性及其支护体系数值模拟研究》", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 * |
唐德玉等: "《巷道迟到突水形成机理及预防措施的分析研究》", 《煤炭科学技术》 * |
陈娅鑫: "《深部煤层开采矿井防治水技术研究》", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109139057A (zh) * | 2018-10-29 | 2019-01-04 | 六盘水师范学院 | 一种采煤巷道底板吸水底鼓治理方法 |
CN109854285A (zh) * | 2019-02-28 | 2019-06-07 | 长沙有色冶金设计研究院有限公司 | 一种深立井支护结构和施工方法 |
CN109854285B (zh) * | 2019-02-28 | 2020-10-02 | 长沙有色冶金设计研究院有限公司 | 一种深立井支护结构和施工方法 |
CN109958461A (zh) * | 2019-03-20 | 2019-07-02 | 济宁学院 | 一种煤矿断层防透水结构 |
CN109958461B (zh) * | 2019-03-20 | 2020-06-02 | 济宁学院 | 一种煤矿断层防透水结构 |
CN110952998A (zh) * | 2019-12-12 | 2020-04-03 | 湖北尧治河化工股份有限公司 | 一种断层破碎顶板支护方法 |
CN110952998B (zh) * | 2019-12-12 | 2021-10-08 | 湖北尧治河化工股份有限公司 | 一种断层破碎顶板支护方法 |
CN111058865B (zh) * | 2019-12-18 | 2021-06-04 | 永城煤电控股集团有限公司 | 一种钻爆法岩巷锚网索喷施工工艺 |
CN111456739A (zh) * | 2020-03-09 | 2020-07-28 | 中国十七冶集团有限公司 | 一种基于有限元的隧道台阶法施工方法 |
CN111305876A (zh) * | 2020-03-27 | 2020-06-19 | 天地科技股份有限公司 | 深部巷道锚固-劈裂注浆-水力压裂卸压协同控制方法 |
CN112483172A (zh) * | 2020-11-25 | 2021-03-12 | 中国煤炭地质总局水文地质局 | 一种人为再造阻水边界的方法 |
CN112780277A (zh) * | 2020-12-30 | 2021-05-11 | 六盘水师范学院 | 一种煤层底板断层水害加筋防治方法 |
CN112780277B (zh) * | 2020-12-30 | 2023-01-24 | 六盘水师范学院 | 一种煤层底板断层水害加筋防治方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103195443B (zh) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Research on roof damage mechanism and control technology of gob-side entry retaining under close distance gob | |
CN103195443B (zh) | 深部开采优化支护参数预防巷道滞后突水的方法 | |
Yang et al. | Design principles and key technologies of gob side entry retaining by roof pre-fracturing | |
Xie et al. | A case study on control technology of surrounding rock of a large section chamber under a 1200-m deep goaf in Xingdong coal mine, China | |
Jiao et al. | Improvement of the U-shaped steel sets for supporting the roadways in loose thick coal seam | |
Kang et al. | Application of a combined support system to the weak floor reinforcement in deep underground coal mine | |
Kang et al. | Investigation on support pattern of a coal mine roadway within soft rocks—a case study | |
CN107191208B (zh) | 沿空留巷巷旁柔性支护体与巷内刚性支护体联合支护方法 | |
Li | Rock support design based on the concept of pressure arch | |
Deng et al. | Feasibility analysis of gob-side entry retaining on a working face in a steep coal seam | |
CN115030722B (zh) | 一种采空区滞后充填高效保水采煤方法 | |
CN104632220B (zh) | 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法 | |
CN102979542B (zh) | 一种锚网梁索支护工艺 | |
CN104265295B (zh) | 倾斜中厚煤层无人工巷旁充填及无煤柱沿空留巷方法 | |
Kang et al. | Deformation characteristics and reinforcement technology for entry subjected to mining-induced stresses | |
CN104358572A (zh) | 大倾角急倾斜煤层自然垮落充填护巷无煤柱开采技术 | |
Zhang et al. | Spontaneous caving and gob-side entry retaining of thin seam with large inclined angle | |
Li et al. | Trial of small gateroad pillar in top coal caving longwall mining of large mining height | |
Wang et al. | Large‐Deformation Failure Mechanism of Coal‐Feeder Chamber and Construction of Wall‐Mounted Coal Bunker in Underground Coal Mine with Soft, Swelling Floor Rocks | |
Singh et al. | Optimal underground extraction of coal at shallow cover beneath surface/subsurface objects: Indian practices | |
CN106761749A (zh) | 大倾角煤层破碎顶板炮采转综采工艺 | |
Chang et al. | Investigation on deformation and failure characteristics and stability control of soft rock roadway surrounding rock in deep coal mine | |
Liu et al. | Numerical studies on surrounding rock deformation controlled by pressure relief groove in deep roadway | |
Kang et al. | Reinforcement technique and its application in complicated roadways in underground coal mines | |
Zhou et al. | Bolting control of a coal roadway under multi-seam mining–a case study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |